Permit GraphShortlistSan Francisco building permits since 2000

Marco Fung

License
C32363
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C32363 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer
Firm
Constructive Solutions
Based in
San Mateo
On San Francisco permits
Jul 2004 to Nov 2026

190 permits since 2000 (architect on 178 permits, engineer on 7 permits, designer on 4 permits, authorized agent-others on 2 permits): 112 completed, 37 in progress, 20 never finaled, 21 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Constructive Solutions Inc. (14), Marchetti Group (8), Amone Corp (7), C C I Commercial Construction & Improv (7), Bcci Construction Company (4), Acer-G Engineering (3), Anton Electric (3), Bhogal Brothers Construction Inc (3), Hillhouse Construction Company Inc (3), First Restaurant Builders (2), Gci, Inc (2), Golden Bay Remodeling Inc (2), J P Malveaux Construction (2), Ping Hong Liang (2), Sodini Enterprises Inc Dba Sodini & Sons (2), Anaba Construction Inc, Galaxy Building Construction, Golden Vector Stars Corporation, Jzhang's Construciton Inc, Kasas Builders Inc, M A C Precision Builders Inc, M Bay Area Construction Inc, Samco Construction Inc, Transform Builder Inc., Vortex Industries Inc, Wai-Wong Construction Company, Waves Remodeling California, Wtam Builder, Zm Builders Inc
Architects
Stanley Lew
Engineers
Keith Huen (2), Maria Wahond (2), Mazen Tawasha (2), Alexander Joseph Pacheco, Edward Rivera, Robert Shaffer, Wilson Lee

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 190.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 18, 2026In progress
filed Nov 2026, not yet issued
2089 Ingalls Stchange of use for unit 3 and 4 from s-1 to f-1 per fire department occupancy requirement.
Details
Permit
202611180918

change of use for unit 3 and 4 from s-1 to f-1 per fire department occupancy requirement.

Open the permit page

$75,000
Nov 13, 2026In progress
filed Nov 2026, not yet issued
799 Market St4th floor: 3 new all gender restrooms. new conference room and private office after office reconfigurations.
Details
Permit
202611130720

4th floor: 3 new all gender restrooms. new conference room and private office after office reconfigurations.

Open the permit page

$175,966
Nov 4, 2026In progress
issued Nov 2026
351 California StConstructive Solutions Inc.8th floor: lighting replacement, new break area counter with sink and faucet, wall infill (interior wall), 2 door replacement.
Details
Permit
202611040332
Permit issued
Nov 5, 2026

8th floor: lighting replacement, new break area counter with sink and faucet, wall infill (interior wall), 2 door replacement.

Open the permit page

$45,000
Oct 28, 2026In progress
filed Oct 2026, not yet issued
365 Corbett Avnon-street facing replcement of window and door. replcement of exterior finishes. replacement of rotten balcony, deck and outdoor stairs. electricla meterl and panel, switch, lighting, replcesmth throughout the building. bathroom exhaust fan replacement.
Details
Permit
202610280018

non-street facing replcement of window and door. replcement of exterior finishes. replacement of rotten balcony, deck and outdoor stairs. electricla meterl and panel, switch, lighting, replcesmth throughout the building. bathroom exhaust fan replacement.

Open the permit page

$57,500
Oct 27, 2026In progress
filed Oct 2026, not yet issued
2089 Ingalls Stnew cultivation rooms in unit 4 and add door between unit 3 and 4 for cannabis cultivation
Details
Permit
202610279959

new cultivation rooms in unit 4 and add door between unit 3 and 4 for cannabis cultivation

Open the permit page

$37,500
Oct 27, 2026In progress
issued Nov 2026
3470 Mission Stnew cafe remodeling per planning code limited restaurant.
Details
Permit
202311201165
Permit issued
Nov 18, 2026

new cafe remodeling per planning code limited restaurant.

Open the permit page

$40,000
Oct 27, 2026In progress
filed Oct 2026, not yet issued
2089 Ingalls Stadd door between unit 3 and 4 for cannabis cultivation
Details
Permit
202610279961

add door between unit 3 and 4 for cannabis cultivation

Open the permit page

$37,500
Oct 22, 2026In progress
issued Oct 2026
351 California StConstructive Solutions Inc.suite 810: light replacement, open office,corridor, and elevator reception. ada upgrade to restroom and breakroom. no plumbing work.
Details
Permit
202610229762
Permit issued
Oct 23, 2026

suite 810: light replacement, open office,corridor, and elevator reception. ada upgrade to restroom and breakroom. no plumbing work.

Open the permit page

$80,000
Oct 7, 2026In progress
filed Oct 2026, not yet issued
2109 Polk Stequipment installation for restaurant (no layout change). installation of power door operator per da-04.
Details
Permit
202610079164

equipment installation for restaurant (no layout change). installation of power door operator per da-04.

Open the permit page

$20,000
Oct 5, 2026In progress
issued Oct 2026
1644 Haight StM Bay Area Construction Incremove existing mezzanine 763 sf.
Details
Permit
202610059050
Permit issued
Oct 6, 2026

remove existing mezzanine 763 sf.

