Gregory Cook
- Listed as
- authorized agent-others, contractor
- Firm
- Cook Construction
- Based in
- San Rafael
- On San Francisco permits
- Apr 2009 to Nov 2026
181 permits since 2000 (contractor on 181 permits, authorized agent-others on 1 permit): 134 completed, 13 in progress, 28 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Eastwood Development Incorporated (4), Elisha Mayost, Essex General Contractors Inc, Murphymckenna Construction, Perez Construction Llc., Upcycle Builders Inc.
- Architects
- John Maniscalco (9), David Armour (4), Alla Agafonov (3), C. Lawson Willard (3), Jean Orino Architect (3), Brent Martin (2), James Howard Westover (2), Jma John Maniscaleo (2), Stephen Sutro (2), Abigail S Lubniewski, Andrew Rob Levine, Chen Jefferson Jie, Dan Phipps, John Lum, John Lum, Mark Topetcher
- Engineers
- Chen Jefferson Jie (4), Daniel Barringer (2), Lawrence Wong (2), Randy Collins (2), David Owen Crestfield, David Strandberg, David Yadegar, Denny Kwan, Erik Mcgregor, James Toby, Jason Powers, Jason R. Powers, Paul Curren
- Authorized agents
- Dan Phipps
- Designers
- Jean Orino
- Subcontractors
- Ken Bloch, Marr Olsen
Where they worked
- Single-family 83
- Multi-family (2-family, apartments) 16
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
Showing the 100 most recent of 181.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 2829 Pacific Av | Cook Construction | repair & rebuild in-kind (e) non-conforming deck structure & garage roof deck within (e) footprint to address water damage; waterproofing & drainage.Details
repair & rebuild in-kind (e) non-conforming deck structure & garage roof deck within (e) footprint to address water damage; waterproofing & drainage. | $45,900 |
| Sep 24, 2026 | In progress issued Oct 2026 | 250 Dore St | Cook Construction | minor interior remodel with guardrail upgrades and window limiters throught for windows less than 36" a.f.f. exterior guardrails added to roof parapet walls and one window.Details
minor interior remodel with guardrail upgrades and window limiters throught for windows less than 36" a.f.f. exterior guardrails added to roof parapet walls and one window. | $20,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 2829 Pacific Av | Cook Construction | int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel.Details
int. remodel of a 4-story sfr including the addition of a retractable and a fixed skylight @ (e) roof; alteration to (e) window openings and (n) windows in primary bedrooms and (n) windows in (e) openings in 3/f & 4/f facing rear yard; (n) interior elevator connecting all stories; kitchen remodel. | $1,804,290 |
| Aug 13, 2026 | In progress issued Aug 2026 | 3777 22nd St | Cook Construction | revision to pa# 202507301925, reference permit 202105070016 (r4) demo & replace front entry stairs in kind, add new foundation & new tread & riser finish. existing stair handrail & guardrail to be reinstalled, typical. new front entry door, new garage door in existing opening,new paintDetails
revision to pa# 202507301925, reference permit 202105070016 (r4) demo & replace front entry stairs in kind, add new foundation & new tread & riser finish. existing stair handrail & guardrail to be reinstalled, typical. new front entry door, new garage door in existing opening,new paint | $50,000 |
| Jun 30, 2026 | In progress issued Jun 2026 | 2829 Pacific Av | Cook Construction | remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft.Details
remodel (1) kitchen, (5) full bathrooms and (1) powder room in kind. no moving walls. no work outside of kitchen and bathrooms. kitchen approx. 400 sq ft. full bathrooms approx. sq ft: 40,40,40,64,36. powder room approx 24 sq ft. | $250,000 |
| Jan 21, 2026 | Completed final sign-off Feb 2026 | 357 Cumberland St | Cook Construction | to obtain final inspection for work approved under pa# 202306200402. all work is complete.Details
to obtain final inspection for work approved under pa# 202306200402. all work is complete. | |
| Jan 13, 2026 | Completed final sign-off May 2026 | 2315 Broadway | Cook Construction | interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout.Details
interior remodel in kind for kitchen, 4 bathrooms, 1 powder room and 2 laundry rooms. interior & exterior painting. refinishing of floors throughout. | $100,000 |
