Raymond Situ
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Innovative Const
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Sep 2026
402 permits since 2000 (engineer on 381 permits, architect on 20 permits, attorney on 1 permit, authorized agent-others on 1 permit, designer on 1 permit): 257 completed, 58 in progress, 48 never finaled, 39 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 402.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 38 Portola Dr | remodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase.Details
remodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase. | $125,000 | |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 1874 18th Av | lightwell in-fill. propose new bedroom, new primary bedroom, new bathroom & new family room on g/f. rebuild interior staircase w/ code compliance. reconfigure bedrooms, bath, & kichen remodel.Details
lightwell in-fill. propose new bedroom, new primary bedroom, new bathroom & new family room on g/f. rebuild interior staircase w/ code compliance. reconfigure bedrooms, bath, & kichen remodel. | $40,000 | |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 237 Sanchez St | erect a four story, 5 units apartment building,one basement type 5 building.Details
erect a four story, 5 units apartment building,one basement type 5 building. | $1,500,000 | |
| Jul 27, 2026 | Completed final sign-off Aug 2026 | 742 Cabrillo St | Ruby Plumbing & Electrical | rev 202204051558: change interior starcase directions on 2/f to lower lvl. add new elec panelboard. relocate laundry. plumbing fixtures reconfig at 3/f master bedroom.Details
rev 202204051558: change interior starcase directions on 2/f to lower lvl. add new elec panelboard. relocate laundry. plumbing fixtures reconfig at 3/f master bedroom. | |
| Jun 30, 2026 | In progress issued Sep 2026 | 2339 30th Av | Global Standard Construction | 1/f:reconfig layout with 2 new bedrs,1 full bath,(n) family room w/ wetbar.2/f:infill courtyard,lightwell,convert (e) 2 bed into 2 primary suite,int'r staircase to code compliant,kitchen,dining remodel w/ new powder room, new skylight.windows replacement throughout. rear deck access to yrd.Details
1/f:reconfig layout with 2 new bedrs,1 full bath,(n) family room w/ wetbar.2/f:infill courtyard,lightwell,convert (e) 2 bed into 2 primary suite,int'r staircase to code compliant,kitchen,dining remodel w/ new powder room, new skylight.windows replacement throughout. rear deck access to yrd. | $40,000 |
| Jun 30, 2026 | In progress issued Oct 2026 | 86 Stratford Dr | Kilb's Construction Inc | remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdwsDetails
remodel: convert (e) playroom& powder room into new bedrm & bath on 1/f. enlarge (e) kitchen & dining rm.relocate staircase 1/f-2/f. reconfig (ew) closet & bathroom and add new masterbath.remove(e) fireplace and install elec fireplace.remove (e) side staircase and (n) rear deck w/stairs.replace wdws | $120,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 129 Yale St | infill rear 1/f, propose new family room w/ wet bar, bedroom, bathroom, mubdroom and rear platform deck. 2/f: kitchen, bedroom & bathroom remodel. propose new deck on 2/f.Details
infill rear 1/f, propose new family room w/ wet bar, bedroom, bathroom, mubdroom and rear platform deck. 2/f: kitchen, bedroom & bathroom remodel. propose new deck on 2/f. | $90,000 | |
| Jun 30, 2026 | In progress issued Aug 2026 | 1951 35th Av | remodel: partially infill lightwell at 1/f & 2/f. remodel (e) kitchen, dining and living room for open concept on 2/f. enlarge (e) closet & (e) master bath on 2/f. convert (e) bed into masterbedroom on 2/f. add new powder room on 2/f.rear platfor deck & roof covered to be removed.Details
remodel: partially infill lightwell at 1/f & 2/f. remodel (e) kitchen, dining and living room for open concept on 2/f. enlarge (e) closet & (e) master bath on 2/f. convert (e) bed into masterbedroom on 2/f. add new powder room on 2/f.rear platfor deck & roof covered to be removed. | $100,000 | |
