John Winder
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Winder Gibson Architects
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Sep 2025
198 permits since 2000 (architect on 191 permits, authorized agent-others on 4 permits, engineer on 2 permits, pmt consultant/expediter on 1 permit): 138 completed, 3 in progress, 20 never finaled, 37 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 198.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2025 | Completed final sign-off May 2026 | 3119 Harrison St | Barron Construction Inc. | demo existing kitchen. renovation of new kitchen and addition of 1/2 bathroom. no work done to exterior. no additional sq ftg. no work done at separate condominium at 3121 harrison.Details
demo existing kitchen. renovation of new kitchen and addition of 1/2 bathroom. no work done to exterior. no additional sq ftg. no work done at separate condominium at 3121 harrison. | $75,000 |
| Dec 22, 2023 | In progress issued Aug 2024 | 3950 20th St | Rinaldi Construction | interior renovation of kitchen and bathrooms. repair and replace noted windows. replace rear yard doors addition of light tube. no work done to front facade. new mechanical system to be design build under sep permit.Details
interior renovation of kitchen and bathrooms. repair and replace noted windows. replace rear yard doors addition of light tube. no work done to front facade. new mechanical system to be design build under sep permit. | $125,000 |
| Dec 15, 2021 | Completed final sign-off Jul 2024 | 127 Scott St | G B U Construction Development | remodel of (e) units, expansion of lower residential unit to unused portion of 1/f, replacement of (e0 alum windows at street front with double pane wood windows. replacement of other single pane window with double pane vinyl windows, remodel of 2 (e) full bath, replacement of 2.25 bathrooms with 2Details
remodel of (e) units, expansion of lower residential unit to unused portion of 1/f, replacement of (e0 alum windows at street front with double pane wood windows. replacement of other single pane window with double pane vinyl windows, remodel of 2 (e) full bath, replacement of 2.25 bathrooms with 2 | $142,500 |
| May 6, 2021 | Never finaled issued Jun 2023, no final | 1660 North Point St | Igreen Builders Inc. | renovation of (e) single fam home. (n) addition expands the rear on all 3 floors. renovation of existing interior courtyard, addition of 1 full bathroom, 2 powder rooms, new stair penthouse, and expanded roof terrace. site permit.Details
renovation of (e) single fam home. (n) addition expands the rear on all 3 floors. renovation of existing interior courtyard, addition of 1 full bathroom, 2 powder rooms, new stair penthouse, and expanded roof terrace. site permit. | $775,000 |
| Nov 30, 2020 | Completed final sign-off Oct 2021 | 4066 24th St | Vsa Construction | t.i. for retail use of street front commercial space. scope of work to include gypsum board, finishes, mechanical systems, electrical, lighting, plumbing, storefront windows, clerestory windows, and commercial space entry door replacement. install power door operator for exterior entry doorDetails
t.i. for retail use of street front commercial space. scope of work to include gypsum board, finishes, mechanical systems, electrical, lighting, plumbing, storefront windows, clerestory windows, and commercial space entry door replacement. install power door operator for exterior entry door | $20,000 |
| Oct 27, 2020 | Never finaled issued Nov 2020, no final | 4064 24th St | Vsa Construction | revision to pa # 201603293285 add#3 arch/mech/elec. to restore clerestory windows at storefront to historical contaxt of assessor's photo taken in 1943, as documented in projects hre part i & ii.trim detail at storefront bulkhead to be restored to match trim detail of bay windows above.Details
revision to pa # 201603293285 add#3 arch/mech/elec. to restore clerestory windows at storefront to historical contaxt of assessor's photo taken in 1943, as documented in projects hre part i & ii.trim detail at storefront bulkhead to be restored to match trim detail of bay windows above. | $10,000 |
| Dec 20, 2019 | Never finaled issued Oct 2022, no final | 159 Fell St | L P Construction | erect 7-story, 1 basement, 24 condo residential units, office building. yes comply maher. 5 stories type iiia over 2 stories type 1a constructionDetails
erect 7-story, 1 basement, 24 condo residential units, office building. yes comply maher. 5 stories type iiia over 2 stories type 1a construction | $4,500,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2025 | 159 Fell St | O'toole Construction Inc. | demolish 2-story, type 5, auto repair bldg. yes comply maher.Details
demolish 2-story, type 5, auto repair bldg. yes comply maher. | $20,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 4064 24th St | Vsa Construction | revision to application 201603293285 s3. revise plans to remove the two hour floor assembly in storage closet between basement & first floor. upgrade two hour fire rated walls surrounding shaft enclosure & 90 min fire rated door into enclosure.a vertical platform lift to be installed by manufacturerDetails
revision to application 201603293285 s3. revise plans to remove the two hour floor assembly in storage closet between basement & first floor. upgrade two hour fire rated walls surrounding shaft enclosure & 90 min fire rated door into enclosure.a vertical platform lift to be installed by manufacturer | $30,000 |