Open the permit page

$25,000
Aug 6, 2026In progress
issued Aug 2026
525 Market StBcci Construction Companyinstallation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft
Details
Permit
202608066214
Permit issued
Aug 24, 2026

installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft

Open the permit page

$35,000
Jul 6, 2026Completed
final sign-off Aug 2026
350 California StC C I Commercial Construction & Improvconstruction revision to 202605060831: add 4 additoinal phone booths for a total of 11.
Details
Permit
202607064583
Permit issued
Jul 14, 2026
Final sign-off
Aug 25, 2026

construction revision to 202605060831: add 4 additoinal phone booths for a total of 11.

Open the permit page

$20,000
Jul 2, 2026In progress
issued Nov 2026
2401 Ingalls StSamco Construction Incremoval of unpermitted and fire damaged 2 story structure and outdoor roof to fully comply with nov 202650332. fire damage repair to existing structure and building improvement to current egress requirement
Details
Permit
202607024513
Permit issued
Nov 6, 2026

removal of unpermitted and fire damaged 2 story structure and outdoor roof to fully comply with nov 202650332. fire damage repair to existing structure and building improvement to current egress requirement

Open the permit page

$10,000
Jun 24, 2026Completed
final sign-off Sep 2026
601 Townsend StBcci Construction Company1/f: dishwasher replacement. structural, electrical and mep drawings included.
Details
Permit
202606243840
Permit issued
Jun 25, 2026
Final sign-off
Sep 2, 2026

1/f: dishwasher replacement. structural, electrical and mep drawings included.

Open the permit page

$224,342
May 11, 2026In progress
filed May 2026, not yet issued
568 Mississippi Stunit 566-568: remove unpermitted electrical + plumbing done by piror owner. comply nov # 202184396.
Details
Permit
202605110997

unit 566-568: remove unpermitted electrical + plumbing done by piror owner. comply nov # 202184396.

Open the permit page

May 6, 2026Completed
final sign-off Aug 2026
350 California StC C I Commercial Construction & Improv4/f: installation of (7) phone booths x 13sf = 91 sf.
Details
Permit
202605060831
Permit issued
Jun 18, 2026
Final sign-off
Aug 25, 2026

4/f: installation of (7) phone booths x 13sf = 91 sf.

Open the permit page

$40,000
May 6, 2026Completed
final sign-off Aug 2026
351 California StConstructive Solutions Inc.13/f: phone booths installation.
Details
Permit
202605060805
Permit issued
May 19, 2026
Final sign-off
Aug 21, 2026

13/f: phone booths installation.

Open the permit page

$15,000
Apr 15, 2026In progress
issued Apr 2026
351 California StConstructive Solutions Inc.15/f- soft demolition - existing exterior furring wall to be removed from interior side to expose existing brick finishing. ab-017 applies
Details
Permit
202604159509
Permit issued
Apr 15, 2026

15/f- soft demolition - existing exterior furring wall to be removed from interior side to expose existing brick finishing. ab-017 applies

Open the permit page

$4,000
Mar 4, 2026Completed
final sign-off Sep 2026
890 Jackson StTransform Builder Inc.2nd and 3rd/fl- interior soft demo of non loading bearing and non shearing wall, door, ceiling, flooring, mechanical , plumbing and electrical utilities inside the suite.
Details
Permit
202603046912
Permit issued
May 29, 2026
Final sign-off
Sep 10, 2026

2nd and 3rd/fl- interior soft demo of non loading bearing and non shearing wall, door, ceiling, flooring, mechanical , plumbing and electrical utilities inside the suite.

Open the permit page

$20,000
Feb 20, 2026In progress
filed Feb 2026, not yet issued
4534 Mission Stunits (1,2,3,4,8): residential units remodeling with layout reconfiguration, bathroom remodeling, kitchen cabinet, sink and hood replacement. no exterior work.
Details
Permit
202602206262

units (1,2,3,4,8): residential units remodeling with layout reconfiguration, bathroom remodeling, kitchen cabinet, sink and hood replacement. no exterior work.

Open the permit page

$100,000
Feb 3, 2026In progress
issued Feb 2026
2311 Taraval StHillhouse Construction Company Increvision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202
Details
Permit
202602035160
Permit issued
Feb 12, 2026

revision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202

Open the permit page

$1,500
Jan 22, 2026In progress
issued Jan 2026
4534 Mission StAnton Electricremove existing redundant stairs and provide flooring at the closet about 40 sf of interior work
Details
Permit
202601224288
Permit issued
Jan 23, 2026

remove existing redundant stairs and provide flooring at the closet about 40 sf of interior work

Open the permit page

$8,500
Jan 22, 2026Completed
final sign-off Jun 2026
22 04th StC C I Commercial Construction & Improv13/f: installation of 2 - 32sq.ft. phone booths.
Details
Permit
202601224373
Permit issued
Jan 30, 2026
Final sign-off
Jun 3, 2026

13/f: installation of 2 - 32sq.ft. phone booths.

Open the permit page

$23,000
Jan 21, 2026Expired or cancelled
withdrawn Feb 2026
2311 Taraval Strevision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate.
Details
Permit
202601214203

revision to pa #2023-1130-1659: lower the reception ceiling and infusion center ceiling to accomodate security gate and minor structural connection revisions for security gate.