| Jun 30, 2026 | In progress issued Sep 2026 | 899 40th Av | Bejarano Construction 9inc | remodel: infill lightwell @1/f & 2/f: add (n) utility room at 1/f to relocate laundry w/ (n) wh & furnace.remodel (e) kitchen & family room on 1/f unit #1.remove(e) powder rm & storage at 2/f to relocate staircase b/t 1/f & 2/f. convert (e) bed into master at 2/f unit 2. relocate kitchen w/ open 2/fDetails
remodel: infill lightwell @1/f & 2/f: add (n) utility room at 1/f to relocate laundry w/ (n) wh & furnace.remodel (e) kitchen & family room on 1/f unit #1.remove(e) powder rm & storage at 2/f to relocate staircase b/t 1/f & 2/f. convert (e) bed into master at 2/f unit 2. relocate kitchen w/ open 2/f | $125,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 43 Rockwood Ct | Luxmore Construction | remodel: add new entertainment room, bathroom at lower level. relcoate laundry to lower level, reconfigure interior staircase, remodel kitchen & main level, remodel all (e) bathroom.Details
remodel: add new entertainment room, bathroom at lower level. relcoate laundry to lower level, reconfigure interior staircase, remodel kitchen & main level, remodel all (e) bathroom. | $80,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 64 Vienna St | remodel: new interior staircase connect to basement, propose new family room at basement level.Details
remodel: new interior staircase connect to basement, propose new family room at basement level. | $75,000 | |
| Jun 22, 2026 | In progress issued Jun 2026 | 302 Bay Shore Bl | Threemile Construction | commerical t.i. g/f: new ada compliant bathroom. replace main water line.Details
commerical t.i. g/f: new ada compliant bathroom. replace main water line. | $35,000 |
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 1372 Underwood Av | comply w/ nov# 202538481 & 202538816: legalize as-built rear deck on 2/f. ground floor legalization per ord.43-14.Details
comply w/ nov# 202538481 & 202538816: legalize as-built rear deck on 2/f. ground floor legalization per ord.43-14. | $80,000 | |
| Jun 10, 2026 | In progress filed Jun 2026, not yet issued | 1831 Hayes St | rear cantilver deck repair like to like on all levels less than 50% due to dry-rot. add posts to deck for safety urposes. not proposing new property line firewallsDetails
rear cantilver deck repair like to like on all levels less than 50% due to dry-rot. add posts to deck for safety urposes. not proposing new property line firewalls | $8,500 | |
| Jun 8, 2026 | In progress issued Jun 2026 | 88 Merlin St | Blue Sky Building | rev 202604300396: replace both (e) damaged wooden truss.Details
rev 202604300396: replace both (e) damaged wooden truss. | |
| Jun 2, 2026 | In progress issued Jun 2026 | 1758 27th Av | A1 Construction Group Corp | infill north lightwell on both levels and relcoate intr staircase. reconfig interior to englarge (e) family rm &y bedrm, add n wic & bathrm on 1/f. relocate plumbing fixtures, add (n) pantry & 2 skylights at (e) kitchen on 2/f. infill south litewll on 2/f, relocate laundry/sink on garage.Details
infill north lightwell on both levels and relcoate intr staircase. reconfig interior to englarge (e) family rm &y bedrm, add n wic & bathrm on 1/f. relocate plumbing fixtures, add (n) pantry & 2 skylights at (e) kitchen on 2/f. infill south litewll on 2/f, relocate laundry/sink on garage. | $150,000 |
| Jun 1, 2026 | Completed final sign-off Sep 2026 | 2985 Lake St | Project Contractor Inc | rev 202507080360. minor layout changes for work under pa 201404012150: convert storage room into new powder room and recon fig (e) bath on g/f. reconfig powder,closet, and pantry into new bathroom on main floor. reconfig 2 baths & closets and add new wet bar & laundry on 2/f.Details
rev 202507080360. minor layout changes for work under pa 201404012150: convert storage room into new powder room and recon fig (e) bath on g/f. reconfig powder,closet, and pantry into new bathroom on main floor. reconfig 2 baths & closets and add new wet bar & laundry on 2/f. | |
| May 21, 2026 | In progress filed May 2026, not yet issued | 3151 Franklin St | comply nov 202652320: legalizie the as-built rooftop deck.Details
