Michael Mccall
- License
- C15502
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C15502 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Mccall Design Group
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Nov 2017
64 permits since 2000 (architect on 56 permits, authorized agent-others on 3 permits, designer on 3 permits, engineer on 3 permits): 40 completed, 12 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- American Mechanical Inc (3), Dome Construction Corp (3), Skyline Construction (3), Terra Nova Industries (3), Trainor Commercial Construction Inc. (3), Del Smith Design Build (2), Dickinson Cameron Construction Company I (2), Golden Gate Sign Company Inc. (2), Rcm Fire Protection Inc. (2), Shrader & Martinez Const. Inc (2), South Bay Construction (2), The Hatch Group Inc (2), Accel Fire Proctection Services, Acco Engineered Systems Inc. Dba Acco En, Angotti & Reilly Inc., Ayoob & Peery Plumbing Co Inc, Bogart Construction Inc ., Build Group Inc., Christy Construction Co, Doyle Developments, Gci, Inc, Gray West Construction Inc, Hathaway Dinwiddie Co., Integrity Construction Maintenance Inc, Oakstone Construction Inc., Pacific Construction & Mfg., Pinnacle Construction, Inc., Retail Construction Services, Royal Allied Incorporated, Solex Contracting Inc, Timberwolff Construction Inc, Utopia Development Inc.
- Architects
- Thomas Wagner
- Engineers
- Hector Pedraza (3), Wilson Lee (3), Jayson Haines (2), Blake Dilsworth, Christopher Wong, Daniel Lewin, Daniel Schoenberger, David Gonzalez, Henry Hirsch, James Puga, Jeff Elmendorf, Jesus Francisco Sierra, Sara Hamill, Shigey Oshi Moroi, Stuart Lowe, William Klock
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 2 Embarcadero Center | Gray West Construction Inc | ground floor - convert partial stock room into fitting rm/closet, reconfigure cabinet wall in sales area. creat ada fitting rm; 2nd fl - convert closet into pos niche, reconfigure cabinet wall in sales area, install atachere display window, add ada toilet rm sign dual gender. convert w/ada hcfr dimsDetails
ground floor - convert partial stock room into fitting rm/closet, reconfigure cabinet wall in sales area. creat ada fitting rm; 2nd fl - convert closet into pos niche, reconfigure cabinet wall in sales area, install atachere display window, add ada toilet rm sign dual gender. convert w/ada hcfr dims | $185,667 |
| Jul 3, 2017 | Expired or cancelled cancelled Nov 2024 | 3160 20th Av | tenant improvement to (e) pet food retailer including (n) storefront, mechanical equipment, pet wash stations; separate permit for exterior signage.Details
tenant improvement to (e) pet food retailer including (n) storefront, mechanical equipment, pet wash stations; separate permit for exterior signage. | $200,000 | |
| Jun 2, 2017 | Completed final sign-off Sep 2017 | 2083 Union St | Timberwolff Construction Inc | minor ti of (e) retail space to includes update of non load bearing interior partitions, floor finishes, furniture, lighting, electrical work & minor plumbing work. storefront scope includes cosmetic patch, repair, and refresh of (e) finishes, shelving & signage under seperate permit.Details
minor ti of (e) retail space to includes update of non load bearing interior partitions, floor finishes, furniture, lighting, electrical work & minor plumbing work. storefront scope includes cosmetic patch, repair, and refresh of (e) finishes, shelving & signage under seperate permit. | $175,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 90 New Montgomery St | Angotti & Reilly Inc. | 2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13Details
2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13 | $141,000 |
| Nov 9, 2016 | Completed final sign-off Nov 2017 | 2 Embarcadero Center | Dome Construction Corp | space # r-2109: revision to pa#201603041173 for design updates, raise floor, add fixtures & shelving, relocate mech. items. value engineering of displays & location. n/a ordinance #155-13Details
space # r-2109: revision to pa#201603041173 for design updates, raise floor, add fixtures & shelving, relocate mech. items. value engineering of displays & location. n/a ordinance #155-13 | $145,000 |
