David Baker
- License
- C12506
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C12506 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- David Baker Architects
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to May 2021
64 permits since 2000 (architect on 59 permits, engineer on 3 permits, authorized agent-others on 1 permit, designer on 1 permit): 53 completed, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill Contractors Inc (10), Balfour Beatty Construction Llc (6), Nibbi Bros Assoc Inc. (6), Cahill Contractors Llc. (5), Cookline Construction Inc (2), Ferma Corporation (2), James E Roberts-Obayashi Corporation (2), Transworld Construction (2), Cahill-Nibbi Joint Venture, Dpr Construction, Intrepid Electronic Systems Inc, K Bali Construction, Liberty West Construction Services Llc, Nibbi Bros Inc., North Star Plumbing & Fire Protection, Oliver & Company Inc., Plant Construction Co, Lp, Pmn Design Elect Inc Dba Design Elc, Rcm Fire Protection Inc., Swinerton Builders, Webcor Construction Lp
- Architects
- Daniel Simons, Gray Leonard Strang, Sally Roth
- Engineers
- Johnathan Toman (2), Adam French, Fabian Serkis, Jeff Brink, John Laws, Mazen Tawasha, Meng Chen, Peter Hutley, Sunil Gupta, Todd Kuchta
- Authorized agents
- John Onken
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 10, 2021 | Expired or cancelled withdrawn Dec 2021 | 1101 Sutter St | construct new 14-story mixed-use building | $40,000,000 | |
| Nov 23, 2020 | Completed final sign-off Aug 2023 | 833 Bryant St | Cahill Contractors Llc. | revision to pa #201902112589-s2 achitectural revise roof water proof epdm 100% affordable homeless housing projectDetails
revision to pa #201902112589-s2 achitectural revise roof water proof epdm 100% affordable homeless housing project | |
| Dec 16, 2019 | Completed final sign-off Dec 2024 | 1 Avenue Of The Palms | Webcor Construction Lp | mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4 | $130,240,000 |
| Nov 12, 2019 | Completed final sign-off Dec 2021 | 833 Bryant St | Cahill Contractors Llc. | demolish 1-story, office building. maher n/a.Details
demolish 1-story, office building. maher n/a. | $6,888 |
| Sep 5, 2019 | Completed final sign-off Nov 2019 | 222 Taylor St | Cahill Contractors Inc | revision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair doorDetails
revision to 201602179822 modifications requested by mod. removal of bab-changing stations in community rm restrooms, addition of braille & raised letter exit routes. modifications to lift fixed approach ramp, addition of power assist to stair door | $500 |
| Apr 30, 2019 | Never finaled issued May 2019, no final | 210 Taylor St | Cahill Contractors Inc | revisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2Details
revisions to handrails + gates at maintenance room and roof to m.o.d requirements. rev to barn door and gate hardware to m.o.d requirements. ref. 201602179822 s2 | $1,000 |
| Mar 1, 2019 | Completed final sign-off Nov 2019 | 210 Taylor St | Cahill Contractors Inc | revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specificationDetails
revision to pa 2016-0217-9822s2 and 2019-0102-9503 including addition of roof farm and revised pavig to roof level, revised community kitchen configuration, and landscape details including tree pit surrounds and turf specification | |
| Feb 21, 2019 | Never finaled issued Mar 2019, no final | 1178 Folsom St | Transworld Construction | ref pa# 2015082653833 a proposed janitor room to be converted to a 2-hr protected room to place fire alarm eqipments, eercs,& two way comm. (all under sep permit) to enlarge elevator closet on the roof to become an elevator room per fire dept. suggestionDetails
ref pa# 2015082653833 a proposed janitor room to be converted to a 2-hr protected room to place fire alarm eqipments, eercs,& two way comm. (all under sep permit) to enlarge elevator closet on the roof to become an elevator room per fire dept. suggestion | |
| Jun 6, 2018 | Completed final sign-off Nov 2019 | 210 Taylor St | Cahill Contractors Llc. | rev to pa# 201602179822 s2; revision of fire rattng to electric closet-sheet g602 to show 2-hr fire rating, to be consistent with the rest of approved set for s-2Details
rev to pa# 201602179822 s2; revision of fire rattng to electric closet-sheet g602 to show 2-hr fire rating, to be consistent with the rest of approved set for s-2 | |
