Block 0282, lot 009
828 Jones St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 6
- Units
- 21
- Rooms
- 21 bathrooms
- Building
- 12,083 sq ft
- Lot
- 2,901 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
49 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 25, 2024 | Completed final sign-off Aug 2025 | 828 Jones St | Hon's Construction Inc. | to perform repairs per facade inspection report: provided by bone consulting per sf facade maintenance program (sffmp) remove prep and recoat loose and failing coating throughout exterior facade. repair instances of spelling concrete seal open penetrations. secure unsecure pipes and wiring.Details
to perform repairs per facade inspection report: provided by bone consulting per sf facade maintenance program (sffmp) remove prep and recoat loose and failing coating throughout exterior facade. repair instances of spelling concrete seal open penetrations. secure unsecure pipes and wiring. | $100,000 |
| Jun 17, 2022 | Completed final sign-off Oct 2022 | 828 Jones St | Axel8 Construction | unit 48 - install 1 ventless (n) clothes washer & dryer. no wall demoDetails
unit 48 - install 1 ventless (n) clothes washer & dryer. no wall demo | $6,000 |
| Dec 23, 2021 | Completed final sign-off May 2022 | 828 Jones St | B-Side Inc. | unit #4: rehabilitate (e) kitchen & (e) bathroom. install washer/dryerDetails
unit #4: rehabilitate (e) kitchen & (e) bathroom. install washer/dryer | $22,000 |
| Aug 11, 2020 | Completed final sign-off Oct 2020 | 828 Jones St | Control Fire Inc. | revision to (e) fire sprinkler pa 2018-1106-5053 as built required for field changes: adjust underground layout per installation. see fp-2 for clouded/delta marked changesDetails
revision to (e) fire sprinkler pa 2018-1106-5053 as built required for field changes: adjust underground layout per installation. see fp-2 for clouded/delta marked changes | $3,325 |
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 828 Jones St | street space w/mtaDetails
street space w/mta | ||
| Feb 10, 2020 | Completed final sign-off Aug 2020 | 828 Jones St | B-Side Inc. | apt 32. remodel bathroom, remodel kitchen, upgrade washer/dryer, no structural work. no moving walls, bathroom size 5 by 8. kitchen size 10 by 10Details
apt 32. remodel bathroom, remodel kitchen, upgrade washer/dryer, no structural work. no moving walls, bathroom size 5 by 8. kitchen size 10 by 10 | $20,000 |
| Feb 10, 2020 | Completed final sign-off Mar 2020 | 828 Jones St | B-Side Inc. | unit #34: replace (e) washer/dryer combo unit vent less. no structuralDetails
unit #34: replace (e) washer/dryer combo unit vent less. no structural | $5,000 |
| Feb 4, 2020 | Completed final sign-off Aug 2020 | 828 Jones St | B-Side Inc. | unit #52: remodel bathroom, remodel kitchen, upgrade washer/dryer, no sturctural work. no moving of walls. 5x8 bahtroom and 10x10 kitchen.Details
unit #52: remodel bathroom, remodel kitchen, upgrade washer/dryer, no sturctural work. no moving of walls. 5x8 bahtroom and 10x10 kitchen. | $20,000 |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 828 Jones St | street spaceDetails
street space | ||
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 828 Jones St | street spaceDetails
street space | ||
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 828 Jones St | Axel8 Construction | unit 46. rehab kitchen 60 sqft and bath. 45 sqft install washer and dryer.Details
unit 46. rehab kitchen 60 sqft and bath. 45 sqft install washer and dryer. | $20,000 |
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 828 Jones St | Axel8 Construction | unit 26. rehab kitchen 60 sqft and bath. 45 sqft install washer and dryer.Details
unit 26. rehab kitchen 60 sqft and bath. 45 sqft install washer and dryer. | $20,000 |
| Oct 29, 2019 | Completed final sign-off Mar 2020 | 828 Jones St | Axel8 Construction | unit 42. rehab kitchen 60 sqft and bath. 45 sqft install washer and dryer.Details
unit 42. rehab kitchen 60 sqft and bath. 45 sqft install washer and dryer. | $20,000 |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 828 Jones St | Axel8 Construction | street spaceDetails