Open the permit page

Jan 20, 2026In progress
issued Jan 2026
4534 Mission StAnton Electricrepair of existing fire rated wall at water heater room in basement.
Details
Permit
202601204167
Permit issued
Jan 21, 2026

repair of existing fire rated wall at water heater room in basement.

Open the permit page

$8,000
Dec 23, 2025In progress
issued Jan 2026
351 California StConstructive Solutions Inc.ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wall
Details
Permit
202512232502
Permit issued
Jan 21, 2026

ste 1000 - remove existing rooms and t-bar ceiling; lighting replacement @ open office; removing existing walls for new window wall

Open the permit page

$80,000
Dec 18, 2025In progress
issued Mar 2026
2311 Taraval StHillhouse Construction Company Incproposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659
Details
Permit
202512182182
Permit issued
Mar 6, 2026

proposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659

Open the permit page

$160,123
Oct 29, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Group7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage.
Details
Permit
202510298474
Permit issued
Nov 7, 2025
Final sign-off
Mar 3, 2026

7/f suite 700: new lighting and new mechanical duct at open office. deffered permit for pa#2025-1022-7874. lighting replacement at private office, restroom & storage.

Open the permit page

$95,000
Oct 22, 2025Completed
final sign-off May 2026
351 California StConstructive Solutions Inc.7th/fl- barrier removal: upper an base cabinet with sink, dishwasher (50sf)
Details
Permit
202510227917
Permit issued
Nov 7, 2025
Final sign-off
May 20, 2026

7th/fl- barrier removal: upper an base cabinet with sink, dishwasher (50sf)

Open the permit page

$75,000
Oct 22, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Group7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment.
Details
Permit
202510227874
Permit issued
Nov 4, 2025
Final sign-off
Mar 3, 2026

7th floor: spec t.i. (building only). remove existing conf. room for open office. break room remodeling. accessibility work. lavatories replacement, accessible toilet stalls; adjustment at men and women, drinking fountain replacement, urinal adjustment.

Open the permit page

$125,000
Sep 26, 2025In progress
filed Sep 2025, not yet issued
525 Market Strevision to pa# 202509122875: revising anchorage detail - anchorage embedment changed from 3" to 2" due to site constraints.
Details
Permit
202509266263

revision to pa# 202509122875: revising anchorage detail - anchorage embedment changed from 3" to 2" due to site constraints.

Open the permit page

Sep 15, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Group7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017.
Details
Permit
202509155289
Permit issued
Nov 4, 2025
Final sign-off
Mar 3, 2026

7th floor: remove existing t-bar, mechanical utility and lighting at (open office) of the remaining suite (interior soft demolitions). per ab-017.

Open the permit page

$5,000
Sep 5, 2025Completed
final sign-off Nov 2025
22 04th StC C I Commercial Construction & Improv13th/f: installation of phone booth (total 3 - 48 sf) architectural & structural scope. mep deferred.
Details
Permit
202509054715
Permit issued
Sep 17, 2025
Final sign-off
Nov 17, 2025

13th/f: installation of phone booth (total 3 - 48 sf) architectural & structural scope. mep deferred.

Open the permit page

$23,000
Aug 22, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Group6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sf
Details
Permit
202508223756
Permit issued
Aug 25, 2025
Final sign-off
Mar 3, 2026

6/7-floor- internal non egress stair walls patching, interior wall at internal stair patching, 35sf, smoke draft patching at internal stairs 35sf

Open the permit page

$35,000
Aug 15, 2025In progress
issued Sep 2025
604 Mission StC C I Commercial Construction & Improvspec ti (architectural scope) 3rd and 4th floor. non structural interior construction and installation of new finishes and restroom inside existing vacant suite with new break room counter.
Details
Permit
202508153221
Permit issued
Sep 5, 2025

spec ti (architectural scope) 3rd and 4th floor. non structural interior construction and installation of new finishes and restroom inside existing vacant suite with new break room counter.

Open the permit page

$100,000
Aug 12, 2025Completed
final sign-off Jan 2026
525 Market StBcci Construction Company18 & 14/fl-install phone booth (7) on the 18th floor and (4) on the 14th floor. total work area 121sf
Details
Permit
202508122875
Permit issued
Aug 29, 2025
Final sign-off
Jan 6, 2026

18 & 14/fl-install phone booth (7) on the 18th floor and (4) on the 14th floor. total work area 121sf

Open the permit page

$35,000
Jul 28, 2025In progress
issued Aug 2025
2258 Market StM A C Precision Builders Inc1/f: stretch lab tenant improvement. interior demolition for open exercise room. new drinking fountain. lighting replacement. change of use from office to exercise gym.
Details
Permit
202507281750
Permit issued
Aug 25, 2025

1/f: stretch lab tenant improvement. interior demolition for open exercise room. new drinking fountain. lighting replacement. change of use from office to exercise gym.

