Marco Fung
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Constructive Solutions
- Based in
- San Mateo
- On San Francisco permits
- Jul 2004 to Oct 2026
182 permits since 2000 (architect on 171 permits, engineer on 6 permits, designer on 4 permits, authorized agent-others on 2 permits): 112 completed, 31 in progress, 19 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 182.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 1644 Haight St | M Bay Area Construction Inc | remove existing mezzanine 763 sf.Details
remove existing mezzanine 763 sf. | $25,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 525 Market St | Bcci Construction Company | installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqftDetails
installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft | $35,000 |
| Jul 6, 2026 | Completed final sign-off Aug 2026 | 350 California St | C C I Commercial Construction & Improv | construction revision to 202605060831: add 4 additoinal phone booths for a total of 11.Details
construction revision to 202605060831: add 4 additoinal phone booths for a total of 11. | $20,000 |
| Jul 2, 2026 | In progress filed Jul 2026, not yet issued | 2401 Ingalls St | interior soft demo of existing office space within recycling center due to fire damage. tenant improvement will be done on separate pemrit to comply with nov#202650332. clean up only.Details
interior soft demo of existing office space within recycling center due to fire damage. tenant improvement will be done on separate pemrit to comply with nov#202650332. clean up only. | $10,000 | |
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 601 Townsend St | Bcci Construction Company | 1/f: dishwasher replacement. structural, electrical and mep drawings included.Details
1/f: dishwasher replacement. structural, electrical and mep drawings included. | $224,342 |
| May 11, 2026 | In progress filed May 2026, not yet issued | 568 Mississippi St | unit 566-568: remove unpermitted electrical + plumbing done by piror owner. comply nov # 202184396.Details
unit 566-568: remove unpermitted electrical + plumbing done by piror owner. comply nov # 202184396. | ||
| May 6, 2026 | Completed final sign-off Aug 2026 | 351 California St | Constructive Solutions Inc. | 13/f: phone booths installation.Details
13/f: phone booths installation. | $15,000 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 350 California St | C C I Commercial Construction & Improv | 4/f: installation of (7) phone booths x 13sf = 91 sf.Details
4/f: installation of (7) phone booths x 13sf = 91 sf. | $40,000 |
| Apr 15, 2026 | In progress issued Apr 2026 | 351 California St | Constructive Solutions Inc. | 15/f- soft demolition - existing exterior furring wall to be removed from interior side to expose existing brick finishing. ab-017 appliesDetails
15/f- soft demolition - existing exterior furring wall to be removed from interior side to expose existing brick finishing. ab-017 applies | $4,000 |
| Mar 4, 2026 | Completed final sign-off Sep 2026 | 890 Jackson St | Transform Builder Inc | 2nd and 3rd/fl- interior soft demo of non loading bearing and non shearing wall, door, ceiling, flooring, mechanical , plumbing and electrical utilities inside the suite.Details
2nd and 3rd/fl- interior soft demo of non loading bearing and non shearing wall, door, ceiling, flooring, mechanical , plumbing and electrical utilities inside the suite. | $20,000 |
| Feb 20, 2026 | In progress filed Feb 2026, not yet issued | 4534 Mission St | units (1,2,3,4,8): residential units remodeling with layout reconfiguration, bathroom remodeling, kitchen cabinet, sink and hood replacement. no exterior work.Details
units (1,2,3,4,8): residential units remodeling with layout reconfiguration, bathroom remodeling, kitchen cabinet, sink and hood replacement. no exterior work. | $100,000 | |
| Feb 3, 2026 | In progress issued Feb 2026 | 2311 Taraval St | Hillhouse Construction Company Inc | revision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202Details
revision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202 | $1,500 |
| Jan 22, 2026 | In progress issued Jan 2026 | 4534 Mission St | Anton Electric | remove existing redundant stairs and provide flooring at the closet about 40 sf of interior workDetails
remove existing redundant stairs and provide flooring at the closet about 40 sf of interior work | $8,500 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 22 04th St | C C I Commercial Construction & Improv | 13/f: installation of 2 - 32sq.ft. phone booths.Details
13/f: installation of 2 - 32sq.ft. phone booths. | $23,000 |
