Bahman Ghassemzadeh
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Bahman Ghassenmzadeh
- Based in
- Hillsborough
- On San Francisco permits
- May 2000 to Jan 2024
223 permits since 2000 (engineer on 162 permits, architect on 46 permits, designer on 10 permits, authorized agent-others on 4 permits, attorney on 1 permit, pmt consultant/expediter on 1 permit): 153 completed, 4 in progress, 43 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 223.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2024 | Completed final sign-off Nov 2024 | 75 07th Av | Velero Inc | revision to pa 202212309559 minor change to north footing. (e) chimney to remain. increase to thickness & depth of portion of north footing near bathroomDetails
revision to pa 202212309559 minor change to north footing. (e) chimney to remain. increase to thickness & depth of portion of north footing near bathroom | |
| Apr 20, 2022 | Completed final sign-off Feb 2025 | 547 Hayes St | proposed addition of fire rated door to restpre 4 residental unit layout, and kitchen remodel in restored unit. addition of 1 bathroom at 3rd fl.. no change to (e) building envelope.Details
proposed addition of fire rated door to restpre 4 residental unit layout, and kitchen remodel in restored unit. addition of 1 bathroom at 3rd fl.. no change to (e) building envelope. | $20,000 | |
| Apr 8, 2022 | Expired or cancelled withdrawn Jan 2024 | 1204 Egbert Av | fire rating of existing external wall and relocation of 2 windows to accomodate future lot split.Details
fire rating of existing external wall and relocation of 2 windows to accomodate future lot split. | $10,000 | |
| Feb 28, 2022 | In progress issued May 2024 | 2231 Powell St | Tip Managers Inc | reconstruction of (e)fire damaged units @ 2nd & 3rd fls with modification to floor plans.all work to be performed withing(e)boundary of the bldg.removal of(e)metal fire escapes.partially addressed nov#202047402.conversion of 4 carpots to one adu(under separate permit)Details
reconstruction of (e)fire damaged units @ 2nd & 3rd fls with modification to floor plans.all work to be performed withing(e)boundary of the bldg.removal of(e)metal fire escapes.partially addressed nov#202047402.conversion of 4 carpots to one adu(under separate permit) | $1,500,000 |
| Feb 14, 2022 | In progress issued Sep 2026 | 1200 Egbert Av | to erect a detached, type 5, 2-story, two residential unit building with one state adu unit per government code sect65852.2. (e) front building to remain.Details
to erect a detached, type 5, 2-story, two residential unit building with one state adu unit per government code sect65852.2. (e) front building to remain. | $600,000 | |
| Dec 22, 2021 | Completed final sign-off May 2024 | 4314 17th St | O Donoghue Construction Inc. | repair of existing retaining wall to comply with nov #202173588.Details
repair of existing retaining wall to comply with nov #202173588. | $150,000 |
| Nov 16, 2021 | Never finaled filed Nov 2021, never issued | 1204 Egbert Av | proposed reduction of building envelope of existing single family home and interior remodel to add one bathroom & partial foundation replacement. adu at ground floor under separate permit.Details
proposed reduction of building envelope of existing single family home and interior remodel to add one bathroom & partial foundation replacement. adu at ground floor under separate permit. | $80,000 | |
| Aug 20, 2021 | Expired or cancelled withdrawn Jun 2024 | 2820 Greenwich St | removal of bearing wall to convert (e)bedroom to dining room. sprinkler under sep permit, if applicable.Details
removal of bearing wall to convert (e)bedroom to dining room. sprinkler under sep permit, if applicable. | $40,000 | |
| May 26, 2021 | Never finaled issued Jan 2022, no final | 2233 Powell St | Nbay Construction And Remodeling Inc, O Donoghue Construction Inc. | emergency repair of fire damaged building to (partially) comply with nov 202047402. maher not reqDetails
emergency repair of fire damaged building to (partially) comply with nov 202047402. maher not req | $30,000 |
| Feb 26, 2021 | Expired or cancelled withdrawn Dec 2023 | 1926 42nd Av | proposed addition of roof shade structure over existing deckDetails
proposed addition of roof shade structure over existing deck | $10,000 | |
| Feb 12, 2021 | Expired or cancelled cancelled Jan 2026 | 145 Hyde St | proposed t.i. at ground floor of extg restaurant(limited), all work within the building boundry and no exterior modification proposed.Details
proposed t.i. at ground floor of extg restaurant(limited), all work within the building boundry and no exterior modification proposed. | $25,000 | |
