Jeff Yan
- License
- C91252
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C91252 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- On San Francisco permits
- Apr 2015 to Jun 2015
2 permits since 2000 (authorized agent-others on 1 permit, engineer on 1 permit): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Smarter Construction Inc
- Architects
- Raymond Situ, Tong Cheung
- Engineers
- Stephen Chan
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2015 | Never finaled issued Sep 2016, no final | 400 05th St | Smarter Construction Inc | horizontal addition to existing auto repair shop, document the removal of gas statian facility has been done ref application #2014-0717-1490. fire sprinkler & mpe systems under separate permit. maher ordinance-extended not required.Details
horizontal addition to existing auto repair shop, document the removal of gas statian facility has been done ref application #2014-0717-1490. fire sprinkler & mpe systems under separate permit. maher ordinance-extended not required. | $200,000 |
| Apr 8, 2015 | Completed final sign-off Aug 2016 | 2125 20th Av | infill 2 (e) lighting well on 2nd floor per plan. (e) bathroom and (e) kitchen remodel on 2nd floor per plan. add recessed light on 2nd floor per plan.Details
infill 2 (e) lighting well on 2nd floor per plan. (e) bathroom and (e) kitchen remodel on 2nd floor per plan. add recessed light on 2nd floor per plan. | $50,000 |