| Jan 21, 2026 | Expired or cancelled withdrawn Feb 2026 | 2311 Taraval St | revision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate.Details
revision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate. | ||
| Jan 20, 2026 | In progress issued Jan 2026 | 4534 Mission St | Anton Electric | repair of existing fire rated wall at water heater room in basement.Details
repair of existing fire rated wall at water heater room in basement. | $8,000 |
| Dec 23, 2025 | In progress issued Jan 2026 | 351 California St | Constructive Solutions Inc. | ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wallDetails
ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wall | $80,000 |
| Dec 18, 2025 | In progress issued Mar 2026 | 2311 Taraval St | Hillhouse Construction Company Inc | proposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659Details
proposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659 | $160,123 |
| Oct 29, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage.Details
7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage. | $95,000 |
| Oct 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment.Details
7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment. | $125,000 |
| Oct 22, 2025 | Completed final sign-off May 2026 | 351 California St | Constructive Solutions Inc. | 7th/fl- barrier removal: upper an base cabinet with sink, dishwasher (50sf)Details
7th/fl- barrier removal: upper an base cabinet with sink, dishwasher (50sf) | $75,000 |
| Sep 26, 2025 | In progress filed Sep 2025, not yet issued | 525 Market St | revision to pa# 202509122875: revising anchorage detail - anchorage embedment changed from 3" to 2" due to site constraints.Details
revision to pa# 202509122875: revising anchorage detail - anchorage embedment changed from 3" to 2" due to site constraints. | ||
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017.Details
7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017. | $5,000 |
| Sep 5, 2025 | Completed final sign-off Nov 2025 | 22 04th St | C C I Commercial Construction & Improv | 13th/f: installation of phone booth (total 3 - 48 sf) architectural & structural scope. mep deferred.Details
13th/f: installation of phone booth (total 3 - 48 sf) architectural & structural scope. mep deferred. | $23,000 |
| Aug 22, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sfDetails
6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sf | $35,000 |
| Aug 15, 2025 | In progress issued Sep 2025 | 604 Mission St | C C I Commercial Construction & Improv | spec ti (architectural scope) 3rd and 4th floor. non structural interior construction and installation of new finishes and restroom inside existing vacant suite with new break room counter.Details
spec ti (architectural scope) 3rd and 4th floor. non structural interior construction and installation of new finishes and restroom inside existing vacant suite with new break room counter. | $100,000 |
| Aug 12, 2025 | Completed final sign-off Jan 2026 | 525 Market St | Bcci Construction Company | 18 & 14/fl-install phone booth (7) on the 18th floor and (4) on the 14th floor. total work area 121sfDetails
18 & 14/fl-install phone booth (7) on the 18th floor and (4) on the 14th floor. total work area 121sf | $35,000 |
| Jul 28, 2025 | In progress issued Aug 2025 | 2258 Market St | M A C Precision Builders Inc | 1/f: stretch lab tenant improvement. interior demolition for open exercise room. new drinking fountain. lighting replacement. change of use from office to exercise gym.Details
1/f: stretch lab tenant improvement. interior demolition for open exercise room. new drinking fountain. lighting replacement. change of use from office to exercise gym. | $85,000 |
| Jul 25, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair)Details
6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair) | $65,000 |
| Jul 14, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | 6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sfDetails
6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sf | $28,000 |
| Jul 14, 2025 | In progress filed Jul 2025, not yet issued | 2501 Taraval St | 1st/f: infusion center concrete slab replacement, ref to 202311301659Details
1st/f: infusion center concrete slab replacement, ref to 202311301659 | $15,000 | |
| Jul 14, 2025 | In progress issued Jan 2026 | 2311 Taraval St | Hillhouse Construction Company Inc | revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain,Details
revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain, | $10,000 |
| Jul 10, 2025 | In progress filed Jul 2025, not yet issued | 799 Market St | Marchetti Group | 5th floor: lighting replacement inside elevator lobby.Details