| Feb 6, 2021 | Completed final sign-off Dec 2022 | 500 Larkin St | Success Construction ***See Notes*** | tenant improvement to (n) limited grocery. modify (e) front facade (larkin st) facade to accomodate handicap accessible entrance, modify (e) bathroom, add counters. all work within (e) building boundaryDetails
tenant improvement to (n) limited grocery. modify (e) front facade (larkin st) facade to accomodate handicap accessible entrance, modify (e) bathroom, add counters. all work within (e) building boundary | $50,000 |
| Jan 12, 2021 | Completed final sign-off Nov 2021 | 2049 San Jose Av | Ampex Engineering & Co | proposed conversion of existing first floor to new accessory dwelling unit all within the building boundary.Details
proposed conversion of existing first floor to new accessory dwelling unit all within the building boundary. | $10,000 |
| Jan 9, 2020 | Completed final sign-off Jul 2021 | 2408 Moraga St | Blue Birds Construction Inc | comply w/ nov #201955731: proposed addition rear of building at first floor & interior remodel of the existing single family house. upgrade part of facade to wood siding finishDetails
comply w/ nov #201955731: proposed addition rear of building at first floor & interior remodel of the existing single family house. upgrade part of facade to wood siding finish | $150,000 |
| Jan 3, 2020 | Completed final sign-off Mar 2021 | 78 Tehama St | rev to pa# 201705187039 & 201901100082 drawing for correction to d.a. check list and removal of drinking fountainDetails
rev to pa# 201705187039 & 201901100082 drawing for correction to d.a. check list and removal of drinking fountain | ||
| Dec 20, 2019 | Completed final sign-off Oct 2024 | 2420 03rd St | revision to pa 2014-0508-5278 foundation & framing to replace the prefabricated simpson frame with conventional built on site moment frameDetails
revision to pa 2014-0508-5278 foundation & framing to replace the prefabricated simpson frame with conventional built on site moment frame | ||
| Aug 21, 2019 | Expired or cancelled expired Feb 2026 | 27 Brompton Av | propose interior remodeling of (e) single family have & add (n) roof deck w/ no stair penthouse. excavation to add one adu unit per ordinance 95-17.Details
propose interior remodeling of (e) single family have & add (n) roof deck w/ no stair penthouse. excavation to add one adu unit per ordinance 95-17. | $450,000 | |
| Aug 8, 2019 | In progress issued Feb 2024 | 231 Onondaga Av | B & J General Construction | legalize (1) illegal unit @ ground fl per adu ordinance #162-16. legalization of the other unit will be under separate permitDetails
legalize (1) illegal unit @ ground fl per adu ordinance #162-16. legalization of the other unit will be under separate permit | $150,000 |
| Aug 8, 2019 | Completed final sign-off Jul 2022 | 955 Wisconsin St | proposed conversion of (e) garage to addition (2) dwelling units per ordinance #162-16.Details
proposed conversion of (e) garage to addition (2) dwelling units per ordinance #162-16. | $150,000 | |
| Aug 8, 2019 | Completed final sign-off Dec 2019 | 372 Hearst Av | voluntary existing foundation anchorageDetails
voluntary existing foundation anchorage | $2,500 | |
| Aug 8, 2019 | In progress issued Feb 2024 | 231 Onondaga Av | B & J General Construction | legalize (1) illegal unit @ ground fl per ordinance #43-14. legalization of the other unit per adu ordinance under separateDetails
legalize (1) illegal unit @ ground fl per ordinance #43-14. legalization of the other unit per adu ordinance under separate | $150,000 |
| Aug 5, 2019 | Completed final sign-off Sep 2022 | 3830 24th St | Loughran Construction Inc. | remove excess concrete at property lineDetails
remove excess concrete at property line | $1,000 |
| Aug 5, 2019 | Completed final sign-off Sep 2022 | 3822 24th St | Loughran Construction Inc. | remove excess concrete at property lineDetails
remove excess concrete at property line | $1,000 |
| Jun 17, 2019 | Completed final sign-off May 2023 | 319 Moultrie St | Paul K Vou | Details
| $2,000 |
| Jun 10, 2019 | Completed final sign-off Oct 2019 | 1006 Hollister Av | Area Development Inc. | to comply w/ n.o.v 201960091. install 7 windows, add full bath, convert half bath to full, change layout, new hvac w/ ductwork. no expansion of footprint of building.Details
to comply w/ n.o.v 201960091. install 7 windows, add full bath, convert half bath to full, change layout, new hvac w/ ductwork. no expansion of footprint of building. | $30,000 |
| May 31, 2019 | Completed final sign-off Apr 2022 | 915 Cayuga Av | Area Development Inc. | to demolish 2 story, industrial building. ** maher: n/a **Details
to demolish 2 story, industrial building. ** maher: n/a ** | $100,000 |