| Jun 6, 2019 | In progress issued Oct 2023 | 4333 26th St | K J Woods Construction Inc | demolish 2-story single family homeDetails
demolish 2-story single family home | $25,000 |
| Jun 6, 2019 | In progress issued Oct 2023 | 4333 26th St | K J Woods Construction Inc | erect 3-story and a basement type v-b construction single family homeDetails
erect 3-story and a basement type v-b construction single family home | $939,000 |
| Nov 30, 2018 | Never finaled issued Nov 2019, no final | 4449 25th St | Woods Const Co | horizontal & vertical addition. renovation of (e) 2-story sfh includes: addition of 3rd flr, rear expansion & interior remodel. proposed project includes (4) bed, (4.5) bath, (1)playroom, (1) car stacker for (2) cars. design build fire sprinkler for nfpa 13r under separate permit.Details
horizontal & vertical addition. renovation of (e) 2-story sfh includes: addition of 3rd flr, rear expansion & interior remodel. proposed project includes (4) bed, (4.5) bath, (1)playroom, (1) car stacker for (2) cars. design build fire sprinkler for nfpa 13r under separate permit. | $642,750 |
| Sep 14, 2018 | Completed final sign-off Apr 2021 | 986 South Van Ness Av | Eastwood Development Incorporated | demolish 1-story auto repair shopDetails
demolish 1-story auto repair shop | $50,000 |
| Aug 30, 2018 | Completed final sign-off Jan 2020 | 290 Lombard St | interior removation of unit 21 and unit 22 on the 2nd flr. no structural modifications or alterations. demo all interior walls, replace kitchens and bathrooms per unit, new laundry closet in 1 unitDetails
interior removation of unit 21 and unit 22 on the 2nd flr. no structural modifications or alterations. demo all interior walls, replace kitchens and bathrooms per unit, new laundry closet in 1 unit | $100,000 | |
| Aug 22, 2018 | Completed final sign-off Mar 2022 | 918 Alabama St | C B C General Contractors | revision to pa 2018-0525-0271 to update section 317 demo calculation per scope of work under pa 2018-0525-0271 permit is for administratvie purposes only. no change in scope work under previously approved permits. enforcement case no 2018-008750 enf due to dry rot discovery at front of stairDetails
revision to pa 2018-0525-0271 to update section 317 demo calculation per scope of work under pa 2018-0525-0271 permit is for administratvie purposes only. no change in scope work under previously approved permits. enforcement case no 2018-008750 enf due to dry rot discovery at front of stair | |
| May 25, 2018 | Completed final sign-off Mar 2022 | 918 Alabama St | C B C General Contractors | comply with dbi correction 5/23/18 201864222. revision to 201702028503 to clarify removal of existing slab on grade and excavatoin below slab (no increase in depth) remove e front entry stair and replace in kind. repair dryrot in 2 locations. revision to foundation detail to reflect field conditionsDetails
comply with dbi correction 5/23/18 201864222. revision to 201702028503 to clarify removal of existing slab on grade and excavatoin below slab (no increase in depth) remove e front entry stair and replace in kind. repair dryrot in 2 locations. revision to foundation detail to reflect field conditions | |
| Jan 26, 2018 | Never finaled issued Sep 2021, no final | 1260 Sacramento St | G B U Construction Development | renovate (e) 2-story single family residence. interior remodel of (e). vertical addition of 3rd flr & roof deck. (n) design-build fire sprinkler system per nfpa-13r under separate permit.Details
renovate (e) 2-story single family residence. interior remodel of (e). vertical addition of 3rd flr & roof deck. (n) design-build fire sprinkler system per nfpa-13r under separate permit. | $732,955 |
| Jan 26, 2018 | Never finaled issued Sep 2021, no final | 61 Pleasant St | G B U Construction Development | vertical addition of 1-story over (e) garage into a (1) bedroom, (1) bathroom unit. remodel of (e) garage. new design-build fire sprinkler system per nfpa-13r under separate permit.Details
vertical addition of 1-story over (e) garage into a (1) bedroom, (1) bathroom unit. remodel of (e) garage. new design-build fire sprinkler system per nfpa-13r under separate permit. | $89,195 |
| Dec 15, 2017 | Completed final sign-off Dec 2017 | 312 Texas St | to comply with complaint #201720416. build fence at property line - replace old fence.Details
to comply with complaint #201720416. build fence at property line - replace old fence. | $3,500 | |
| Nov 22, 2017 | Completed final sign-off Apr 2018 | 1156 Dolores St | Eastwood Development Incorporated | remodel existing conditioned storage area into new bath at gr flDetails
remodel existing conditioned storage area into new bath at gr fl | $20,000 |
| Nov 13, 2017 | Expired or cancelled cancelled Jul 2024 | 4068 24th St | to erect 4 stories, no basement, type v-b, 4 units residential with retail (r-2,b)Details
to erect 4 stories, no basement, type v-b, 4 units residential with retail (r-2,b) | $1,168,650 | |
| Nov 13, 2017 | Expired or cancelled cancelled Nov 2024 | 4068 24th St | demolition of a 1-story retail building.Details
demolition of a 1-story retail building. | $20,000 | |
| Oct 6, 2017 | Completed final sign-off Oct 2017 | 1156 Dolores St | Eastwood Development Incorporated | new pre-fabricated spa on (e) roof terrace.Details
new pre-fabricated spa on (e) roof terrace. | $3,000 |