street space | |
| Oct 2, 2019 | Completed final sign-off Oct 2019 | 828 Jones St | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm to comply with sffc 1103.7.6.1 & nfpa 72. as-built to 2018-1107-5273. arch ref # 2018-1017-3435.Details
upgrade existing fire alarm to comply with sffc 1103.7.6.1 & nfpa 72. as-built to 2018-1107-5273. arch ref # 2018-1017-3435. | |
| Sep 26, 2019 | Completed final sign-off Jan 2020 | 828 Jones St | Axel8 Construction | unit 8-1/f: relocate kitchen, rehabilitatio (e) bathroom install w/dDetails
unit 8-1/f: relocate kitchen, rehabilitatio (e) bathroom install w/d | $38,000 |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 828 Jones St | Axel8 Construction | unit 56 - rehabilitate (e) kitchen & bathroom. install w/d ventless - near kitchenDetails
unit 56 - rehabilitate (e) kitchen & bathroom. install w/d ventless - near kitchen | $22,000 |
| Jul 17, 2019 | Never finaled issued Oct 2019, no final | 828 Jones St | Soil Engineering Construction | repair of rear yard retaining wall between 828 jones st. and 766 sutter st. ref pa 201810042324Details
repair of rear yard retaining wall between 828 jones st. and 766 sutter st. ref pa 201810042324 | |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 828 Jones St | Holland Brooks Builders Inc | street spaceDetails
street space | |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 828 Jones St | street spaceDetails
street space | ||
| Dec 5, 2018 | Expired or cancelled cancelled Jan 2026 | 828 Jones St | revision to 201811065191 kitchen reconfiguration, bath is enlargedDetails
revision to 201811065191 kitchen reconfiguration, bath is enlarged | ||
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 828 Jones St | unit 58: street spaceDetails
unit 58: street space | ||
| Nov 13, 2018 | Never finaled issued Nov 2018, no final | 828 Jones St | street spaceDetails
street space | ||
| Nov 7, 2018 | Completed final sign-off Dec 2018 | 828 Jones St | Au Electric Corporation/Aec Alarms | upgrade extg fire alarm to comply with 1103.7.6.1 n/a for maherDetails
upgrade extg fire alarm to comply with 1103.7.6.1 n/a for maher | $30,000 |
| Nov 6, 2018 | Completed final sign-off Mar 2019 | 828 Jones St | Holland Brooks Builders Inc | unit 58: rehabailitate existing kitchen, rehabilitate e bath, install washer and dryerDetails
unit 58: rehabailitate existing kitchen, rehabilitate e bath, install washer and dryer | $30,000 |
| Nov 6, 2018 | Completed final sign-off Oct 2020 | 828 Jones St | Control Fire Inc. | installation of overhead fire protection sprinkler system maher naDetails
installation of overhead fire protection sprinkler system maher na | $3,325 |
| Oct 17, 2018 | Never finaled issued Nov 2018, no final | 828 Jones St | Casman Construction Inc | revision 201710100742, layout adjustment and concrete slab replacementDetails
revision 201710100742, layout adjustment and concrete slab replacement | $5,000 |
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 828 Jones St | street spaceDetails
street space | ||
| Oct 10, 2017 | Never finaled issued Oct 2018, no final | 828 Jones St | Casman Construction Inc | legalization of existing illegal unit per ord 43-14. replace elec/plumb upgrade fire rating of egress components. sprinklerper nfpa 13, standpipe and fire alarm under separated applicationsDetails
legalization of existing illegal unit per ord 43-14. replace elec/plumb upgrade fire rating of egress components. sprinklerper nfpa 13, standpipe and fire alarm under separated applications | $79,013 |
| Oct 2, 2017 | Never finaled issued Oct 2017, no final | 828 Jones St | street space permitDetails
street space permit | ||
| Aug 31, 2017 | Never finaled issued Aug 2017, no final | 828 Jones St | street space w/mtaDetails
street space w/mta | ||
| Jul 26, 2017 | Never finaled issued Jul 2017, no final | 828 Jones St | renewal of permit # m802147; street space permit and mta permitDetails