| May 29, 2019 | Never finaled filed May 2019, never issued | 2891 San Bruno Av | comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270763 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitorDetails
comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270763 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor | $250,000 | |
| May 29, 2019 | Never finaled filed May 2019, never issued | 2883 San Bruno Av | comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270764 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitorDetails
comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270764 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor | $250,000 | |
| May 29, 2019 | Never finaled filed May 2019, never issued | 2875 San Bruno Av | comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270765 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitorDetails
comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270765 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor | $250,000 | |
| May 29, 2019 | Never finaled filed May 2019, never issued | 2867 San Bruno Av | comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 2 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270766 to accomondate 4 unit,facade modify to match as built conditions per zoning adminitorDetails
comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 2 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270766 to accomondate 4 unit,facade modify to match as built conditions per zoning adminitor | $250,000 | |
| May 29, 2019 | Never finaled filed May 2019, never issued | 2899 San Bruno Av | comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270758 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitorDetails
comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270758 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor | $250,000 | |
| May 20, 2019 | Completed final sign-off Mar 2023 | 165 Crescent Av | Majestic Landscape | vertical & horizontal additoin; interior remodel single family house to convert crawl space to basement living space and addition of 1 bedroom and 2 bathrooms.Details
vertical & horizontal additoin; interior remodel single family house to convert crawl space to basement living space and addition of 1 bedroom and 2 bathrooms. | $250,000 |
| May 1, 2019 | Completed final sign-off Jun 2023 | 3169 Sacramento St | Tritec Construction Co Inc--See Notes, Daly Builders Group | inteiror remodel. convert basement storage to master bed. 1st flr remodel -relocate laundry, relocate closet, add bath.Details
inteiror remodel. convert basement storage to master bed. 1st flr remodel -relocate laundry, relocate closet, add bath. | $40,000 |
| May 1, 2019 | Completed final sign-off Oct 2020 | 250 10th Av | Design Line Construction | conversion 1st flr garage & storage to 2 dwelling units. remodel 2nd & 3rd flrs. add bath, add laundry, relocating kitchen. remove curb cut.Details
conversion 1st flr garage & storage to 2 dwelling units. remodel 2nd & 3rd flrs. add bath, add laundry, relocating kitchen. remove curb cut. | $95,000 |
| Mar 27, 2019 | Completed final sign-off Jan 2020 | 1749 Cayuga Av | interior remodeling of (e) single family house in order to add adu unit @ garage level per ordinance 95-17.Details
interior remodeling of (e) single family house in order to add adu unit @ garage level per ordinance 95-17. | $40,000 | |
| Feb 21, 2019 | Completed final sign-off Aug 2019 | 988 Oak St | Sft Construction Corp | rev to pa 201710232003 & 201801128607; proposed soft story retrofit for 988-998 oak st. per 1ebc2012 appendix a4, revision to the approvd permit (commercial portion)Details
rev to pa 201710232003 & 201801128607; proposed soft story retrofit for 988-998 oak st. per 1ebc2012 appendix a4, revision to the approvd permit (commercial portion) | |
| Jan 30, 2019 | Completed final sign-off Mar 2021 | 3005 San Bruno Av | proposed addition of (1)res unit to (e)(2)units. convert com'l unit to res'l for total (3)res'l. convert com'l space to (n)(1)bdrm, (2)bath dwelling unit, conversion of (e)storage space to (1)bdrm dwelling unit, all work within e building boundary. ref #201903124993Details
proposed addition of (1)res unit to (e)(2)units. convert com'l unit to res'l for total (3)res'l. convert com'l space to (n)(1)bdrm, (2)bath dwelling unit, conversion of (e)storage space to (1)bdrm dwelling unit, all work within e building boundary. ref #201903124993 | $300,000 | |
| Jan 15, 2019 | Completed final sign-off Mar 2025 | 4822 19th St | S F Garage Company Inc., Harty Development | to erect 3 stories over basement, type v-b, single family home.Details
to erect 3 stories over basement, type v-b, single family home. | $600,000 |