5th floor: lighting replacement inside elevator lobby. | $12,000 |
| Jul 9, 2025 | Completed final sign-off Mar 2026 | 799 Market St | Marchetti Group | lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl)Details
lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl) | $50,000 |
| Jun 24, 2025 | Completed final sign-off May 2026 | 351 California St | Constructive Solutions Inc. | 6th fl suite 600: lighting replacement, open office and new executive office improvement, corridor and elevator reception and restroom remodeling.Details
6th fl suite 600: lighting replacement, open office and new executive office improvement, corridor and elevator reception and restroom remodeling. | $125,000 |
| Jun 12, 2025 | Completed final sign-off Dec 2025 | 351 California St | Constructive Solutions Inc. | 9th fl. lighting replacement open office and new executive office improvement corridor and elevator rception for 351 california st. suite 900 and hallwayDetails
9th fl. lighting replacement open office and new executive office improvement corridor and elevator rception for 351 california st. suite 900 and hallway | $85,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 351 California St | Constructive Solutions Inc. | 12th fl. suite 1210: lighting replacement. break room and new executive office improvementDetails
12th fl. suite 1210: lighting replacement. break room and new executive office improvement | $65,000 |
| May 2, 2025 | Completed final sign-off Sep 2025 | 225 Bush St | Bcci Construction Company | 17/fl-install 14 phone booths (10 sf each x 14 = 140 sf) for live ramp at 225 bush st.Details
17/fl-install 14 phone booths (10 sf each x 14 = 140 sf) for live ramp at 225 bush st. | $7,000 |
| May 1, 2025 | In progress filed May 2025, not yet issued | 348 Point Lobos Av | revise pa#2024-1105-4380 to remove existing counter and sink, construct non bearing walls, convert (e) family room to a 2 bedrooms with eero windows along with associated lighting and electrical switches.Details
revise pa#2024-1105-4380 to remove existing counter and sink, construct non bearing walls, convert (e) family room to a 2 bedrooms with eero windows along with associated lighting and electrical switches. | $10,000 | |
| Apr 21, 2025 | In progress filed Apr 2025, not yet issued | 377 Bay St | resturant remodel: remove one restroom, new flooring and wall paneling new roof top unit, new kitchen equipmentDetails
resturant remodel: remove one restroom, new flooring and wall paneling new roof top unit, new kitchen equipment | $350,000 | |
| Mar 26, 2025 | In progress issued Apr 2025 | 351 California St | Constructive Solutions Inc. | interior soft demo for 351 california st, 1st fl non load bearing or lateral structural wall, remove lighting, electrical conduit, plumbing fixture, ceilijng, mechanical register and mechanical ductDetails
interior soft demo for 351 california st, 1st fl non load bearing or lateral structural wall, remove lighting, electrical conduit, plumbing fixture, ceilijng, mechanical register and mechanical duct | $20,000 |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 39 Bannan Pl | Galaxy Building Construction | revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung windowDetails
revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung window | $4,000 |
| Mar 14, 2025 | Completed final sign-off Aug 2026 | 439 Judah St | proposed permeable area at front yard of the house and partially comply nov (additioanl work - permit required per sfbc106.4.7) #202425751. 60 square feet of landscaping, 81 square feet of permeable driveway pavers.Details
proposed permeable area at front yard of the house and partially comply nov (additioanl work - permit required per sfbc106.4.7) #202425751. 60 square feet of landscaping, 81 square feet of permeable driveway pavers. | $10,000 | |
| Mar 13, 2025 | Expired or cancelled withdrawn Sep 2025 | 826 Washington St | to partial abate nov 202302199- to legalize sign c located at side of property double sided non illuminated visible from street. share plans with 202503132209Details
to partial abate nov 202302199- to legalize sign c located at side of property double sided non illuminated visible from street. share plans with 202503132209 | $500 | |
| Mar 13, 2025 | Completed final sign-off Oct 2025 | 826 Washington St | Acer-G Engineering | to partial abate nov 202302199- to include remove sign mounted on building wall at 2nd floor (sign d) and projecting sign (sign c). separte permits to abate the rest of the novDetails
to partial abate nov 202302199- to include remove sign mounted on building wall at 2nd floor (sign d) and projecting sign (sign c). separte permits to abate the rest of the nov | $1,500 |