comply nov 202652320: legalizie the as-built rooftop deck. | ||
| May 15, 2026 | In progress filed May 2026, not yet issued | 1354 24th Av | gound floor adu per government code section 66314. comply with complaint# 202419273 to legalize as-built rooms, entryway & front setback landscaping.Details
gound floor adu per government code section 66314. comply with complaint# 202419273 to legalize as-built rooms, entryway & front setback landscaping. | $80,000 | |
| May 11, 2026 | In progress filed May 2026, not yet issued | 851 Rhode Island St | vertical addtion @(e) attic space & propose (n) entertainment area, bathroom, storage, proposed (n) roof deck w/ stairecase from attic to rear yard.reconfigure interior staircase between 2/f to attic. remodel (e) 2nd flr deck to comply w/ setback requirements.Details
vertical addtion @(e) attic space & propose (n) entertainment area, bathroom, storage, proposed (n) roof deck w/ stairecase from attic to rear yard.reconfigure interior staircase between 2/f to attic. remodel (e) 2nd flr deck to comply w/ setback requirements. | $120,000 | |
| May 7, 2026 | Completed final sign-off May 2026 | 1371 34th Av | comply with nov 202654182: legalize window replacmeen throughout dwelling (all windows) and sliding door . remove as-built cover at north light-well. legalize the electrical fireplace on 2/f. ext casenent alum-wood wdws. int other wdws - sliding double-hung.Details
comply with nov 202654182: legalize window replacmeen throughout dwelling (all windows) and sliding door . remove as-built cover at north light-well. legalize the electrical fireplace on 2/f. ext casenent alum-wood wdws. int other wdws - sliding double-hung. | $15,000 | |
| May 7, 2026 | In progress issued Jul 2026 | 40 Ceres St | Building Construction Express | comply 2025-010489enf: legalize as-built family room w/ wet bar, media room, laundry & tradesman door relocation. and garage door w/o setback at 1/f.reduce as-built shed size and fully remove as-built tool shed at rear. convert (e) storage into office on 1/f.Details
comply 2025-010489enf: legalize as-built family room w/ wet bar, media room, laundry & tradesman door relocation. and garage door w/o setback at 1/f.reduce as-built shed size and fully remove as-built tool shed at rear. convert (e) storage into office on 1/f. | $45,000 |
| Apr 30, 2026 | In progress issued May 2026 | 88 Merlin St | Ts Metal Inc | comply with nov 202015176: legalizae as-built restroom layouts and break room counters. replace (e) damaged wooden truss.Details
comply with nov 202015176: legalizae as-built restroom layouts and break room counters. replace (e) damaged wooden truss. | $5,000 |
| Apr 30, 2026 | In progress issued Jul 2026 | 57 Loomis St | Hong's General Construction Inc | to comply with complaint 202545245 of (e) commercial space. no change of use or t.i. to show as-built conditions. removal of non permitted work, installation of metal decking and bringing existing restroom to compliance.Details
to comply with complaint 202545245 of (e) commercial space. no change of use or t.i. to show as-built conditions. removal of non permitted work, installation of metal decking and bringing existing restroom to compliance. | $5,000 |
| Apr 24, 2026 | In progress filed Apr 2026, not yet issued | 522 Vienna St | comply w/ 2025-011472enf: legalize as-built basement: bdrm, bath, study, fam rm. legalize as-built bdrm, media rm, entertainment @1/f. relocate (e) bath, legalize as-built dining rm, kitchen @2/f. legalize as-built mstbth, dormers, relocate (e) bath @ attic. legalize rear deck, (n) spiral stair.Details
comply w/ 2025-011472enf: legalize as-built basement: bdrm, bath, study, fam rm. legalize as-built bdrm, media rm, entertainment @1/f. relocate (e) bath, legalize as-built dining rm, kitchen @2/f. legalize as-built mstbth, dormers, relocate (e) bath @ attic. legalize rear deck, (n) spiral stair. | $80,000 | |
| Apr 22, 2026 | In progress issued May 2026 | 248 Naples St | Parkin Construction Inc | (rev of 202601304908: lightwell infill):additional foundation work in basement area.Details
