Bloszies
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Charles Bloszies Faia Ltd.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Jun 2026
38 permits since 2000 (architect on 30 permits, engineer on 7 permits, authorized agent-others on 1 permit): 24 completed, 1 in progress, 7 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 1275 Sacramento St | Truebeck Construction | revision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping.Details
revision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping. | |
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 120 Kearny St | install new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy.Details
install new exit stairway at 38 story office tower, which is part of post-montgomery center. new stairway to provide second means of egress from level one and ground level of tower which will replace exiting egress path that runs through 3-story retail facility. no change of use or occupancy. | $1,000,000 | |
| Nov 4, 2016 | Never finaled filed Nov 2016, never issued | 744 Harrison St | to erect 8 stories, 1 basement, 4 units residential, 55 hotel rooms, restaurant & storage, roof deck building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph **Details
to erect 8 stories, 1 basement, 4 units residential, 55 hotel rooms, restaurant & storage, roof deck building. ** maher: disturbance of at least 50 cu.yd. of soil. route to dph ** | $10,000,000 | |
| Jun 8, 2016 | Completed final sign-off Nov 2017 | 856 Market St | South Bay Construction | proposed work is a revision to base building renovation project,appn. 201512084521, revisions include alterations of structural framing details & a revision,revised location for a new electrical service that was approved under the base permit.no other work is proposed, maher n/aDetails
proposed work is a revision to base building renovation project,appn. 201512084521, revisions include alterations of structural framing details & a revision,revised location for a new electrical service that was approved under the base permit.no other work is proposed, maher n/a | $123,000 |
| Dec 24, 2015 | Completed final sign-off Aug 2016 | 368 Jackson St | Devlin/Mcnally Construction | change in use of existing retail use to office use; interior t.i. in 1/f suite of existing bldg, seperate from rest of bldg and accessable directly from street. work consists of installation of new partitions and fixtures, demo/mep/sprinkler system under seperate permit. n/a ordinance #155-13Details
change in use of existing retail use to office use; interior t.i. in 1/f suite of existing bldg, seperate from rest of bldg and accessable directly from street. work consists of installation of new partitions and fixtures, demo/mep/sprinkler system under seperate permit. n/a ordinance #155-13 | $150,000 |
| Oct 16, 2015 | Completed final sign-off Mar 2017 | 135 Townsend St | Cannon Constructors North Inc | seismic strengthening of existing bldg, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinanceDetails
seismic strengthening of existing bldg, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinance | $1,500,000 |
| May 18, 2015 | Completed final sign-off Jan 2016 | 1 Kearny St | Novo Construction Inc | new non load bearing partitions, ceiling & finishes. mechanical & electrical included.Details
new non load bearing partitions, ceiling & finishes. mechanical & electrical included. | $36,000 |
| Mar 9, 2015 | Completed final sign-off Sep 2015 | 345 Brannan St | Swinerton Builders | revision to 200810275193. new subgrade room to house backflow prevention valves. maher not reqDetails
revision to 200810275193. new subgrade room to house backflow prevention valves. maher not req | $20,000 |
| Nov 19, 2014 | Completed final sign-off Dec 2014 | 690 Folsom St | Plant Construction Company Lp | revision to app#201307292946 .handrail minimum clearance detail change.n/a for the interimDetails
revision to app#201307292946 .handrail minimum clearance detail change.n/a for the interim | |
| Sep 5, 2014 | Completed final sign-off Nov 2015 | 660 Market St | reconfigure stairs and new partition wall @ basement. n/a ordinance #155-13Details
reconfigure stairs and new partition wall @ basement. n/a ordinance #155-13 | $36,000 | |
| Jul 3, 2014 | Completed final sign-off Jan 2015 | 460 Bryant St | documentation only. change of use from warehouse to office approved by s.f. planning commission 8/9/12 case #20110895b and planning commision approval#18685. n/a maher ordinanceDetails
documentation only. change of use from warehouse to office approved by s.f. planning commission 8/9/12 case #20110895b and planning commision approval#18685. n/a maher ordinance | ||
| Apr 30, 2013 | Completed final sign-off Jan 2015 | 460 Bryant St | compliance/w maher ord. #155-13 not req'd. excavation less than 50 cu ft. new roof deck on the (e) roof of the 1 story portion of building. work to include new lobby serving roof deck, exterior walkways & stairs that connect the roof deck to exit stairs.Details