| Dec 12, 2018 | Completed final sign-off Sep 2019 | 3933 Mission St | second and 3rd floor remodel: lightwell infill. adu under seperate permit #2018-0313-3575. structural work under soft story permit # 2018-1011-2968Details
second and 3rd floor remodel: lightwell infill. adu under seperate permit #2018-0313-3575. structural work under soft story permit # 2018-1011-2968 | $200,000 | |
| Aug 23, 2018 | Completed final sign-off Feb 2020 | 757 39th Av | Hugo Tejada/Dba Alpha & Omega Renovation | interior remodel. rearrange kitchen layout, add 1 more bedroom, 1 more bath on second floor.Details
interior remodel. rearrange kitchen layout, add 1 more bedroom, 1 more bath on second floor. | $30,000 |
| Aug 1, 2018 | Completed final sign-off Nov 2019 | 2112 Bryant St | R & D Construction Co Inc | revision to approved app#201801269702 to reconfigure 4th floor master bedroom. repair, replace and reinforce damage rear and side wall membrane on 2nd and 3rd floor.Details
revision to approved app#201801269702 to reconfigure 4th floor master bedroom. repair, replace and reinforce damage rear and side wall membrane on 2nd and 3rd floor. | $15,000 |
| Jul 31, 2018 | Completed final sign-off Apr 2021 | 25 Rutledge St | Ampex Engineering & Co | construction of a new stairway as part of sidewalk improvement plan.Details
construction of a new stairway as part of sidewalk improvement plan. | $25,000 |
| Jun 26, 2018 | Never finaled issued Nov 2018, no final | 127 Edgehill Wy | A B J Construction | structural revision to approved permit #201405296982, construction of a new single family home.Details
structural revision to approved permit #201405296982, construction of a new single family home. | |
| Jun 21, 2018 | Never finaled issued Jul 2018, no final | 3240 Lyon St | J.W.D. Construction | rev to pa# 201509106564; adding a new bedroom, family room, office & bathroom at ground level, kitchen and bathroom wall modification at 2nd fl, relocating a bathroom at 3rd fl.Details
rev to pa# 201509106564; adding a new bedroom, family room, office & bathroom at ground level, kitchen and bathroom wall modification at 2nd fl, relocating a bathroom at 3rd fl. | |
| Jun 8, 2018 | Never finaled filed Jun 2018, never issued | 519 Ellis St | to erect 8 stories, 1 basement, type i-b, 21 units residential with mix use bldg. (r-2,m)Details
to erect 8 stories, 1 basement, type i-b, 21 units residential with mix use bldg. (r-2,m) | $2,000,000 | |
| Jun 1, 2018 | Expired or cancelled cancelled Jan 2026 | 524 Kansas St | rev pa#201404163414: to modify the approved basement and 1st fl- relocation of w.h. gas meter cabinetDetails
rev pa#201404163414: to modify the approved basement and 1st fl- relocation of w.h. gas meter cabinet | ||
| May 17, 2018 | Completed final sign-off Jan 2025 | 66 Mountain Spring Av | Transatlantic Construction Company | to erect 3 stories, no basement, type v-b construction single family dwelling. sprinkler under separate permit.Details
to erect 3 stories, no basement, type v-b construction single family dwelling. sprinkler under separate permit. | $1,150,000 |
| May 16, 2018 | Completed final sign-off Jan 2023 | 556 Sanchez St | Rohan Wallace & Aherne Inc | proposed (n) add unit in the (e) storage arra @ 1st fl. interior modification of (e) units @ 2nd & 3rd fl. lightwell infill on north & south property line wall per ord 162-16.Details
proposed (n) add unit in the (e) storage arra @ 1st fl. interior modification of (e) units @ 2nd & 3rd fl. lightwell infill on north & south property line wall per ord 162-16. | $476,000 |
| May 10, 2018 | Never finaled issued Jun 2018, no final | 680 Illinois St | Transatlantic Construction Company | revision to 201612296253. scope includes add 1 storage 1 freezer addition ot e commercial space. addition of 5 class 1 bicycle parking space to e garage. change bathroom and seating layout. change door/window locatoin at street front maher not reqDetails
revision to 201612296253. scope includes add 1 storage 1 freezer addition ot e commercial space. addition of 5 class 1 bicycle parking space to e garage. change bathroom and seating layout. change door/window locatoin at street front maher not req | $25,000 |
| May 4, 2018 | Never finaled filed May 2018, never issued | 527 Stevenson St | proposed new construction of seven story commercial building.Details
proposed new construction of seven story commercial building. | $6,000,000 | |
| May 4, 2018 | Never finaled filed May 2018, never issued | 527 Stevenson St | to demolish a type v-b, 1-story office.Details
to demolish a type v-b, 1-story office. | $25,000 | |
| Apr 20, 2018 | Never finaled issued Jan 2020, no final | 7 Lake Forest Ct | proposed vertical addition to (e) single family home, adding a new floor. interior remodel to 1st & 2nd floors, adding one new bathroom & one new half bathroom.Details