| Oct 8, 2025 | Completed final sign-off Oct 2025 | 824 Vallejo St | Cook Construction | reinstall 3x fire rated unit entry doors in kind. repair interior wall, patch holes on top floor.Details
reinstall 3x fire rated unit entry doors in kind. repair interior wall, patch holes on top floor. | $2,000 |
| Oct 6, 2025 | Completed final sign-off Oct 2025 | 824 Vallejo St | Cook Construction | to obtain final inspection for work approved under pa # 2007-0912-2431. all work is complete.Details
to obtain final inspection for work approved under pa # 2007-0912-2431. all work is complete. | |
| Jul 30, 2025 | In progress issued Aug 2025 | 3777 22nd St | Cook Construction | rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run withDetails
rev to 202105070016: add direct vent gas fireplace in living rm. move previously approbed kitchen window to offic @ west elevation, adjust locations of skylights & attic access ladder, adjust office 312 & closet 319 ceiling to be flat w/ 4:12 sloped roof above. clarify rear deck stair run with | $25,000 |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 200 Cervantes Bl | Cook Construction | remodel powder room "in-kind) no structural alterations, new tile, new plumbing and electrical fixtures. no removal wallsDetails
remodel powder room "in-kind) no structural alterations, new tile, new plumbing and electrical fixtures. no removal walls | $30,000 |
| Jun 11, 2025 | In progress issued Aug 2025 | 4024 25th St | Cook Construction | revision to pa# 2023-1213-2404-s2 (e) rear yard retaining wallsDetails
revision to pa# 2023-1213-2404-s2 (e) rear yard retaining walls | $30,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | Cook Construction | remove garden apartment guest bathroom from scope. remove powder room off living room from scope. revision to permit 202501087923.Details
remove garden apartment guest bathroom from scope. remove powder room off living room from scope. revision to permit 202501087923. | |
| May 13, 2025 | Completed final sign-off Nov 2025 | 3782 21st St | Cook Construction | revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrationsDetails
revision to pa # 2025-0228-1298 new framing at kitchen area, add patching sheetrock on ground fl garage & property line wall using 5/8 type x, add strap at top plates, fire blocking at dropped ceiling & fire caulking at penatrations | $5,000 |
| Apr 21, 2025 | In progress issued Apr 2025 | 3777 22nd St | Cook Construction | repair ~20 ft of dry rot on grid line 2 from a.5 to f on ground floor and 2nd floor. notice for building permit #202105070016.Details
repair ~20 ft of dry rot on grid line 2 from a.5 to f on ground floor and 2nd floor. notice for building permit #202105070016. | $3,000 |
| Apr 4, 2025 | In progress issued May 2025 | 3777 22nd St | Cook Construction | revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks.Details
revision to pa #202105070016 change spiral to conventional stair. adjust 2nd fl deck extents & corresponding fire walls. adjust ext windows & doors. 1st fl: adjust fl height, rearrange interior rooms. 2nd fl: adjust kitchen layout. 3rd fl: revise layout of bathrooms,closet, add laundry & 3 sinks. | $10,000 |
| Mar 11, 2025 | Completed final sign-off Jan 2026 | 357 Cumberland St | Cook Construction | (n) windscreen on roof. visable from street. revision to pa# 2020.0311.6723Details
(n) windscreen on roof. visable from street. revision to pa# 2020.0311.6723 | $15,000 |
| Feb 28, 2025 | Completed final sign-off Dec 2025 | 3782 21st St | Cook Construction | kitchen remodel, new plumbing, new electrical, insulation, drywall, cabinetry, tile, and paint in kitchen, new plumbing fixtures in powder room. new tile at fireplace.Details
kitchen remodel, new plumbing, new electrical, insulation, drywall, cabinetry, tile, and paint in kitchen, new plumbing fixtures in powder room. new tile at fireplace. | $70,000 |
| Jan 22, 2025 | Completed final sign-off Feb 2026 | 2830 Filbert St | Cook Construction | revision to 201905140541 for rear yard retaining walls in response to inspector requestDetails
revision to 201905140541 for rear yard retaining walls in response to inspector request | |
| Jan 8, 2025 | Completed final sign-off Jun 2025 | 2935 Pacific Av | Cook Construction | remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations)Details
