Block 2806, lot 026
245 Hoffman Ave
- City’s use
- Single Family Residential
- Built
- 1903
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,171 sq ft
- Lot
- 2,250 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2021 | Never finaled filed Sep 2021, never issued | 245 Hoffman Av | rear horizontal addition. replace gabled roof w/ (n) flat roof at rear 2nd flr. remodel interior basmnt, 1st & 2nd flrs. replace interior stairs. widen (e) garage. (n) wndws, drs. (n) meps.Details
rear horizontal addition. replace gabled roof w/ (n) flat roof at rear 2nd flr. remodel interior basmnt, 1st & 2nd flrs. replace interior stairs. widen (e) garage. (n) wndws, drs. (n) meps. | $825,000 | |
| Feb 14, 2018 | Completed final sign-off Feb 2018 | 245 Hoffman Av | Planart Construction Corp | complain with nov #201726052. replace water heater, furnace and enclose closet area.Details
complain with nov #201726052. replace water heater, furnace and enclose closet area. | $5,000 |
| Sep 26, 2017 | Completed final sign-off Dec 2017 | 245 Hoffman Av | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $23,000 |
| Jun 9, 2010 | Completed final sign-off Jun 2010 | 245 Hoffman Av | Grey-Design And Build | permit revision to pa 200910209374 for reduction in scope of work, eliminate 2 skylights at (n) master bathDetails
permit revision to pa 200910209374 for reduction in scope of work, eliminate 2 skylights at (n) master bath | |
| Oct 20, 2009 | Completed final sign-off Jun 2010 | 245 Hoffman Av | Grey-Design And Build | second fl: demo (e) bath and non structural wall. convert (e) bath to bedroom. create new full bath. install new lighting. install 2 new skylights over new bathroom. basement: legalize full bathroom.Details
second fl: demo (e) bath and non structural wall. convert (e) bath to bedroom. create new full bath. install new lighting. install 2 new skylights over new bathroom. basement: legalize full bathroom. | $28,000 |
| Jul 22, 2004 | Completed final sign-off Oct 2004 | 245 Hoffman Av | remove/replace kitchen cabinets (upgrade electrical/plumbing), sheetrock/countertops/flooringDetails
remove/replace kitchen cabinets (upgrade electrical/plumbing), sheetrock/countertops/flooring | $30,000 | |
| Nov 30, 2000 | Completed final sign-off Jun 2001 | 245 Hoffman Av | Jjj & K Inc./Dba: Alexander Company | found rotten siding. replacement of woodsiding @ back of home. siding replaced in kind & matching orDetails
found rotten siding. replacement of woodsiding @ back of home. siding replaced in kind & matching or | $5,000 |
| Sep 11, 2000 | Completed final sign-off Oct 2000 | 245 Hoffman Av | Jjj & K Inc./Dba: Alexander Company | 8 windows to be replaced size for sizeDetails
8 windows to be replaced size for size | $17,569 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grey-Design And Build (2), Jjj & K Inc./Dba: Alexander Company (2), Planart Construction Corp, Tom Lee Roofing Inc.
- Architects
- Jennifer Butler
- Engineers
- Lawrence Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.