| May 23, 2018 | Completed final sign-off Mar 2019 | 1001 Howard St | Cookline Construction Inc | ref t.i. pa#201805048251: mechanical adjustments for limited use restaurant. maher n/a.Details
ref t.i. pa#201805048251: mechanical adjustments for limited use restaurant. maher n/a. | $165,000 |
| May 23, 2018 | Completed final sign-off Mar 2021 | 1601 Mariposa St | Liberty West Construction Services Llc | erect tower crane to aid wood frame construction - ref pa 2016-0303-1058. (1601 mariposa). n/a for maher.Details
erect tower crane to aid wood frame construction - ref pa 2016-0303-1058. (1601 mariposa). n/a for maher. | $200,000 |
| May 4, 2018 | Completed final sign-off Mar 2019 | 1001 Howard St | Cookline Construction Inc | bini's kitchen - ti of (e) restaurant space to become a restaurant with work including gyp board walls, finishes, commercial kitchen, millwork, lighting and paintingDetails
bini's kitchen - ti of (e) restaurant space to become a restaurant with work including gyp board walls, finishes, commercial kitchen, millwork, lighting and painting | $60,000 |
| Aug 11, 2017 | Completed final sign-off Sep 2017 | 392 Fulton St | Intrepid Electronic Systems Inc | fire alarm system modification for t.i. pa#201608185373, address change pa#201707212577 change of address.Details
fire alarm system modification for t.i. pa#201608185373, address change pa#201707212577 change of address. | $4,000 |
| Aug 10, 2017 | Completed final sign-off Apr 2019 | 210 Taylor St | Cahill Contractors Inc | revision to foundation as previously approved in pa# 2016/02/17/9822-s1.Details
revision to foundation as previously approved in pa# 2016/02/17/9822-s1. | |
| Jul 20, 2017 | Completed final sign-off Jun 2018 | 388 Fulton St | revision to pa#201608185378, 201704043120, 201704144019, revision of mep permit to alter makeup air routing & water heater ventingDetails
revision to pa#201608185378, 201704043120, 201704144019, revision of mep permit to alter makeup air routing & water heater venting | ||
| Jun 30, 2017 | Completed final sign-off Apr 2019 | 210 Taylor St | Cahill Contractors Llc. | shoring ref pa #201602179822Details
shoring ref pa #201602179822 | $200,000 |
| May 25, 2017 | Expired or cancelled expired Dec 2018 | 801 Brannan St | Balfour Beatty Construction Llc | for record purposes only: revision to ab-005 approved pa# 2017-0124-7758. ** maher: n/a **Details
for record purposes only: revision to ab-005 approved pa# 2017-0124-7758. ** maher: n/a ** | |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 388 Fulton St | move some gyp board walls, change doors and change counter height for t.i. of extg retail to become limitted restaurant. ref app#201608185378.Details
move some gyp board walls, change doors and change counter height for t.i. of extg retail to become limitted restaurant. ref app#201608185378. | ||
| Apr 4, 2017 | Completed final sign-off Aug 2018 | 388 Fulton St | K Bali Construction | mep work for deffered submittal 201608185378 for ti- (e) retail space to become a limited bakeryDetails
mep work for deffered submittal 201608185378 for ti- (e) retail space to become a limited bakery | $60,000 |
| Jan 24, 2017 | Completed final sign-off Dec 2018 | 801 Brannan St | Balfour Beatty Construction Llc | alteration to mechanical roof ventialation system to pa# 2013/09/04/5886-s , including mechanical ventilation of concelaed space associated wit roof area ** maher: n/a **Details
alteration to mechanical roof ventialation system to pa# 2013/09/04/5886-s , including mechanical ventilation of concelaed space associated wit roof area ** maher: n/a ** | $250,000 |
| Dec 22, 2016 | Completed final sign-off Mar 2017 | 588 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | revision to 201404042522 s3 to revise the draft stopping in roof. crickets combustible concealed space - includes ab-005 maher naDetails
revision to 201404042522 s3 to revise the draft stopping in roof. crickets combustible concealed space - includes ab-005 maher na | $10,000 |
| Dec 20, 2016 | Completed final sign-off Mar 2017 | 588 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | revision to 201404042522s3, clarifies smoke detection in elevator hoistway and remove door hold-opens in exterior stair.Details
revision to 201404042522s3, clarifies smoke detection in elevator hoistway and remove door hold-opens in exterior stair. | |
| Dec 19, 2016 | Completed final sign-off May 2017 | 140 Middle Point Rd | Cahill-Nibbi Joint Venture | revision to 201308204720 addenda 2, add access panel and smoke detector to elevator shaft detail per fire alarm review requirementsDetails