| Mar 13, 2025 | Completed final sign-off Oct 2025 | 826 Washington St | Acer-G Engineering | to partial abate nov 202302199- to legalize sign b for the arcylic only inside the (e) sign box. share plans with 202503132209/2210/2012. electrify existing sign.Details
to partial abate nov 202302199- to legalize sign b for the arcylic only inside the (e) sign box. share plans with 202503132209/2210/2012. electrify existing sign. | $500 |
| Mar 13, 2025 | Completed final sign-off Oct 2025 | 826 Washington St | Acer-G Engineering | to partial abate nov 202302199- to legalize sign a located at side of property single sided non illuminated visible from street. share plans with 202503132209/2210/2011Details
to partial abate nov 202302199- to legalize sign a located at side of property single sided non illuminated visible from street. share plans with 202503132209/2210/2011 | $500 |
| Feb 27, 2025 | In progress filed Feb 2025, not yet issued | 799 Pacific Av | Amone Corp | new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00Details
new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00 | $10,000 |
| Feb 20, 2025 | In progress issued Apr 2025 | 795 Pacific Av | Amone Corp | new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property lineDetails
new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line | $15,000 |
| Feb 7, 2025 | In progress filed Feb 2025, not yet issued | 377 Bay St | suite a: interior soft demolitionDetails
suite a: interior soft demolition | $9,500 | |
| Jan 7, 2025 | In progress issued Jan 2025 | 799 Pacific Av | Amone Corp | new outdoor fence and gate.Details
new outdoor fence and gate. | $15,000 |
| Dec 6, 2024 | Completed final sign-off Jun 2025 | 1400 Noriega St | Amone Corp | 2nd fl remodel reception desk, soffit, light & security gateDetails
2nd fl remodel reception desk, soffit, light & security gate | $200,000 |
| Oct 7, 2024 | Completed final sign-off Jun 2025 | 1261 Stockton St | First Restaurant Builders | change of use from retail to restaurant. new rooftop unit. electrical panel replacement. tenant improvement new dining, restroom and kitchen.Details
change of use from retail to restaurant. new rooftop unit. electrical panel replacement. tenant improvement new dining, restroom and kitchen. | $350,000 |
| Aug 7, 2024 | Completed final sign-off Sep 2024 | 935 Howard St | Golden Vector Stars Corporation | residential bathroom & kitchen remodel. hvac replacement-new. new mini-split. window like for like replacment on 2/f.Details
residential bathroom & kitchen remodel. hvac replacement-new. new mini-split. window like for like replacment on 2/f. | $50,000 |
| Jul 15, 2024 | Completed final sign-off Dec 2024 | 648 Kearny St | Jzhang's Construciton Inc | remove plumbing fixture at basement to convert restroom to be storage. new ada restroom at first floor. removed existing open kitchen at dining area.Details
remove plumbing fixture at basement to convert restroom to be storage. new ada restroom at first floor. removed existing open kitchen at dining area. | $32,500 |
| Jul 10, 2024 | In progress filed Jul 2024, not yet issued | 933 Howard St | outdoor balcony and outdoor residential stair replacement with new fire rated wall at rearDetails
outdoor balcony and outdoor residential stair replacement with new fire rated wall at rear | $50,000 | |
| Apr 8, 2024 | Completed final sign-off Oct 2024 | 1447 Taraval St | Sodini Enterprises Inc Dba Sodini & Sons | equipment installation: hood, make up air and exhaust fan installation.Details
equipment installation: hood, make up air and exhaust fan installation. | $20,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2024 | 2035 Union St | Zm Builders Inc | revision to 202102100891 -remove and fill in rear exterior door opening for boba cafe. not facing front street. rDetails
revision to 202102100891 -remove and fill in rear exterior door opening for boba cafe. not facing front street. r | $1,000 |
| Mar 26, 2024 | Completed final sign-off Apr 2025 | 39 Bannan Pl | J P Malveaux Construction | revision to bpa# 202310168693: correct address from 41 bannan pl to 39 bannan place. new layout and location of door, washer and dryer at bathroom. move door at bathroom off hallway relocate washer & dryerDetails
revision to bpa# 202310168693: correct address from 41 bannan pl to 39 bannan place. new layout and location of door, washer and dryer at bathroom. move door at bathroom off hallway relocate washer & dryer | |
| Mar 8, 2024 | Completed final sign-off Jun 2024 | 250 Howard St | Gci, Inc | revision to pa# 202308114264, removed exhaust duct and dryer, clarification of no special inspection is required due to no epoxy anchorage to the project, electrical disconnect is changed from 125ato 100a, change of light fixture, change of power outlet.Details
