Block 0481, lot 004
3139 Gough St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 21, 2013 | Completed final sign-off Jun 2013 | 3139 Gough St | San Francisco Fire Protection | new "sprinkler waterflow & supervisory system". install new conreol panel ifp-25 in the garage, heat detector above & pull station near panel. tie-in existing waterflow & 2 tamper switches (installed by others inder pa #2013.0118.8324) to new panel to be monitor.Details
new "sprinkler waterflow & supervisory system". install new conreol panel ifp-25 in the garage, heat detector above & pull station near panel. tie-in existing waterflow & 2 tamper switches (installed by others inder pa #2013.0118.8324) to new panel to be monitor. | $2,700 |
| Jan 18, 2013 | Completed final sign-off May 2013 | 3139 Gough St | Piper's Fire Protection | install (n) sprinkler system through-out building per nfpa 13 in both units & common areas & garage with 2 " fire service off of 6" main on gough.Details
install (n) sprinkler system through-out building per nfpa 13 in both units & common areas & garage with 2 " fire service off of 6" main on gough. | $15,000 |
| Jun 28, 2012 | Completed final sign-off May 2013 | 3139 Gough St | per boa decision #12-063. window on 2nd & 3rd fl in light well adjacent to appelant be frosted; & the length of deck railing on 4th fl facing the appelant's light well be constructed w 42" solid railing & w/ lattice at lease 6' high.Details
per boa decision #12-063. window on 2nd & 3rd fl in light well adjacent to appelant be frosted; & the length of deck railing on 4th fl facing the appelant's light well be constructed w 42" solid railing & w/ lattice at lease 6' high. | ||
| Dec 2, 2010 | Completed final sign-off May 2013 | 3139 Gough St | H T H Construction | vertical addition of a new full 3rd floor & partial fourth floor & rear addition beside (e) sunroom.Details
vertical addition of a new full 3rd floor & partial fourth floor & rear addition beside (e) sunroom. | $550,000 |
| Dec 13, 2007 | Completed final sign-off Jun 2008 | 3139 Gough St | Cardea Bldg Dba Dimension Design Group | work to comply with physical inspection report 3r-5016.Details
work to comply with physical inspection report 3r-5016. | $13,000 |
| Dec 15, 2006 | Never finaled issued Dec 2006, no final | 3139 Gough St | additional addressDetails
additional address | ||
| May 4, 2004 | Completed final sign-off Jun 2005 | 3141 Gough St | replace cabinets,appliances,countertops in kitchen,enlarge bath,including using closet spaces &Details
replace cabinets,appliances,countertops in kitchen,enlarge bath,including using closet spaces & | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cardea Bldg Dba Dimension Design Group, H T H Construction, Piper's Fire Protection, San Francisco Fire Protection
- Architects
- Jeff Gibson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.