C B C General Contractors
- Based in
- Walnut Creek
- On San Francisco permits
- Oct 2010 to Jun 2019
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2019 | Completed final sign-off Mar 2023 | 3882 19th St | abate nov 201955021 and planning vio 2019-006599enf. revise bpa 201501206104 & 201806252857 to provide clarification to the as built conditions and demonstrate demo calcs per planning code section 317. new window at level 1 rearDetails
abate nov 201955021 and planning vio 2019-006599enf. revise bpa 201501206104 & 201806252857 to provide clarification to the as built conditions and demonstrate demo calcs per planning code section 317. new window at level 1 rear | $10,000 |
| Feb 1, 2019 | Completed final sign-off Mar 2022 | 918 Alabama St | revision to pa 201702028503. add (n) rainwater catchment systemDetails
revision to pa 201702028503. add (n) rainwater catchment system | $5,000 |
| Aug 22, 2018 | Completed final sign-off Mar 2022 | 918 Alabama St | revision to pa 2018-0525-0271 to update section 317 demo calculation per scope of work under pa 2018-0525-0271 permit is for administratvie purposes only. no change in scope work under previously approved permits. enforcement case no 2018-008750 enf due to dry rot discovery at front of stairDetails
revision to pa 2018-0525-0271 to update section 317 demo calculation per scope of work under pa 2018-0525-0271 permit is for administratvie purposes only. no change in scope work under previously approved permits. enforcement case no 2018-008750 enf due to dry rot discovery at front of stair | |
| May 25, 2018 | Completed final sign-off Mar 2022 | 918 Alabama St | comply with dbi correction 5/23/18 201864222. revision to 201702028503 to clarify removal of existing slab on grade and excavatoin below slab (no increase in depth) remove e front entry stair and replace in kind. repair dryrot in 2 locations. revision to foundation detail to reflect field conditionsDetails
comply with dbi correction 5/23/18 201864222. revision to 201702028503 to clarify removal of existing slab on grade and excavatoin below slab (no increase in depth) remove e front entry stair and replace in kind. repair dryrot in 2 locations. revision to foundation detail to reflect field conditions | |
| Apr 25, 2018 | Completed final sign-off Apr 2018 | 1783 Noe St | renew for final 201407111073 final onlyDetails
renew for final 201407111073 final only | |
| Nov 20, 2017 | Completed final sign-off Mar 2023 | 3880 19th St | rear yard. re-grading & raising rear yard in (e) 45% setback. (n) concrete retaining wall & stair. variance application submitted separately. planning: tree planting in #201501206104Details
rear yard. re-grading & raising rear yard in (e) 45% setback. (n) concrete retaining wall & stair. variance application submitted separately. planning: tree planting in #201501206104 | $10,000 |
| Feb 2, 2017 | Completed final sign-off Mar 2022 | 918 Alabama St | interior & exterior renovation of (e) 3-story house. raise & flatten roof. (n) bedrooms & bathrooms @ 3rd storyDetails
interior & exterior renovation of (e) 3-story house. raise & flatten roof. (n) bedrooms & bathrooms @ 3rd story | $525,000 |
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 2536 Greenwich St | construct new deck connect to lower floor - 2 1/2 feet above groundDetails
construct new deck connect to lower floor - 2 1/2 feet above ground | $20,000 |
| Oct 7, 2016 | Completed final sign-off Oct 2018 | 2536 Greenwich St | revision to pa#201411141578 to revise structural plan.Details
revision to pa#201411141578 to revise structural plan. | |
| Sep 12, 2016 | Completed final sign-off Jul 2020 | 2266 Bay St | remodel existing two story home. add two new stories. add rear addition. two new bedrooms and 3.5 bath net. fire sprinkler under separate permit. ** maher: n/a **Details
remodel existing two story home. add two new stories. add rear addition. two new bedrooms and 3.5 bath net. fire sprinkler under separate permit. ** maher: n/a ** | $800,000 |
| Apr 22, 2016 | Never finaled issued Apr 2016, no final | 2536 Greenwich St | pre-construction investigation of (e) electrical, plumbing and structural system for pa#201411141578. site permit issued. remove sheetrock for exploratory demo only. no new construction -sheetrock removal only at base & head of walls for exploratory demo.Details
pre-construction investigation of (e) electrical, plumbing and structural system for pa#201411141578. site permit issued. remove sheetrock for exploratory demo only. no new construction -sheetrock removal only at base & head of walls for exploratory demo. | $30,000 |
| Jan 27, 2016 | Never finaled issued Jan 2016, no final | 229 Jersey St | add 6' wooden fence to top of concrete retaining wallDetails
add 6' wooden fence to top of concrete retaining wall | $5,000 |
| Apr 15, 2015 | Completed final sign-off Nov 2015 | 2146 Bay St | revision to appl. #2013.1016.0430 to change fire sprinkler system requirement from nfpa13 to nfpa13r. maher n/a.Details
revision to appl. #2013.1016.0430 to change fire sprinkler system requirement from nfpa13 to nfpa13r. maher n/a. | |
| Nov 14, 2014 | Never finaled issued Mar 2016, no final | 2536 Greenwich St | interior and exterior remodel of an existing single familydwelling by changing the floor plans and front facade elevations. ** maher: compliance with ordinance no# 155-13 not required **Details