| Oct 4, 2017 | Completed final sign-off Sep 2022 | 2121 Mason St | O Donoghue Construction Inc. | renovate (e)(2) bed (2) bath single family home. proposed project to add (1) story & create 2nd unit. comprising of: 1st unit (1)bed/(1.5) bath. 2nd unit (3)bed/(2.5)bath & (1)car parking. increase (e) by (2) bed/(2)bath.Details
renovate (e)(2) bed (2) bath single family home. proposed project to add (1) story & create 2nd unit. comprising of: 1st unit (1)bed/(1.5) bath. 2nd unit (3)bed/(2.5)bath & (1)car parking. increase (e) by (2) bed/(2)bath. | $507,450 |
| Jun 13, 2017 | Expired or cancelled cancelled Sep 2017 | 709 York St | renovation of front facade only. ** maher: n/a **Details
renovation of front facade only. ** maher: n/a ** | $30,000 | |
| Apr 3, 2017 | Never finaled issued Apr 2017, no final | 717 California St | D B I Contracting Inc | revision to (e) permit #201611092299. new layout or restrooms due to (e) mechanical pipes discovered during demolition. minor changes to layout, with no change to electrical or plumbing scope.Details
revision to (e) permit #201611092299. new layout or restrooms due to (e) mechanical pipes discovered during demolition. minor changes to layout, with no change to electrical or plumbing scope. | |
| Mar 10, 2017 | Completed final sign-off Dec 2018 | 4567 19th St | Eastwood Development Incorporated | infill (e) lightwell, bathroom remodel including new fixtures & finishes. new skylight.Details
infill (e) lightwell, bathroom remodel including new fixtures & finishes. new skylight. | $7,000 |
| Mar 6, 2017 | Expired or cancelled cancelled Nov 2024 | 220 Battery St | four story, approximately 3,258 square foot vertical addition atop exisitng two story structure. addition to include four dwelling units, four class i bike parking spaces, roof deck. glass canopy at main entrance. no change to use of exisitng building. ** maher: n/a **Details
four story, approximately 3,258 square foot vertical addition atop exisitng two story structure. addition to include four dwelling units, four class i bike parking spaces, roof deck. glass canopy at main entrance. no change to use of exisitng building. ** maher: n/a ** | $1,800,000 | |
| Jan 9, 2017 | Completed final sign-off Oct 2017 | 1156 Dolores St | Eastwood Development Incorporated | to comply with complaint #201652319. revision to 2015-06-04-8121. no work. submittal of demo to planning.Details
to comply with complaint #201652319. revision to 2015-06-04-8121. no work. submittal of demo to planning. | |
| Oct 27, 2016 | Completed final sign-off Oct 2019 | 333 Diamond St | Mutual Seiko Construction | remodel of interior of (e) 2 unit bldg and (e) garage. development of (e) ground flr storage space as (n) bdrm & living room. rear addition for (n) family rm and master bdrm. (n) 4th flr for rec room study & bathroom.Details
remodel of interior of (e) 2 unit bldg and (e) garage. development of (e) ground flr storage space as (n) bdrm & living room. rear addition for (n) family rm and master bdrm. (n) 4th flr for rec room study & bathroom. | $650,000 |
| Oct 6, 2016 | Completed final sign-off Apr 2019 | 330 Twin Peaks Bl | The Toboni Group | renovation of an (e) 3 story home. addition of 4th floor, rear expansion & interior renovation. add 2 bed & 2 bath.Details
renovation of an (e) 3 story home. addition of 4th floor, rear expansion & interior renovation. add 2 bed & 2 bath. | $550,000 |
| Aug 24, 2016 | Completed final sign-off Mar 2019 | 4565 19th St | Eastwood Development Incorporated | vertical addition of new third floor. renovation of 1st and 2nd floors. addition of 2 bedrooms and one bath and one additional master bedroom and bathDetails
vertical addition of new third floor. renovation of 1st and 2nd floors. addition of 2 bedrooms and one bath and one additional master bedroom and bath | $600,000 |
| Jun 3, 2016 | Completed final sign-off Feb 2019 | 1689 Sutter St | interior remodel of kitchen, family room & poweder room on 1st floor. interior remodel of bedrooms & bathrooms on 2nd floor. new master bath on 2nd floor. replace (e) rear deck.horizontal addition of family on ground floorDetails
interior remodel of kitchen, family room & poweder room on 1st floor. interior remodel of bedrooms & bathrooms on 2nd floor. new master bath on 2nd floor. replace (e) rear deck.horizontal addition of family on ground floor | $450,000 | |
| Mar 29, 2016 | Completed final sign-off Aug 2021 | 4064 24th St | Vsa Construction | horizontal & vertical addition. rear addition at b & 1/f. add (n)2 & 3/f. renovate b & 1/f. add 3 dwelling units to one existing (r-3 to r-2). expansion of b/f retail. sprinkler system nfpa 13 throughoutDetails
horizontal & vertical addition. rear addition at b & 1/f. add (n)2 & 3/f. renovate b & 1/f. add 3 dwelling units to one existing (r-3 to r-2). expansion of b/f retail. sprinkler system nfpa 13 throughout | $1,000,000 |
| Feb 10, 2016 | Never finaled issued May 2016, no final | 1605 Dolores St | Luke Gilligan Inc. | interior remodel of both floors of existing two unit residence. changes to front facade with new entry & windows. changes to rear facade with new windows.Details
interior remodel of both floors of existing two unit residence. changes to front facade with new entry & windows. changes to rear facade with new windows. | $120,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2019 | 1424 Sanchez St | Luke Gilligan Inc. | (n) horizontal add on the 1st flr to include (n) study & laundry rm with renovation of bathroom. 2nd flr renovation of living room, kitchen & horizontal add for family room. (n) vertical & horizontal add to the 3rd flr for (n) bathroom & bedroom with renovation to existing bathroom & bedroomDetails