remodel 2 kitchens, 4 bathrooms and 2 laundry rooms (in kind, no structural alterations) | $60,000 |
| Sep 4, 2024 | Completed final sign-off Nov 2025 | 2212 Lake St | Cook Construction | revision to pa #202405242908. foundation replacement. lower 12 inches interior slab; remove (e) wall at the ground level in billards room, add new steel beam and back-to-back strong wall at same wall lineDetails
revision to pa #202405242908. foundation replacement. lower 12 inches interior slab; remove (e) wall at the ground level in billards room, add new steel beam and back-to-back strong wall at same wall line | $150,000 |
| Jul 23, 2024 | Completed final sign-off Jan 2025 | 228 30th St | Cook Construction | 1 kitchen remodel in-kind no structural changesDetails
1 kitchen remodel in-kind no structural changes | $100,000 |
| May 24, 2024 | Completed final sign-off Oct 2025 | 2212 Lake St | Cook Construction | interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath.Details
interior remodel: relocate kitchen to dining room. create wetbar btwn dining room & kitchen. frame (n) opening btwn (n) dining room & hall. remodel powder room and reframe pocket door. replace fire place unit at living room, primary room & billards room. convert part primary room into full bath. | $30,000 |
| Apr 4, 2024 | Completed final sign-off Nov 2024 | 3010 Pacific Av | Cook Construction | replacement of (7) front exterior doors in kind. no change to transom.Details
replacement of (7) front exterior doors in kind. no change to transom. | $100,000 |
| Mar 19, 2024 | Completed final sign-off Feb 2026 | 2830 Filbert St | Cook Construction | revision to 201905140541. framing at front facade to be replaced in kind to provide shear walls. e framing sub-standard. structural design unchangedDetails
revision to 201905140541. framing at front facade to be replaced in kind to provide shear walls. e framing sub-standard. structural design unchanged | $50,000 |
| Mar 14, 2024 | Completed final sign-off Dec 2025 | 2212 Lake St | Cook Construction | 1 kitchen, 3 bathrooms - replacement in kindDetails
1 kitchen, 3 bathrooms - replacement in kind | $350,000 |
| Jan 26, 2024 | Completed final sign-off Feb 2026 | 2830 Filbert St | Cook Construction | construction of new occupied roof deck and deck accessDetails
construction of new occupied roof deck and deck access | $45,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 2898 Broadway | Cook Construction | remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind.Details
remodel 2 kitchens, 2 baths, 1 powder room, no structfural alterations. replace in kind. | $100,000 |
| Dec 13, 2023 | In progress issued Aug 2024 | 4024 25th St | Cook Construction | to erect a 4-story, 2 residential units, r-3, type vb building.Details
to erect a 4-story, 2 residential units, r-3, type vb building. | $1,600,000 |
| Dec 13, 2023 | In progress issued Aug 2024 | 4024 25th St | Cook Construction | to demolish a 2-story, 1 residential unit, r-3 building. (new construction under a separate permit)Details
to demolish a 2-story, 1 residential unit, r-3 building. (new construction under a separate permit) | $20,000 |
| Nov 8, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | Cook Construction | 3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027Details
3/f: conversion of bedroom/exterior terrace to (2) bedrooms & study space, includes removal of (1) window & (2) glazed doors, addition of (2) pairs of glazed doors. ref sturctural bpa#202309066027 | $48,950 |
| Sep 6, 2023 | Completed final sign-off Dec 2024 | 3544 Baker St | Cook Construction | structural upgrades within (e) bldg envelope in preparation for a future addition, to be permitted seperately. no changes to architectural features.Details
structural upgrades within (e) bldg envelope in preparation for a future addition, to be permitted seperately. no changes to architectural features. | $80,000 |
| Jul 3, 2023 | Completed final sign-off Mar 2024 | 1900 Green St | Cook Construction | revisions to pa# 202202258702, front yard- replace front steps inkind (terrazzo), porch, and fence; in rear yard- install new outdoor sink, shower, gas fire/ grill, firepit and hot tub.Details
revisions to pa# 202202258702, front yard- replace front steps inkind (terrazzo), porch, and fence; in rear yard- install new outdoor sink, shower, gas fire/ grill, firepit and hot tub. | $200,000 |
