Block 4058, lot 001
555 19th St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 16, 2011 | Completed final sign-off Apr 2012 | 555 19th St | Yum's Mechanical Co Inc | four furnaces and ductwork in basement to supply air to 1st fl. 1st fl: 4 bathrm exhaust d=fans and duct work,. 2nd fl: 2 bathrm exhaust fans and ductwork. 3rd fl: 2 bathroom exhaust fans &duct work.rooftop: 4 units &ductwork to supply air to 2nd & 3rd fl. exhaust fan to south side of bldgDetails
four furnaces and ductwork in basement to supply air to 1st fl. 1st fl: 4 bathrm exhaust d=fans and duct work,. 2nd fl: 2 bathrm exhaust fans and ductwork. 3rd fl: 2 bathroom exhaust fans &duct work.rooftop: 4 units &ductwork to supply air to 2nd & 3rd fl. exhaust fan to south side of bldg | $100,000 |
| Mar 14, 2011 | Completed final sign-off Nov 2012 | 555 19th St | Nibbi Bros Assoc Inc. | removal of rear shed addition to rear of building facing illnois street.Details
removal of rear shed addition to rear of building facing illnois street. | $8,000 |
| Mar 11, 2011 | Completed final sign-off Apr 2012 | 555 19th St | J C Construction Co | this is a permit to document various structural field changes to the interior accessible upgrade permit app#200503177819,currently under construction. revised lobby seismic steel, revised lobby siesmic detail within joist space, e-w stair header, roof block out at a.h.u.Details
this is a permit to document various structural field changes to the interior accessible upgrade permit app#200503177819,currently under construction. revised lobby seismic steel, revised lobby siesmic detail within joist space, e-w stair header, roof block out at a.h.u. | $12,000 |
| Feb 11, 2011 | Completed final sign-off Aug 2012 | 555 19th St | Star Plumbing & Fire Const Co. | install new fire sprinkler system through out the building per nfpa 13Details
install new fire sprinkler system through out the building per nfpa 13 | $97,500 |
| Nov 22, 2010 | Never finaled issued Nov 2010, no final | 555 19th St | street spaceDetails
street space | ||
| Apr 28, 2010 | Never finaled issued Apr 2010, no final | 555 19th St | to obtain final inspection for work approved under pa # 200503177819. all work has been completed.Details
to obtain final inspection for work approved under pa # 200503177819. all work has been completed. | $25,000 | |
| Apr 28, 2010 | Completed final sign-off Mar 2012 | 555 19th St | to obtain final inspection for work approved under pa # 200408262615. all work has been completed.Details
to obtain final inspection for work approved under pa # 200408262615. all work has been completed. | ||
| Apr 28, 2010 | Completed final sign-off Mar 2012 | 555 19th St | to obtain final inspection for work approved under pa # 200302046585. all work has been completed.Details
to obtain final inspection for work approved under pa # 200302046585. all work has been completed. | ||
| Apr 30, 2009 | Never finaled issued Apr 2009, no final | 555 19th St | K Lui General Const, | to complete work and obtain final inspection for work approved under pa#200503177819.Details
to complete work and obtain final inspection for work approved under pa#200503177819. | $30,000 |
| Apr 7, 2009 | Never finaled issued Apr 2009, no final | 555 19th St | renew pa# 2004/08/26/2615 to obtain final inspection. all work has been completed.Details
renew pa# 2004/08/26/2615 to obtain final inspection. all work has been completed. | ||
| Apr 7, 2009 | Never finaled issued Apr 2009, no final | 555 19th St | renew pa# 2003/02/04/6585 to obtain final inspection. all work has been completed.Details
renew pa# 2003/02/04/6585 to obtain final inspection. all work has been completed. | ||
| Mar 17, 2005 | Expired or cancelled cancelled Apr 2010 | 555 19th St | original permit was for umb upgrade per 998294. this permit is for exterior on grade parking, newDetails
original permit was for umb upgrade per 998294. this permit is for exterior on grade parking, new | $21,000 | |
| Mar 17, 2005 | Completed final sign-off Mar 2012 | 555 19th St | this is an acceessibility upgrade component to the umb permit 200302046585. new work include accessible entry, 8 accessible wc, 3 story 1 hour stair shaft and non rated stair, self closing smoke activated mag lock doors on elevator doors.Details
this is an acceessibility upgrade component to the umb permit 200302046585. new work include accessible entry, 8 accessible wc, 3 story 1 hour stair shaft and non rated stair, self closing smoke activated mag lock doors on elevator doors. | $94,000 | |
| Aug 26, 2004 | Expired or cancelled expired Jan 2005 | 555 19th St | u m b - rev. to permit #2003/02/04/6585Details
u m b - rev. to permit #2003/02/04/6585 | ||
| Jan 20, 2004 | Expired or cancelled expired Jun 2004 | 555 19th St | rev. to appl#200302046585, umbDetails
rev. to appl#200302046585, umb | ||
| Feb 4, 2003 | Completed final sign-off Mar 2012 | 555 19th St | umb seismic retrofit, vacant disabled access will be done under separate t.i. permit per ab/17Details
umb seismic retrofit, vacant disabled access will be done under separate t.i. permit per ab/17 | $225,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- J C Construction Co, K Lui General Const,, Nibbi Bros Assoc Inc., Star Plumbing & Fire Const Co., Yum's Mechanical Co Inc
- Architects
- Jeff Gibson (3)
- Engineers
- Calvin Lee, Mhc Engineers, Vincent De Nevers
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.