proposed vertical addition to (e) single family home, adding a new floor. interior remodel to 1st & 2nd floors, adding one new bathroom & one new half bathroom. | $20,000 | |
| Apr 11, 2018 | Never finaled issued May 2018, no final | 127 Edgehill Wy | A B J Construction | modification to the approved plan #2014-0529-6982 to modify temporary shoring system per plans. no change or modification to the approved boundary and architecture of the new building. the final revision to the original building permit will be submitted under separate building applicationDetails
modification to the approved plan #2014-0529-6982 to modify temporary shoring system per plans. no change or modification to the approved boundary and architecture of the new building. the final revision to the original building permit will be submitted under separate building application | $10,000 |
| Apr 4, 2018 | Completed final sign-off Apr 2021 | 2779 Folsom St | Transatlantic Construction Company | convert (e) 2-story industrial space into an (n) 4-story mixed use with 6-unit residential over community facility & parking at ground floor.Details
convert (e) 2-story industrial space into an (n) 4-story mixed use with 6-unit residential over community facility & parking at ground floor. | $3,500,000 |
| Apr 3, 2018 | Completed final sign-off Oct 2024 | 350 San Jose Av | Transatlantic Construction Company | addition of 8 units & 1 adu to an (e) 4 dwelling unit bldg: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to (e) 2-story bldg; excavation of (e) garage to add basement level and open space.Details
addition of 8 units & 1 adu to an (e) 4 dwelling unit bldg: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to (e) 2-story bldg; excavation of (e) garage to add basement level and open space. | $3,556,000 |
| Mar 13, 2018 | Completed final sign-off Sep 2019 | 3933 Mission St | adding two dwelling units at ground fl. per ordinace 162-16.Details
adding two dwelling units at ground fl. per ordinace 162-16. | $350,000 | |
| Mar 7, 2018 | Completed final sign-off Sep 2019 | 3933 Mission St | proposed seismic streghtening volunteerly. lightwell infill is being processed under bpa# 2018-0313-3575.Details
proposed seismic streghtening volunteerly. lightwell infill is being processed under bpa# 2018-0313-3575. | $150,000 | |
| Feb 15, 2018 | Completed final sign-off Mar 2020 | 2857 Folsom St | addition of one dwelling unit to (e) 2 units building within the boundary of the bldg. total conversion non habitable to habitable. attic to become 4th story. ref to pa# 2017-1114-3972.Details
addition of one dwelling unit to (e) 2 units building within the boundary of the bldg. total conversion non habitable to habitable. attic to become 4th story. ref to pa# 2017-1114-3972. | $375,000 | |
| Feb 15, 2018 | Completed final sign-off Mar 2020 | 2861 Folsom St | addition of one dwelling unit to (e) 2 unit building within the boundary of the bldg. total conversion non-habitable to habitable. ref to pa# 2017-1114-3972Details
addition of one dwelling unit to (e) 2 unit building within the boundary of the bldg. total conversion non-habitable to habitable. ref to pa# 2017-1114-3972 | $375,000 | |
| Feb 14, 2018 | Completed final sign-off Sep 2018 | 6 Bonview St | Transatlantic Construction Company | revision to pa 2017/0925/9510 & 2015/0572/6076s2 provide easement through adjacent lot 5613-064 (2 bonview) as per easement agreement. as built for minor interior changes. additional walls for furnace space on basement & 2nd floor. rebuild stairs (2nd to 3rd stair)Details
revision to pa 2017/0925/9510 & 2015/0572/6076s2 provide easement through adjacent lot 5613-064 (2 bonview) as per easement agreement. as built for minor interior changes. additional walls for furnace space on basement & 2nd floor. rebuild stairs (2nd to 3rd stair) | |
| Feb 7, 2018 | Expired or cancelled withdrawn Aug 2018 | 468 Valley St | convert (e) 2 story, 1 unit dwelling into (n) 4 story, 2 unit dwelling with 4th fl set back 26'-4" from front property lineDetails
convert (e) 2 story, 1 unit dwelling into (n) 4 story, 2 unit dwelling with 4th fl set back 26'-4" from front property line | $550,000 | |
| Jan 31, 2018 | Completed final sign-off Feb 2018 | 2877 Folsom St | revision to app#201412012688 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg.Details
revision to app#201412012688 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg. | ||
| Jan 31, 2018 | Completed final sign-off Feb 2018 | 50 Lucky St | revision to app#201412012693 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg. reconfiguration of kitchen layout.Details