| Jun 20, 2023 | Expired or cancelled expired Jan 2026 | 357 Cumberland St | Cook Construction | revision to pa# 202003116723. addition of (n) below grade unconditioned storage room. 157 sqft. approc 67 cy of excavation.Details
revision to pa# 202003116723. addition of (n) below grade unconditioned storage room. 157 sqft. approc 67 cy of excavation. | $55,735 |
| Jun 5, 2023 | Completed final sign-off Nov 2023 | 3544 Baker St | Cook Construction | remodel of kitchen and 3 bathss, light electrical, light plumbingDetails
remodel of kitchen and 3 bathss, light electrical, light plumbing | $75,000 |
| Jan 10, 2023 | Completed final sign-off May 2024 | 625 El Camino Del Mar | Cook Construction | basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled.Details
basement floor: no work at this level. 1st fl kitchen remodel portion of e wall to be removed between kitchen and breakfast room. 2nd fl e master bath to be removed, wall between master bath and master bedroom, to be removed. e secondary m bath to be remodeled. | $20,000 |
| Nov 7, 2022 | Completed final sign-off Mar 2024 | 625 El Camino Del Mar | Cook Construction | (1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work.Details
(1) kitchen remodel in kind. (6) bath remodel in kind. all non structural work. | $100,000 |
| Oct 4, 2022 | Completed final sign-off Apr 2025 | 12 Rossi Av | Cook Construction | interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairsDetails
interior remodel level 1, demo portion of e conc slab foundation to provide 8' clearance head height. total excavation 33.7 cy, add new bath, laundry rm, pwdr rm. n patio slider door to rear yard. level 2, demo e sunroom, int walls and reconfig space to add a new bath,stairs to roof deck,n stairs | $500,000 |
| Aug 17, 2022 | Completed final sign-off Aug 2022 | 118 09th Av | Cook Construction | to obtain final inspection of work approved under permit application #201210292988.100% complete.Details
to obtain final inspection of work approved under permit application #201210292988.100% complete. | |
| Jun 7, 2022 | Completed final sign-off May 2023 | 3829 Clay St | Cook Construction | redo floors, cabinetry, and baseboards for cosemetic purposes. restore back to original- water damage repair.Details
redo floors, cabinetry, and baseboards for cosemetic purposes. restore back to original- water damage repair. | $48,000 |
| Feb 25, 2022 | Completed final sign-off Jan 2024 | 1900 Green St | Cook Construction | exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces.Details
exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces. | $1,200,000 |
| Dec 20, 2021 | Completed final sign-off Aug 2025 | 1279 Sanchez St | Cook Construction | - new dwelling unit on first floor. - horizontal addition at rear first floor. - vertical addition to add third floor. - facade restoration & new exterior staircase to replace existing.Details
- new dwelling unit on first floor. - horizontal addition at rear first floor. - vertical addition to add third floor. - facade restoration & new exterior staircase to replace existing. | $147,225 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | Cook Construction | rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall.Details
rev to pa202109037747: remove wall at kitchen and wall at wine cellar, enlarge kitchen and reconfigure wine cellar. add structural moment frame. replace cabinets in living room. infill rear window. mf to replace (e) se in basement gl4. new beam to replace bearing wall. | $40,000 |
| Sep 24, 2021 | In progress issued Nov 2023 | 4570 19th St | Cook Construction, Upcycle Builders Inc. | remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors.Details
remodel (e) 3-story sfd w/(n) bay windows & rear infill. 2(n) bedrms, 1(n) bathrm, uprade 1 powder rm to full bath. modify & relocate living rm, kitchen, dining, family rm, media rm, rec rm. excavate baasement into (e) crawlspace. relocate circulation to basement, add elevator serve all floors. | $409,937 |
| Sep 3, 2021 | Completed final sign-off Jun 2022 | 2528 Union St | Cook Construction | kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition.Details
kitchen remodel in kind. wine room cabinets to be replaced in same locations and redo wall finishes. new fixture and finishes. all interior work. no structural work. no layout change, no wall stud framing demolition. | $55,000 |