Open the permit page

$85,000
Jul 25, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Group6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair)
Details
Permit
202507251632
Permit issued
Aug 21, 2025
Final sign-off
Mar 3, 2026

6th & 7th/f: lighting replacement 2 elevator lobby, open office at ste 600 & 700, break room at ste# 700. mech duct replacemenr at open office suites 600 & 700 (suite 600 & 700 are single suite w/ e) internal stair)

Open the permit page

$65,000
Jul 14, 2025In progress
filed Jul 2025, not yet issued
2501 Taraval St1st/f: infusion center concrete slab replacement, ref to 202311301659
Details
Permit
202507140766

1st/f: infusion center concrete slab replacement, ref to 202311301659

Open the permit page

$15,000
Jul 14, 2025In progress
issued Jan 2026
2311 Taraval StHillhouse Construction Company Increvision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain,
Details
Permit
202506209135
Permit issued
Jan 15, 2026

revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain,

Open the permit page

$10,000
Jul 14, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Group6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sf
Details
Permit
202507140713
Permit issued
Aug 21, 2025
Final sign-off
Mar 3, 2026

6/f -interior soft demolition: existing non load bearig wall to be removed. remove (e) door (e) stair and guard to remanin, remove (e) t-bar ceiling and lighting at hatched area 6065 sf

Open the permit page

$28,000
Jul 10, 2025In progress
filed Jul 2025, not yet issued
799 Market StMarchetti Group5th floor: lighting replacement inside elevator lobby.
Details
Permit
202507100576

5th floor: lighting replacement inside elevator lobby.

Open the permit page

$12,000
Jul 9, 2025Completed
final sign-off Mar 2026
799 Market StMarchetti Grouplighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl)
Details
Permit
202507090444
Permit issued
Aug 21, 2025
Final sign-off
Mar 25, 2026

lighting replacement, 3 power receptacles at main lobby, 1742 sf (1st fl)

Open the permit page

$50,000
Jun 24, 2025Completed
final sign-off May 2026
351 California StConstructive Solutions Inc.6th fl suite 600: lighting replacement, open office and new executive office improvement, corridor and elevator reception and restroom remodeling.
Details
Permit
202506249359
Permit issued
Jun 30, 2025
Final sign-off
May 21, 2026

6th fl suite 600: lighting replacement, open office and new executive office improvement, corridor and elevator reception and restroom remodeling.

Open the permit page

$125,000
Jun 12, 2025Completed
final sign-off Dec 2025
351 California StConstructive Solutions Inc.9th fl. lighting replacement open office and new executive office improvement corridor and elevator rception for 351 california st. suite 900 and hallway
Details
Permit
202506128542
Permit issued
Jun 30, 2025
Final sign-off
Dec 1, 2025

9th fl. lighting replacement open office and new executive office improvement corridor and elevator rception for 351 california st. suite 900 and hallway

Open the permit page

$85,000
Jun 6, 2025In progress
issued Jun 2025
351 California StConstructive Solutions Inc.12th fl. suite 1210: lighting replacement. break room and new executive office improvement
Details
Permit
202506068132
Permit issued
Jun 30, 2025

12th fl. suite 1210: lighting replacement. break room and new executive office improvement

Open the permit page

$65,000
May 2, 2025Completed
final sign-off Sep 2025
225 Bush StBcci Construction Company17/fl-install 14 phone booths (10 sf each x 14 = 140 sf) for live ramp at 225 bush st.
Details
Permit
202505025733
Permit issued
May 19, 2025
Final sign-off
Sep 15, 2025

17/fl-install 14 phone booths (10 sf each x 14 = 140 sf) for live ramp at 225 bush st.

Open the permit page

$7,000
May 1, 2025In progress
filed May 2025, not yet issued
348 Point Lobos Avrevise pa#2024-1105-4380 to remove existing counter and sink, construct non bearing walls, convert (e) family room to a 2 bedrooms with eero windows along with associated lighting and electrical switches.
Details
Permit
202505015652

revise pa#2024-1105-4380 to remove existing counter and sink, construct non bearing walls, convert (e) family room to a 2 bedrooms with eero windows along with associated lighting and electrical switches.

Open the permit page

$10,000
Apr 21, 2025In progress
filed Apr 2025, not yet issued
377 Bay Stresturant remodel: remove one restroom, new flooring and wall paneling new roof top unit, new kitchen equipment
Details
Permit
202504214877

resturant remodel: remove one restroom, new flooring and wall paneling new roof top unit, new kitchen equipment

Open the permit page

$350,000
Mar 26, 2025In progress
issued Apr 2025
351 California StConstructive Solutions Inc.interior soft demo for 351 california st, 1st fl non load bearing or lateral structural wall, remove lighting, electrical conduit, plumbing fixture, ceilijng, mechanical register and mechanical duct
Details
Permit
202503263062
Permit issued
Apr 3, 2025

interior soft demo for 351 california st, 1st fl non load bearing or lateral structural wall, remove lighting, electrical conduit, plumbing fixture, ceilijng, mechanical register and mechanical duct

Open the permit page

$20,000
Mar 24, 2025Completed
final sign-off Apr 2025
39 Bannan PlGalaxy Building Constructionrevision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung window
Details
Permit
202503242893
Permit issued
Apr 9, 2025
Final sign-off
Apr 25, 2025

revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung window

Open the permit page

$4,000
Mar 14, 2025Completed
final sign-off Aug 2026
439 Judah Stproposed permeable area at front yard of the house and partially comply nov (additioanl work - permit required per sfbc106.4.7) #202425751. 60 square feet of landscaping, 81 square feet of permeable driveway pavers.
Details
Permit
202503142287
Permit issued
Apr 23, 2025
Final sign-off
Aug 3, 2026

proposed permeable area at front yard of the house and partially comply nov (additioanl work - permit required per sfbc106.4.7) #202425751. 60 square feet of landscaping, 81 square feet of permeable driveway pavers.

