Lawrence Wong
- Listed as
- architect, engineer
- Firm
- L Wong Engineering
- Based in
- San Francisco
- On San Francisco permits
- Mar 2010 to Oct 2026
106 permits since 2000 (engineer on 105 permits, architect on 1 permit): 64 completed, 21 in progress, 8 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 106.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2026 | In progress filed Oct 2026, not yet issued | 682 Miramar Av | covert (e) detached garage into adu. work to be performed within (e) walls, change roof structure from flat to shed within (e) envelop. no addition or extension. project will comply with all-electric per the sfdbi ab-112.Details
covert (e) detached garage into adu. work to be performed within (e) walls, change roof structure from flat to shed within (e) envelop. no addition or extension. project will comply with all-electric per the sfdbi ab-112. | $500,000 | |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 682 Miramar Av | full interior remodel for bathrooms, kitchen & living spaces. excavation of (e) basement to add more habitable space. replace windows throughout project. add skylight. remove deck.Details
full interior remodel for bathrooms, kitchen & living spaces. excavation of (e) basement to add more habitable space. replace windows throughout project. add skylight. remove deck. | $1,000,000 | |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 131 Parker Av | vertical addition to increase ceiling height @ 1st & 2nd flr,horizontal addition @ 1st & 2nd flr & complete remodel,conversion 1st flr unconditioned space into habitable space. addition of new partial 3rd flr.Details
vertical addition to increase ceiling height @ 1st & 2nd flr,horizontal addition @ 1st & 2nd flr & complete remodel,conversion 1st flr unconditioned space into habitable space. addition of new partial 3rd flr. | $1,000,000 | |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 112 Ellsworth St | renovation of a single-family residence.windows & garage door to be replaced @ front facade.non-code compliant front stairs & structurally compromised front retaining wall to be replaced.gable roof to be extended to rear wall @ existing height.Details
renovation of a single-family residence.windows & garage door to be replaced @ front facade.non-code compliant front stairs & structurally compromised front retaining wall to be replaced.gable roof to be extended to rear wall @ existing height. | $750,000 | |
| Feb 25, 2026 | In progress issued Aug 2026 | 3969 Washington St | Larkspur Builders Inc. | relocate front entry door, landscaping stair and install 3 direct vent gas fireplaces.Details
relocate front entry door, landscaping stair and install 3 direct vent gas fireplaces. | $40,000 |
| Feb 11, 2026 | In progress issued Jul 2026 | 3969 Washington St | Larkspur Builders Inc. | exterior alterations: vertical roof addition / dormer to provide headroom for interior stair to 4th floor. interior alteration: construct new stair to 4th floor.Details
exterior alterations: vertical roof addition / dormer to provide headroom for interior stair to 4th floor. interior alteration: construct new stair to 4th floor. | $150,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 4121 20th St | Doran Construction & Design | revision to pa# 202308235085: extend depth of previously approved rear deck by 3'0" to reconcile to previously approved structure drawings. total new deck depth to be 6'2" with 5'6" extension for spiral stair to grade. all work within buildable lot area. (ref pa# 202507251674)Details
revision to pa# 202308235085: extend depth of previously approved rear deck by 3'0" to reconcile to previously approved structure drawings. total new deck depth to be 6'2" with 5'6" extension for spiral stair to grade. all work within buildable lot area. (ref pa# 202507251674) | $5,000 |
| Jan 28, 2026 | Completed final sign-off Sep 2026 | 650 23rd Av | Perez Construction Llc. | revision to bpa:2025-0728-1762 per field conditions: ground floor: add two grade beams and 2 shearwalls (same location as previously approved) and sump pump; second floor: add shear wall; roof: add one steel beamDetails
revision to bpa:2025-0728-1762 per field conditions: ground floor: add two grade beams and 2 shearwalls (same location as previously approved) and sump pump; second floor: add shear wall; roof: add one steel beam | |
| Jan 9, 2026 | In progress issued Jan 2026 | 145 Ulloa St | Saturn Construction Co | interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath,Details
interior remodel 1st fl. remove (e) concrete slab and portions of ext. wall footings add new concrete slab and footings at removed locations remodel (e) bath, bedroom, family room, hall and int stair. add new laundry bedroom and bath. remodel (e) 2nd fl. living, dining, kitchen, hall bath, | $425,000 |
| Oct 29, 2025 | In progress issued May 2026 | 55 Rosewood Dr | Cameron Builders Sf | horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitcheDetails
horizontal addition @ front, replace all stucco, replace all windows and exterior doors, 2 new skylights, new roof, remove (e) hvac flues & chimney, new hvac, level floor in basement, new footings, slab & waterproofing @ basement, rebuild interior stair & stair railings, new flooring, remodel kitche | $1,600,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 2700 22nd St | Matarozzi/Pelsinger Builders Inc. | addition of an elevator at existing lightwellDetails
addition of an elevator at existing lightwell | $65,000 |