revision to 201308204720 addenda 2, add access panel and smoke detector to elevator shaft detail per fire alarm review requirements | |
| Dec 16, 2016 | Completed final sign-off Jan 2018 | 801 Brannan St | Balfour Beatty Construction Llc | revision to pa #201309045886 - roof ventilation & draft stopping requirements- n/a maher ordinanceDetails
revision to pa #201309045886 - roof ventilation & draft stopping requirements- n/a maher ordinance | $200,000 |
| Sep 21, 2016 | Completed final sign-off May 2021 | 1950 Mission St | mod. erect two type 1a buildings, one 9 story mixed use 93 unit residential building, and a 6 story mixed use 64 unit residential building with day care facilities, building function, offices, and commercial tenant spaces on the ground floorDetails
mod. erect two type 1a buildings, one 9 story mixed use 93 unit residential building, and a 6 story mixed use 64 unit residential building with day care facilities, building function, offices, and commercial tenant spaces on the ground floor | $60,000,000 | |
| Aug 18, 2016 | Completed final sign-off Aug 2018 | 388 Fulton St | change of use. tenant improvement of an (e) retair space to become a limited restaurant (bakery) w/ work including gyp board walls, finishes, commercial kitchen (deferred), casework, lighting, painting.Details
change of use. tenant improvement of an (e) retair space to become a limited restaurant (bakery) w/ work including gyp board walls, finishes, commercial kitchen (deferred), casework, lighting, painting. | $40,000 | |
| Aug 8, 2016 | Completed final sign-off Aug 2017 | 801 Brannan St | Ferma Corporation, Balfour Beatty Construction Llc | roof deck fire pit (ref. pa 201309045886); maher n/aDetails
roof deck fire pit (ref. pa 201309045886); maher n/a | $5,000 |
| Aug 8, 2016 | Completed final sign-off Aug 2017 | 388 Fulton St | pa #201303273113 approved dwgs show an automatically-closing fire & smoke curtain protecting the trash chute compartment opening,which is now changed to an automatically closing fire & smoke door.new door meets the 60-minute fire protection rating.Details
pa #201303273113 approved dwgs show an automatically-closing fire & smoke curtain protecting the trash chute compartment opening,which is now changed to an automatically closing fire & smoke door.new door meets the 60-minute fire protection rating. | $1,000 | |
| Jul 28, 2016 | Never finaled issued Dec 2018, no final | 2675 Folsom St | erect 4 stories 117 residential with double car stacker parking in basement, no fire pump on lot nos. 006,007 and 024 (lots will be merged in future)Details
erect 4 stories 117 residential with double car stacker parking in basement, no fire pump on lot nos. 006,007 and 024 (lots will be merged in future) | $32,000,000 | |
| Jun 27, 2016 | Never finaled issued Jun 2016, no final | 1751 Carroll Av | Nibbi Bros Assoc Inc. | assembly permit revision to include a-2 occupancy ref 201211073775s2Details
assembly permit revision to include a-2 occupancy ref 201211073775s2 | |
| May 12, 2016 | Completed final sign-off May 2017 | 1380 07th St | James E Roberts-Obayashi Corporation | correction notice from dbi: all f1 type flex units (#l01,l02,l03,l04,l05,l06,l16,l17,l18,1l9,l20,l21,l22 & l23) label storage area only above bathroom due to lack of headroom as indicated in drawings, reference pa 201112070234.Details
correction notice from dbi: all f1 type flex units (#l01,l02,l03,l04,l05,l06,l16,l17,l18,1l9,l20,l21,l22 & l23) label storage area only above bathroom due to lack of headroom as indicated in drawings, reference pa 201112070234. | |
| Apr 5, 2016 | Completed final sign-off May 2017 | 1380 07th St | James E Roberts-Obayashi Corporation | correction notice from jeff barnes to indicate on drawings that storage loft is not a mezzanine. rev. to pa# 201112070234. n/a ordinance #155-13. n/a maher ord. # 155-13Details
correction notice from jeff barnes to indicate on drawings that storage loft is not a mezzanine. rev. to pa# 201112070234. n/a ordinance #155-13. n/a maher ord. # 155-13 | |
| Mar 3, 2016 | Completed final sign-off Mar 2021 | 1601 Mariposa St | to erect 4 stories, no basement, 145 units residential & commercial building. ** maher: exempted; see approval letter from dph on the plans **Details
to erect 4 stories, no basement, 145 units residential & commercial building. ** maher: exempted; see approval letter from dph on the plans ** | $40,000,000 | |