| Jul 21, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | Cook Construction | revision to app#202008141750: consists of relocation of garage door 3'-5" back from approved location, elimination of concrete landing at front stair, expanding portion of roof deck to adj. propertylineDetails
revision to app#202008141750: consists of relocation of garage door 3'-5" back from approved location, elimination of concrete landing at front stair, expanding portion of roof deck to adj. propertyline | $10,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | Cook Construction | replace (11) (e) windows in-kind, some in front/some in rearDetails
replace (11) (e) windows in-kind, some in front/some in rear | $20,000 |
| Jun 25, 2021 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction | replace 4 (e) windows in-kind at east elevation, not street visible. remove additional 287.25 sq ft of siding from east elevation. wall framing remains. install (n) siding over (e) siding on east & west elevation.Details
replace 4 (e) windows in-kind at east elevation, not street visible. remove additional 287.25 sq ft of siding from east elevation. wall framing remains. install (n) siding over (e) siding on east & west elevation. | $5,000 |
| May 17, 2021 | Completed final sign-off Aug 2022 | 50 Surrey St | Cook Construction | repair of (e) exterior stair in kind , less than 50% . no full replacement. repair only. front facing.Details
repair of (e) exterior stair in kind , less than 50% . no full replacement. repair only. front facing. | $1,000 |
| May 7, 2021 | In progress issued Jul 2024 | 3777 22nd St | Perez Construction Llc., Cook Construction | partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen,Details
partial demo (e) rear kitchen extension & deck & (e) interior walls, stairs. excavate portion of (e) storage to allow occupiable headroom @ lower level. addition @ rear yard include extending (e) roof heigh, new windows & new skylights. new walls for interior remodel. 4 bedrooms, 3.5 baths, kitchen, | $1,250,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2022 | 2737 Clay St | Cook Construction | the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck.Details
the renovation and reconfiguration of the kitchen and family room. areas and reconfigured door openings to exterior rear deck. | $65,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 64 Santa Rita Av | Cook Construction | erect (n) 3-story single family dwelling | $705,500 |
| Nov 14, 2020 | Expired or cancelled expired Apr 2026 | 35 Belgrave Av | Cook Construction | demolish 1 story type 5 construction single family dwellingDetails
demolish 1 story type 5 construction single family dwelling | $65,000 |
| Nov 14, 2020 | Expired or cancelled expired Apr 2026 | 35 Belgrave Av | Cook Construction | erect a three story type 5 construction 1 basement single family dwellingDetails
erect a three story type 5 construction 1 basement single family dwelling | $1,700,000 |
| Oct 30, 2020 | Completed final sign-off Mar 2022 | 1330 Masonic Av | Cook Construction | revision to bpa# 201907055221 & 201907055209. to incorporate the clouded changes per plans. n-exterior stair from rear yard down to garage level; n patio at grade at l2; rebuild front stairs; n skylights; n garage door and side door; new window opening on 3rd floor north; new interior stair @gar-l2.Details
revision to bpa# 201907055221 & 201907055209. to incorporate the clouded changes per plans. n-exterior stair from rear yard down to garage level; n patio at grade at l2; rebuild front stairs; n skylights; n garage door and side door; new window opening on 3rd floor north; new interior stair @gar-l2. | |
| Aug 14, 2020 | Completed final sign-off Aug 2022 | 50 Surrey St | Cook Construction | revision to bpa#201610130162.addition of two car garage, modification to the (e) exterior entry stair, replacement of (e) door with new window & (e) window with new sliding door @ front facade on 1st fl, lower(e) fl level @ 1st fl,(n) interior stair fron(n) garage to 1st fl, new bath on 1st flDetails