| Jul 16, 2025 | In progress issued Oct 2025 | 249 Santa Rosa Av | C H Burnham Inc | interior remodel and horizontal addition consisting of full interior remodel, horizontal addition at rear first and second level. landscape modification.Details
interior remodel and horizontal addition consisting of full interior remodel, horizontal addition at rear first and second level. landscape modification. | $190,000 |
| Jun 26, 2025 | Completed final sign-off Aug 2026 | 1225 17th Av | C H Burnham Inc | remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical additionDetails
remodel new kitchenette & new window at 1st fl. remodel of kitchen & bathroom at 2nd fl. lighting & electrical upgrades. new boiler for radiant heat att 1st & 2nd fl. no new square footage, no horizontal or vertical addition | $350,000 |
| May 16, 2025 | In progress issued Sep 2025 | 3969 Washington St | Larkspur Builders Inc. | demo 1-story rear addition at rear, 8'x8' roof dormer window, rear yard deck, retain (e) deck firewall. in-fill @ west side blind wall (a0.6 neighbor consent ltr). new rear windows & siding; demo interior partitions & fixtures, remodel interior areas, electrical, plumbing & hvac work; foundationDetails
demo 1-story rear addition at rear, 8'x8' roof dormer window, rear yard deck, retain (e) deck firewall. in-fill @ west side blind wall (a0.6 neighbor consent ltr). new rear windows & siding; demo interior partitions & fixtures, remodel interior areas, electrical, plumbing & hvac work; foundation | $1,500,000 |
| Nov 20, 2024 | Completed final sign-off Mar 2026 | 472 Clipper St | Wyss Construction | renovation of 2 family residence including a new dormer and relocated bathroom at level 4 and a remodeled kitchen bath and relocated bedroom at level 3Details
renovation of 2 family residence including a new dormer and relocated bathroom at level 4 and a remodeled kitchen bath and relocated bedroom at level 3 | $100,000 |
| Nov 19, 2024 | Completed final sign-off Apr 2026 | 900 Chenery St | Barker-O'donoghue Master Bldrs | revision to pa#202101072240. minor re-orginazation to basement media room and media bathroom, minor re-organization of 1st floor kitchen, replacement of 2 metal gates with glass doors, elimination of 2 metal awnings, reduction in cabinetry, simplification of rear yard.Details
revision to pa#202101072240. minor re-orginazation to basement media room and media bathroom, minor re-organization of 1st floor kitchen, replacement of 2 metal gates with glass doors, elimination of 2 metal awnings, reduction in cabinetry, simplification of rear yard. | |
| Nov 4, 2024 | In progress issued Dec 2025 | 511 10th Av | C H Burnham Inc | remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bathDetails
remove non historic exterior cladding; infill under (e) elevated 2 story wing facing rear yard; replace 7 exterior windows; replace windows w/(n) clad windows; 1st fl excavation increase ceiling ht; construct (n) bedrm & (n) bath; 2nd fl - kitchen remodel & (n) powder rm; 3rd fl - remodel 2 (e) bath | $400,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 782 Lakeview Av | C H Burnham Inc | revision to pa # 2022-1230-9538 for changes to s2.1 & s2.2 to be more consistent with approved architectural drawings.Details
revision to pa # 2022-1230-9538 for changes to s2.1 & s2.2 to be more consistent with approved architectural drawings. | $5,000 |
| Oct 3, 2024 | Completed final sign-off Jul 2025 | 2671 17th Av | Mizen Construction Inc | revision to pa # 2022-0304-9310 remove from rear deck scope: demo (e) 2-story rear wood deck & stairs, replace with (n) steel framed decks with spiral stair. minor interior partition changes and changes to (n) exterior window sizesDetails
revision to pa # 2022-0304-9310 remove from rear deck scope: demo (e) 2-story rear wood deck & stairs, replace with (n) steel framed decks with spiral stair. minor interior partition changes and changes to (n) exterior window sizes | |
| Sep 5, 2024 | In progress issued Sep 2024 | 481 Dewey Bl | S A Baxter Inc. | enlarge opening at living room into den at 1st fl. add new bathroom and closet at 2nd fl. no new square footage, no changes to exteriorDetails
enlarge opening at living room into den at 1st fl. add new bathroom and closet at 2nd fl. no new square footage, no changes to exterior | $50,000 |
| Jul 30, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | Mcmahon Construction | revision to pa 202403077342 1st fl demo & rebuild sun room & utility rooms; revise location of originally proposed powder roomDetails
revision to pa 202403077342 1st fl demo & rebuild sun room & utility rooms; revise location of originally proposed powder room | $10,000 |
| May 24, 2024 | Expired or cancelled expired Mar 2026 | 706 15th Av | Sound Build | addition of a new elevator including elevator shaft exterior to replace (e) service stairDetails
addition of a new elevator including elevator shaft exterior to replace (e) service stair | $55,000 |
| Dec 29, 2023 | In progress issued Dec 2024 | 35 Valley St | Christopher Gate Construction Inc, Dan Gillies Construction Services Inc | vertical and horizontal addition and interior remodel of existing single family home, pursuant to 2022-004380cua. mse required for front stair sidewalk encroachment.Details
vertical and horizontal addition and interior remodel of existing single family home, pursuant to 2022-004380cua. mse required for front stair sidewalk encroachment. | $950,000 |