revision to pa# 202308114264, removed exhaust duct and dryer, clarification of no special inspection is required due to no epoxy anchorage to the project, electrical disconnect is changed from 125ato 100a, change of light fixture, change of power outlet. | |
| Feb 14, 2024 | Completed final sign-off May 2024 | 1441 Ocean Av | Amone Corp | 7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4Details
7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4 | |
| Jan 8, 2024 | Expired or cancelled cancelled Oct 2024 | 1447 Taraval St | Sodini Enterprises Inc Dba Sodini & Sons | interior soft demolition per plan. t.i. under separate permit.Details
interior soft demolition per plan. t.i. under separate permit. | $2,000 |
| Dec 14, 2023 | Completed final sign-off May 2024 | 1536 Wallace Av | Amone Corp | demo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170Details
demo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170 | $8,000 |
| Nov 20, 2023 | In progress filed Nov 2023, not yet issued | 3470 Mission St | new cafe remodelingDetails
new cafe remodeling | $40,000 | |
| Nov 1, 2023 | Completed final sign-off May 2024 | 1441 Ocean Av | Amone Corp | conversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf.Details
conversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf. | $160,000 |
| Oct 16, 2023 | In progress issued Nov 2023 | 41 Bannan Pl | J P Malveaux Construction | 2/f: 2 bathroom and kitchen remodel, new location of kitchen, 1-new bedroom.Details
2/f: 2 bathroom and kitchen remodel, new location of kitchen, 1-new bedroom. | $27,000 |
| Sep 22, 2023 | In progress issued Nov 2023 | 1355 Monterey Bl | Bhogal Brothers Construction Inc | relocation of (e) water closet lavatory. power outlet at 2nd floor. 1/f sink relocation.Details
relocation of (e) water closet lavatory. power outlet at 2nd floor. 1/f sink relocation. | $15,000 |
| Aug 11, 2023 | Completed final sign-off Jun 2024 | 250 Howard St | Gci, Inc | gr/f: change of use from retail to exercise studio. new restroom and shower room. new storage.Details
gr/f: change of use from retail to exercise studio. new restroom and shower room. new storage. | $300,000 |
| Aug 4, 2023 | In progress issued Jul 2024 | 3470 Mission St | Waves Remodeling California | to comply with nov 202309077. storefront window replacement due to car crashing to the suite. underslab concrete repair @ basement w/in sidewalk due to car crashing in suiteDetails
to comply with nov 202309077. storefront window replacement due to car crashing to the suite. underslab concrete repair @ basement w/in sidewalk due to car crashing in suite | $35,000 |
| Apr 24, 2023 | Never finaled issued Jul 2023, no final | 2675 Geary Bl | Wtam Builder | ste 100 & e101: from retail to exercise studio. new restroom with plumbing fixtures. new excercise studio. new ceiling, lighting fixture & mech ducts. 2 indoor exhaust fans, new power & data outlets. no juice bar & hot tub.Details
ste 100 & e101: from retail to exercise studio. new restroom with plumbing fixtures. new excercise studio. new ceiling, lighting fixture & mech ducts. 2 indoor exhaust fans, new power & data outlets. no juice bar & hot tub. | $250,000 |
| Apr 21, 2023 | Completed final sign-off Aug 2023 | 579 Howard St | Golden Bay Remodeling Inc, First Restaurant Builders | change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons.Details
change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons. | |
| Apr 18, 2023 | Completed final sign-off Feb 2024 | 1355 Monterey Bl | Bhogal Brothers Construction Inc | convert of existing outdoor covered balcony at 3rd flr to a new bathroom.Details
convert of existing outdoor covered balcony at 3rd flr to a new bathroom. | $100,000 |
| Mar 31, 2023 | Never finaled filed Mar 2023, never issued | 2033 Union St | assembly permit for fire reviewDetails
assembly permit for fire review | ||
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 579 Howard St | Golden Bay Remodeling Inc | accessibility barrier removal. new ada counter.Details
accessibility barrier removal. new ada counter. | $1,500 |
| Feb 1, 2023 | Never finaled issued Feb 2023, no final | 4534 Mission St | Anton Electric | remodel bathroom and replace in kind fixtures at mezz level.Details
remodel bathroom and replace in kind fixtures at mezz level. | $6,300 |
| Jan 30, 2023 | Completed final sign-off Jun 2023 | 475 Connecticut St | Wai-Wong Construction Company | new storage at 1st fl. new kitchen plumbing fixture at 1st fl. new bathroom plumbing fixture at 2nd fl.Details