revision to bpa#201610130162.addition of two car garage, modification to the (e) exterior entry stair, replacement of (e) door with new window & (e) window with new sliding door @ front facade on 1st fl, lower(e) fl level @ 1st fl,(n) interior stair fron(n) garage to 1st fl, new bath on 1st fl | $185,000 |
| Jul 14, 2020 | Completed final sign-off Mar 2021 | 112 Mallorca Wy | Essex General Contractors Inc, Cook Construction | replace 6 front windows. front windows to be replaced "in-kind" windows will be marvin ultimate casement with arches to match existing, aluminum-clad, multi-lite casement windows. all windows within existing openingsDetails
replace 6 front windows. front windows to be replaced "in-kind" windows will be marvin ultimate casement with arches to match existing, aluminum-clad, multi-lite casement windows. all windows within existing openings | $75,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2026 | 357 Cumberland St | Cook Construction | to erect 3 stories, 1 basement, type v-b, single family dwelling.Details
to erect 3 stories, 1 basement, type v-b, single family dwelling. | $1,750,000 |
| Mar 5, 2020 | Completed final sign-off Apr 2022 | 3010 Pacific Av | Cook Construction | temporary building and basement wall shoring for the future construction of a new below grade basement floor. seismic retrofit, and remodel at upper floors under pa #202001091526. scope at framing levels to be limited to shoring beams as indicated in the construction sequencing notes.Details
temporary building and basement wall shoring for the future construction of a new below grade basement floor. seismic retrofit, and remodel at upper floors under pa #202001091526. scope at framing levels to be limited to shoring beams as indicated in the construction sequencing notes. | $50,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | Cook Construction | rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear.Details
rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear. | $125,000 |
| Jan 9, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | Cook Construction | 1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stairDetails
1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stair | $200,000 |
| Nov 26, 2019 | Completed final sign-off Feb 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | temporary tarp building in preparation for rain onlyDetails
temporary tarp building in preparation for rain only | $2,000 |
| Nov 5, 2019 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | revision to pa 2018-0606-1104 to clarify scope of demo & correct nov 201976792Details
revision to pa 2018-0606-1104 to clarify scope of demo & correct nov 201976792 | $1,000 |
| Sep 25, 2019 | Completed final sign-off Jan 2021 | 135 Avila St | Cook Construction | installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5Details
installation of new tile and replace plumbing fixtures in existing location @ existing powder room and guest bathroom. install new countertop @ existing kitchen. interior and exterior painting. kitchen and bathroom remodel in kind. no structural work. comply with cec 15.0(k) 5 | $20,000 |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 22 Normandie Tr | Cook Construction | revision to pa 2019-0621-4133 replace (e) retaining wall, change wood posts to steel postsDetails
revision to pa 2019-0621-4133 replace (e) retaining wall, change wood posts to steel posts | |
| Sep 13, 2019 | Completed final sign-off Apr 2021 | 10 Normandie Tr | Cook Construction | revision to pa 2019-0621-4130 replace (e) retaining wallDetails
revision to pa 2019-0621-4130 replace (e) retaining wall | $200 |
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 10 Normandie Tr | Cook Construction | street space | |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | Cook Construction | horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall.Details
horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall. | $120,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | Cook Construction | renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind.Details
renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind. | $250,000 |
| Jun 21, 2019 | Completed final sign-off Apr 2021 | 10 Normandie Tr | Cook Construction | replace existing retaining wall.Details
replace existing retaining wall. | $5,000 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 22 Normandie Tr | Cook Construction | replace existing retaining wall.Details