| Dec 22, 2023 | Completed final sign-off Sep 2024 | 330 Roosevelt Wy | Bryce C B Construction Inc | new roof dormer at east side.Details
new roof dormer at east side. | $18,000 |
| Oct 27, 2023 | Completed final sign-off Jul 2024 | 144 25th Av | Mizen Construction Inc | to comply with boa's decision no. 23-030. revision to original pa 202302021229. reconfigure rear deck and stairs. provide structural details for 10' fence.Details
to comply with boa's decision no. 23-030. revision to original pa 202302021229. reconfigure rear deck and stairs. provide structural details for 10' fence. | |
| Oct 10, 2023 | In progress issued May 2024 | 3880 Cesar Chavez St | C H Burnham Inc | revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st.Details
revision to pa# 202108045703. revise primary bath layout. reduce rear yard deck (no fire wall), remove deck stairs, reduce landscape patio at rear. revise kitchen layout. revise 1st fl bathroom layout. revise location of rear-facing windows. no work visible from st. | |
| Aug 23, 2023 | In progress issued Mar 2024 | 4121 20th St | Doran Construction & Design | basement: replace damaged footings, create foyer and interior stair to lower unit. 1st fl: remodel (e) unit, reconfigure entry doors. 2nd fl: lower ceiling height, remodel unit. 3rd fl: legalize habitable attic space & remodel unit & add dormers. exterior: replace windows in-kind wood atDetails
basement: replace damaged footings, create foyer and interior stair to lower unit. 1st fl: remodel (e) unit, reconfigure entry doors. 2nd fl: lower ceiling height, remodel unit. 3rd fl: legalize habitable attic space & remodel unit & add dormers. exterior: replace windows in-kind wood at | $700,000 |
| Jul 25, 2023 | In progress issued Jan 2025 | 447 Hoffman Av | interior remodel & vertical& horizontal addition.converting the 1st level, which is an unconditioned space to habitable space.horizontal addition @ rear,@ first @ 2nd levels.full interior remodel of the second level,modifying the entry level in order to accommodate for a deeper front porch.Details
interior remodel & vertical& horizontal addition.converting the 1st level, which is an unconditioned space to habitable space.horizontal addition @ rear,@ first @ 2nd levels.full interior remodel of the second level,modifying the entry level in order to accommodate for a deeper front porch. | $500,000 | |
| Jun 20, 2023 | Completed final sign-off Aug 2023 | 10 Hillway Av | Initial Construction | remove kitchen wall. install new beam. construct kitchen island.Details
remove kitchen wall. install new beam. construct kitchen island. | $30,000 |
| Mar 29, 2023 | Completed final sign-off Sep 2024 | 559 Liberty St | Macetown Builders Inc, J K Construction Co | replace e rear yard facde french doors & double hung windows w/ new door system, replace e wood trellis w/ steel-wood hybrid type, design in-knd, replace e rear yard elec outlets/lighting, hose bibs &irrigation systems, relocate e rear yard masonry steps, ret.walls & patio w/new cip concrete.Details
replace e rear yard facde french doors & double hung windows w/ new door system, replace e wood trellis w/ steel-wood hybrid type, design in-knd, replace e rear yard elec outlets/lighting, hose bibs &irrigation systems, relocate e rear yard masonry steps, ret.walls & patio w/new cip concrete. | $45,000 |
| Mar 23, 2023 | Completed final sign-off Apr 2024 | 364 16th Av | Alan Wong Construction Inc | remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylightsDetails
remodel and remove wall at kitchen relocate powder room remodel and relocate two full bathrooms new laundry room remove one bedroom replace furnace replace front windows in-kind new rear windows, new skylights | $30,000 |
| Mar 9, 2023 | Completed final sign-off Aug 2024 | 844 Page St | C H Burnham Inc | new 241sf roof deck on existing single-family home located within the required rear yard. roof deck to have open railings. construct new single exit deck access stair. no new bldg envelope increase proposed.Details
new 241sf roof deck on existing single-family home located within the required rear yard. roof deck to have open railings. construct new single exit deck access stair. no new bldg envelope increase proposed. | $100,000 |
| Feb 2, 2023 | Completed final sign-off Jul 2024 | 144 25th Av | Mizen Construction Inc | the project generally consists of replacement of the (e) first floor deck and expanding the deck to the rear - yard setback line; addition of a roof deck above the second br office floor, accessed via 4 new door from the third fl. officeDetails
the project generally consists of replacement of the (e) first floor deck and expanding the deck to the rear - yard setback line; addition of a roof deck above the second br office floor, accessed via 4 new door from the third fl. office | $50,000 |
| Dec 23, 2022 | Completed final sign-off Dec 2025 | 210 Spruce St | Krekow Jennings Inc. | add 303 sf of (n) unconditioned storage space at (e) garage, replace stair from garage to basement, interior partition changes, plumbing/electrical @ garage/basement. no change to bldg envelopeDetails
add 303 sf of (n) unconditioned storage space at (e) garage, replace stair from garage to basement, interior partition changes, plumbing/electrical @ garage/basement. no change to bldg envelope | $225,000 |
| Nov 29, 2022 | In progress issued Oct 2023 | 150 24th Av | Jeff King And Company Inc | renovation & partition changes all (3) flrs. provide (n) mep, fixtures, finishes & fittings. add (1) skylight, replace (1) exterior door & (16) windows. rebuild fencing, gate & add lanscape at (n) rear entry.conver 1st space to habitableDetails