| Sep 2, 2016 | Never finaled issued Sep 2016, no final | 890 Market St | Acco Engineered Systems Inc. Dba Acco En, American Mechanical Inc | replacement of extg water sourced heat pumps that are old/damaged. (see units indicated) at bsmt and 1st floor. n/a maher ord. 155-13Details
replacement of extg water sourced heat pumps that are old/damaged. (see units indicated) at bsmt and 1st floor. n/a maher ord. 155-13 | $470,000 |
| Jul 11, 2016 | Expired or cancelled cancelled Jan 2026 | 2223 Fillmore St | revision to ref pa 2015 1027 0876: ti of (e) retail space, change of ownership, change from formula retail - black fleese ro formula retail use - intermix. new non bearing partitions, ceilinmg, finishes and hvac. the (e) storefront shall remain.Details
revision to ref pa 2015 1027 0876: ti of (e) retail space, change of ownership, change from formula retail - black fleese ro formula retail use - intermix. new non bearing partitions, ceilinmg, finishes and hvac. the (e) storefront shall remain. | $315,477 | |
| Jul 8, 2016 | Never finaled issued Sep 2016, no final | 256 Grant Av | American Mechanical Inc | revision to 201510220534. add 1 water sourced heat pump.Details
revision to 201510220534. add 1 water sourced heat pump. | $80,000 |
| Mar 31, 2016 | Completed final sign-off Nov 2017 | 2 Embarcadero Center | Dome Construction Corp | install shelving for space r-2109Details
install shelving for space r-2109 | $8,000 |
| Mar 4, 2016 | Completed final sign-off Nov 2017 | 2 Embarcadero Center | Dome Construction Corp | space #r-2109: full remodel of existing retail space, scope includes new storefront, non-bearing interior partition walls,new floor finishes,new paint,new casework & furniture,structural work,electrical work,mechanicalwork, and plumbing work; maher n/aDetails
space #r-2109: full remodel of existing retail space, scope includes new storefront, non-bearing interior partition walls,new floor finishes,new paint,new casework & furniture,structural work,electrical work,mechanicalwork, and plumbing work; maher n/a | $895,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2016 | 3251 20th Av | Del Smith Design Build | ste 138: relocation and expansion of an established massage therapy in ground level, scope includes wall partitions, suspended ceiling, electrical, mechanical and plumbing.Details
ste 138: relocation and expansion of an established massage therapy in ground level, scope includes wall partitions, suspended ceiling, electrical, mechanical and plumbing. | $95,000 |
| Oct 27, 2015 | Never finaled issued Jun 2016, no final | 2223 Fillmore St | Solex Contracting Inc | tenant improvement of an existing retail space including but not limited to the construction of new non-bearing partitions, ceilings, finishes, and hvac. the existing store front shall remain.Details
tenant improvement of an existing retail space including but not limited to the construction of new non-bearing partitions, ceilings, finishes, and hvac. the existing store front shall remain. | $315,477 |
| Oct 22, 2015 | Never finaled issued Oct 2015, no final | 256 Grant Av | American Mechanical Inc | basement & 1st floor: replace select water source heat pumpsDetails
basement & 1st floor: replace select water source heat pumps | $609,400 |
| Sep 16, 2015 | Completed final sign-off Nov 2015 | 33 Powell St | Accel Fire Proctection Services | add & relocate drops for fire sprinklers from existing plugs. 55 sprinklers-9 relocated/ 46 addDetails
add & relocate drops for fire sprinklers from existing plugs. 55 sprinklers-9 relocated/ 46 add | $5,000 |
| Sep 2, 2015 | Completed final sign-off Sep 2015 | 415 De Haro St | South Bay Construction | revision to app #201503130835. bathroom relocation to provide as built in order to obain "co" n/a for maherDetails
revision to app #201503130835. bathroom relocation to provide as built in order to obain "co" n/a for maher | |
| Jul 21, 2015 | Expired or cancelled withdrawn Oct 2015 | 256 Grant Av | storeront repair | $25,000 | |