(rev of 202601304908: lightwell infill):additional foundation work in basement area. | $1,000 |
| Apr 21, 2026 | In progress issued Sep 2026 | 1934 Union St | Novelty Construction Inc | prop h: commercial ti. mep deferred under separate application.Details
prop h: commercial ti. mep deferred under separate application. | $80,000 |
| Apr 20, 2026 | In progress issued Sep 2026 | 1934 Union St | Novelty Construction Inc | prop h: new sign on wall for "ocha matcha"Details
prop h: new sign on wall for "ocha matcha" | $5,000 |
| Apr 16, 2026 | Expired or cancelled withdrawn Jun 2026 | 1229 45th Av | repair rear deck & staircase in-kind due to dry-rot.change bldg finish from shingle siding to wood siding on facade. interior remodel: relocate (e) kitchen, bathr & 2 beds at 2/f (unit 1). relocate (e) kitchen, bdrm,closet & mech equip & reconfig (e) bath at 1/f (unit 2). add (n)laundry on both flDetails
repair rear deck & staircase in-kind due to dry-rot.change bldg finish from shingle siding to wood siding on facade. interior remodel: relocate (e) kitchen, bathr & 2 beds at 2/f (unit 1). relocate (e) kitchen, bdrm,closet & mech equip & reconfig (e) bath at 1/f (unit 2). add (n)laundry on both fl | $45,000 | |
| Apr 15, 2026 | In progress issued Jul 2026 | 553 28th Av | remove and replace (e) rear exterior deck and add new lift at rear.Details
remove and replace (e) rear exterior deck and add new lift at rear. | $80,000 | |
| Apr 15, 2026 | In progress issued Aug 2026 | 1380 Revere Av | ground floor adu per government code section 66323.Details
ground floor adu per government code section 66323. | $50,000 | |
| Apr 8, 2026 | In progress issued May 2026 | 1250 Pennsylvania Av | comply nov 202432435. remove metal gate.Details
comply nov 202432435. remove metal gate. | $2,500 | |
| Apr 6, 2026 | In progress issued Apr 2026 | 2198 31st Av | Kilb's Construction Inc | rev 202512192305 & 202601143857: underpin (e) foundation along grile line 1 and c due to insufficient foundation depth. level out concrete slab on 1/f to match garage ch. window replcements on south wall.reconfig layout on 1/f: add new powder rm and (n) bathroom. new tankless water heater & radiantDetails
rev 202512192305 & 202601143857: underpin (e) foundation along grile line 1 and c due to insufficient foundation depth. level out concrete slab on 1/f to match garage ch. window replcements on south wall.reconfig layout on 1/f: add new powder rm and (n) bathroom. new tankless water heater & radiant | $10,000 |
| Apr 3, 2026 | In progress issued Jun 2026 | 6 Burlwood Dr | rev 202510097117 & 202511139570: reconfig/relocate new bathrooms, new lcoset and n wet bar on basement. add new laundry rm. reconfig interior stairs.convert (e) bedrm and (e) master bed into 1 (n) m.suite on 1/f. replace windows and door at patio per plan.Details
rev 202510097117 & 202511139570: reconfig/relocate new bathrooms, new lcoset and n wet bar on basement. add new laundry rm. reconfig interior stairs.convert (e) bedrm and (e) master bed into 1 (n) m.suite on 1/f. replace windows and door at patio per plan. | ||
| Mar 23, 2026 | In progress issued May 2026 | 2039 43rd Av | O'neil Engineering Inc | remodel kitchen & dining room for open concept on 2/f. upgrade let recessed lighting on 2/f. eliminate (e) bathroom. propose glass railing system to interior staircase.Details
remodel kitchen & dining room for open concept on 2/f. upgrade let recessed lighting on 2/f. eliminate (e) bathroom. propose glass railing system to interior staircase. | $50,000 |
| Mar 23, 2026 | In progress issued Apr 2026 | 170 Caselli Av | Hawthorne Construction | 170-172 caselli avenue: repair (e) dry-rot wooden deck like to like @ rear, less than 50%. #170: replace window w/ sliding door @ 2/f. #172: repair (e) cantilever balcony @ 3/f. remodel kitchen for open design. raise ceiling @ (e) hall to match 3/f (e) ceiling height.Details
170-172 caselli avenue: repair (e) dry-rot wooden deck like to like @ rear, less than 50%. #170: replace window w/ sliding door @ 2/f. #172: repair (e) cantilever balcony @ 3/f. remodel kitchen for open design. raise ceiling @ (e) hall to match 3/f (e) ceiling height. | $80,000 |