renovation & partition changes all (3) flrs. provide (n) mep, fixtures, finishes & fittings. add (1) skylight, replace (1) exterior door & (16) windows. rebuild fencing, gate & add lanscape at (n) rear entry.conver 1st space to habitable | $200,000 |
| Oct 6, 2022 | In progress issued Feb 2026 | 99 Cedro Av | Hps Palo Alto Inc. | to erect 1 story, no basement, type v-b of a new detached garage.Details
to erect 1 story, no basement, type v-b of a new detached garage. | $40,000 |
| Jul 12, 2022 | Completed final sign-off Mar 2023 | 1554 44th Av | Kingfish Construction Llc. | 1st fl: convert 659sf of habitalbe space: office, bathroom, walk-in closet, den, and laundry within existing envelope. 2nd fl: remodel existing kitchen and bathroom.Details
1st fl: convert 659sf of habitalbe space: office, bathroom, walk-in closet, den, and laundry within existing envelope. 2nd fl: remodel existing kitchen and bathroom. | $250,000 |
| Jun 7, 2022 | Completed final sign-off May 2023 | 737 Moultrie St | Atlas General Construction | (n) deck in (e) lightwell. replace (e) ext stairs & landing. remodel(e) mudroom, partially expand into lightwell.Details
(n) deck in (e) lightwell. replace (e) ext stairs & landing. remodel(e) mudroom, partially expand into lightwell. | $50,000 |
| Apr 25, 2022 | Completed final sign-off May 2023 | 3740 Ulloa St | kitchen remodel. removal of partition wall. recess supporting beam.Details
kitchen remodel. removal of partition wall. recess supporting beam. | $37,500 | |
| Mar 4, 2022 | Completed final sign-off Jul 2025 | 2671 17th Av | Mizen Construction Inc | in-fill (e) 57 sq ft 2-story light court w/ connected horizontal addition over (e) roof. in-fill (e) 9 sf 3-story property line light well. demo (e) 2-story rear wood deck & stairs, replace w/ steel-framed balconies & 1-story spiral stair. shift (e) interior main stair +/- 36" to rear.Details
in-fill (e) 57 sq ft 2-story light court w/ connected horizontal addition over (e) roof. in-fill (e) 9 sf 3-story property line light well. demo (e) 2-story rear wood deck & stairs, replace w/ steel-framed balconies & 1-story spiral stair. shift (e) interior main stair +/- 36" to rear. | $320,000 |
| Jan 12, 2022 | Completed final sign-off Nov 2023 | 2154 Leavenworth St | Hive Builds Inc. | revision to pa 2021-0212-4580 add 7 new skylightsDetails
revision to pa 2021-0212-4580 add 7 new skylights | $5,600 |
| Sep 8, 2021 | Never finaled filed Sep 2021, never issued | 245 Hoffman Av | rear horizontal addition. replace gabled roof w/ (n) flat roof at rear 2nd flr. remodel interior basmnt, 1st & 2nd flrs. replace interior stairs. widen (e) garage. (n) wndws, drs. (n) meps.Details
rear horizontal addition. replace gabled roof w/ (n) flat roof at rear 2nd flr. remodel interior basmnt, 1st & 2nd flrs. replace interior stairs. widen (e) garage. (n) wndws, drs. (n) meps. | $825,000 | |
| Jul 20, 2021 | Completed final sign-off Aug 2024 | 1110 Dolores St | construct 580 soft roof deck w/ perimeter planter on (e) flat roof, construct (n) interior 3rd floor roof access stair w/ retractable skylight upgrade (e) roof framing in areas of deck, relocate (e) plumbing and mechanical roof terminations, extend (e) fireplace chimney to 84" above deckDetails
construct 580 soft roof deck w/ perimeter planter on (e) flat roof, construct (n) interior 3rd floor roof access stair w/ retractable skylight upgrade (e) roof framing in areas of deck, relocate (e) plumbing and mechanical roof terminations, extend (e) fireplace chimney to 84" above deck | $100,000 | |
| Apr 26, 2021 | Completed final sign-off Jul 2022 | 2482 Great Hy | Unicon Construction Solutions Llc | unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floorDetails
unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floor | $120,000 |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 1261 28th Av | interior remmodel of (e) first floor /conversion of 505 sqft from unconditioned to conditioned, relocate bathroom and laundry, creation of new family room, no work at upper floors, no work visible from streetDetails
interior remmodel of (e) first floor /conversion of 505 sqft from unconditioned to conditioned, relocate bathroom and laundry, creation of new family room, no work at upper floors, no work visible from street | $75,000 | |
| Mar 25, 2021 | Never finaled issued Sep 2021, no final | 2458 Vallejo St | Campillo Builders Inc | kitchen remodel with no plumbing location changes. 2 bathrooms remodel with plumbing location changes. minor wall changes including new headers. renovate 2 (e) gas fireplaces. (n) wood flooring. electrical upgrades.Details
kitchen remodel with no plumbing location changes. 2 bathrooms remodel with plumbing location changes. minor wall changes including new headers. renovate 2 (e) gas fireplaces. (n) wood flooring. electrical upgrades. | $500,000 |
| Feb 23, 2021 | Completed final sign-off Apr 2023 | 354 Bradford St | Aguilar Construction | addition of 2 (n) dormers to (e) attic. add (n) interior spiral staircase connect attic & 1st flr. add ductless mini split for attic. add (n) windows at proposed dormers, replace 2 windows in (e) openings 1 front & 1 rear attic, add (n) wall at attic to create storageDetails
addition of 2 (n) dormers to (e) attic. add (n) interior spiral staircase connect attic & 1st flr. add ductless mini split for attic. add (n) windows at proposed dormers, replace 2 windows in (e) openings 1 front & 1 rear attic, add (n) wall at attic to create storage | $80,000 |