renewal of permit # m802147; street space permit and mta permit | ||
| Jun 27, 2017 | Never finaled issued Jun 2017, no final | 828 Jones St | street spaceDetails
street space | ||
| May 25, 2017 | Never finaled issued May 2017, no final | 828 Jones St | street spaceDetails
street space | ||
| Apr 20, 2017 | Never finaled issued Apr 2017, no final | 828 Jones St | street space w/mtaDetails
street space w/mta | ||
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 828 Jones St | street space w/mtaDetails
street space w/mta | ||
| Feb 13, 2017 | Never finaled issued Feb 2017, no final | 828 Jones St | street space permitDetails
street space permit | ||
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 828 Jones St | street spaceDetails
street space | ||
| Dec 12, 2016 | Never finaled issued Dec 2016, no final | 828 Jones St | street space permit & mta permit - renewal of permit 3 201609278875Details
street space permit & mta permit - renewal of permit 3 201609278875 | ||
| Oct 13, 2016 | Completed final sign-off Jul 2017 | 828 Jones St | Target Construction Llc | unit # 34: kitchen remodel - replace wall cabinets, replace kitchen lights min. 50% he. bathroom: install tile, pedestal, shower pan - door - replace light (ceiling) replace min 1 he; existing hood/ 13r fan remain same. n/a maher ord. 155-13Details
unit # 34: kitchen remodel - replace wall cabinets, replace kitchen lights min. 50% he. bathroom: install tile, pedestal, shower pan - door - replace light (ceiling) replace min 1 he; existing hood/ 13r fan remain same. n/a maher ord. 155-13 | $16,000 |
| Sep 27, 2016 | Completed final sign-off Jul 2017 | 828 Jones St | Target Construction Llc | replace cabinets, counter, dishwasher - kitchen (1) unit 46. bathroom: replacing tub, sink wall tile; install floor tile. (1 bathroom)Details
replace cabinets, counter, dishwasher - kitchen (1) unit 46. bathroom: replacing tub, sink wall tile; install floor tile. (1 bathroom) | $25,000 |
| Sep 6, 2016 | Never finaled issued Sep 2016, no final | 828 Jones St | street space permitDetails
street space permit | ||
| Aug 3, 2016 | Never finaled issued Aug 2016, no final | 828 Jones St | street spaceDetails
street space | ||
| May 20, 2016 | Completed final sign-off Jun 2017 | 828 Jones St | 4th floor, unit 44: remodel (e) bathroom, kitchen, add washer & dryer. n/a maher ord. 155-13Details
4th floor, unit 44: remodel (e) bathroom, kitchen, add washer & dryer. n/a maher ord. 155-13 | $25,000 | |
| May 12, 2014 | Completed final sign-off Aug 2014 | 828 Jones St | C&M Development & Construction Inc | #22- remodel kitchen and bathroom at 2nd floor unit 22Details
#22- remodel kitchen and bathroom at 2nd floor unit 22 | $22,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 828 Jones St | Pacific Coast Construction | replacement of kitchen cabinet, toilet, vanity. varnish floor, paint, & reglaze bath-tub. upgrade electrical power. lighting to comply with cec 150 (k)Details
replacement of kitchen cabinet, toilet, vanity. varnish floor, paint, & reglaze bath-tub. upgrade electrical power. lighting to comply with cec 150 (k) | $16,948 |
| May 19, 2008 | Completed final sign-off Oct 2008 | 828 Jones St | F B E And Sons General Const | apt #56- kitchen & bathroom remodel. no structural work. no lighting work, renovate replace cabinet, counter, floor, wall, tile. replace window bathroom lightwork.Details
apt #56- kitchen & bathroom remodel. no structural work. no lighting work, renovate replace cabinet, counter, floor, wall, tile. replace window bathroom lightwork. | $15,000 |
| Dec 18, 2006 | Completed final sign-off Jan 2007 | 828 Jones St | F B E And Sons General Const | apt# 6. remove & replace 48" sink base cabinet. (broken down) and counter. new counter top. no structural work. no lighting work.Details
apt# 6. remove & replace 48" sink base cabinet. (broken down) and counter. new counter top. no structural work. no lighting work. | $2,000 |
| Jul 3, 2006 | Never finaled issued Jul 2006, no final | 828 Jones St | street spaceDetails
street space |