C B C General Contractors
- Based in
- Walnut Creek
- On San Francisco permits
- Oct 2010 to Jun 2019
- Last 24 months
- 0 permits filed
28 permits since 2000: 24 completed, 4 never finaled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 40 days from filing to permit and 910 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2018 | Completed final sign-off Mar 2022 | 918 Alabama St | revision to pa 2018-0525-0271 to update section 317 demo calculation per scope of work under pa 2018-0525-0271 permit is for administratvie purposes only. no change in scope work under previously approved permits. enforcement case no 2018-008750 enf due to dry rot discovery at front of stairDetails
revision to pa 2018-0525-0271 to update section 317 demo calculation per scope of work under pa 2018-0525-0271 permit is for administratvie purposes only. no change in scope work under previously approved permits. enforcement case no 2018-008750 enf due to dry rot discovery at front of stair | |
| May 25, 2018 | Completed final sign-off Mar 2022 | 918 Alabama St | comply with dbi correction 5/23/18 201864222. revision to 201702028503 to clarify removal of existing slab on grade and excavatoin below slab (no increase in depth) remove e front entry stair and replace in kind. repair dryrot in 2 locations. revision to foundation detail to reflect field conditionsDetails
comply with dbi correction 5/23/18 201864222. revision to 201702028503 to clarify removal of existing slab on grade and excavatoin below slab (no increase in depth) remove e front entry stair and replace in kind. repair dryrot in 2 locations. revision to foundation detail to reflect field conditions | |
| Nov 20, 2017 | Completed final sign-off Mar 2023 | 3880 19th St | rear yard. re-grading & raising rear yard in (e) 45% setback. (n) concrete retaining wall & stair. variance application submitted separately. planning: tree planting in #201501206104Details
rear yard. re-grading & raising rear yard in (e) 45% setback. (n) concrete retaining wall & stair. variance application submitted separately. planning: tree planting in #201501206104 | $10,000 |
| Oct 29, 2014 | Completed final sign-off Jun 2016 | 3838 25th St | revision to pa# 2013/10/03/8444 to add interior stair from garage to 1st floor and revise interior layout at 1st and 2nd floors.Details
revision to pa# 2013/10/03/8444 to add interior stair from garage to 1st floor and revise interior layout at 1st and 2nd floors. | $25,000 |
| Oct 18, 2011 | Completed final sign-off Jan 2014 | 4365 26th St | horizontal & vertical addition include renovation of (e) home to be 2 stories over basement. family room, 4th bedroom, 2.5 bathrooms to be added. front facade to be modified with widen garage door, bay window to be modified, entry stair to be reconfigured, windows to be modified / replaced.Details
horizontal & vertical addition include renovation of (e) home to be 2 stories over basement. family room, 4th bedroom, 2.5 bathrooms to be added. front facade to be modified with widen garage door, bay window to be modified, entry stair to be reconfigured, windows to be modified / replaced. | $300,000 |