| Jan 8, 2021 | Completed final sign-off Mar 2022 | 64 Brentwood Av | Gill Construction | remodel of single family residence to include remodel of (e) stair, kitchen & guest bath. (n) plumbing, electrical, windows, doors, and interior finishes in area of remodel.Details
remodel of single family residence to include remodel of (e) stair, kitchen & guest bath. (n) plumbing, electrical, windows, doors, and interior finishes in area of remodel. | $105,000 |
| Nov 21, 2020 | Expired or cancelled cancelled Jan 2026 | 737 Castro St | Argos Construction | new rear deck in backyard. height=8'6". total size=167 sqft. l-shaped deck. (17'3" x 7'10") + (5'3" x 6'1").Details
new rear deck in backyard. height=8'6". total size=167 sqft. l-shaped deck. (17'3" x 7'10") + (5'3" x 6'1"). | $25,000 |
| Oct 17, 2020 | Never finaled issued Feb 2021, no final | 43 Everson St | Saturn Construction Co | exterior windows & skylights. east & west elevations to be reconfigured and remove 1 wndw. west elev: new window, new skylights on roof. ref pa201601278097/202007210540.Details
exterior windows & skylights. east & west elevations to be reconfigured and remove 1 wndw. west elev: new window, new skylights on roof. ref pa201601278097/202007210540. | $4,000 |
| Jun 23, 2020 | Completed final sign-off Feb 2024 | 42 Walter St | Arbor Homes Inc, Modern Craft Construction | 4 vertical and horizontal addition at rear, full renovation of interior.Details
4 vertical and horizontal addition at rear, full renovation of interior. | $450,000 |
| Feb 20, 2020 | Never finaled issued Aug 2021, no final | 210 Beacon St | Rico's General Construction | vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additionsDetails
vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additions | $100,000 |
| Feb 19, 2020 | Completed final sign-off Feb 2021 | 101 Huntington Dr | 415 Remodeling Inc | lower level remodel to increase conditioned space of residence. (n) conditioned space includes (n) bathroom and (n) nedroom, add 2 windows to (n) bedroom & (n) bathroom.Details
lower level remodel to increase conditioned space of residence. (n) conditioned space includes (n) bathroom and (n) nedroom, add 2 windows to (n) bedroom & (n) bathroom. | $75,000 |
| Feb 12, 2020 | Expired or cancelled withdrawn Feb 2020 | 101 Huntington Dr | 415 Remodeling Inc | remodel of garage level to add approx 341 sqft of (n) conditioned space. (n) conditioned space to include (n) bathroom and (n) bedroom. add (n) window in (n) bathroom; add (n) windows in (n) bedroom, in (n) bedroom an (e) egress window to remain.Details
remodel of garage level to add approx 341 sqft of (n) conditioned space. (n) conditioned space to include (n) bathroom and (n) bedroom. add (n) window in (n) bathroom; add (n) windows in (n) bedroom, in (n) bedroom an (e) egress window to remain. | $100,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 2104 Divisadero St | Rozen Home Builders Inc, Level 8 Construction Inc | rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio,Details
rooms down project - adding a family room with a bathroom. includes new underground plumbing, new electrical, new plumbing. adding new led lights, new high eff forced air system, new patio, | $200,000 |
| Jul 5, 2019 | Completed final sign-off Dec 2020 | 844 Cabrillo St | C H Burnham Inc | renovation to (e) 1/f including (n) master bedrm, (n) closet, (n) bath; modification to (e) interior stairs; window/door changes at rear on 1/f; replacement of 2/f fireplace; minor interior modification at 2/f; 2 lightwell to be replaced in kind; cosmetic upgrades to (e) common hallDetails
renovation to (e) 1/f including (n) master bedrm, (n) closet, (n) bath; modification to (e) interior stairs; window/door changes at rear on 1/f; replacement of 2/f fireplace; minor interior modification at 2/f; 2 lightwell to be replaced in kind; cosmetic upgrades to (e) common hall | $100,000 |
| Jun 27, 2019 | Never finaled issued Mar 2020, no final | 1 Raycliff Tr | Matarozzi/Pelsinger Builders Inc. | new roof deck, access stair, and stair penthouse.Details
new roof deck, access stair, and stair penthouse. | $50,000 |
| May 23, 2019 | Completed final sign-off Nov 2019 | 2640 Divisadero St | Mueller Nicholls Inc | ground level remodel -add 1 guest bedroom, 1 guest bathroom, 1 laundry, and new sliding door at rear.Details
ground level remodel -add 1 guest bedroom, 1 guest bathroom, 1 laundry, and new sliding door at rear. | $50,000 |
| May 1, 2019 | Completed final sign-off Jul 2020 | 283 Richland Av | Kotas Construction Inc | residential remodel of 3-story sfd/ scope includes remodel of 2 bathrooms (relocated), improvements to an (e) bedroom, new sliding door on the rear facade, replacement windows on the east facade and new cabinetry as shown. no other ext work.Details
residential remodel of 3-story sfd/ scope includes remodel of 2 bathrooms (relocated), improvements to an (e) bedroom, new sliding door on the rear facade, replacement windows on the east facade and new cabinetry as shown. no other ext work. | $75,000 |
| Mar 21, 2019 | Never finaled issued Mar 2019, no final | 4219 Lawton St | new bedroom, bathroom, and den in existing 1st fl space. replace (e) rear windows. relocate lw/h & washer/dryer.Details
new bedroom, bathroom, and den in existing 1st fl space. replace (e) rear windows. relocate lw/h & washer/dryer. | $20,000 | |