| Jul 21, 2015 | Expired or cancelled withdrawn Aug 2015 | 256 Grant Av | minor interior modifications and refresh. replacement of select water source heat pumps.Details
minor interior modifications and refresh. replacement of select water source heat pumps. | $563,079 | |
| Jul 7, 2015 | Completed final sign-off Apr 2016 | 2142 Fillmore St | Doyle Developments | remove 2 (e) counters,rise up toe kick from 4" to 8" & put 2 (e) counters on top of new 8" toe kick,install 4 shelves, paint,floorDetails
remove 2 (e) counters,rise up toe kick from 4" to 8" & put 2 (e) counters on top of new 8" toe kick,install 4 shelves, paint,floor | $12,000 |
| Jul 1, 2015 | Completed final sign-off Aug 2015 | 415 De Haro St | Terra Nova Industries | revision ap# 201503231587 & 201506259877. change of egress per plan. maher n/a.Details
revision ap# 201503231587 & 201506259877. change of egress per plan. maher n/a. | |
| Jun 22, 2015 | Never finaled issued Sep 2015, no final | 300 Folsom St | Trainor Commercial Construction Inc. | t.i.- construction of coffee ship, 1990 sq.ft., install wall partitions, susp. ceiling, plumbing, electrical. installation of food service equipment. modify fire sprinklers, mechanical system. n/a ordinance #155-13Details
t.i.- construction of coffee ship, 1990 sq.ft., install wall partitions, susp. ceiling, plumbing, electrical. installation of food service equipment. modify fire sprinklers, mechanical system. n/a ordinance #155-13 | $250,000 |
| Mar 23, 2015 | Completed final sign-off Oct 2015 | 415 De Haro St | Terra Nova Industries | ground floor: ti for coffee shop on ground level space of (e) 4 story mixed use blg. installation of wall partitions, susp clg, cabinets, food service equip, mech, elect & plum systems. modify (e) sprinklers & fire alarms - first time tenant of space. maher - not req'dDetails
ground floor: ti for coffee shop on ground level space of (e) 4 story mixed use blg. installation of wall partitions, susp clg, cabinets, food service equip, mech, elect & plum systems. modify (e) sprinklers & fire alarms - first time tenant of space. maher - not req'd | $250,000 |
| Mar 13, 2015 | Completed final sign-off Sep 2015 | 415 De Haro St | South Bay Construction | tenant improvement to a landlord provided empty sheell space. new concrete topping slab over e mat foundation, new floor finishes, interior non bearing ealls, new paint, casework, furniture, elec, mech units and duct work, plumbing, lighting, new suspended ceiling. exteior work includes replacementDetails
tenant improvement to a landlord provided empty sheell space. new concrete topping slab over e mat foundation, new floor finishes, interior non bearing ealls, new paint, casework, furniture, elec, mech units and duct work, plumbing, lighting, new suspended ceiling. exteior work includes replacement | $227,000 |
| Jan 23, 2015 | Never finaled issued Apr 2015, no final | 549 Castro St | Terra Nova Industries | change from vacant commercial space to coffee shop. tenant mprovement remvoe (e) walls, construct (n) partition walls, (n) storefront window, flooring, electrical, plumbing, mech systems. install food service equip & counters.Details
change from vacant commercial space to coffee shop. tenant mprovement remvoe (e) walls, construct (n) partition walls, (n) storefront window, flooring, electrical, plumbing, mech systems. install food service equip & counters. | $250,000 |
| Dec 16, 2014 | Completed final sign-off Jan 2017 | 1246 Folsom St | install partition with door.Details
install partition with door. | $2,500 | |
| Nov 19, 2014 | Completed final sign-off Mar 2015 | 865 Market St | Build Group Inc. | space 238: retail t.i. for temporary cosmetic sales store (n) sinage, (n) partitions, (n) ceiling, (n) lighting, (n) fisnishes and display fixtures, modifications to (e) electrical, mechanical, plumbing.; maher n/aDetails
space 238: retail t.i. for temporary cosmetic sales store (n) sinage, (n) partitions, (n) ceiling, (n) lighting, (n) fisnishes and display fixtures, modifications to (e) electrical, mechanical, plumbing.; maher n/a | $185,000 |
