Block 4002, lot 016C
263 Missouri St
- City’s use
- Single Family Residential
- Built
- 1934
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,088 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 24, 2024 | Completed final sign-off Oct 2024 | 263 Missouri St | Chavez Plumbing | replacement of (2) front windows. (e) windows are vinyl to be changed to integrity marvin. aluminum clad, wood inside. u=.30maxDetails
replacement of (2) front windows. (e) windows are vinyl to be changed to integrity marvin. aluminum clad, wood inside. u=.30max | $4,000 |
| May 24, 2018 | Completed final sign-off Jul 2018 | 263 Missouri St | Lake Marine Construction Inc | revision to 201703302847 concrete foundation line 4 and 6 to remain as (e)Details
revision to 201703302847 concrete foundation line 4 and 6 to remain as (e) | |
| Mar 19, 2018 | Completed final sign-off Jun 2018 | 263 Missouri St | Chavez Plumbing | bathroom remodel, replace plumbing and electrical fixtures. new insulation, drywall, tile, no structural work to be done.Details
bathroom remodel, replace plumbing and electrical fixtures. new insulation, drywall, tile, no structural work to be done. | $9,000 |
| Mar 30, 2017 | Completed final sign-off Jul 2018 | 263 Missouri St | Lake Marine Construction Inc | convert a portion of existing 1st floor area to additional conditioned space to include family room, master bedroom with bath and study, new windows and doors at 1 st fl rear and window at 1st fl frontDetails
convert a portion of existing 1st floor area to additional conditioned space to include family room, master bedroom with bath and study, new windows and doors at 1 st fl rear and window at 1st fl front | $150,000 |
| Nov 7, 2008 | Completed final sign-off Mar 2009 | 263 Missouri St | Speedy Construction/See Note: | increase value of job per inspector on pa# 2008/10/03/3416. kitchen remodel.Details
increase value of job per inspector on pa# 2008/10/03/3416. kitchen remodel. | $20,000 |
| Oct 21, 2008 | Completed final sign-off Mar 2009 | 263 Missouri St | Speedy Construction/See Note: | revise app #200810033416. remove part of wall on dining room(sliding door)Details
revise app #200810033416. remove part of wall on dining room(sliding door) | |
| Oct 3, 2008 | Completed final sign-off Mar 2009 | 263 Missouri St | Speedy Construction/See Note: | install skylight within envelope of bldg over kitchen, remove wall between kitchen and living, raise headroom over interior stairway. add posts and footings.Details
install skylight within envelope of bldg over kitchen, remove wall between kitchen and living, raise headroom over interior stairway. add posts and footings. | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Speedy Construction/See Note: (3), Chavez Plumbing (2), Lake Marine Construction Inc (2)
- Architects
- Mark Topetcher, Stephen Chan
- Engineers
- Michael Hom
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.