| Nov 2, 2018 | Completed final sign-off Jun 2022 | 1730 46th Av | Kingfish Construction Llc., Lee Construction | 1st flr remodel & horizongtal addition of 305 sq.st. femodel of 2nd flr. new roof deck(wood) 256 sq.ft.Details
1st flr remodel & horizongtal addition of 305 sq.st. femodel of 2nd flr. new roof deck(wood) 256 sq.ft. | $145,000 |
| Jul 6, 2018 | Completed final sign-off May 2019 | 565 Jersey St | stell framed bridge and landing w/structural glass floor panels from rear of 2nd flr to backyard grade. door & window replacement in modified (e) opening at rear facade. replace guard at (e) rear yard retainin wallDetails
stell framed bridge and landing w/structural glass floor panels from rear of 2nd flr to backyard grade. door & window replacement in modified (e) opening at rear facade. replace guard at (e) rear yard retainin wall | $11,800 | |
| Feb 21, 2018 | Completed final sign-off Jul 2019 | 2 Everson St | Saturn Construction Co, Hymac Construction Inc | 1/f: (n) entertainment rm below (e) living space to include (n) ext doors, (n) elec, mech & insul work. 2/f: (n) office & storage w/(n) access catwalk, below (e) living space to include (n) ext. doors & windows, (n) found, elec, mech & insul work. roof: (n) retractable skylight over e oculus.Details
1/f: (n) entertainment rm below (e) living space to include (n) ext doors, (n) elec, mech & insul work. 2/f: (n) office & storage w/(n) access catwalk, below (e) living space to include (n) ext. doors & windows, (n) found, elec, mech & insul work. roof: (n) retractable skylight over e oculus. | $165,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 651 04th Av | Hing Wah Construction Inc | cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors.Details
cantilever (e) bay window, (n) garage door and person door at 1st floor, (n) facade windows & siding, interior remodel - (n) 1st floor stair, remodeled bathroom, remodel kitchen & baths on 2nd & 3rd floors. | $325,000 |
| Nov 1, 2017 | Expired or cancelled withdrawn Jul 2019 | 210 Maynard St | remove and replace existing concrete and wood framed stairs in existing locatoin extend exiting planter at frontDetails
remove and replace existing concrete and wood framed stairs in existing locatoin extend exiting planter at front | $75,000 | |
| Sep 13, 2017 | Completed final sign-off Feb 2022 | 2355 Scott St | Sure, Inc. | mandatory soft story seismic retrofit per sfebc chapter 4d, design criteria per 2016 cebc appendix a-4.Details
mandatory soft story seismic retrofit per sfebc chapter 4d, design criteria per 2016 cebc appendix a-4. | $35,000 |
| Sep 7, 2017 | Completed final sign-off Aug 2018 | 179 Dolores St | Grizzly Builders Inc. | unit #9 on 4th floor - relocate kitchen & bathroom. new kitchen cabinets, new plumbing fixtures, new lighting, electrical & mechanical. no exterior work, no fire alarm or sprinkler work. ---- relocate kitchen & bathroom ---Details
unit #9 on 4th floor - relocate kitchen & bathroom. new kitchen cabinets, new plumbing fixtures, new lighting, electrical & mechanical. no exterior work, no fire alarm or sprinkler work. ---- relocate kitchen & bathroom --- | $85,000 |
| Jul 13, 2017 | Completed final sign-off Dec 2017 | 55 Exeter St | Cornerstone Dba Ag Construction | kitchen & bathroom remodel. add new stairs to garage.Details
kitchen & bathroom remodel. add new stairs to garage. | $50,000 |
| Jun 6, 2017 | Expired or cancelled cancelled Nov 2022 | 220 Upper Tr | renovation & expansion of top floor including a new bedroom, bathroom, closet & roof deck. expansion of 163 sqft. located at the rear of top floor, see dwgs.Details
renovation & expansion of top floor including a new bedroom, bathroom, closet & roof deck. expansion of 163 sqft. located at the rear of top floor, see dwgs. | $150,000 | |
| May 31, 2017 | Never finaled issued Jul 2017, no final | 88 Clairview Ct | H T H Construction | remodel & relocate kitchen, living, dining & bathroom at 2nd floor to ground floor. conversion of (e) 2nd floor kitchen into home office. creation of laundry/linen at 2nd floor. remov (e) substandard internal stair & replace with new code compliant stair.Details
remodel & relocate kitchen, living, dining & bathroom at 2nd floor to ground floor. conversion of (e) 2nd floor kitchen into home office. creation of laundry/linen at 2nd floor. remov (e) substandard internal stair & replace with new code compliant stair. | $100,000 |
| May 17, 2017 | Completed final sign-off Mar 2018 | 624 Noriega St | Bjlgc Inc | replacement of rear windows to taller windows in same location @ rear of house & replacement of front windows in same size and configuration, all new windows to be aluminum.Details
replacement of rear windows to taller windows in same location @ rear of house & replacement of front windows in same size and configuration, all new windows to be aluminum. | $1,000 |
| Mar 23, 2017 | Completed final sign-off Jun 2017 | 1805 Fillmore St | J M Construction | #304- demo non structural wall in kitchen, add 2 ceiling lights.Details
#304- demo non structural wall in kitchen, add 2 ceiling lights. | $25,000 |
| Oct 13, 2016 | Expired or cancelled cancelled Jan 2026 | 4258 26th St | revision to pa #201412093393s1 - revisions include shotcrete option & use of ordinary steel moment frames instead of special moment frames.Details
revision to pa #201412093393s1 - revisions include shotcrete option & use of ordinary steel moment frames instead of special moment frames. | $1,000 | |