compliance/w maher ord. #155-13 not req'd. excavation less than 50 cu ft. new roof deck on the (e) roof of the 1 story portion of building. work to include new lobby serving roof deck, exterior walkways & stairs that connect the roof deck to exit stairs. | $65,000 | |
| May 14, 2012 | Expired or cancelled cancelled Feb 2013 | 2655 Broderick St | response to nov# 201168973 to legalize (e) roof deck. no new onstruction proposed.Details
response to nov# 201168973 to legalize (e) roof deck. no new onstruction proposed. | ||
| Apr 3, 2012 | Never finaled issued May 2012, no final | 211 Sutter St | install new stair and elevator to serve current vacant space in the basement. new wheelchair lift t0 serve future retail tenant. gr fl and mezz retail tenant work and all related mech/elec will be under seperate permits.Details
install new stair and elevator to serve current vacant space in the basement. new wheelchair lift t0 serve future retail tenant. gr fl and mezz retail tenant work and all related mech/elec will be under seperate permits. | $300,000 | |
| Mar 19, 2012 | Expired or cancelled cancelled Feb 2013 | 2655 Broderick St | to respond to nov 201139322. no construction proposed. verify extg deck as approved per app#9009756 and 8504468Details
to respond to nov 201139322. no construction proposed. verify extg deck as approved per app#9009756 and 8504468 | ||
| Jan 13, 2012 | Completed final sign-off Dec 2013 | 460 Bryant St | Plant Construction Company Lp | proceed with partial soft demolition of non fire rated/non structural interior partitions on 1st,2nd, & 3rd floors including subsurface investigation. demo is in advance of future permit application for core/shell/tenant improvement applicaiton. hote ab-17.bldg vacant on all floors.Details
proceed with partial soft demolition of non fire rated/non structural interior partitions on 1st,2nd, & 3rd floors including subsurface investigation. demo is in advance of future permit application for core/shell/tenant improvement applicaiton. hote ab-17.bldg vacant on all floors. | $30,000 |
| Jan 3, 2011 | Completed final sign-off Feb 2012 | 1840 Washington St | James E Roberts-Obayashi Corporation | convert unoccupied areas on floor 2-8 to owners' individual storage spaces. each area will have access doors, electrical and fire sprinklers installed. revision to #200604149027. addendum#3. fire sprinkler and life safety mep under seperate permit.Details
convert unoccupied areas on floor 2-8 to owners' individual storage spaces. each area will have access doors, electrical and fire sprinklers installed. revision to #200604149027. addendum#3. fire sprinkler and life safety mep under seperate permit. | $15,000 |
| Jul 20, 2010 | Never finaled issued Jul 2010, no final | 1 Kearny St | Gci, Inc | demolition of steel stair (non-egress) and infill of opening with slab. space will remain unoccupied under ab-017.Details
demolition of steel stair (non-egress) and infill of opening with slab. space will remain unoccupied under ab-017. | $10,000 |
| Feb 4, 2010 | Completed final sign-off Feb 2012 | 1840 Washington St | revisions to work previously approved under addendum 3 of 200604149027. revisions include delineation of extent of fireproofing required and fireproofing details omitted in the previously approved submittalDetails
revisions to work previously approved under addendum 3 of 200604149027. revisions include delineation of extent of fireproofing required and fireproofing details omitted in the previously approved submittal | ||
| Dec 9, 2009 | Completed final sign-off Feb 2012 | 1840 Washington St | expansion of living & dining areas in units #801 & 802 only approx 135 sq ft eachDetails
expansion of living & dining areas in units #801 & 802 only approx 135 sq ft each | $67,500 | |
| Aug 10, 2009 | Expired or cancelled cancelled Jan 2026 | 710 Market St | void- per charles bloszies aia request on 12/18/09. j.v.Details
void- per charles bloszies aia request on 12/18/09. j.v. | ||
| Aug 10, 2009 | Completed final sign-off Mar 2011 | 710 Market St | Premier Structures Inc | construction of office bldg lobby, interior construction, mechanical, electrical & plumbing. flooring, wall finishes, ceiling. also installation of public art in lobby. work included in 200607136416. fire sprinkler & fire alarm under separate applDetails
construction of office bldg lobby, interior construction, mechanical, electrical & plumbing. flooring, wall finishes, ceiling. also installation of public art in lobby. work included in 200607136416. fire sprinkler & fire alarm under separate appl | $300,000 |
| Mar 13, 2009 | Completed final sign-off Mar 2009 | 660 03rd St | Cci Com'l Constr & Improv**See 985808*** | revision to appl.#2008/1216/8633 showing structural support for non-load bearing flr. mounted glass partition that is being installed as part of a previously approved tenant improvement project.Details
revision to appl.#2008/1216/8633 showing structural support for non-load bearing flr. mounted glass partition that is being installed as part of a previously approved tenant improvement project. | |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 660 03rd St | Incom Mechanical Inc | 1st floor-remove 2 (e) pendants to accomodate full height walls, add 6 new uprights, add 12 new pendantsDetails