Open the permit page

$10,000
Mar 13, 2025Completed
final sign-off Oct 2025
826 Washington StAcer-G Engineeringto partial abate nov 202302199- to legalize sign b for the arcylic only inside the (e) sign box. share plans with 202503132209/2210/2012. electrify existing sign.
Details
Permit
202503132211
Permit issued
Sep 25, 2025
Final sign-off
Oct 9, 2025

to partial abate nov 202302199- to legalize sign b for the arcylic only inside the (e) sign box. share plans with 202503132209/2210/2012. electrify existing sign.

Open the permit page

$500
Mar 13, 2025Completed
final sign-off Oct 2025
826 Washington StAcer-G Engineeringto partial abate nov 202302199- to legalize sign a located at side of property single sided non illuminated visible from street. share plans with 202503132209/2210/2011
Details
Permit
202503132212
Permit issued
Sep 25, 2025
Final sign-off
Oct 9, 2025

to partial abate nov 202302199- to legalize sign a located at side of property single sided non illuminated visible from street. share plans with 202503132209/2210/2011

Open the permit page

$500
Mar 13, 2025Expired or cancelled
withdrawn Sep 2025
826 Washington Stto partial abate nov 202302199- to legalize sign c located at side of property double sided non illuminated visible from street. share plans with 202503132209
Details
Permit
202503132210

to partial abate nov 202302199- to legalize sign c located at side of property double sided non illuminated visible from street. share plans with 202503132209

Open the permit page

$500
Mar 13, 2025Completed
final sign-off Oct 2025
826 Washington StAcer-G Engineeringto partial abate nov 202302199- to include remove sign mounted on building wall at 2nd floor (sign d) and projecting sign (sign c). separte permits to abate the rest of the nov
Details
Permit
202503132209
Permit issued
Sep 25, 2025
Final sign-off
Oct 8, 2025

to partial abate nov 202302199- to include remove sign mounted on building wall at 2nd floor (sign d) and projecting sign (sign c). separte permits to abate the rest of the nov

Open the permit page

$1,500
Feb 27, 2025In progress
filed Feb 2025, not yet issued
799 Pacific AvAmone Corpnew out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00
Details
Permit
202502271260

new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00

Open the permit page

$10,000
Feb 20, 2025In progress
issued Apr 2025
795 Pacific AvAmone Corpnew outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line
Details
Permit
202502200736
Permit issued
Apr 9, 2025

new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line

Open the permit page

$15,000
Feb 7, 2025In progress
filed Feb 2025, not yet issued
377 Bay Stsuite a: interior soft demolition
Details
Permit
202502079881

suite a: interior soft demolition

Open the permit page

$9,500
Jan 7, 2025In progress
issued Jan 2025
799 Pacific AvAmone Corpnew outdoor fence and gate.
Details
Permit
202501077873
Permit issued
Jan 15, 2025

new outdoor fence and gate.

Open the permit page

$15,000
Dec 6, 2024Completed
final sign-off Jun 2025
1400 Noriega StAmone Corp2nd fl remodel reception desk, soffit, light & security gate
Details
Permit
202412066356
Permit issued
Feb 21, 2025
Final sign-off
Jun 27, 2025

2nd fl remodel reception desk, soffit, light & security gate

Open the permit page

$200,000
Oct 7, 2024Completed
final sign-off Jun 2025
1261 Stockton StFirst Restaurant Builderschange of use from retail to restaurant. new rooftop unit. electrical panel replacement. tenant improvement new dining, restroom and kitchen.
Details
Permit
202410072483
Permit issued
Jan 2, 2025
Final sign-off
Jun 9, 2025

change of use from retail to restaurant. new rooftop unit. electrical panel replacement. tenant improvement new dining, restroom and kitchen.

Open the permit page

$350,000
Aug 7, 2024Completed
final sign-off Sep 2024
935 Howard StGolden Vector Stars Corporationresidential bathroom & kitchen remodel. hvac replacement-new. new mini-split. window like for like replacment on 2/f.
Details
Permit
202408078191
Permit issued
Aug 9, 2024
Final sign-off
Sep 20, 2024

residential bathroom & kitchen remodel. hvac replacement-new. new mini-split. window like for like replacment on 2/f.

Open the permit page

$50,000
Jul 15, 2024Completed
final sign-off Dec 2024
648 Kearny StJzhang's Construciton Incremove plumbing fixture at basement to convert restroom to be storage. new ada restroom at first floor. removed existing open kitchen at dining area.
Details
Permit
202407156507
Permit issued
Aug 14, 2024
Final sign-off
Dec 11, 2024

remove plumbing fixture at basement to convert restroom to be storage. new ada restroom at first floor. removed existing open kitchen at dining area.