| Oct 4, 2016 | Completed final sign-off Dec 2016 | 3420 Market St | Ca Sunrise Construction Solution Inc | 2nd floor interior renovation of one existing apartment. new lighting, electrical, plumbing, new heaters on apts 1,3,5. no work visible form street, no sprinkler or fire alarm.Details
2nd floor interior renovation of one existing apartment. new lighting, electrical, plumbing, new heaters on apts 1,3,5. no work visible form street, no sprinkler or fire alarm. | $80,000 |
| Aug 16, 2016 | Completed final sign-off Sep 2019 | 495 Chapman St | Nima Construction | to erect 3 stories, no basement, single family dwelling building.Details
to erect 3 stories, no basement, single family dwelling building. | $120,000 |
| Jul 5, 2016 | Completed final sign-off May 2017 | 112 Commonwealth Av | Narrowback Construction Co. | new exterior stucco, new roof, some new windows (front & side of bldg) & two new doors (rear of bldg), a remodeled kitchen, family room & master bedroom.Details
new exterior stucco, new roof, some new windows (front & side of bldg) & two new doors (rear of bldg), a remodeled kitchen, family room & master bedroom. | $68,000 |
| Jun 16, 2016 | Completed final sign-off Jan 2017 | 277 Bradford St | Jln Builders | remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st flDetails
remove (e) wall between kitchen and liv rm. renovate (e) kitchen, remove portion of wall between interior stair and liv rm. renovate/enlarge (e) bath. add 1 closet at ea bdrm. plumb/elec sep permit. interior work only, only struct at bsmt and 1st fl | $85,000 |
| May 20, 2016 | Completed final sign-off Aug 2017 | 52 Landers St | rear bldg - repair & replace (e) foundation. add 2 (n) windows, replace (e) windows.Details
rear bldg - repair & replace (e) foundation. add 2 (n) windows, replace (e) windows. | $50,000 | |
| May 2, 2016 | Completed final sign-off Sep 2016 | 2151 Lombard St | Genuine Construction Inc. | ground fl: revision to pa #2015-0514-6406 - interior minor structural framing for soffit & support for mechanical unit.Details
ground fl: revision to pa #2015-0514-6406 - interior minor structural framing for soffit & support for mechanical unit. | $3,000 |
| Mar 24, 2016 | Completed final sign-off Nov 2016 | 1326 Utah St | Bay Metro Corporation | remove an (e) bearing wall on 3rd floor unit between kitchen & living room, bvetween dining & living room; remodel 2 bathrooms and kitchen in same location and new drywall for unit, new laundry room.Details
remove an (e) bearing wall on 3rd floor unit between kitchen & living room, bvetween dining & living room; remodel 2 bathrooms and kitchen in same location and new drywall for unit, new laundry room. | $8,000 |
| Jul 7, 2015 | Completed final sign-off Dec 2016 | 859 Kansas St | 1st flr - add (n) dewlling unit incl. 1 kitchen, 1 bath, 1 bedrm & new ext patio. 2nd & 3rd flr - renovate incl. kitchen, liv space + bedroom, (n) inter stair, add 2 (n) baths, (n) deck @ 2nd flr 2 (n) shed dormers @ 3rd flr. throughout: some new windows, plbg, elect work as req'd at all levels.Details
1st flr - add (n) dewlling unit incl. 1 kitchen, 1 bath, 1 bedrm & new ext patio. 2nd & 3rd flr - renovate incl. kitchen, liv space + bedroom, (n) inter stair, add 2 (n) baths, (n) deck @ 2nd flr 2 (n) shed dormers @ 3rd flr. throughout: some new windows, plbg, elect work as req'd at all levels. | $425,000 | |
| Jun 1, 2015 | Expired or cancelled cancelled Jan 2026 | 3511 Clay St | revision to appl #2015.0417.3898 - revision includes (n) foundtion at garage level media room. n/a maher ordinanceDetails
revision to appl #2015.0417.3898 - revision includes (n) foundtion at garage level media room. n/a maher ordinance | $5,000 | |
| May 21, 2015 | Expired or cancelled cancelled Jan 2026 | 5243 California St | re-configuration of interior walls @ dining + kitchen. (n) millwork & appliances @ kitchen. (n) bath to replace closet space. n obuilidng expansion, all interior work.Details
re-configuration of interior walls @ dining + kitchen. (n) millwork & appliances @ kitchen. (n) bath to replace closet space. n obuilidng expansion, all interior work. | $25,000 | |
| Mar 17, 2015 | Completed final sign-off Jun 2016 | 709 27th St | Hive Builds Inc. | revision to pa#201301258758-s1 to allow for shotcrete concrete placement instead of cast in place.Details
revision to pa#201301258758-s1 to allow for shotcrete concrete placement instead of cast in place. | |
| Feb 11, 2015 | Completed final sign-off Mar 2016 | 2672 Filbert St | Aaron Gordon Construction Inc | (e) kitchen remodel, replacement of doors, (n) mudroom & laundry construction @ 1/f, removal interior stair between 3/f & 4/f, bathrooms remodel. n/a ordinance #155-13Details
(e) kitchen remodel, replacement of doors, (n) mudroom & laundry construction @ 1/f, removal interior stair between 3/f & 4/f, bathrooms remodel. n/a ordinance #155-13 | $50,000 |
| Dec 23, 2014 | Expired or cancelled withdrawn Jun 2015 | 104 09th Av | interior remodel only: upper unit - remodel (e) kitchen & powder room, replace (e) interior stairs. lower unit - remodel (e) kitchen & relocate (e) bath. add (n) windows & patio doors.Details
interior remodel only: upper unit - remodel (e) kitchen & powder room, replace (e) interior stairs. lower unit - remodel (e) kitchen & relocate (e) bath. add (n) windows & patio doors. | $265,000 | |
| Dec 17, 2014 | Completed final sign-off Jul 2015 | 254 11th Av | Essex General Contractors Inc | revision to appl #2014.1209.3346 - remove bedroom wall, remodel master bath & closets.Details