replace existing retaining wall. | |
| May 14, 2019 | Completed final sign-off Feb 2026 | 2830 Filbert St | Cook Construction | rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit.Details
rear horizontal addiiton at all stories.renovation (e)3-story sfd. new roof deck above 1st level addition. new patio at rear yard. no work to front facade. addition is not visible from public right of way. 1 new bedroom, 1 new bath.install fire protection system throughout under separate permit. | $780,600 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 3800 Washington St | Cook Construction | street space | |
| Jan 25, 2019 | Never finaled issued Jan 2019, no final | 3800 Washington St | Cook Construction | interior renovation to ground floor kitchen, pantry, wet bar, study room and powder roomDetails
interior renovation to ground floor kitchen, pantry, wet bar, study room and powder room | $55,000 |
| Oct 1, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | Cook Construction | revision to 201710040350 and pa # 201805219677 revised ele & hvac plan changes. n/a for maherDetails
revision to 201710040350 and pa # 201805219677 revised ele & hvac plan changes. n/a for maher | |
| Aug 27, 2018 | Completed final sign-off Feb 2019 | 1080 Chestnut St | Cook Construction | replace fixtures and finishes at kitchen and (1) bathroom. no structural workDetails
replace fixtures and finishes at kitchen and (1) bathroom. no structural work | $20,000 |
| Aug 1, 2018 | Completed final sign-off Feb 2019 | 150 Glenbrook Av | Cook Construction | revision to bpa# 2013-0529-8042s1. add two (1) wet bar at basement level and one on first floor. re-configure bathroom layout on 1 floor.Details
revision to bpa# 2013-0529-8042s1. add two (1) wet bar at basement level and one on first floor. re-configure bathroom layout on 1 floor. | |
| Jun 25, 2018 | Completed final sign-off Jun 2019 | 325 Cornwall St | Cook Construction | revisionto 201805189603 submittal of structural drawings onlyDetails
revisionto 201805189603 submittal of structural drawings only | |
| Jun 12, 2018 | Completed final sign-off May 2019 | 2831 Baker St | Cook Construction | remodel of (2) existing kitchens, paint throughout, new plumbing & electrical at kitchens. no alteration of wall, window and doorDetails
remodel of (2) existing kitchens, paint throughout, new plumbing & electrical at kitchens. no alteration of wall, window and door | $200,000 |
| Jun 6, 2018 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | demo of 625.50 square feet of 2nd fl horizontal element and interior walls to allow for construction of 1st floorDetails
demo of 625.50 square feet of 2nd fl horizontal element and interior walls to allow for construction of 1st floor | $30,000 |
| May 21, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | Cook Construction | revision to 201710040350 & 201701088019 revised floorplan structural details & replacement of 4th flr roof. this revision superceedes 201212176385 maher naDetails
revision to 201710040350 & 201701088019 revised floorplan structural details & replacement of 4th flr roof. this revision superceedes 201212176385 maher na | |
| May 18, 2018 | Never finaled issued Jun 2018, no final | 325 Cornwall St | Cook Construction | replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit.Details
replacement of doors, windows in situ (n) plumbing, kitchen & bathroom fixtures,interior finishes, replacement of (e) wood exterior stair (n) exterior stair. structural under separate permit. | $200,000 |
| May 16, 2018 | Never finaled issued May 2018, no final | 145 Mallorca Wy | Cook Construction | supplemental structural work. revision to pa 2018-0327-4759Details
supplemental structural work. revision to pa 2018-0327-4759 | $3,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 150 Glenbrook Av | Cook Construction | street space | |
| May 8, 2018 | Never finaled issued May 2018, no final | 10 Normandie Tr | Cook Construction | street space | |
| Mar 27, 2018 | Never finaled issued May 2018, no final | 145 Mallorca Wy | Cook Construction | replace (e) front balconies in kind original corbels & metal railings to be removed & reused. repair surrounding stucco as needed. no construction or other work. maher naDetails