| Mar 1, 2016 | Completed final sign-off Sep 2020 | 210 Arkansas St | Nibbi Bros Inc. | to erect 4 stories, 1 basement, type va & ia, 154 units residential with commercial & parking.Details
to erect 4 stories, 1 basement, type va & ia, 154 units residential with commercial & parking. | $50,000,000 |
| Feb 17, 2016 | Completed final sign-off Oct 2019 | 210 Taylor St | Cahill Contractors Llc., Cahill Contractors Inc | erect 9 story, type 1, zero basement, 113 dwelling unit and retail building.Details
erect 9 story, type 1, zero basement, 113 dwelling unit and retail building. | $40,000,000 |
| Jan 25, 2016 | Completed final sign-off May 2017 | 801 Brannan St | Balfour Beatty Construction Llc | comply with correction notice and report per app#201309045886 regarding top plates detail. n/a for maher.Details
comply with correction notice and report per app#201309045886 regarding top plates detail. n/a for maher. | |
| Dec 17, 2015 | Completed final sign-off Dec 2018 | 801 Brannan St | Ferma Corporation, Balfour Beatty Construction Llc | revision to pa# 2013/09/04/5886 s-2. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. ** maher: n/a **Details
revision to pa# 2013/09/04/5886 s-2. added one transformer room for ac revision. added ac unit support on roof. revise garage b entrance. ** maher: n/a ** | $5,700,000 |
| Aug 26, 2015 | Completed final sign-off Aug 2021 | 1174 Folsom St | North Star Plumbing & Fire Protection, Transworld Construction | erect 6-story, 1 basement for 42 dwelling units, retail and office building. type 3-a construction. maher ordinance is comply.Details
erect 6-story, 1 basement for 42 dwelling units, retail and office building. type 3-a construction. maher ordinance is comply. | $6,300,000 |
| Oct 23, 2014 | Completed final sign-off May 2020 | 150 Hooper St | Dpr Construction | construct (n) mercantile/retail/pdr building.Details
construct (n) mercantile/retail/pdr building. | $7,500,000 |
| Jul 31, 2014 | Completed final sign-off Apr 2017 | 1380 07th St | Rcm Fire Protection Inc. | install new 8-inch fire service off of 8-inch main on hubbell st per nfpa 13 & 24. above ground piping of sprinkler and standpipe system under separate application. ref. 201112070234; maher n/aDetails
install new 8-inch fire service off of 8-inch main on hubbell st per nfpa 13 & 24. above ground piping of sprinkler and standpipe system under separate application. ref. 201112070234; maher n/a | $7,000 |
| Apr 4, 2014 | Completed final sign-off Jun 2017 | 588 Mission Bay Blvd North Bl | Pmn Design Elect Inc Dba Design Elc, Nibbi Bros Assoc Inc. | erect 5 story 200 residential unit and commercial 5 story type iii construction.Details
erect 5 story 200 residential unit and commercial 5 story type iii construction. | $33,857,234 |
| Sep 13, 2013 | Completed final sign-off Jun 2014 | 401 Grove St | Cahill Contractors Inc | base building revisions for future restaurant tenant. replace retail shaft 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated 3m fire barrier duct wrap 615+ and revise roof discharge of makeup air and general exhaust forDetails
base building revisions for future restaurant tenant. replace retail shaft 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated intermediate shaft walls at grease ducts with 2 hr rated 3m fire barrier duct wrap 615+ and revise roof discharge of makeup air and general exhaust for | $10,000 |
| Aug 14, 2013 | Completed final sign-off Nov 2013 | 1075 Le Conte Av | Cahill Contractors Inc | revision to pa#201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration.Details
revision to pa#201007196949, replace fire dampers at supply air ducts with fire smoke dampers at each unit supply shaft penetration. | $48,000 |
| Mar 27, 2013 | Completed final sign-off Aug 2017 | 388 Fulton St | Oliver & Company Inc. | erect 6 stories, no basement, 69 units residential apartments with ground floor retail.Details
erect 6 stories, no basement, 69 units residential apartments with ground floor retail. | $12,500,000 |
| Nov 7, 2012 | Completed final sign-off May 2016 | 1751 Carroll Av | Nibbi Bros Assoc Inc. | erect 4-story, type 5, 121 dwelling units building.Details
erect 4-story, type 5, 121 dwelling units building. | $32,000,000 |
| Dec 7, 2011 | Completed final sign-off May 2017 | 1400 07th St | erect 6 story 65 units residential & commercial building.Details
erect 6 story 65 units residential & commercial building. | $25,000,000 | |