interior and exterior remodel of an existing single familydwelling by changing the floor plans and front facade elevations. ** maher: compliance with ordinance no# 155-13 not required ** | $200,000 |
| Nov 12, 2014 | Completed final sign-off Nov 2015 | 2152 Bay St | construct replacement footing to existing shared footing with the adjacent property at 2146 bay st. n/a maher ordinance # 155-13Details
construct replacement footing to existing shared footing with the adjacent property at 2146 bay st. n/a maher ordinance # 155-13 | $15,000 |
| Oct 29, 2014 | Completed final sign-off Nov 2015 | 2140 Bay St | construct foundation replacement to separate the shared footing between 2160 & 2146 bay street.Details
construct foundation replacement to separate the shared footing between 2160 & 2146 bay street. | $10,000 |
| Oct 29, 2014 | Completed final sign-off Jun 2016 | 3838 25th St | revision to pa# 2013/10/03/8444 to add interior stair from garage to 1st floor and revise interior layout at 1st and 2nd floors.Details
revision to pa# 2013/10/03/8444 to add interior stair from garage to 1st floor and revise interior layout at 1st and 2nd floors. | $25,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2018 | 1783 Noe St | to erect 3 stories, no basement, single family dwelling unit building.Details
to erect 3 stories, no basement, single family dwelling unit building. | $850,000 |
| Nov 6, 2013 | Completed final sign-off Jun 2018 | 2025 Castro St | renovate 2-story 2 units building to add new 3rd level, with roof deck and decks at front and rear. full structural upgrade interior remodel per plans, addition of half bath, new elec & plumb. fire sprinklers on new 3/fl.Details
renovate 2-story 2 units building to add new 3rd level, with roof deck and decks at front and rear. full structural upgrade interior remodel per plans, addition of half bath, new elec & plumb. fire sprinklers on new 3/fl. | $450,000 |
| Oct 3, 2013 | Completed final sign-off Jun 2016 | 3838 25th St | leed platinum gut rehab - foundation upgrade, new hvac, elec, plumbing. remodel, small rear horizontal addition. garage reconstruction. basement conversion.Details
leed platinum gut rehab - foundation upgrade, new hvac, elec, plumbing. remodel, small rear horizontal addition. garage reconstruction. basement conversion. | $450,000 |
| Jun 18, 2013 | Completed final sign-off Oct 2013 | 1111 Bay St | #301- replace floor tile, new tub & tile, new shower valve, no lighting change.Details
#301- replace floor tile, new tub & tile, new shower valve, no lighting change. | $5,000 |
| Mar 20, 2012 | Completed final sign-off Oct 2013 | 41 Cervantes Bl | remodel of kitchen & bathroom, replace windows @ side of house not visible from the street, remodel of bathroom & construction of new bath.Details
remodel of kitchen & bathroom, replace windows @ side of house not visible from the street, remodel of bathroom & construction of new bath. | $75,000 |
| Feb 15, 2012 | Completed final sign-off Jun 2012 | 2359 Jackson St | bathroom remodel. new electrical to bathroom. shower walls, tile floor & walls.Details
bathroom remodel. new electrical to bathroom. shower walls, tile floor & walls. | $10,000 |
| Nov 4, 2011 | Completed final sign-off Feb 2014 | 523 Valley St | add bathroom to (e) storage room at lower level. mud & tape (e) in place, drywall, replace 2 (e) windows (same size & same openings). create closet in utility room & close utility room off from garage (add door)Details
add bathroom to (e) storage room at lower level. mud & tape (e) in place, drywall, replace 2 (e) windows (same size & same openings). create closet in utility room & close utility room off from garage (add door) | $15,000 |
| Oct 18, 2011 | Completed final sign-off Jan 2014 | 4365 26th St | horizontal & vertical addition include renovation of (e) home to be 2 stories over basement. family room, 4th bedroom, 2.5 bathrooms to be added. front facade to be modified with widen garage door, bay window to be modified, entry stair to be reconfigured, windows to be modified / replaced.Details
horizontal & vertical addition include renovation of (e) home to be 2 stories over basement. family room, 4th bedroom, 2.5 bathrooms to be added. front facade to be modified with widen garage door, bay window to be modified, entry stair to be reconfigured, windows to be modified / replaced. | $300,000 |
| Oct 12, 2011 | Completed final sign-off Mar 2012 | 1566 Sanchez St | field revision to permit 2008-1224-9167 change wood roof deck to tile, remove planters add colum below fireplace.Details
field revision to permit 2008-1224-9167 change wood roof deck to tile, remove planters add colum below fireplace. | |
| Dec 27, 2010 | Completed final sign-off Mar 2012 | 1566 Sanchez St | to comply with nov# 201082366 of dec 10, 2010 to install temporary shoring and detail sequence of construction. approved pa# 2008.12.24.9167 for referenceDetails
to comply with nov# 201082366 of dec 10, 2010 to install temporary shoring and detail sequence of construction. approved pa# 2008.12.24.9167 for reference | $2,500 |
| Oct 21, 2010 | Completed final sign-off Mar 2012 | 1566 Sanchez St | demo/soft prior to permit 200812249167 approval, deconstruction of house on 1st flr, removal & reuse of doors, windows, woodwork, removal of old plaster, kitchen cabinetsDetails
demo/soft prior to permit 200812249167 approval, deconstruction of house on 1st flr, removal & reuse of doors, windows, woodwork, removal of old plaster, kitchen cabinets | $4,000 |