Open the permit page

$32,500
Jul 10, 2024In progress
filed Jul 2024, not yet issued
933 Howard Stoutdoor balcony and outdoor residential stair replacement with new fire rated wall at rear
Details
Permit
202407106136

outdoor balcony and outdoor residential stair replacement with new fire rated wall at rear

Open the permit page

$50,000
Apr 8, 2024Completed
final sign-off Oct 2024
1447 Taraval StSodini Enterprises Inc Dba Sodini & Sonsequipment installation: hood, make up air and exhaust fan installation.
Details
Permit
202404089576
Permit issued
Jul 10, 2024
Final sign-off
Oct 22, 2024

equipment installation: hood, make up air and exhaust fan installation.

Open the permit page

$20,000
Apr 5, 2024Completed
final sign-off Aug 2024
2035 Union StZm Builders Increvision to 202102100891 -remove and fill in rear exterior door opening for boba cafe. not facing front street. r
Details
Permit
202404059484
Permit issued
Jul 9, 2024
Final sign-off
Aug 29, 2024

revision to 202102100891 -remove and fill in rear exterior door opening for boba cafe. not facing front street. r

Open the permit page

$1,000
Mar 26, 2024Completed
final sign-off Apr 2025
39 Bannan PlJ P Malveaux Constructionrevision to bpa# 202310168693: correct address from 41 bannan pl to 39 bannan place. new layout and location of door, washer and dryer at bathroom. move door at bathroom off hallway relocate washer & dryer
Details
Permit
202403268620
Permit issued
Apr 25, 2024
Final sign-off
Apr 25, 2025

revision to bpa# 202310168693: correct address from 41 bannan pl to 39 bannan place. new layout and location of door, washer and dryer at bathroom. move door at bathroom off hallway relocate washer & dryer

Open the permit page

Mar 8, 2024Completed
final sign-off Jun 2024
250 Howard StGci, Increvision to pa# 202308114264, removed exhaust duct and dryer, clarification of no special inspection is required due to no epoxy anchorage to the project, electrical disconnect is changed from 125ato 100a, change of light fixture, change of power outlet.
Details
Permit
202403087456
Permit issued
Mar 26, 2024
Final sign-off
Jun 25, 2024

revision to pa# 202308114264, removed exhaust duct and dryer, clarification of no special inspection is required due to no epoxy anchorage to the project, electrical disconnect is changed from 125ato 100a, change of light fixture, change of power outlet.

Open the permit page

Feb 14, 2024Completed
final sign-off May 2024
1441 Ocean AvAmone Corp7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4
Details
Permit
202402145911
Permit issued
Feb 28, 2024
Final sign-off
May 29, 2024

7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4

Open the permit page

Jan 8, 2024Expired or cancelled
cancelled Oct 2024
1447 Taraval StSodini Enterprises Inc Dba Sodini & Sonsinterior soft demolition per plan. t.i. under separate permit.
Details
Permit
202401083595
Permit issued
Jan 9, 2024

interior soft demolition per plan. t.i. under separate permit.

Open the permit page

$2,000
Dec 14, 2023Completed
final sign-off May 2024
1536 Wallace AvAmone Corpdemo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170
Details
Permit
202312142531
Permit issued
Apr 5, 2024
Final sign-off
May 7, 2024

demo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170

Open the permit page

$8,000
Nov 1, 2023Completed
final sign-off May 2024
1441 Ocean AvAmone Corpconversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf.
Details
Permit
202311019923
Permit issued
Dec 29, 2023
Final sign-off
May 29, 2024

conversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf.

Open the permit page

$160,000
Oct 16, 2023Never finaled
issued Nov 2023, no final
41 Bannan PlJ P Malveaux Construction2/f: 2 bathroom and kitchen remodel, new location of kitchen, 1-new bedroom.
Details
Permit
202310168693
Permit issued
Nov 9, 2023

2/f: 2 bathroom and kitchen remodel, new location of kitchen, 1-new bedroom.

Open the permit page

$27,000
Sep 22, 2023Never finaled
issued Nov 2023, no final
1355 Monterey BlBhogal Brothers Construction Increlocation of (e) water closet lavatory. power outlet at 2nd floor. 1/f sink relocation.
Details
Permit
202309227212
Permit issued
Nov 3, 2023

relocation of (e) water closet lavatory. power outlet at 2nd floor. 1/f sink relocation.

Open the permit page

$15,000
Aug 11, 2023Completed
final sign-off Jun 2024
250 Howard StGci, Incgr/f: change of use from retail to exercise studio. new restroom and shower room. new storage.
Details
Permit
202308114264
Permit issued
Jan 25, 2024
Final sign-off
Jun 25, 2024

gr/f: change of use from retail to exercise studio. new restroom and shower room. new storage.