(n) horizontal add on the 1st flr to include (n) study & laundry rm with renovation of bathroom. 2nd flr renovation of living room, kitchen & horizontal add for family room. (n) vertical & horizontal add to the 3rd flr for (n) bathroom & bedroom with renovation to existing bathroom & bedroom | $700,000 |
| Jan 14, 2016 | Never finaled issued Jul 2017, no final | 959 Chenery St | H T H Construction | addition of new third story to (e) two story house for 3 new bedrooms & 2 bathrooms. interior remodel to (e) second floor & first floor.Details
addition of new third story to (e) two story house for 3 new bedrooms & 2 bathrooms. interior remodel to (e) second floor & first floor. | $450,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2017 | 2741 Greenwich St | H T H Construction | revision to previously issued to pa#2014-0820-4281 & 2015-0902-5912. addition of new roof terrace above third fl. addition of new exterior stair to roof terrace within already permitted building envelope. no increase in bldg envelope, height or footprint.Details
revision to previously issued to pa#2014-0820-4281 & 2015-0902-5912. addition of new roof terrace above third fl. addition of new exterior stair to roof terrace within already permitted building envelope. no increase in bldg envelope, height or footprint. | $30,000 |
| Nov 4, 2015 | Completed final sign-off Oct 2021 | 941 Treat Av | Arcon Construction Corp | erect (n) 4-story multifamily dwelling unitsDetails
erect (n) 4-story multifamily dwelling units | $797,000 |
| Nov 4, 2015 | Completed final sign-off Nov 2021 | 949 Treat Av | Arcon Construction Corp | building# 2. to erect 4 stories, no basement, 3 units residential building. lot 027 & lot 028 going to merge. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
building# 2. to erect 4 stories, no basement, 3 units residential building. lot 027 & lot 028 going to merge. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $686,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2019 | 953 Treat Av | Arcon Construction Corp | to demolish 1 story single family home. ** maher: compliance with ordinance no# 155-13 not required **Details
to demolish 1 story single family home. ** maher: compliance with ordinance no# 155-13 not required ** | $20,000 |
| Sep 23, 2015 | Expired or cancelled cancelled Aug 2022 | 58 Waller St | rear addition for living room. extension of rear deck. new exterior stair at rear. insterior remodel of second floor. new study at first floor.Details
rear addition for living room. extension of rear deck. new exterior stair at rear. insterior remodel of second floor. new study at first floor. | $120,000 | |
| Sep 2, 2015 | Completed final sign-off Apr 2017 | 2741 Greenwich St | H T H Construction | revision to 201408204261. revisions to interior floor plans at basement, 1st and 2nd fls. replacement of proposed rear landscape stair with new inclined ladder from basement terrace to rear yard. evision to increase excavation and lower floor levelsDetails
revision to 201408204261. revisions to interior floor plans at basement, 1st and 2nd fls. replacement of proposed rear landscape stair with new inclined ladder from basement terrace to rear yard. evision to increase excavation and lower floor levels | $50,000 |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 2152 Bay St | H T H Construction | infill existing lightwell at 2nd fl. remodel existing bathroom. install new skylight. compliance with maher ordinance no 155-13 not required.Details
infill existing lightwell at 2nd fl. remodel existing bathroom. install new skylight. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Jun 4, 2015 | Completed final sign-off Oct 2017 | 1156 Dolores St | Eastwood Development Incorporated | interior demo & renovation. conversion of penthouse flat roof to(n)roof terrace & addition of (n) stairs from main roof terrace. partial infill of(e)north lightwell @ first fl only. interior partial (<75% demo) work -separate permit. (n) design/bld auto fire sprinkler nfpa-13r - separate permit.Details
interior demo & renovation. conversion of penthouse flat roof to(n)roof terrace & addition of (n) stairs from main roof terrace. partial infill of(e)north lightwell @ first fl only. interior partial (<75% demo) work -separate permit. (n) design/bld auto fire sprinkler nfpa-13r - separate permit. | $300,000 |
| Jun 4, 2015 | Completed final sign-off Oct 2017 | 1156 Dolores St | Eastwood Development Incorporated | interior remodel of floors of (e)2-unit bldg <75%demo.relocate lower residential unit from 2/f to 1/f.excavation & foundation work to create level 1/f & addition of car stacker unit.new elevator.(n)windows & stucco @(e)side& rear.(n) facade, remove (e) bay window at front.repair (e) front stairDetails
interior remodel of floors of (e)2-unit bldg <75%demo.relocate lower residential unit from 2/f to 1/f.excavation & foundation work to create level 1/f & addition of car stacker unit.new elevator.(n)windows & stucco @(e)side& rear.(n) facade, remove (e) bay window at front.repair (e) front stair | $900,000 |
| Mar 31, 2015 | Completed final sign-off May 2016 | 44 Lundys Ln | Stingray Builders Inc. | no exterior expansion to building envelope. kitchen & bathroom remodel at 1st floor. new interior stair down to (e) conditioned space at basement increase conditioned space at basement by 159sf. new bathroom at basement level, bathroom remodel at 2nd flr. foundation replacement.Details