| Mar 2, 2026 | Completed final sign-off Sep 2026 | 1369 Plymouth Av | Jun Meng Li | add (n) entertainment area, family woom w/ wetbar, bath, media room & bedroom w/ wic at 1/f. convert (e) storage rooms into (n) mud room. relocate water heater at (e) garage.Details
add (n) entertainment area, family woom w/ wetbar, bath, media room & bedroom w/ wic at 1/f. convert (e) storage rooms into (n) mud room. relocate water heater at (e) garage. | $50,000 |
| Feb 23, 2026 | In progress issued Jul 2026 | 119 Otsego Av | H&X Construction Inc | revision to #20210819674: convert closet into (n) bath & reconfigure kitchen, fmaily room on 2/f. reconfigure staircase between 1/f & 2/f. add (n) family room w/ wetbar on 1/f. relocate laundry, furnace, wh, & sump pumps. update applicable building code from 2019 to 2025.extr stucco 50%<s/ly facade.Details
revision to #20210819674: convert closet into (n) bath & reconfigure kitchen, fmaily room on 2/f. reconfigure staircase between 1/f & 2/f. add (n) family room w/ wetbar on 1/f. relocate laundry, furnace, wh, & sump pumps. update applicable building code from 2019 to 2025.extr stucco 50%<s/ly facade. | |
| Feb 5, 2026 | In progress issued Feb 2026 | 261 San Carlos St | Project Contractor Inc | revision to #202601023179: basement - replace waterheater, remove (e) storage. 3/f - relocate/remodel (e) kitchen, dining room, & laundry. cosmetic remodel (e) bathrooms & bedrooms. upgrade lighting to led recessed.Details
revision to #202601023179: basement - replace waterheater, remove (e) storage. 3/f - relocate/remodel (e) kitchen, dining room, & laundry. cosmetic remodel (e) bathrooms & bedrooms. upgrade lighting to led recessed. | $80,000 |
| Jan 30, 2026 | In progress issued Mar 2026 | 248 Naples St | Parkin Construction Inc | revision to # 202509266243: 1f - remodel (e) master bedroom, (e) bathroom. add (n) media room, entertainment area w/ wetbar. 2/f - add (n) bedroom. remodel (e) kitchen, dining, master bedroom, living room & bathroom. light-well infill & replace exterior dry-rot wall like to like.Details
revision to # 202509266243: 1f - remodel (e) master bedroom, (e) bathroom. add (n) media room, entertainment area w/ wetbar. 2/f - add (n) bedroom. remodel (e) kitchen, dining, master bedroom, living room & bathroom. light-well infill & replace exterior dry-rot wall like to like. | $200,000 |
| Dec 30, 2025 | In progress issued Feb 2026 | 226 Bridgeview Dr | rev 202509084787: remove previous proposed media room, revise the interior staircase. revise bathroom layout.Details
rev 202509084787: remove previous proposed media room, revise the interior staircase. revise bathroom layout. | ||
| Nov 13, 2025 | In progress issued Nov 2025 | 6 Burlwood Dr | rev 202510097117i: relocate closet and bathroom at bedroom on 1/f. reverse direction of staircase. partial foundatoin repair/replacement at gridline f and at between gridline f-g.Details
rev 202510097117i: relocate closet and bathroom at bedroom on 1/f. reverse direction of staircase. partial foundatoin repair/replacement at gridline f and at between gridline f-g. | ||
| Nov 12, 2025 | Completed final sign-off Jun 2026 | 1552 Palou Av | U T E C Construction Company Inc | revision to pa # 202506178863: proposed 1/f plamn only use for structural work, foundation, wall stud & plywood. 1/f remain unconditioned space, no plumbing & electrical fixtures on 1/f.Details
revision to pa # 202506178863: proposed 1/f plamn only use for structural work, foundation, wall stud & plywood. 1/f remain unconditioned space, no plumbing & electrical fixtures on 1/f. | |
| Nov 3, 2025 | In progress issued Jun 2026 | 1910 18th Av | D Construction Inc | convert (e) family room to 2 bedrooms. new mudroom & wetbar on 1/f. all work on 1/f only.Details
convert (e) family room to 2 bedrooms. new mudroom & wetbar on 1/f. all work on 1/f only. | $80,000 |
| Oct 21, 2025 | Completed final sign-off Jul 2026 | 622 19th Av | Rake Construction Inc | structural revision to pa # 202306129774 & 202503061759: update rear retaining wall locations & replace (e) front foundation w/ (n) grade beam.Details