Open the permit page

$300,000
Aug 4, 2023In progress
issued Jul 2024
3470 Mission StWaves Remodeling Californiato comply with nov 202309077. storefront window replacement due to car crashing to the suite. underslab concrete repair @ basement w/in sidewalk due to car crashing in suite
Details
Permit
202308043835
Permit issued
Jul 16, 2024

to comply with nov 202309077. storefront window replacement due to car crashing to the suite. underslab concrete repair @ basement w/in sidewalk due to car crashing in suite

Open the permit page

$35,000
Apr 24, 2023Never finaled
issued Jul 2023, no final
2675 Geary BlWtam Builderste 100 & e101: from retail to exercise studio. new restroom with plumbing fixtures. new excercise studio. new ceiling, lighting fixture & mech ducts. 2 indoor exhaust fans, new power & data outlets. no juice bar & hot tub.
Details
Permit
202304246337
Permit issued
Jul 6, 2023

ste 100 & e101: from retail to exercise studio. new restroom with plumbing fixtures. new excercise studio. new ceiling, lighting fixture & mech ducts. 2 indoor exhaust fans, new power & data outlets. no juice bar & hot tub.

Open the permit page

$250,000
Apr 21, 2023Completed
final sign-off Aug 2023
579 Howard StGolden Bay Remodeling Inc, First Restaurant Builderschange of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons.
Details
Permit
202304216266
Permit issued
Jul 10, 2023
Final sign-off
Aug 4, 2023

change of ownership. equipment replacement proposed, equipment utility consumption shall be less than or equal with the (e) equipment. (e) kitchen hood to remain. hood/duct fire suppression system under separate permit. max occ load 49 persons.

Open the permit page

Apr 18, 2023Completed
final sign-off Feb 2024
1355 Monterey BlBhogal Brothers Construction Incconvert of existing outdoor covered balcony at 3rd flr to a new bathroom.
Details
Permit
202304185937
Permit issued
Jun 28, 2023
Final sign-off
Feb 16, 2024

convert of existing outdoor covered balcony at 3rd flr to a new bathroom.

Open the permit page

$100,000
Mar 31, 2023Never finaled
filed Mar 2023, never issued
2033 Union Stassembly permit for fire review
Details
Permit
202303314836

assembly permit for fire review

Open the permit page

Feb 17, 2023Completed
final sign-off Jun 2023
579 Howard StGolden Bay Remodeling Incaccessibility barrier removal. new ada counter.
Details
Permit
202302172214
Permit issued
May 4, 2023
Final sign-off
Jun 30, 2023

accessibility barrier removal. new ada counter.

Open the permit page

$1,500
Feb 1, 2023Never finaled
issued Feb 2023, no final
4534 Mission StAnton Electricremodel bathroom and replace in kind fixtures at mezz level.
Details
Permit
202302011194
Permit issued
Feb 21, 2023

remodel bathroom and replace in kind fixtures at mezz level.

Open the permit page

$6,300
Jan 30, 2023Completed
final sign-off Jun 2023
475 Connecticut StWai-Wong Construction Companynew storage at 1st fl. new kitchen plumbing fixture at 1st fl. new bathroom plumbing fixture at 2nd fl.
Details
Permit
202301300996
Permit issued
Apr 12, 2023
Final sign-off
Jun 26, 2023

new storage at 1st fl. new kitchen plumbing fixture at 1st fl. new bathroom plumbing fixture at 2nd fl.

Open the permit page

$45,000
Jan 20, 2023Completed
final sign-off Sep 2024
56 Navajo Avto comply with nov 202301337. legalize the unpermitted storage and bathroom at garage with new exterior window. watar heater replacement (existing 30 gal at 30000btuh: proposed 30 gal at 30000btuh with 0.92% min afue)
Details
Permit
202301200518
Permit issued
Jan 27, 2023
Final sign-off
Sep 13, 2024

to comply with nov 202301337. legalize the unpermitted storage and bathroom at garage with new exterior window. watar heater replacement (existing 30 gal at 30000btuh: proposed 30 gal at 30000btuh with 0.92% min afue)

Open the permit page

$25,000
Jan 17, 2023Never finaled
filed Jan 2023, never issued
443 Cortland Avto comply with accessible business entrance program per ord 51-16. accessibility barrier removal of public sidewalk to meet accessible slope at entry and replacement of (e) door lever with ease grip accessible lever at door. ref abe 201912270359
Details
Permit
202301170244

to comply with accessible business entrance program per ord 51-16. accessibility barrier removal of public sidewalk to meet accessible slope at entry and replacement of (e) door lever with ease grip accessible lever at door. ref abe 201912270359

Open the permit page

$45,000
Jan 3, 2023In progress
issued Sep 2026
568 Mississippi StKasas Builders Inccomply w/ nov #202184396: new adu at 1st floor. new electrical meter for adu. new plumbing line for adu. new mini-split system for adu.
Details
Permit
202301039639
Permit issued
Sep 2, 2026

comply w/ nov #202184396: new adu at 1st floor. new electrical meter for adu. new plumbing line for adu. new mini-split system for adu.