no exterior expansion to building envelope. kitchen & bathroom remodel at 1st floor. new interior stair down to (e) conditioned space at basement increase conditioned space at basement by 159sf. new bathroom at basement level, bathroom remodel at 2nd flr. foundation replacement. | $90,000 |
| Mar 30, 2015 | Completed final sign-off Aug 2017 | 355 Clipper St | new 3rd floor addition for 3 bedrooms, 2 baths. new 1st floor rear addition for recreation room. new 2nd floor addition for family room. interior remodel of kitchen.Details
new 3rd floor addition for 3 bedrooms, 2 baths. new 1st floor rear addition for recreation room. new 2nd floor addition for family room. interior remodel of kitchen. | $400,000 | |
| Mar 20, 2015 | Completed final sign-off Apr 2015 | 312 Texas St | replaceing concrete piers w/pipe piers rev to ref pa# 2013 12244960 s/1Details
replaceing concrete piers w/pipe piers rev to ref pa# 2013 12244960 s/1 | ||
| Mar 6, 2015 | Completed final sign-off Jul 2018 | 1649 Washington St | Shiel Construction | to comply w/ nov #201119582. 3-story over basement. remodeled in 2008-2009 w/ various permits, however, rear deck exceeded the work shown on permit #200807015782-s, which expired before receiving final sign-off. this permit is intended to legalize non-permitted work & submit special inspection.Details
to comply w/ nov #201119582. 3-story over basement. remodeled in 2008-2009 w/ various permits, however, rear deck exceeded the work shown on permit #200807015782-s, which expired before receiving final sign-off. this permit is intended to legalize non-permitted work & submit special inspection. | |
| Feb 27, 2015 | Completed final sign-off May 2015 | 1525 Mission St | Sf Town Builders Inc | renovate existing front bar, new interior non structural wall. new ada compliant lavatory sink, maher not reqDetails
renovate existing front bar, new interior non structural wall. new ada compliant lavatory sink, maher not req | $50,000 |
| Feb 4, 2015 | Never finaled issued Feb 2015, no final | 1561 California St | Cody Vermette Group Inc | revision to appl #2014.1006.8210 - to eliminate fire sprinklers where not required by code at upper studio & upper storage room.Details
revision to appl #2014.1006.8210 - to eliminate fire sprinklers where not required by code at upper studio & upper storage room. | |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 61 Mizpah St | Jose Olmos General Contractor | revision to appl #2014.0912.6238: to cut new opening in existing non-structural interior wall. increase construction cost by $20,000.Details
revision to appl #2014.0912.6238: to cut new opening in existing non-structural interior wall. increase construction cost by $20,000. | $20,000 |
| Oct 6, 2014 | Completed final sign-off Apr 2015 | 1561 California St | Cody Vermette Group Inc | new personal service fitness studio in existing retail building. new ada compliant bathrooms. new ada compliant lift.n ew storefront. design/build mechanical system under separate permit. design build sprinkler system under separate permit.Details
new personal service fitness studio in existing retail building. new ada compliant bathrooms. new ada compliant lift.n ew storefront. design/build mechanical system under separate permit. design build sprinkler system under separate permit. | $190,000 |
| Aug 25, 2014 | Expired or cancelled suspend Jan 2015 | 214 States St | front facade: 1) replace existing shingles with new painted, redwood lap siding returning to original state per historical photo, 2) enclose existing balconies as bay window returning to original state prior to pa 296721, 3) relocate existing front door at 1st flr to grnd flr and relocate (e) garagDetails
front facade: 1) replace existing shingles with new painted, redwood lap siding returning to original state per historical photo, 2) enclose existing balconies as bay window returning to original state prior to pa 296721, 3) relocate existing front door at 1st flr to grnd flr and relocate (e) garag | $25,000 | |
| Aug 20, 2014 | Completed final sign-off Apr 2017 | 2741 Greenwich St | H T H Construction | new partial third fl for rec room, new rear addition at 1st fl for master bedroom and 2nd fl for family room, relocate lower unit to basement level, new elevator, design/build sprinkler system under separate permit.2/11/15: green priority permit per ab-004 per j. romaidis. byan.Details
new partial third fl for rec room, new rear addition at 1st fl for master bedroom and 2nd fl for family room, relocate lower unit to basement level, new elevator, design/build sprinkler system under separate permit.2/11/15: green priority permit per ab-004 per j. romaidis. byan. | $600,000 |
| Aug 19, 2014 | Expired or cancelled suspend Jan 2015 | 214 States St | Structure Built | comply w/nov 201391903 & repair front balconies. comply w/complaint 201391904 & correct work in attic @ 3floor. kitchen & bath remodel at 1st & 2nd flr. new dormer windows at 3rd floor per zoning ab #3. new bedroom & bath on 3rd floor. fire sprinkler under separate permit.Details
comply w/nov 201391903 & repair front balconies. comply w/complaint 201391904 & correct work in attic @ 3floor. kitchen & bath remodel at 1st & 2nd flr. new dormer windows at 3rd floor per zoning ab #3. new bedroom & bath on 3rd floor. fire sprinkler under separate permit. | $90,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2018 | 1783 Noe St | C B C General Contractors | to erect 3 stories, no basement, single family dwelling unit building.Details