| Nov 3, 2014 | Completed final sign-off Apr 2015 | 1258 Minnesota St | Trainor Commercial Construction Inc. | construction of coffee shop in the ground level of an existing 5 story building. scope of work includes installation of wall partitions, cabinets, food service equipment, electrical and plumbing system. n/a ordinance #155-13.Details
construction of coffee shop in the ground level of an existing 5 story building. scope of work includes installation of wall partitions, cabinets, food service equipment, electrical and plumbing system. n/a ordinance #155-13. | $250,000 |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 1 Front St | Gci, Inc | #100-ti a coffee shop in (e) g/f in a 2 story annex bldg connected to a 38 story office bldg, install of non-load bearing partitions, ceilings, food service equipment, millwork, mechanical duct work, electrical/plumbing systems no work at exterior, signal permitted seperately. n/a ord.#155-13Details
#100-ti a coffee shop in (e) g/f in a 2 story annex bldg connected to a 38 story office bldg, install of non-load bearing partitions, ceilings, food service equipment, millwork, mechanical duct work, electrical/plumbing systems no work at exterior, signal permitted seperately. n/a ord.#155-13 | $200,000 |
| Sep 12, 2014 | Completed final sign-off Mar 2019 | 411 Ofarrell St | Del Smith Design Build | tenant improvement to (e) 759 s.f. enclosed mezzanine space located behind double height lobby in youth hostel - work to include removal of interior partiiton & construction of interior millwork project also includes minor plumbing & electrical alteration. n/a maher ordinanceDetails
tenant improvement to (e) 759 s.f. enclosed mezzanine space located behind double height lobby in youth hostel - work to include removal of interior partiiton & construction of interior millwork project also includes minor plumbing & electrical alteration. n/a maher ordinance | $50,000 |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 7 Powell St | 1st floor renovation tenant improvement work of retail store. new partitions, finishes, lighting & electric. mechanical separate permit. n/a maher ordinanceDetails
1st floor renovation tenant improvement work of retail store. new partitions, finishes, lighting & electric. mechanical separate permit. n/a maher ordinance | $295,000 | |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 7 Powell St | 3rd level: renovation tenant improvement work of retail store. new partitions, finishes, fixtures & lighting. mechanical under separate permit. n/a maher ordinance. life safety to be deferred.Details
3rd level: renovation tenant improvement work of retail store. new partitions, finishes, fixtures & lighting. mechanical under separate permit. n/a maher ordinance. life safety to be deferred. | $294,000 | |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 7 Powell St | second level tenant improvement work of retail store. new floor fixtures, finishes, paint, lighting. mechanical under separate permit. n/a maher ordinanceDetails
second level tenant improvement work of retail store. new floor fixtures, finishes, paint, lighting. mechanical under separate permit. n/a maher ordinance | $205,000 | |
| Jun 5, 2014 | Completed final sign-off Dec 2016 | 610 Cortland Av | Royal Allied Incorporated | change of use. minor non structural demolition:new alum. storefront and glzaing, new atm, new accessible restroom. doors, and finishes. remove garage doors. note: level landings under bsm permit, mep under seperate permits. revision has 2 cuts for tree planting in sidewalk.Details
change of use. minor non structural demolition:new alum. storefront and glzaing, new atm, new accessible restroom. doors, and finishes. remove garage doors. note: level landings under bsm permit, mep under seperate permits. revision has 2 cuts for tree planting in sidewalk. | $74,000 |
| Nov 4, 2013 | Expired or cancelled cancelled Dec 2016 | 151 Powell St | erect electric single faced sign | $5,000 | |
| Nov 4, 2013 | Expired or cancelled cancelled Dec 2016 | 151 Powell St | erect non-electric projecting double faced sign | $5,000 | |