structural revision to pa # 202306129774 & 202503061759: update rear retaining wall locations & replace (e) front foundation w/ (n) grade beam. | |
| Oct 20, 2025 | In progress filed Oct 2025, not yet issued | 355 Barneveld Av | provide exterior storage rack w/ metal frame structural & rooptop cover.Details
provide exterior storage rack w/ metal frame structural & rooptop cover. | $100,000 | |
| Sep 2, 2025 | Completed final sign-off May 2026 | 1339 46th Av | L C Construction | reconfigure interior staircases. remodel (e) bedrooms, (e) laundry, & (e) bathroom on 1/f. remodel kitchen, dining, & living room on 2/f.Details
reconfigure interior staircases. remodel (e) bedrooms, (e) laundry, & (e) bathroom on 1/f. remodel kitchen, dining, & living room on 2/f. | $100,000 |
| Aug 4, 2025 | Completed final sign-off Jan 2026 | 2700 Taylor St | Luxmore Construction | replace the exterior doors same sizeDetails
replace the exterior doors same size | $39,545 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 335 Jones St | Sure, Inc. | comply with nov202430228: legalize removal of alum storefront.replace withas-built storefront storage rooms and staircase.repair damaged wall w/ exposed wiring at mezzanin.legalize condensor unit on roof.Details
comply with nov202430228: legalize removal of alum storefront.replace withas-built storefront storage rooms and staircase.repair damaged wall w/ exposed wiring at mezzanin.legalize condensor unit on roof. | $10,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 2076 14th Av | Kyle Wong Construction | rev 201901301666: close the side window on garage floor and 1/f per pland. reduce size of size window on 2/f per plan.Details
rev 201901301666: close the side window on garage floor and 1/f per pland. reduce size of size window on 2/f per plan. | |
| Apr 17, 2025 | In progress issued Aug 2025 | 2015 Mckinnon Av | Minerva Construction | commerical ti to (e) tenant space, add new office room, breakroom and mezzanine. replace (e) sliding fence gate with new motorized gate at front.Details
commerical ti to (e) tenant space, add new office room, breakroom and mezzanine. replace (e) sliding fence gate with new motorized gate at front. | $300,000 |
| Apr 14, 2025 | In progress issued May 2025 | 30 Jules Av | Galaxy Building Construction | rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior.Details
rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior. | |
| Apr 9, 2025 | In progress filed Apr 2025, not yet issued | 87 Rockwood Ct | install soldier piles & soil erosion measures at rear yard.Details
install soldier piles & soil erosion measures at rear yard. | $12,000 | |
| Mar 31, 2025 | Completed final sign-off Feb 2026 | 1369 Plymouth Av | voluntary foundation retrofit for the front section on 1/f garage. replacing (e) 6x12 wood beam to steel beam in garage.Details
voluntary foundation retrofit for the front section on 1/f garage. replacing (e) 6x12 wood beam to steel beam in garage. | $50,000 | |
| Mar 21, 2025 | Completed final sign-off Jan 2026 | 2700 Taylor St | Luxmore Construction | prop h: commerical ti to (e) restaurant. changing latino-american restaurant to sushi restaurant.merging two commercial storefronts in this case.Details
prop h: commerical ti to (e) restaurant. changing latino-american restaurant to sushi restaurant.merging two commercial storefronts in this case. | $100,000 |
| Mar 5, 2025 | In progress issued Aug 2025 | 86 Stanford Heights Av | Bay Point Construction Inc | add (n) game room & rear yard staicase @ basement. add (n) gym room & entertainment area @ sub-basement. reconfigure stairs between basement & 1/f. add (n) bathh, (n) family room w/ wet bar, and relocate laundry @ 1/f. remodel (e) living room, kitchen, bath, main bath, & bedrooms on 2/f.Details
add (n) game room & rear yard staicase @ basement. add (n) gym room & entertainment area @ sub-basement. reconfigure stairs between basement & 1/f. add (n) bathh, (n) family room w/ wet bar, and relocate laundry @ 1/f. remodel (e) living room, kitchen, bath, main bath, & bedrooms on 2/f. | $200,000 |
