Back to bathroom remodel contractors
C B C General Contractors
- Based in
- Walnut Creek
- On San Francisco permits
- Oct 2010 to Jun 2019
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 294 days from filing to permit and 690 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2017 | Completed final sign-off Mar 2022 | 918 Alabama St | interior & exterior renovation of (e) 3-story house. raise & flatten roof. (n) bedrooms & bathrooms @ 3rd storyDetails
interior & exterior renovation of (e) 3-story house. raise & flatten roof. (n) bedrooms & bathrooms @ 3rd story | $525,000 |
| Sep 12, 2016 | Completed final sign-off Jul 2020 | 2266 Bay St | remodel existing two story home. add two new stories. add rear addition. two new bedrooms and 3.5 bath net. fire sprinkler under separate permit. ** maher: n/a **Details
remodel existing two story home. add two new stories. add rear addition. two new bedrooms and 3.5 bath net. fire sprinkler under separate permit. ** maher: n/a ** | $800,000 |
| Nov 6, 2013 | Completed final sign-off Jun 2018 | 2025 Castro St | renovate 2-story 2 units building to add new 3rd level, with roof deck and decks at front and rear. full structural upgrade interior remodel per plans, addition of half bath, new elec & plumb. fire sprinklers on new 3/fl.Details
renovate 2-story 2 units building to add new 3rd level, with roof deck and decks at front and rear. full structural upgrade interior remodel per plans, addition of half bath, new elec & plumb. fire sprinklers on new 3/fl. | $450,000 |
| Mar 20, 2012 | Completed final sign-off Oct 2013 | 41 Cervantes Bl | remodel of kitchen & bathroom, replace windows @ side of house not visible from the street, remodel of bathroom & construction of new bath.Details
remodel of kitchen & bathroom, replace windows @ side of house not visible from the street, remodel of bathroom & construction of new bath. | $75,000 |
| Feb 15, 2012 | Completed final sign-off Jun 2012 | 2359 Jackson St | bathroom remodel. new electrical to bathroom. shower walls, tile floor & walls.Details
bathroom remodel. new electrical to bathroom. shower walls, tile floor & walls. | $10,000 |
| Nov 4, 2011 | Completed final sign-off Feb 2014 | 523 Valley St | add bathroom to (e) storage room at lower level. mud & tape (e) in place, drywall, replace 2 (e) windows (same size & same openings). create closet in utility room & close utility room off from garage (add door)Details
add bathroom to (e) storage room at lower level. mud & tape (e) in place, drywall, replace 2 (e) windows (same size & same openings). create closet in utility room & close utility room off from garage (add door) | $15,000 |
| Oct 18, 2011 | Completed final sign-off Jan 2014 | 4365 26th St | horizontal & vertical addition include renovation of (e) home to be 2 stories over basement. family room, 4th bedroom, 2.5 bathrooms to be added. front facade to be modified with widen garage door, bay window to be modified, entry stair to be reconfigured, windows to be modified / replaced.Details
horizontal & vertical addition include renovation of (e) home to be 2 stories over basement. family room, 4th bedroom, 2.5 bathrooms to be added. front facade to be modified with widen garage door, bay window to be modified, entry stair to be reconfigured, windows to be modified / replaced. | $300,000 |