| Nov 4, 2013 | Expired or cancelled cancelled Jan 2026 | 151 Powell St | interior remodel of existing gr level retail space at multi upse building. improvements include new partition walls, doors, finishes, and merchandizing fixturesDetails
interior remodel of existing gr level retail space at multi upse building. improvements include new partition walls, doors, finishes, and merchandizing fixtures | $75,000 | |
| Jul 11, 2013 | Completed final sign-off Aug 2016 | 33 Powell St | Golden Gate Sign Company Inc. | erect an electric double faced projecting sign.Details
erect an electric double faced projecting sign. | $8,000 |
| Jul 11, 2013 | Completed final sign-off Aug 2016 | 33 Powell St | Golden Gate Sign Company Inc. | erect an electric single faced projecting sign.Details
erect an electric single faced projecting sign. | $9,000 |
| May 21, 2013 | Completed final sign-off May 2014 | 3936 24th St | Integrity Construction Maintenance Inc | move one office, new carpet, tile, paint, new casework, new non-bearing partition wall.Details
move one office, new carpet, tile, paint, new casework, new non-bearing partition wall. | $40,000 |
| May 8, 2013 | Never finaled issued Jun 2013, no final | 450 Sansome St | Skyline Construction | #120 - revision to appl #2012.12.27.6901: remove existing accessible lift.Details
#120 - revision to appl #2012.12.27.6901: remove existing accessible lift. | |
| Apr 3, 2013 | Expired or cancelled cancelled Jan 2026 | 450 Sansome St | 1st floor suite 120 -revision to appl #2012.12.27.6901: revised workroom layout, all gyp board ceilings, revised to act system, lighting & hvac system.Details
1st floor suite 120 -revision to appl #2012.12.27.6901: revised workroom layout, all gyp board ceilings, revised to act system, lighting & hvac system. | ||
| Dec 27, 2012 | Completed final sign-off Mar 2014 | 450 Sansome St | Skyline Construction | t.i to a landlord provided empty shell space. includes non bearing partition walls, a portion of raised floor with structural foam w/conc top. new floor finishes. new paint, new casework & furniture. elect,mech & plumb, work on ste 120Details
t.i to a landlord provided empty shell space. includes non bearing partition walls, a portion of raised floor with structural foam w/conc top. new floor finishes. new paint, new casework & furniture. elect,mech & plumb, work on ste 120 | $325,000 |
| Dec 13, 2012 | Completed final sign-off Mar 2016 | 33 Powell St | The Hatch Group Inc | scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13Details
scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13 | $1,070,000 |
| Nov 29, 2012 | Never finaled issued Dec 2012, no final | 450 Sansome St | Skyline Construction | exterior windows & doors to part of the lower level of a non-historical downtown high rise bldg. note: (e) window system requires upgrades due to weathering & (e) damaged condition. one window bay will house an atm & night drop fora proposed bank. interior t.i. under separate permit.ext.Details
exterior windows & doors to part of the lower level of a non-historical downtown high rise bldg. note: (e) window system requires upgrades due to weathering & (e) damaged condition. one window bay will house an atm & night drop fora proposed bank. interior t.i. under separate permit.ext. | $30,000 |
| Nov 15, 2012 | Completed final sign-off Mar 2016 | 33 Powell St | The Hatch Group Inc | remodel existing sephora store front at powell str. new entry doors, new signage, new storefront system and stone piers, new metal canopy. new store piers.Details
remodel existing sephora store front at powell str. new entry doors, new signage, new storefront system and stone piers, new metal canopy. new store piers. | $175,000 |
| Jul 3, 2012 | Completed final sign-off Nov 2012 | 865 Market St | work @ space# 3320 & s326 only. revision to pa# 2012/05/24/1200. revise storefront by adding additional portal openings. add wall cabinets and displays. relocate mens room and electrical room in stock room- sprinklers and fire alarm separate permit.Details