to erect 3 stories, no basement, single family dwelling unit building. | $850,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2018 | 1783 Noe St | demolish 2-story, 1 dwelling unit building.Details
demolish 2-story, 1 dwelling unit building. | $10,000 | |
| Jun 3, 2014 | Completed final sign-off Aug 2014 | 407 Eureka St | O'neill & Neville Construction Inc | new 20'x20' roof deck with guardrailDetails
new 20'x20' roof deck with guardrail | $14,000 |
| Apr 18, 2014 | Completed final sign-off Feb 2021 | 852 Green St | partial third floor addition for 3 new bedrooms, partial fourth floor addition for 1 new family room, interior remodel to all floors, new elevator, new design/build sprinkler system under seperate permit. legalize in-law unit.Details
partial third floor addition for 3 new bedrooms, partial fourth floor addition for 1 new family room, interior remodel to all floors, new elevator, new design/build sprinkler system under seperate permit. legalize in-law unit. | $425,000 | |
| Mar 6, 2014 | Never finaled issued Mar 2014, no final | 101 South Park | revision to app#201212276899. new interior non-rated, non-structural partitions and new interior non-rated doors for work spaces.n/a for the maher ordinance. will be complying with the interim control per bos resolution no. 428-13Details
revision to app#201212276899. new interior non-rated, non-structural partitions and new interior non-rated doors for work spaces.n/a for the maher ordinance. will be complying with the interim control per bos resolution no. 428-13 | $32,000 | |
| Feb 28, 2014 | Expired or cancelled expired Mar 2023 | 1506 Willard St | Rod Heisler Construction | rear adition at 3rd flr for new family room and vertical addition of 4th flr for new master suite. interior remodel new garage with curb cut.Details
rear adition at 3rd flr for new family room and vertical addition of 4th flr for new master suite. interior remodel new garage with curb cut. | $575,000 |
| Dec 24, 2013 | Completed final sign-off Jun 2018 | 312 Texas St | Tom Mccaffrey | interior renovation to 2-story (e) house, partial 3rd floor addition for (n) kitchen, living room, dining room, (n) roof deck @ 4th floor, (n) elevation.Details
interior renovation to 2-story (e) house, partial 3rd floor addition for (n) kitchen, living room, dining room, (n) roof deck @ 4th floor, (n) elevation. | $430,000 |
| Dec 19, 2013 | Completed final sign-off Mar 2017 | 35 Lafayette St | Sincere Construction Company Inc | convert lower floor to 2 addition dwellings. no expansion of enverlop of building. exterior work (n) windows and (n) doors.Details
convert lower floor to 2 addition dwellings. no expansion of enverlop of building. exterior work (n) windows and (n) doors. | $100,000 |
| Dec 19, 2013 | Completed final sign-off Mar 2017 | 1043 Minna St | Sincere Construction Company Inc | convert lower floor to 2 addition dwellings. no expansion of enverlop of building. exterior work (n) windows and (n) doors.Details
convert lower floor to 2 addition dwellings. no expansion of enverlop of building. exterior work (n) windows and (n) doors. | $100,000 |
| Dec 16, 2013 | Completed final sign-off Apr 2014 | 555 19th St | Principal Builders Inc. | t.i. includes:new non-rated, non-structural partitions, work spaces, break areas, and voluntary multi accomodation toilet rooms. mep, sprinkler under separate permit.Details
t.i. includes:new non-rated, non-structural partitions, work spaces, break areas, and voluntary multi accomodation toilet rooms. mep, sprinkler under separate permit. | $241,945 |
| Oct 10, 2013 | Never finaled issued Oct 2013, no final | 128 Coleridge St | Room By Room Maintenance Inc | adding a shower and sink to unit 128 coleridge (2nd floor).Details
adding a shower and sink to unit 128 coleridge (2nd floor). | $2,000 |
| Sep 9, 2013 | Expired or cancelled expired Jun 2017 | 865 El Camino Del Mar | board of appeal no. 13-036, dated on 09/04/2013 for pa# 2012/02/06/3645 's' .Details
board of appeal no. 13-036, dated on 09/04/2013 for pa# 2012/02/06/3645 's' . | ||
| Jun 13, 2013 | Expired or cancelled cancelled Jan 2020 | 210 Rose St | work related to varianc case #2012.152.iv. install new spiral stair at rear yard of upper unit of existing two unit. two story building exterior work onlyDetails
work related to varianc case #2012.152.iv. install new spiral stair at rear yard of upper unit of existing two unit. two story building exterior work only | $8,500 | |
| May 14, 2013 | Completed final sign-off Aug 2013 | 4070 17th St | Aidan Mc Cracken Const Inc. | front bldg, top unit - kitchen remodel: new cabs, plumbing, electric & bathroom remodel - new tub,toilet, tile, plumbingDetails
front bldg, top unit - kitchen remodel: new cabs, plumbing, electric & bathroom remodel - new tub,toilet, tile, plumbing | $25,000 |
| May 14, 2013 | Completed final sign-off Aug 2013 | 22 Normandie Tr | Plath & Company Inc | replace six extg painted wood window units with new painted double glazed wood windows custom fabricated to match. no structural work.Details
replace six extg painted wood window units with new painted double glazed wood windows custom fabricated to match. no structural work. | $42,000 |
| Mar 26, 2013 | Completed final sign-off Oct 2015 | 29 Dorland St | Cardea Bldg Dba Dimension Design Group | new garage at basement and new third story addition to (e) two story house.interior remodel at all levels.Details