1st floor-remove 2 (e) pendants to accomodate full height walls, add 6 new uprights, add 12 new pendants | $4,050 |
| Dec 30, 2008 | Completed final sign-off Feb 2011 | 710 Market St | Dpr Construction Inc | installation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3Details
installation of emergency generator, fuel line, exhaust flue office building is currently under construction under pa# 2006-0713-6416/s3 | $75,000 |
| Dec 16, 2008 | Completed final sign-off Mar 2009 | 660 03rd St | t.i. for ground floor - new floor finishes, elec, lighting & mech, new acoustical enclosure at new shop, new workspace & project rooms. (all mep under separate permit).Details
t.i. for ground floor - new floor finishes, elec, lighting & mech, new acoustical enclosure at new shop, new workspace & project rooms. (all mep under separate permit). | $120,000 | |
| Dec 1, 2008 | Completed final sign-off Oct 2009 | 942 Market St | replace e wood fixed windows on market st and mason st facades and lightwell with new operable windowsDetails
replace e wood fixed windows on market st and mason st facades and lightwell with new operable windows | $42,000 | |
| Sep 15, 2008 | Never finaled issued Sep 2008, no final | 690 Market St | 5th floor employees break room, relocate walls around room 509 adding door, relocate plum,bing & electrical.Details
5th floor employees break room, relocate walls around room 509 adding door, relocate plum,bing & electrical. | $20,000 | |
| Aug 27, 2008 | Never finaled issued Aug 2008, no final | 660 Market St | renew pa# 2007/05/17/1584 to complete work. (remove skylights from elevator penthouse & in fill with 2 hours construction)Details
renew pa# 2007/05/17/1584 to complete work. (remove skylights from elevator penthouse & in fill with 2 hours construction) | $4,000 | |
| May 8, 2008 | Completed final sign-off Mar 2009 | 660 03rd St | ground floor improvements, work includes new floor finishes & lighting; new rated enclosures at existing freight elevator shafts; new rear exit; reconfigured rear loading dock; and new space for tenant bicycle storage; new accessible restrooms. m.e.p. under separate permit.Details
ground floor improvements, work includes new floor finishes & lighting; new rated enclosures at existing freight elevator shafts; new rear exit; reconfigured rear loading dock; and new space for tenant bicycle storage; new accessible restrooms. m.e.p. under separate permit. | $90,000 | |
| Mar 10, 2008 | Completed final sign-off Feb 2011 | 710 Market St | Dpr Construction Inc | tower crane drawings to site permit application 200607136416.Details
tower crane drawings to site permit application 200607136416. | |
| Oct 25, 2007 | Completed final sign-off Feb 2011 | 710 Market St | Dpr Construction Inc | sidewalk shoring and excavation reference to site permit # 200607136416 and demo permit #200705252255Details
sidewalk shoring and excavation reference to site permit # 200607136416 and demo permit #200705252255 | $150,000 |
| Aug 29, 2007 | Expired or cancelled expired Jun 2008 | 88 Kearny St | raise access to existing water tank in basement to increase tank capacity. no work to life safety system. no mechanical/plumbing/electrical.Details
raise access to existing water tank in basement to increase tank capacity. no work to life safety system. no mechanical/plumbing/electrical. | $9,000 | |
| Feb 12, 2007 | Expired or cancelled expired Jun 2008 | 690 Market St | revision to pa# 200308051235s2-the scope of this work is to clarify the doors that required 18 stirke edge clearence and other disable access items.Details
revision to pa# 200308051235s2-the scope of this work is to clarify the doors that required 18 stirke edge clearence and other disable access items. | ||
| Jan 30, 2007 | Expired or cancelled withdrawn May 2007 | 250 Brannan St | renovate (e) 3 story brick and timber bldg converting it to residential. demo (e) penthouse & replace with two (n) penthouses. two story parking garage to remain.Details
renovate (e) 3 story brick and timber bldg converting it to residential. demo (e) penthouse & replace with two (n) penthouses. two story parking garage to remain. | $12,000,000 | |
| Dec 2, 2004 | Completed final sign-off Jun 2005 | 228 Grant Av | tenant improvement of 6th floor. provide mirror at back of elevator cab for upgrade.Details
tenant improvement of 6th floor. provide mirror at back of elevator cab for upgrade. | $85,000 | |
| Aug 5, 2003 | Never finaled issued May 2007, no final | 942 Market St | conversion of existing office to residential, new seismic upgrade, fire protection, newDetails
conversion of existing office to residential, new seismic upgrade, fire protection, new | $4,000,000 | |
| Dec 28, 2001 | Completed final sign-off Mar 2002 | 2 Embarcadero Center | new flr, partitions to be constructed within existing tenant shell. repair existing gypsum board ceiDetails
new flr, partitions to be constructed within existing tenant shell. repair existing gypsum board cei | $30,000 |