work @ space# 3320 & s326 only. revision to pa# 2012/05/24/1200. revise storefront by adding additional portal openings. add wall cabinets and displays. relocate mens room and electrical room in stock room- sprinklers and fire alarm separate permit. | $37,000 | |
| May 24, 2012 | Completed final sign-off Nov 2012 | 865 Market St | Bogart Construction Inc . | interior remodel of extg space #330 and #326. ab 056 certified under pa# 2011/04/21/4569.Details
interior remodel of extg space #330 and #326. ab 056 certified under pa# 2011/04/21/4569. | $1,000,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 135 04th St | Christy Construction Co | 1st floor-remodel frozen yogurt retail kiosk (400 sq ft) at westfield metreon, alteration to counter, electrical, plumbing & space renovation finishes. accessible path of travel is referenced to permit#2010098080463.Details
1st floor-remodel frozen yogurt retail kiosk (400 sq ft) at westfield metreon, alteration to counter, electrical, plumbing & space renovation finishes. accessible path of travel is referenced to permit#2010098080463. | $55,000 |
| Jul 7, 2010 | Completed final sign-off Nov 2010 | 370 04th St | Oakstone Construction Inc. | interior tenant improvement; new interior non-bearing partitions; new paint and flooring throughout; new mechanical, electrical, lighting, and plumbing; fire sprinkler work under separate permiot.-existing to remain.Details
interior tenant improvement; new interior non-bearing partitions; new paint and flooring throughout; new mechanical, electrical, lighting, and plumbing; fire sprinkler work under separate permiot.-existing to remain. | $220,000 |
| May 15, 2009 | Completed final sign-off Jul 2009 | 3251 20th Av | Dickinson Cameron Construction Company I | space #262 t.i.-revision to pa #200901200417, 2 existing shafts in space to remain, relocate int fixtures, finishes, lighting, floor outlets as required, shifted mechanical units & ductwork.Details
space #262 t.i.-revision to pa #200901200417, 2 existing shafts in space to remain, relocate int fixtures, finishes, lighting, floor outlets as required, shifted mechanical units & ductwork. | $20,000 |
| May 7, 2009 | Completed final sign-off Jul 2009 | 3251 20th Av | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements-total heads relocate 59 heads.Details
relocate fire sprinkler heads per tenant improvements-total heads relocate 59 heads. | $9,000 |
| Jan 20, 2009 | Completed final sign-off Jul 2009 | 3251 20th Av | Dickinson Cameron Construction Company I, Hathaway Dinwiddie Co. | space #262 t.i.-combine 2 tenant space,demolish demising wall bet 2 tenant spaces to make 1 larger space,demolish & provide all finishes & fixtures.provide new toilet rooms, ductwork, elec equip,sprinklers,storefront.relocating (e)mall fire hose valve.fire sprinkler,signage under separate permit.Details
space #262 t.i.-combine 2 tenant space,demolish demising wall bet 2 tenant spaces to make 1 larger space,demolish & provide all finishes & fixtures.provide new toilet rooms, ductwork, elec equip,sprinklers,storefront.relocating (e)mall fire hose valve.fire sprinkler,signage under separate permit. | $602,394 |
| Aug 19, 2008 | Completed final sign-off Nov 2008 | 865 Market St | Utopia Development Inc. | retail space 169: remove fitting room partitions and sales fixtures, replace new sales fixtures, new paint and floor finishes, addition of sales floor lighting, all electric separate permit. new awning at front. (inside mall)Details
retail space 169: remove fitting room partitions and sales fixtures, replace new sales fixtures, new paint and floor finishes, addition of sales floor lighting, all electric separate permit. new awning at front. (inside mall) | $88,000 |
| May 29, 2008 | Completed final sign-off Jul 2008 | 3251 20th Av | ti for existing retail space. construct new extended display walls, new display fixtures for sales merchandise, add 4 light fixtures and new outlet locations. (stonestown galleria)Details
ti for existing retail space. construct new extended display walls, new display fixtures for sales merchandise, add 4 light fixtures and new outlet locations. (stonestown galleria) | $14,000 | |