replace (e) front balconies in kind original corbels & metal railings to be removed & reused. repair surrounding stucco as needed. no construction or other work. maher na | $10,000 |
| Mar 19, 2018 | Completed final sign-off May 2023 | 1973 Broadway | Cook Construction, Eastwood Development Incorporated | revision to pa 2015-0415-3728 (s2) structural design due to (e) site conditions.Details
revision to pa 2015-0415-3728 (s2) structural design due to (e) site conditions. | $5,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | Cook Construction | to obtain final inspection for work approved under pa # 201605117166Details
to obtain final inspection for work approved under pa # 201605117166 | |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | Cook Construction | recommencement and completion of work approved under pa # 201107019377Details
recommencement and completion of work approved under pa # 201107019377 | $30,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | Cook Construction | to obtain final inspection for work approved under pa # 201605117167Details
to obtain final inspection for work approved under pa # 201605117167 | |
| Jan 16, 2018 | Completed final sign-off Sep 2019 | 2717 Pacific Av | Cook Construction | recommencement and completion of work approved under pa # 201503272067Details
recommencement and completion of work approved under pa # 201503272067 | $10,000 |
| Jan 8, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | Cook Construction | revision to app#201710040350 to add moment frame to rear wall ground floor. n/a for maherDetails
revision to app#201710040350 to add moment frame to rear wall ground floor. n/a for maher | |
| Dec 14, 2017 | Completed final sign-off Aug 2018 | 240 Cervantes Bl | Cook Construction | repair of water damage and install waterproofing for existing front entry stair. no demo of stairs. remove existing terra cotta, install waterproofing, and re-install terra cotta. repair in-kind. n/a for maher.Details
repair of water damage and install waterproofing for existing front entry stair. no demo of stairs. remove existing terra cotta, install waterproofing, and re-install terra cotta. repair in-kind. n/a for maher. | $20,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2020 | 101 Terrace Dr | Murphymckenna Construction, Cook Construction | the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roofDetails
the project scope is the remodel of an existing two story over basement building, including renovation of basement, kitchen, two bathrooms, roof deck and part of the roof | $273,000 |
| Nov 22, 2017 | Completed final sign-off Apr 2018 | 1080 Chestnut St | Cook Construction | #5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of (e) layout, no rough plumbing and electrical. maher naDetails
#5b: install new tile shower. paint throughout. new kitchen appliances and countertops. no change of (e) layout, no rough plumbing and electrical. maher na | $20,000 |
| Oct 6, 2017 | Completed final sign-off Oct 2017 | 2211 Broderick St | Cook Construction | repair/replace two existing water damaged double hung windows in light well with new awning and double hung window.Details
repair/replace two existing water damaged double hung windows in light well with new awning and double hung window. | $500 |
| Oct 6, 2017 | Completed final sign-off Dec 2017 | 2211 Broderick St | Cook Construction | patch/repair building common area, plaster walls in hallway, appx 4 sq ftDetails
patch/repair building common area, plaster walls in hallway, appx 4 sq ft | $250 |
| Oct 4, 2017 | Completed final sign-off Sep 2019 | 431 Avila St | Cook Construction | interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street).Details
interior remodel on all floors including reconfiguration of bedrooms & bathrooms, 4/f non-conforming (e) roof deck to be expanded & legalized, window changes at 4/f deck (not visible to street). | $170,000 |
| Sep 13, 2017 | Completed final sign-off Dec 2019 | 138 23rd Av | Elisha Mayost, Cook Construction | residential alteration & addition including voluntary seismic upgradesDetails
residential alteration & addition including voluntary seismic upgrades | $100,000 |
| Jun 26, 2017 | Completed final sign-off Nov 2017 | 2908 Pacific Av | Cook Construction | kitchen remodel, replacing cabinets in-kindDetails
kitchen remodel, replacing cabinets in-kind | $25,000 |