revision to appl #2014.1209.3346 - remove bedroom wall, remodel master bath & closets. | $25,000 |
| Dec 15, 2014 | Completed final sign-off Nov 2016 | 1238 11th Av | Luo's Construction Company **Check Id*** | kitchen remodel of 1238 11th avenue (lower unit) & add (n) patio door, skylight & windows.Details
kitchen remodel of 1238 11th avenue (lower unit) & add (n) patio door, skylight & windows. | $20,000 |
| Nov 24, 2014 | Completed final sign-off Feb 2016 | 11 Manor Dr | Wesco Construction | renovation of kitchen and 2 bathrooms and closet, new partitions, finishes, plumbing and electrical, new skylight and roof over master bathroom.Details
renovation of kitchen and 2 bathrooms and closet, new partitions, finishes, plumbing and electrical, new skylight and roof over master bathroom. | $60,000 |
| Sep 19, 2014 | Completed final sign-off Mar 2015 | 1501 06th Av | Elisha Mayost | interior renovation of (e) kitchen including (n) plumbing fixtures, appliances, cabinetry, (n) lighting & electrical work as required. enlarge (e) opening between kitchen & dining room, no (n) windows/doors, no change to bldg envelope, add recessed lighting to (e) living & dining rooms.Details
interior renovation of (e) kitchen including (n) plumbing fixtures, appliances, cabinetry, (n) lighting & electrical work as required. enlarge (e) opening between kitchen & dining room, no (n) windows/doors, no change to bldg envelope, add recessed lighting to (e) living & dining rooms. | $50,000 |
| Aug 15, 2014 | Expired or cancelled withdrawn Feb 2015 | 566 46th Av | Frank & Grossman Landscaping Contr Inc | residential remodel&rear expansion:expand(e)1st&2nd flrs,add a 3rd partial flr,which set back 15'0" fr the main front wall.1/fl:family rm w/ bathrm. 2/fl:great rm w/kitchen,dining,living area,powder rm,remodel(e)bathrm.3/fl:mstr bedrm,bathrm&closet.Details
residential remodel&rear expansion:expand(e)1st&2nd flrs,add a 3rd partial flr,which set back 15'0" fr the main front wall.1/fl:family rm w/ bathrm. 2/fl:great rm w/kitchen,dining,living area,powder rm,remodel(e)bathrm.3/fl:mstr bedrm,bathrm&closet. | $575,000 |
| Aug 5, 2014 | Never finaled issued Aug 2014, no final | 148 Ulloa St | Travis General Contractors | revision to app#201406269579. structural foundation repairDetails
revision to app#201406269579. structural foundation repair | $5,000 |
| Jul 29, 2014 | Completed final sign-off May 2015 | 635 04th Av | Hing Wah Construction Inc | relocate second unit to ground floor, square off garage, add new garage door. new wood dual paned windows to replace existing at front, new front door with sidelite. fill in area between bay windows at rear. reduce building @southwest corner. add new deck at 2nd and 3rd flr. six new skylights.Details
relocate second unit to ground floor, square off garage, add new garage door. new wood dual paned windows to replace existing at front, new front door with sidelite. fill in area between bay windows at rear. reduce building @southwest corner. add new deck at 2nd and 3rd flr. six new skylights. | $250,000 |
| Jul 2, 2014 | Completed final sign-off Dec 2014 | 407 39th Av | Cal Am Construction Inc. | revision to pa#201307313202 changes to window sizes and locations on east & south facade, changes to skylight sizes and locations.Details
revision to pa#201307313202 changes to window sizes and locations on east & south facade, changes to skylight sizes and locations. | |
| Jun 10, 2014 | Completed final sign-off Dec 2014 | 447 Clipper St | Aotearoa Construction | remove an existing wall between kitchen and dinning roomDetails
remove an existing wall between kitchen and dinning room | $15,000 |
| Apr 25, 2014 | Completed final sign-off Apr 2015 | 1045 Sanchez St | Loughran Construction Inc. | add new dormers to existing single family. 3rd fl to include new den, office & bath. remodel 1st fl to include new bedroom. remodel 2nd fl, new stairs, new windows in dormers. new skylights in roof.Details
add new dormers to existing single family. 3rd fl to include new den, office & bath. remodel 1st fl to include new bedroom. remodel 2nd fl, new stairs, new windows in dormers. new skylights in roof. | $175,000 |
| Mar 14, 2014 | Completed final sign-off Aug 2015 | 79 Fair Oaks St | Narrowback Construction Co. | addition of stair connecting the first & second levels along north prop line.Details
addition of stair connecting the first & second levels along north prop line. | $13,500 |
| Dec 20, 2013 | Completed final sign-off Aug 2014 | 1140 Diamond St | revise pa#201310159260 to reflect plans dated 12/12/2013. convert existing storage space to bedroom, install 3 steel beams. replace 7 windows, same size.Details
revise pa#201310159260 to reflect plans dated 12/12/2013. convert existing storage space to bedroom, install 3 steel beams. replace 7 windows, same size. | $35,000 | |
| Dec 18, 2013 | Completed final sign-off Mar 2014 | 1 Douglass St | to comply with physical inspection report #cc-7319 legalize existing deck for 203 states street.Details
to comply with physical inspection report #cc-7319 legalize existing deck for 203 states street. | $3,000 | |
| Jun 14, 2013 | Completed final sign-off May 2014 | 1712 Castro St | Hive Builds Inc. | revision to 201111179098: substitute shotcrete in place of cast in place concrete as per structural engineers allowanceDetails
revision to 201111179098: substitute shotcrete in place of cast in place concrete as per structural engineers allowance |