revision to app#201412012693 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg. reconfiguration of kitchen layout. | ||
| Jan 26, 2018 | Completed final sign-off Nov 2019 | 2112 Bryant St | interior at 1st, 2nd, 3rd and attic. enlarge both units. foundation replacement and structural upgrade. remove (e) rear stairs. create (n) master bedroom, family room and 1.5 bath on 1st floor; 2nd fl - create (n) bathroom and layout change; 3rd fl - add (n) bathroom. add 4 new dormersDetails
interior at 1st, 2nd, 3rd and attic. enlarge both units. foundation replacement and structural upgrade. remove (e) rear stairs. create (n) master bedroom, family room and 1.5 bath on 1st floor; 2nd fl - create (n) bathroom and layout change; 3rd fl - add (n) bathroom. add 4 new dormers | $450,000 | |
| Jan 19, 2018 | Never finaled issued Dec 2020, no final | 332 Bradford St | Nassif A Ayyad | to erect 2 stories, 1 basement, type v-b, sigle family dwelling.Details
to erect 2 stories, 1 basement, type v-b, sigle family dwelling. | $450,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2023 | 1220 Hayes St | J P F Construction | to add two accessory dwelling units (adu) at ground floor per ord no. 162-16.Details
to add two accessory dwelling units (adu) at ground floor per ord no. 162-16. | $60,000 |
| Jan 16, 2018 | Completed final sign-off Jul 2021 | 310 Montcalm St | O'pro Construction Inc. | compliance with notice of violation: planning complaint# 2011-002370enf. dbi compliant# 2017.87861 & 2017.65203 & 2016.10071. to bring the proposed remodeling into compliance. expansion of previously approval dormers pa# 2016/07/14/2394 & pa# 2016/04/11/4470, reduction of rear massing.Details
compliance with notice of violation: planning complaint# 2011-002370enf. dbi compliant# 2017.87861 & 2017.65203 & 2016.10071. to bring the proposed remodeling into compliance. expansion of previously approval dormers pa# 2016/07/14/2394 & pa# 2016/04/11/4470, reduction of rear massing. | $250,000 |
| Jan 16, 2018 | Completed final sign-off Dec 2020 | 4068 Folsom St | R & D Construction Co Inc | revision to approved pa# 2017/03/09/1099 to comply with planning enforcement case# 2017-007370enf. to add a roof deck with no stair penthhouse.Details
revision to approved pa# 2017/03/09/1099 to comply with planning enforcement case# 2017-007370enf. to add a roof deck with no stair penthhouse. | $350,000 |
| Jan 12, 2018 | Expired or cancelled expired May 2022 | 1200 Indiana St | to comply with nov 201650011 and & 201758221 - return current use of event space (assembly group a) to warehouse (storage group s) mahernaDetails
to comply with nov 201650011 and & 201758221 - return current use of event space (assembly group a) to warehouse (storage group s) maherna | $30,000 | |
| Jan 12, 2018 | Completed final sign-off Aug 2019 | 998 Oak St | Sft Construction Corp | soft story retrofit for 988-998 oak street per cebc 2016 appendix a-4. (commercial portion)Details
soft story retrofit for 988-998 oak street per cebc 2016 appendix a-4. (commercial portion) | $50,000 |
| Jan 5, 2018 | Completed final sign-off Apr 2019 | 1350 Howard St | proposed interior remodel of (e) unoccupied commercial space, proposed 1 new bathroom, 2 new accessory offices, 2 new mezzanines, no change of use proposed, unveil (e) windows, install new glass in (e) steel windows. in kind replacement of (e) front door - for planning purposes (e) use is motor;Details
proposed interior remodel of (e) unoccupied commercial space, proposed 1 new bathroom, 2 new accessory offices, 2 new mezzanines, no change of use proposed, unveil (e) windows, install new glass in (e) steel windows. in kind replacement of (e) front door - for planning purposes (e) use is motor; | $30,000 | |
| Dec 18, 2017 | Completed final sign-off Jan 2019 | 244 Ashton Av | Albco | to add an accessory dwelling unit (adu)at ground fl. per ordinance 95-17. (studio unit)Details
to add an accessory dwelling unit (adu)at ground fl. per ordinance 95-17. (studio unit) | $60,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2024 | 674 Capp St | S M Construction And Assoc | horizontal & vertical addition, interior remodel of (e)bldg. adding (n)1st fl with 2 new beds & 1 bath. add 2 new beds & 2 baths on 2nd fl. relocating dining & living room to 3rd fl and add new roof deck. one new unit portion on side of (e) bldg with 3 beds, 3 baths and roof deck. total add 2 units.Details
horizontal & vertical addition, interior remodel of (e)bldg. adding (n)1st fl with 2 new beds & 1 bath. add 2 new beds & 2 baths on 2nd fl. relocating dining & living room to 3rd fl and add new roof deck. one new unit portion on side of (e) bldg with 3 beds, 3 baths and roof deck. total add 2 units. | $850,000 |