new garage at basement and new third story addition to (e) two story house.interior remodel at all levels. | $450,000 |
| Jan 23, 2013 | Expired or cancelled expired Feb 2016 | 456 Douglass St | Gavin Painting & Cont* See 934867* | insert one skylight more than 5 feet from the property linesDetails
insert one skylight more than 5 feet from the property lines | $5,000 |
| Dec 11, 2012 | Completed final sign-off Feb 2014 | 723 14th Av | comply with complaint #201299853-renovate front facade including replacement of e 3 section aluminum windows on the 4th fl with 4 new windows. relace wood shingles at 4th fl with stucco and add new wood fascia, no structural workDetails
comply with complaint #201299853-renovate front facade including replacement of e 3 section aluminum windows on the 4th fl with 4 new windows. relace wood shingles at 4th fl with stucco and add new wood fascia, no structural work | $35,000 | |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 2153 Lake St | Gech Inc. | remove existing columns, canopy, railing & tile at entry stairs. install new solid railing, stone tile & handrail at entry stairs. install new trim at entry alcove.Details
remove existing columns, canopy, railing & tile at entry stairs. install new solid railing, stone tile & handrail at entry stairs. install new trim at entry alcove. | $15,000 |
| Jun 26, 2012 | Completed final sign-off Aug 2012 | 22 Normandie Tr | Plath & Company Inc | rebuild 2 existing masonry clad wood framed chimneys to match existing. repair existing gutter, flashing and roofing. repair existing masonry wallDetails
rebuild 2 existing masonry clad wood framed chimneys to match existing. repair existing gutter, flashing and roofing. repair existing masonry wall | $50,000 |
| Jun 5, 2012 | Expired or cancelled expired Jan 2024 | 66 Seacliff Av | Gavin Painting & Cont* See 934867* | interior renovation of basement family room. rebuild interior stair between basement and first floor. foundation replacement and structural upgrades.Details
interior renovation of basement family room. rebuild interior stair between basement and first floor. foundation replacement and structural upgrades. | $75,000 |
| Mar 20, 2012 | Completed final sign-off Sep 2013 | 1411 Diamond St | Brian Mac Namara Construction | interior renovation of first story of two story building. infill below overhang at rear. infill lightwell at north side. foundation replacement & structural upgrades.Details
interior renovation of first story of two story building. infill below overhang at rear. infill lightwell at north side. foundation replacement & structural upgrades. | $58,000 |
| Feb 24, 2012 | Expired or cancelled cancelled Jan 2026 | 280 Chenery St | revision to 201108152501. 3 unit residential located at 280-4 chenery st. install 1 e' wide, 6'tall window on the back of the houseDetails
revision to 201108152501. 3 unit residential located at 280-4 chenery st. install 1 e' wide, 6'tall window on the back of the house | $1,000 | |
| Feb 23, 2012 | Completed final sign-off Sep 2016 | 1360 Dolores St | new 1 story addition at front of bldg with new terrace at 2nd fl. renovation of existing 1st floor bathroom. renovation of exterior landscaping, stairs and entry. no changes to north & west elevations.Details
new 1 story addition at front of bldg with new terrace at 2nd fl. renovation of existing 1st floor bathroom. renovation of exterior landscaping, stairs and entry. no changes to north & west elevations. | $55,000 | |
| Oct 28, 2011 | Expired or cancelled cancelled Mar 2020 | 120 Montalvo Av | partial second story addition and master suite remodel. new deck and stair at rear. window replacement.Details
partial second story addition and master suite remodel. new deck and stair at rear. window replacement. | $75,000 | |
| Oct 6, 2011 | Completed final sign-off Aug 2012 | 181 03rd St | Rudolph Commercial Interiors Inc, Rci | revision to 201104144040: gr fl change to roll down fire door in lieu of smoke wall and doors. 2nd fl: change to roll down fire door in lieu of smoke wall and doors. changes to footprint of proposed bar. revision to occupant load calculations. fire alartm and smoke detection separate permit-Details
revision to 201104144040: gr fl change to roll down fire door in lieu of smoke wall and doors. 2nd fl: change to roll down fire door in lieu of smoke wall and doors. changes to footprint of proposed bar. revision to occupant load calculations. fire alartm and smoke detection separate permit- | $80,000 |
| Jul 8, 2011 | Never finaled issued Jul 2012, no final | 55 Aptos Av | H T H Construction | patrial 2nd story addition. kitchen remodel at 1st story.Details
patrial 2nd story addition. kitchen remodel at 1st story. | $160,000 |
| Jun 2, 2011 | Never finaled issued Jun 2011, no final | 849 Sanchez St | H T H Construction | remodel closet & laundry room. remove fireplace & add new windowDetails
remodel closet & laundry room. remove fireplace & add new window | $18,000 |
| Jun 2, 2011 | Completed final sign-off May 2012 | 3041 Baker St | Hon's Construction Inc. | conversion of (e) storage space on 1st floor into a studio residential unit. update (e) bathroom on 1st floor, (e) building is 3 stories & 1 unit residential. no change will be make to the foot print or height of (e) building.Details
conversion of (e) storage space on 1st floor into a studio residential unit. update (e) bathroom on 1st floor, (e) building is 3 stories & 1 unit residential. no change will be make to the foot print or height of (e) building. | $48,000 |