| Apr 20, 2007 | Completed final sign-off Aug 2007 | 2100 Chestnut St | Pacific Construction & Mfg. | remodel(e)retail space sales area only-include remove portion of (e)wall framing to accept new sales floor fixtures&route (e) elec to new fixture.casewk liteing,refinish (e)wood flooring& storefront finishes,repl (e)trackheads&down lites.repaint interior,repl(e)elec fl boxes.adddisabe toilet room...Details
remodel(e)retail space sales area only-include remove portion of (e)wall framing to accept new sales floor fixtures&route (e) elec to new fixture.casewk liteing,refinish (e)wood flooring& storefront finishes,repl (e)trackheads&down lites.repaint interior,repl(e)elec fl boxes.adddisabe toilet room... | $819,000 |
| Feb 21, 2007 | Never finaled issued Feb 2007, no final | 865 Market St | Pinnacle Construction, Inc. | space #330 - to eliminate note 1 of special inspection on seet s01.1 of permit application 200607318139.Details
space #330 - to eliminate note 1 of special inspection on seet s01.1 of permit application 200607318139. | |
| Feb 7, 2007 | Completed final sign-off Apr 2007 | 301 Sutter St | Shrader & Martinez Const. Inc | removal of awnings. repalce glass. remove transom. repaint exterior.Details
removal of awnings. repalce glass. remove transom. repaint exterior. | $250,000 |
| Dec 12, 2006 | Never finaled issued Dec 2006, no final | 845 Market St | Trainor Commercial Construction Inc. | installation of trasformer detail 2nd floorDetails
installation of trasformer detail 2nd floor | |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 865 Market St | Rcm Fire Protection Inc. | to relocate 121 sprinklers from existing outlets, delete 22 existing.Details
to relocate 121 sprinklers from existing outlets, delete 22 existing. | $18,000 |
| Oct 30, 2006 | Completed final sign-off Apr 2007 | 301 Sutter St | Shrader & Martinez Const. Inc | ground floor-demo (e) fixtures, finishes & partitions. construct new partitions, floor finishes, display fixtures. basement-demo (e) fixtures & toilet room. install new storage fixtures, construct new toilety room, (e) partition repair. install new handrails at (e) stair. mei under seperate permit.Details
ground floor-demo (e) fixtures, finishes & partitions. construct new partitions, floor finishes, display fixtures. basement-demo (e) fixtures & toilet room. install new storage fixtures, construct new toilety room, (e) partition repair. install new handrails at (e) stair. mei under seperate permit. | $90,000 |
| Aug 30, 2006 | Never finaled issued Sep 2006, no final | 845 Market St | Rcm Fire Protection Inc. | olive oil, space# 227. 2/fl, cti-4, sp.Details
olive oil, space# 227. 2/fl, cti-4, sp. | $10,000 |
| Jul 31, 2006 | Completed final sign-off Mar 2007 | 865 Market St | remodel of (e) retail space @ s.f. center. sales, non sales & storefront area. partitions, door, fixtures, ceiling, etc. minor mep work. all exterior h/c accessibility upgrade under appl#200511077585Details
remodel of (e) retail space @ s.f. center. sales, non sales & storefront area. partitions, door, fixtures, ceiling, etc. minor mep work. all exterior h/c accessibility upgrade under appl#200511077585 | $349,720 | |
| Mar 2, 2006 | Expired or cancelled expired Feb 2009 | 845 Market St | Retail Construction Services | cti-2, 3rd floor, space 333, el, me. retail tenant build out/new demising wall / new electical/new hvac and altered plumbing.Details
cti-2, 3rd floor, space 333, el, me. retail tenant build out/new demising wall / new electical/new hvac and altered plumbing. | $105,000 |
| Dec 23, 2002 | Completed final sign-off Jan 2003 | 2390 Market St | add security gate at parking lot per app #200111284040Details
add security gate at parking lot per app #200111284040 | $7,000 | |
| Sep 24, 2001 | Completed final sign-off Jun 2004 | 1403 Mcallister St | remodel of kitchens; addition of bathrooms;rmdl exist bathrooms. minor hall alteration on one floorDetails
remodel of kitchens; addition of bathrooms;rmdl exist bathrooms. minor hall alteration on one floor | $30,000 |