| Dec 1, 2017 | Expired or cancelled cancelled Aug 2019 | 676 Capp St | adding (n) unit at rear of (e) blg(storage) with 2 beds, 1 kitchen, 1 living, 1 dining at basement, 3 baths and roof deck (rear bldg)Details
adding (n) unit at rear of (e) blg(storage) with 2 beds, 1 kitchen, 1 living, 1 dining at basement, 3 baths and roof deck (rear bldg) | $450,000 | |
| Nov 14, 2017 | Completed final sign-off Mar 2020 | 2857 Folsom St | revision to 201703091134, removal of rear wood stair. full sprinkler building on separate permitDetails
revision to 201703091134, removal of rear wood stair. full sprinkler building on separate permit | $15,000 | |
| Oct 23, 2017 | Completed final sign-off Aug 2019 | 988 Oak St | Sft Construction Corp | proposed soft story retrofit for residential 988-998 oak st per iebc 2012 app a4. commercial on pa# 2018/01/12/8607.Details
proposed soft story retrofit for residential 988-998 oak st per iebc 2012 app a4. commercial on pa# 2018/01/12/8607. | $250,000 |
| Oct 18, 2017 | Expired or cancelled withdrawn Feb 2020 | 449 09th St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (bakery) n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (bakery) n/a for maher | ||
| Oct 17, 2017 | Completed final sign-off May 2019 | 661 Page St | add roof deck with no stair penthouse. interior remodel & adjustment of floor plans @ unit# 661 & 663. rear extension at 1st and 2nd floor not ot exceed 25% setback line. eliminate wood stair to 2nd floor. add a unit @ basement level & 1st floor is revisionto permit 201706139268Details
add roof deck with no stair penthouse. interior remodel & adjustment of floor plans @ unit# 661 & 663. rear extension at 1st and 2nd floor not ot exceed 25% setback line. eliminate wood stair to 2nd floor. add a unit @ basement level & 1st floor is revisionto permit 201706139268 | $120,000 | |
| Oct 12, 2017 | Expired or cancelled expired Nov 2019 | 53 States St | revised temp shoring at 53 states to extend the shoring to cover the 51 states rear portion to comply with nov 201707772 and 201797352.Details
revised temp shoring at 53 states to extend the shoring to cover the 51 states rear portion to comply with nov 201707772 and 201797352. | $3,000 | |
| Oct 12, 2017 | Completed final sign-off Mar 2018 | 51 States St | Geo Grout Ground Modifications Spec Inc. | drill and fill voids under foundation with portland cement slurry type i & 11 low viscosity grout. work at west property line foundation only. work being performed will not affect neighboring propertyDetails
drill and fill voids under foundation with portland cement slurry type i & 11 low viscosity grout. work at west property line foundation only. work being performed will not affect neighboring property | $10,000 |
| Sep 25, 2017 | Completed final sign-off Sep 2018 | 6 Bonview St | Transatlantic Construction Company | revisionto 201505126076 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stairpenthouse.Details
revisionto 201505126076 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stairpenthouse. | $15,000 |
| Sep 25, 2017 | Completed final sign-off Jan 2020 | 363 21st Av | Maan Global Development | revision to 201306210141 to add an additional unit at gr fl to previously approved new 4 story, 3 unit bldg. reprograming previously approved floor plans on upper 3 floor.Details
revision to 201306210141 to add an additional unit at gr fl to previously approved new 4 story, 3 unit bldg. reprograming previously approved floor plans on upper 3 floor. | $110,000 |
| Sep 25, 2017 | Completed final sign-off Sep 2018 | 2 Bonview St | Transatlantic Construction Company | revisionto 201505126084 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stair penthouse.Details
revisionto 201505126084 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stair penthouse. | $15,000 |
| Sep 18, 2017 | Never finaled issued Sep 2017, no final | 708 Buchanan St | Yerba Buena Engineering & Construction | excavation, installation of new sewerline, backfill, concrete, ac paving. plan to install a new sewer line. adding alterations to permit app#201607273540.Details
excavation, installation of new sewerline, backfill, concrete, ac paving. plan to install a new sewer line. adding alterations to permit app#201607273540. | $20,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2019 | 1034 Divisadero St | Hing Wah Construction Inc | proposed seismic strenghtening to comply w/ san francisco soft story ordinance sfbc ch. 34b. all work with (e) boundary of bldg. 2016 cebc appendix a-4.Details
proposed seismic strenghtening to comply w/ san francisco soft story ordinance sfbc ch. 34b. all work with (e) boundary of bldg. 2016 cebc appendix a-4. | $150,000 |