| Dec 7, 2011 | Completed final sign-off May 2017 | 1380 07th St | erect 6 story 393 units residential & commercial building.Details
erect 6 story 393 units residential & commercial building. | $55,000,000 | |
| Jun 30, 2011 | Expired or cancelled cancelled Jan 2026 | 222 Sutter St | Plant Construction Co, Lp | 9th floor #900 -renovation of an existing office , to remain an office, including non-structural demolition, gyp board partitions, glass aprtitions, refinish floor, casework, & painting.Details
9th floor #900 -renovation of an existing office , to remain an office, including non-structural demolition, gyp board partitions, glass aprtitions, refinish floor, casework, & painting. | $300,000 |
| Sep 1, 2010 | Completed final sign-off Oct 2010 | 5688 03rd St | Nibbi Bros Assoc Inc. | suite d -tenant improvement build out for leasing office from retail space, new interior metal stud walls, sheetrock, decorative wood system, carpet, new lighting, hvac, duct work.Details
suite d -tenant improvement build out for leasing office from retail space, new interior metal stud walls, sheetrock, decorative wood system, carpet, new lighting, hvac, duct work. | $50,000 |
| Apr 7, 2010 | Completed final sign-off Sep 2011 | 365 Fulton St | Cahill Contractors Inc | building of foundation for tower crane to be used during construction of new bldg (pa #200807116520-s).Details
building of foundation for tower crane to be used during construction of new bldg (pa #200807116520-s). | $4,500 |
| Oct 3, 2008 | Expired or cancelled expired Aug 2010 | 5600 03rd St | install of 8 precast, prestressed 14" square indicator piles on vacant lot, ref new #200703136088s.Details
install of 8 precast, prestressed 14" square indicator piles on vacant lot, ref new #200703136088s. | $45,000 | |
| Jul 11, 2008 | Completed final sign-off Sep 2011 | 365 Fulton St | Cahill Contractors Inc | erect 5 stories ,120 residential units & commercial.Details
erect 5 stories ,120 residential units & commercial. | $20,000,000 |
| Mar 13, 2007 | Completed final sign-off Oct 2010 | 5600 03rd St | bldg #3 - erect a 5 stories, 116 residential with daycare, retail and parking building.Details
bldg #3 - erect a 5 stories, 116 residential with daycare, retail and parking building. | $18,000,000 | |
| Nov 2, 2006 | Completed final sign-off Feb 2010 | 5600 03rd St | to erect 3 stories 2 dwelling units bldg.Details
to erect 3 stories 2 dwelling units bldg. | $250,000 | |
| Nov 2, 2006 | Completed final sign-off Feb 2010 | 5600 03rd St | to erect 3 stories 2 dwelling units bldg.Details
to erect 3 stories 2 dwelling units bldg. | $250,000 | |
| Nov 2, 2006 | Completed final sign-off Feb 2010 | 5600 03rd St | to erect 3 stories 2 dwelling units bldg.Details
to erect 3 stories 2 dwelling units bldg. | $250,000 | |
| Nov 2, 2006 | Completed final sign-off Feb 2010 | 5600 03rd St | to erect 3 stories 2 dwelling units bldg.Details
to erect 3 stories 2 dwelling units bldg. | $250,000 | |
| Nov 2, 2006 | Completed final sign-off Feb 2010 | 5600 03rd St | to erect 3 stories 2 dwelling units bldg.Details
to erect 3 stories 2 dwelling units bldg. | $250,000 | |
| Sep 29, 2005 | Completed final sign-off Feb 2010 | 5600 03rd St | bldg. 2- erect 5 stories 67 multi family dwelling/office bldg.Details
bldg. 2- erect 5 stories 67 multi family dwelling/office bldg. | $16,500,000 | |
| Sep 28, 2005 | Completed final sign-off Nov 2005 | 145 Taylor St | revision to pa 200209277669Details
revision to pa 200209277669 | ||
| Jul 27, 2005 | Never finaled issued Jan 2006, no final | 5600 03rd St | Swinerton Builders | bldg #5 - demolish industrial manufacturing, 1 story building.Details
bldg #5 - demolish industrial manufacturing, 1 story building. | |
| Jul 13, 2005 | Completed final sign-off Nov 2005 | 145 Taylor St | Cahill Contractors Inc | correct drawing to show sprinkler protection at all property line windowsDetails
correct drawing to show sprinkler protection at all property line windows | |
| May 11, 2005 | Completed final sign-off Oct 2007 | 420 Berry St | erect 4 stories 236 dwelling residential/fitness room/common room.Details
erect 4 stories 236 dwelling residential/fitness room/common room. | $5,000,000 | |
| Apr 11, 2005 | Never finaled filed Apr 2005, never issued | 339 Shotwell St | to erect 3 stories, 1 dwelling single family. at rear of 339 shotwell st.Details
to erect 3 stories, 1 dwelling single family. at rear of 339 shotwell st. | $100,000 |