| May 24, 2011 | Expired or cancelled withdrawn Dec 2016 | 181 03rd St | revision to appl #201104144040 - ground floor & 2nd floor: reivse proposal of smoke curtain in lieu of smoke wall & doors. 2nd floor: revise proposal of smoke curtain in lieu of smoke wall & doors, changes to foot print of proposed bar, revisions to occupant load calculation.Details
revision to appl #201104144040 - ground floor & 2nd floor: reivse proposal of smoke curtain in lieu of smoke wall & doors. 2nd floor: revise proposal of smoke curtain in lieu of smoke wall & doors, changes to foot print of proposed bar, revisions to occupant load calculation. | $1,150 | |
| May 24, 2011 | Completed final sign-off Aug 2012 | 181 03rd St | Rudolph Commercial Interiors Inc, Rci | 2nd floor revision to pa #201104013282: demolish wing wall to gain ada clearance. (replace vanity sinks & addition of 2 urinals in permit 201104013282.Details
2nd floor revision to pa #201104013282: demolish wing wall to gain ada clearance. (replace vanity sinks & addition of 2 urinals in permit 201104013282. | $1,150 |
| May 5, 2011 | Completed final sign-off Jan 2013 | 1415 Diamond St | vertical addition of a new 3rd floor & remodel to (e) dwelling.Details
vertical addition of a new 3rd floor & remodel to (e) dwelling. | $330,000 | |
| Apr 21, 2011 | Completed final sign-off May 2012 | 11 17th Av | Gavins Construction | new 500 sf wood deck over existing flat roof. new metal spiral stair up to roof deck with new fire-rated property line wall.Details
new 500 sf wood deck over existing flat roof. new metal spiral stair up to roof deck with new fire-rated property line wall. | $22,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 209 09th St | Modern Construction Inc | non structural interior demolition per ab 017 within the framework of site permit pa# 2008.10.16.4336. remove first fl non struc slab.Details
non structural interior demolition per ab 017 within the framework of site permit pa# 2008.10.16.4336. remove first fl non struc slab. | $10,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2012 | 181 03rd St | Rudolph Commercial Interiors Inc, Rci | gr floor; new check in counters, storage cabinets, ceiling system. level 2: replace vanity sinks, addition of 2 urinals. level 3: replace vanity sinksDetails
gr floor; new check in counters, storage cabinets, ceiling system. level 2: replace vanity sinks, addition of 2 urinals. level 3: replace vanity sinks | $80,000 |
| Mar 21, 2011 | Completed final sign-off Feb 2012 | 149 09th St | Jon K Takata Corp Dba Restoration Mgmt | interior demo per ab17. demo non struc. partition walls,doors, elec outlets, lighting , plbg fixtures, fl finishes and cabs for future ti. interior only on basement, 1st and 2nd fl. space currently vacant.Details
interior demo per ab17. demo non struc. partition walls,doors, elec outlets, lighting , plbg fixtures, fl finishes and cabs for future ti. interior only on basement, 1st and 2nd fl. space currently vacant. | $21,000 |
| Mar 16, 2011 | Completed final sign-off Feb 2012 | 149 09th St | Jon K Takata Corp Dba Restoration Mgmt | non structural exploratory demolition work for future remodeling permit, interior only. no exterior work, basement, 1/f & 2/f only. space currently vacant. all ada upgrade work under future t.i. permit per ab-017Details
non structural exploratory demolition work for future remodeling permit, interior only. no exterior work, basement, 1/f & 2/f only. space currently vacant. all ada upgrade work under future t.i. permit per ab-017 | $5,000 |
| Mar 14, 2011 | Completed final sign-off Nov 2012 | 555 19th St | Nibbi Bros Assoc Inc. | removal of rear shed addition to rear of building facing illnois street.Details
removal of rear shed addition to rear of building facing illnois street. | $8,000 |
| Dec 22, 2010 | Completed final sign-off Oct 2014 | 828 Brannan St | Sincere Construction Company Inc | non structural exploratory demo for future remodeling permit. interior only, no exterior workDetails
non structural exploratory demo for future remodeling permit. interior only, no exterior work | $2,500 |
| Dec 9, 2010 | Completed final sign-off Nov 2013 | 616 20th St | erect 5 stories, 16 dwelling units type 1 & 5, commercial & residential new building.Details
erect 5 stories, 16 dwelling units type 1 & 5, commercial & residential new building. | $2,250,000 | |
| Dec 2, 2010 | Completed final sign-off May 2013 | 3139 Gough St | H T H Construction | vertical addition of a new full 3rd floor & partial fourth floor & rear addition beside (e) sunroom.Details
vertical addition of a new full 3rd floor & partial fourth floor & rear addition beside (e) sunroom. | $550,000 |
| Nov 22, 2010 | Never finaled issued Dec 2010, no final | 181 03rd St | add new steel-frame room with structural wall and roof framing, roofing, glazing. add plumbing fixtures to meet occupancy requirements, doors, finishes. note: fire sprinklers, electrical, hvac, life-safety on separate permits.Details
add new steel-frame room with structural wall and roof framing, roofing, glazing. add plumbing fixtures to meet occupancy requirements, doors, finishes. note: fire sprinklers, electrical, hvac, life-safety on separate permits. | $450,000 | |
| Nov 18, 2010 | Completed final sign-off May 2012 | 1901 Jackson St | Lias Mechanical Inc | install 2 air conditioning units in 2 existing furnaces spaceDetails
install 2 air conditioning units in 2 existing furnaces space | $6,000 |