| Sep 7, 2017 | Completed final sign-off Oct 2022 | 1368 46th Av | Pinnacle Remodeling Construction | horizontal additon at rear of (e) single family home at each flr, adding (n) bedrooms, bathroom, kitchen, dining & living room. proposed sprinkler system (nfpa-13r) under separate permit.Details
horizontal additon at rear of (e) single family home at each flr, adding (n) bedrooms, bathroom, kitchen, dining & living room. proposed sprinkler system (nfpa-13r) under separate permit. | $350,000 |
| Aug 31, 2017 | Expired or cancelled cancelled Feb 2020 | 600 Vermont St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $175,000 | |
| Aug 28, 2017 | Completed final sign-off Jun 2018 | 1266 Hampshire St | Transatlantic Construction Company | replacement of old foundation with new foundation in kind.Details
replacement of old foundation with new foundation in kind. | $60,000 |
| Aug 24, 2017 | Never finaled issued Oct 2017, no final | 1560 Dolores St | revision to pa #201410159002 - add a roof deck with new open stair.Details
revision to pa #201410159002 - add a roof deck with new open stair. | $5,000 | |
| Aug 23, 2017 | Completed final sign-off Jul 2023 | 2342 03rd St | exploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area). patch & replace as needed after expoloratory work. maher naDetails
exploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area). patch & replace as needed after expoloratory work. maher na | $1,000 | |
| Aug 18, 2017 | Completed final sign-off Apr 2019 | 4334 Geary Bl | K J Woods Construction Inc | revision to pa #201410179280 - change two sides (side elevation) of building from wood siding to stucco. n/a maher ordinanceDetails
revision to pa #201410179280 - change two sides (side elevation) of building from wood siding to stucco. n/a maher ordinance | |
| Aug 16, 2017 | Completed final sign-off Mar 2019 | 4565 19th St | Eastwood Development Incorporated | proposed temporary shoringDetails
proposed temporary shoring | $55,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2022 | 1621 Diamond St | Maan Global Development | horizontal/vertical addition to (e) single family house. add (2) (n) bath. add (2) (n) half bath.Details
horizontal/vertical addition to (e) single family house. add (2) (n) bath. add (2) (n) half bath. | $400,000 |
| Jul 14, 2017 | Completed final sign-off Dec 2019 | 70 Washburn St | proposed revision to permit #201509106580. interior layout changes on 1st fl and mezzanine level. add one full bath at 1st fl. rearrangement of staircase.Details
proposed revision to permit #201509106580. interior layout changes on 1st fl and mezzanine level. add one full bath at 1st fl. rearrangement of staircase. | ||
| Jul 6, 2017 | Never finaled issued Jun 2020, no final | 244 09th St | vertical & horizontal addition to an (e) bldg to accomodate five story bldg w/ (4) studio dwelling units and (5) 2-bdrm dwelling units & (1) commercial unit. new building is a covered multi-family dwelling building.Details
vertical & horizontal addition to an (e) bldg to accomodate five story bldg w/ (4) studio dwelling units and (5) 2-bdrm dwelling units & (1) commercial unit. new building is a covered multi-family dwelling building. | $3,600,000 | |
| Jun 13, 2017 | Completed final sign-off May 2019 | 661 Page St | Paul Power Construction | add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3.Details
add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3. | $600,000 |
| Jun 7, 2017 | Completed final sign-off May 2018 | 1867 San Jose Av | proposed partial foundation replacement per plan.Details
proposed partial foundation replacement per plan. | $20,000 | |
| May 18, 2017 | Completed final sign-off Mar 2021 | 78 Tehama St | interior remodel e office at bsmt, 1,mezz,2nd fl no chng use,facade,windows. bsmt:rmv e stairs,add new code complnt stairs to 1st fl.1st fl:remove e spiral stairs, add new code compliant hc bath. mezz: demolish part of floor slab, 2nd fl:new code complnt hc bathDetails
interior remodel e office at bsmt, 1,mezz,2nd fl no chng use,facade,windows. bsmt:rmv e stairs,add new code complnt stairs to 1st fl.1st fl:remove e spiral stairs, add new code compliant hc bath. mezz: demolish part of floor slab, 2nd fl:new code complnt hc bath | $80,000 | |
| May 5, 2017 | Never finaled issued May 2021, no final | 562 28th Av | Romkon Inc | to erect 4 stories, 1 basement, 6 dwelling units bldg.Details
to erect 4 stories, 1 basement, 6 dwelling units bldg. | $1,800,888 |
| May 5, 2017 | Never finaled issued May 2021, no final | 562 28th Av | Romkon Inc | to demolish a three stories of a single family dwellingDetails
to demolish a three stories of a single family dwelling | $5,000 |