new storage at 1st fl. new kitchen plumbing fixture at 1st fl. new bathroom plumbing fixture at 2nd fl. | $45,000 |
| Jan 20, 2023 | Completed final sign-off Sep 2024 | 56 Navajo Av | to comply with nov 202301337. legalize the unpermitted storage and bathroom at garage with new exterior window. watar heater replacement (existing 30 gal at 30000btuh: proposed 30 gal at 30000btuh with 0.92% min afue)Details
to comply with nov 202301337. legalize the unpermitted storage and bathroom at garage with new exterior window. watar heater replacement (existing 30 gal at 30000btuh: proposed 30 gal at 30000btuh with 0.92% min afue) | $25,000 | |
| Jan 17, 2023 | Never finaled filed Jan 2023, never issued | 443 Cortland Av | to comply with accessible business entrance program per ord 51-16. accessibility barrier removal of public sidewalk to meet accessible slope at entry and replacement of (e) door lever with ease grip accessible lever at door. ref abe 201912270359Details
to comply with accessible business entrance program per ord 51-16. accessibility barrier removal of public sidewalk to meet accessible slope at entry and replacement of (e) door lever with ease grip accessible lever at door. ref abe 201912270359 | $45,000 | |
| Jan 3, 2023 | In progress issued Sep 2026 | 568 Mississippi St | Kasas Builders Inc | comply w/ nov #202184396: new adu at 1st floor. new electrical meter for adu. new plumbing line for adu. new mini-split system for adu.Details
comply w/ nov #202184396: new adu at 1st floor. new electrical meter for adu. new plumbing line for adu. new mini-split system for adu. | $200,000 |
| Dec 28, 2022 | Never finaled issued Mar 2023, no final | 351 California St | Constructive Solutions Inc. | t.i. of basement space includes new non-load bearing partitions, millwork and finishes. all modifications to mechanical, electrical and plumbing systesm are deferred. convert (e) basement to gymDetails
t.i. of basement space includes new non-load bearing partitions, millwork and finishes. all modifications to mechanical, electrical and plumbing systesm are deferred. convert (e) basement to gym | $165,000 |
| Nov 23, 2022 | Completed final sign-off Mar 2023 | 1869 Union St | Bhogal Brothers Construction Inc | t.i. buildout of fitness studioDetails
t.i. buildout of fitness studio | $125,000 |
| Nov 15, 2022 | Completed final sign-off Dec 2022 | 600 Townsend St | C C I Commercial Construction & Improv | revision to 202209071974 provide accessible door push botton,door operator at ments restroom door in lieu of modificaion of plumbing lines, water closets/toilet partition due to infeasibility of plumbing line modification. modify e private office config,no change area/ftprint.due to no shower availDetails
revision to 202209071974 provide accessible door push botton,door operator at ments restroom door in lieu of modificaion of plumbing lines, water closets/toilet partition due to infeasibility of plumbing line modification. modify e private office config,no change area/ftprint.due to no shower avail | $40,000 |
| Sep 23, 2022 | Never finaled filed Sep 2022, never issued | 2089 Ingalls St | cultivating room, new office, new restroom, new break room, new seared storage.Details
cultivating room, new office, new restroom, new break room, new seared storage. | $10,000 | |
| Sep 7, 2022 | Completed final sign-off Dec 2022 | 600 Townsend St | C C I Commercial Construction & Improv | new hallway, 854sf; restroom improvement to meet current accessibility requirement (+/- 300sf).Details
new hallway, 854sf; restroom improvement to meet current accessibility requirement (+/- 300sf). | $196,000 |
| Aug 26, 2022 | Completed final sign-off Feb 2023 | 3319 Balboa St | new accessible push button to operate the (e) door with automatic door per abe program ordinance 51-16. replace entrance doorDetails
new accessible push button to operate the (e) door with automatic door per abe program ordinance 51-16. replace entrance door | $10,000 | |
| Jul 29, 2022 | Completed final sign-off Oct 2022 | 351 California St | Constructive Solutions Inc. | 12/f: lighting and exit sign replcement at common hallway. common elevator hallway at the 12th floor. maher n/a.Details
12/f: lighting and exit sign replcement at common hallway. common elevator hallway at the 12th floor. maher n/a. | $5,000 |
| Jul 8, 2022 | Completed final sign-off Oct 2023 | 1438 California St | Vortex Industries Inc | accessibility barrier removal of the entry. replacement of existing single door button w/ 36" high accessible push button. abe# 201902125114. accessible business entrance program per ordinance 51-16Details