Open the permit page

$200,000
Dec 28, 2022Never finaled
issued Mar 2023, no final
351 California StConstructive Solutions Inc.t.i. of basement space includes new non-load bearing partitions, millwork and finishes. all modifications to mechanical, electrical and plumbing systesm are deferred. convert (e) basement to gym
Details
Permit
202212289240
Permit issued
Mar 3, 2023

t.i. of basement space includes new non-load bearing partitions, millwork and finishes. all modifications to mechanical, electrical and plumbing systesm are deferred. convert (e) basement to gym

Open the permit page

$165,000
Nov 23, 2022Completed
final sign-off Mar 2023
1869 Union StBhogal Brothers Construction Inct.i. buildout of fitness studio
Details
Permit
202211237108
Permit issued
Nov 28, 2022
Final sign-off
Mar 23, 2023

t.i. buildout of fitness studio

Open the permit page

$125,000
Nov 15, 2022Completed
final sign-off Dec 2022
600 Townsend StC C I Commercial Construction & Improvrevision to 202209071974 provide accessible door push botton,door operator at ments restroom door in lieu of modificaion of plumbing lines, water closets/toilet partition due to infeasibility of plumbing line modification. modify e private office config,no change area/ftprint.due to no shower avail
Details
Permit
202211156576
Permit issued
Nov 18, 2022
Final sign-off
Dec 5, 2022

revision to 202209071974 provide accessible door push botton,door operator at ments restroom door in lieu of modificaion of plumbing lines, water closets/toilet partition due to infeasibility of plumbing line modification. modify e private office config,no change area/ftprint.due to no shower avail

Open the permit page

$40,000
Sep 23, 2022Expired or cancelled
withdrawn Oct 2026
2089 Ingalls Stcultivating room, new office, new restroom, new break room, new seared storage.
Details
Permit
202209233029

cultivating room, new office, new restroom, new break room, new seared storage.

Open the permit page

$10,000
Sep 7, 2022Completed
final sign-off Dec 2022
600 Townsend StC C I Commercial Construction & Improvnew hallway, 854sf; restroom improvement to meet current accessibility requirement (+/- 300sf).
Details
Permit
202209071974
Permit issued
Sep 15, 2022
Final sign-off
Dec 5, 2022

new hallway, 854sf; restroom improvement to meet current accessibility requirement (+/- 300sf).

Open the permit page

$196,000
Aug 26, 2022Completed
final sign-off Feb 2023
3319 Balboa Stnew accessible push button to operate the (e) door with automatic door per abe program ordinance 51-16. replace entrance door
Details
Permit
202208261403
Permit issued
Sep 8, 2022
Final sign-off
Feb 2, 2023

new accessible push button to operate the (e) door with automatic door per abe program ordinance 51-16. replace entrance door

Open the permit page

$10,000
Jul 29, 2022Completed
final sign-off Oct 2022
351 California StConstructive Solutions Inc.12/f: lighting and exit sign replcement at common hallway. common elevator hallway at the 12th floor. maher n/a.
Details
Permit
202207299588
Permit issued
Aug 1, 2022
Final sign-off
Oct 12, 2022

12/f: lighting and exit sign replcement at common hallway. common elevator hallway at the 12th floor. maher n/a.

Open the permit page

$5,000
Jul 8, 2022Completed
final sign-off Oct 2023
1438 California StVortex Industries Incaccessibility barrier removal of the entry. replacement of existing single door button w/ 36" high accessible push button. abe# 201902125114. accessible business entrance program per ordinance 51-16
Details
Permit
202207088009
Permit issued
Sep 16, 2022
Final sign-off
Oct 5, 2023

accessibility barrier removal of the entry. replacement of existing single door button w/ 36" high accessible push button. abe# 201902125114. accessible business entrance program per ordinance 51-16

Open the permit page

$10,000
Feb 11, 2022Completed
final sign-off Jun 2022
128 Spear StConstructive Solutions Inc.title 24 compliance. lighting fixtures replacement.sep electrical permit if required.
Details
Permit
202202117860
Permit issued
Feb 11, 2022
Final sign-off
Jun 7, 2022

title 24 compliance. lighting fixtures replacement.sep electrical permit if required.

Open the permit page

$2,000
Dec 20, 2021Completed
final sign-off Jan 2022
619 17th AvAnaba Construction Increv to pa202111182697: removal of non-strucutural walls for kitchen & bathroom remodel.
Details
Permit
202112204710
Permit issued
Dec 22, 2021
Final sign-off
Jan 26, 2022

rev to pa202111182697: removal of non-strucutural walls for kitchen & bathroom remodel.

Open the permit page

Nov 19, 2021Completed
final sign-off Jul 2023
2033 Union StPing Hong Liangslab and footing repair at existing office at rear comply with nov 202184307
Details
Permit
202111192791
Permit issued
Nov 19, 2021
Final sign-off
Jul 18, 2023

slab and footing repair at existing office at rear comply with nov 202184307

Open the permit page

$1,500
Oct 20, 2021Completed
final sign-off Aug 2024
2035 Union StPing Hong Liangconversion of fashion boutique to restaurants annex for picking up (owner of this mild tea sales is same as the restaurant) this suite is an annes to the restaurant
Details
Permit
202110200891
Permit issued
Jan 19, 2022
Final sign-off
Aug 29, 2024

conversion of fashion boutique to restaurants annex for picking up (owner of this mild tea sales is same as the restaurant) this suite is an annes to the restaurant

Open the permit page

$20,000
Oct 18, 2021Completed
final sign-off May 2022
351 California StConstructive Solutions Inc.5/f: spec tenant improvement with restroom improvement for accessibility. maher n/a.
Details
Permit
202110180680
Permit issued
Oct 22, 2021
Final sign-off
May 18, 2022

5/f: spec tenant improvement with restroom improvement for accessibility. maher n/a.

Open the permit page

$170,466