accessibility barrier removal of the entry. replacement of existing single door button w/ 36" high accessible push button. abe# 201902125114. accessible business entrance program per ordinance 51-16 | $10,000 |
| Feb 11, 2022 | Completed final sign-off Jun 2022 | 128 Spear St | Constructive Solutions Inc. | title 24 compliance. lighting fixtures replacement.sep electrical permit if required.Details
title 24 compliance. lighting fixtures replacement.sep electrical permit if required. | $2,000 |
| Dec 20, 2021 | Completed final sign-off Jan 2022 | 619 17th Av | Anaba Construction Inc | rev to pa202111182697: removal of non-strucutural walls for kitchen & bathroom remodel.Details
rev to pa202111182697: removal of non-strucutural walls for kitchen & bathroom remodel. | |
| Nov 19, 2021 | Completed final sign-off Jul 2023 | 2033 Union St | Ping Hong Liang | slab and footing repair at existing office at rear comply with nov 202184307Details
slab and footing repair at existing office at rear comply with nov 202184307 | $1,500 |
| Oct 20, 2021 | Completed final sign-off Aug 2024 | 2035 Union St | Ping Hong Liang | conversion of fashion boutique to restaurants annex for picking up (owner of this mild tea sales is same as the restaurant) this suite is an annes to the restaurantDetails
conversion of fashion boutique to restaurants annex for picking up (owner of this mild tea sales is same as the restaurant) this suite is an annes to the restaurant | $20,000 |
| Oct 18, 2021 | Completed final sign-off May 2022 | 351 California St | Constructive Solutions Inc. | 5/f: spec tenant improvement with restroom improvement for accessibility. maher n/a.Details
5/f: spec tenant improvement with restroom improvement for accessibility. maher n/a. | $170,466 |
| Oct 14, 2021 | Expired or cancelled cancelled Jan 2026 | 1446 41st Av | remove existing sunroom at 3/f. partial reroofing. replace existing damaged gyp. bedroom and wood structure with new. replace existing damaged deck with new at 2/f (outside the kitchen)Details
remove existing sunroom at 3/f. partial reroofing. replace existing damaged gyp. bedroom and wood structure with new. replace existing damaged deck with new at 2/f (outside the kitchen) | $4,000 | |
| Sep 29, 2021 | Completed final sign-off Apr 2022 | 351 California St | Constructive Solutions Inc. | interior office reconfiguration with break room suite 1110 minor upgrade of e elevator lobby and common fire rated corridor accessibility upgrade of e restroomsDetails
interior office reconfiguration with break room suite 1110 minor upgrade of e elevator lobby and common fire rated corridor accessibility upgrade of e restrooms | $118,963 |
| Sep 9, 2021 | Completed final sign-off Feb 2022 | 143 02nd St | Constructive Solutions Inc. | 5/f -new t bar ceiling @ elevator lobby after (e) wall demolition (e) evac to be remainedDetails
5/f -new t bar ceiling @ elevator lobby after (e) wall demolition (e) evac to be remained | $20,000 |
| Aug 23, 2021 | Completed final sign-off Oct 2021 | 200 California St | Constructive Solutions Inc. | new power and communication outlet @ office. enclosed open office into provide office on 4th floor.Details
new power and communication outlet @ office. enclosed open office into provide office on 4th floor. | $14,500 |
| Jul 8, 2021 | Completed final sign-off Jul 2023 | 2033 Union St | Ping Hong Liang | new ada compliance restrooms, new panic door at entry, new fire exitinguisher. existing hvac serving the restaurant/kitchen existing hood systems to remain as is.Details
new ada compliance restrooms, new panic door at entry, new fire exitinguisher. existing hvac serving the restaurant/kitchen existing hood systems to remain as is. | $30,000 |
| May 12, 2021 | Completed final sign-off Dec 2021 | 185 Berry St | Bevilacqua & Sons | suite 350, room 385, 386: remove existing wall to convert existing lunch room to open breakroom. new sidelite at existing office.Details
suite 350, room 385, 386: remove existing wall to convert existing lunch room to open breakroom. new sidelite at existing office. | $75,000 |
| Apr 6, 2021 | Never finaled issued Jun 2021, no final | 1333 Jones St | J P Lindstrom Inc | unit 1202: kitchen and 2 bathroom remodel; new walk in closetDetails
unit 1202: kitchen and 2 bathroom remodel; new walk in closet | $5,000 |
| Apr 6, 2021 | Expired or cancelled cancelled Jul 2024 | 3470 Mission St | upgrading the egress from rear of the 1st floor.exterior elevation modification due to the seismic upgrade.repair & replace existing rear stair.Details
upgrading the egress from rear of the 1st floor.exterior elevation modification due to the seismic upgrade.repair & replace existing rear stair. | $200,000 |