| Feb 21, 2025 | Completed final sign-off Feb 2026 | 355 Barneveld Av | Cbs Construction Inc. | comply w/ nov # 202432373, 202432372, 202432371: propose storage & restroom on mezzanine level. obtain electrical permit for new electrical conduit, junction box, and led lights per plan.Details
comply w/ nov # 202432373, 202432372, 202432371: propose storage & restroom on mezzanine level. obtain electrical permit for new electrical conduit, junction box, and led lights per plan. | $5,000 |
| Jan 14, 2025 | In progress issued Mar 2025 | 963 Valencia St | comply w/ nov 202315945: repair fire damaged wall and roof for unit 3 & 4; like-for-like kitchen and bath remodel for unit 3 & 4; replace insulation and new drywall for unit 2 & 4Details
comply w/ nov 202315945: repair fire damaged wall and roof for unit 3 & 4; like-for-like kitchen and bath remodel for unit 3 & 4; replace insulation and new drywall for unit 2 & 4 | $80,000 | |
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 2511 37th Av | Great Ocean Construction Inc. | relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f.Details
relocate/remodel (e) laundry & (e) family room, add (n) bedroom & (n) bath, reconfigure interior staircase @ 1/f. relocate skylight. convert (e) bedroom into master suite, remodel (e) living room, relocate (e) kitchen, dining, & bath @ 2/f. | $200,000 |
| Jan 7, 2025 | Completed final sign-off Feb 2026 | 140 Oak Park Dr | Lee And Son Construction Inc. | residential remodel covert 295 sqft of lower level from unfinished to finished sq ft. remodel (2) bathrooms , add 1 bathroom, remodel kitchen in same location. replace windows in kind at front of house. replace windows in the side and back of house. new locations. partial layout change upstairs. newDetails
residential remodel covert 295 sqft of lower level from unfinished to finished sq ft. remodel (2) bathrooms , add 1 bathroom, remodel kitchen in same location. replace windows in kind at front of house. replace windows in the side and back of house. new locations. partial layout change upstairs. new | $95,000 |
| Dec 31, 2024 | Completed final sign-off Jul 2026 | 750 26th Av | Wl Construction Group | prop h: commercial ti interior renovation to restroom remodel, new minor interior non-bearing partition, relocate kitchen area and install new hvac system.Details
prop h: commercial ti interior renovation to restroom remodel, new minor interior non-bearing partition, relocate kitchen area and install new hvac system. | $200,000 |
| Sep 23, 2024 | Completed final sign-off Jul 2026 | 184 Lunado Wy | correction permit to #2019-013666enf: legalize as-built wetbar, fence, and smooth stucco replacement. reasonable modification to park in the rear setback. approved under 202001900var.Details
correction permit to #2019-013666enf: legalize as-built wetbar, fence, and smooth stucco replacement. reasonable modification to park in the rear setback. approved under 202001900var. | $3,000 | |
| Sep 17, 2024 | Completed final sign-off Sep 2025 | 643 41st Av | Jian's Builder Corp | comply w/ nov # 202425795: legalize the as-built concrete retaining wall at rear yard.Details
comply w/ nov # 202425795: legalize the as-built concrete retaining wall at rear yard. | $8,000 |
| Sep 5, 2024 | Completed final sign-off Jun 2025 | 276 Seneca Av | Wah Wong Construction Inc | add mech room, mug room, enlarge (e) full bath on 1/f. infill (e) light-well, relocate kitchen area, new master suite, like-to-like remodel common bathroom on 2/f. cosmetically remodel 2 bedroom & full bath w/ new lighting on 3/f.Details
add mech room, mug room, enlarge (e) full bath on 1/f. infill (e) light-well, relocate kitchen area, new master suite, like-to-like remodel common bathroom on 2/f. cosmetically remodel 2 bedroom & full bath w/ new lighting on 3/f. | $100,000 |
| May 24, 2024 | Completed final sign-off Jun 2025 | 81 Lakeshore Dr | Wl Construction Group | remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylightsDetails
remodel upper fl: 2 bathrooms, reconfigure (e) bedrooms, remodel kitchen, replace street facing windows, relocate stairs from upper level to lower level. change size of door at back of the house. reduce kitchen window size. close 3 non street facing windows. replace 2 skylights & add 2 (n) skylights | $100,000 |
| Mar 11, 2024 | Completed final sign-off Mar 2024 | 184 Lunado Wy | legalize as-built wet bar on 1/f.Details
legalize as-built wet bar on 1/f. | $1,000 | |
| Mar 8, 2024 | Completed final sign-off Jul 2024 | 57 Virginia Av | Chun Hung Construction Co Inc. | structural repair at front of main entrance staircase. window replacement on 2/f dining room facing street. no change to size or operation.Details
structural repair at front of main entrance staircase. window replacement on 2/f dining room facing street. no change to size or operation. | $2,500 |
| Jan 17, 2024 | In progress issued Aug 2024 | 230 Avila St | Deluxe Windows And Doors | revision to #201512114790: reduce the (e) parking garage side to create a bigger family/entertainment room on g/f.reconfig bathroom fixtures on 2/f.eliminate (e) ctr wall at (e) kitchen on 2/f.add wine cellar under stairs.eliminate full height wall along stair w/ open railing on 2/f.Details
revision to #201512114790: reduce the (e) parking garage side to create a bigger family/entertainment room on g/f.reconfig bathroom fixtures on 2/f.eliminate (e) ctr wall at (e) kitchen on 2/f.add wine cellar under stairs.eliminate full height wall along stair w/ open railing on 2/f. | $100,000 |
| Jan 16, 2024 | Completed final sign-off Feb 2025 | 31 Romolo Pl | add new roof deck per plan. rev to pa 202311291630 to update structural plan at g/f.Details
add new roof deck per plan. rev to pa 202311291630 to update structural plan at g/f. | $150,000 | |
| Dec 28, 2023 | Completed final sign-off Apr 2025 | 1569 16th Av | rev pa202303083242: proposed new sliding door on 2/f living room and englarge (e) window on 2/f dining room (not street visible).Details
rev pa202303083242: proposed new sliding door on 2/f living room and englarge (e) window on 2/f dining room (not street visible). | ||
| Dec 21, 2023 | Completed final sign-off Jul 2024 | 1355 Minna St | B B M T Inc | rev pa202308023586: relocate & replace all rtu's to be 6feet away from the p|l per bid c/n. no change in equipment.Details
rev pa202308023586: relocate & replace all rtu's to be 6feet away from the p|l per bid c/n. no change in equipment. | |
| Dec 19, 2023 | Completed final sign-off Apr 2024 | 3636 Cesar Chavez St | Innovative Construction Implement | rev to pa 202210134322: to reflect the as-built site condition per inspection correction action. update mechanical hvac unit and update water heater unit per plan.Details
rev to pa 202210134322: to reflect the as-built site condition per inspection correction action. update mechanical hvac unit and update water heater unit per plan. | $15,000 |
| Dec 14, 2023 | Completed final sign-off Mar 2024 | 3045 21st Av | Lee And Son Construction Inc. | rev to pa202310259389 for structural stregthening only on 2/f at the kitchen area only per plan. rev to bathroom #1 & 2 with mintor non-structural alt per plan.Details
rev to pa202310259389 for structural stregthening only on 2/f at the kitchen area only per plan. rev to bathroom #1 & 2 with mintor non-structural alt per plan. | $10,000 |
| Nov 29, 2023 | Completed final sign-off Feb 2025 | 31 Romolo Pl | Atelier 19ad6 | amend to pa202309196917: remodel the (e) bathroom & (e) kitchen to all units including units 1 & 2. add a laundry area to each unit.Details
amend to pa202309196917: remodel the (e) bathroom & (e) kitchen to all units including units 1 & 2. add a laundry area to each unit. | $50,000 |
| Nov 20, 2023 | Completed final sign-off Apr 2025 | 372 Moultrie St | Great Ocean Construction Inc., C B And R Construction | main floor remodel with new stiars to garage legvel. 2) convert portion of garage to living and add sf under (e) main level floor. 3) new deck out rear. 4) rebuild front entry stairs.Details
main floor remodel with new stiars to garage legvel. 2) convert portion of garage to living and add sf under (e) main level floor. 3) new deck out rear. 4) rebuild front entry stairs. | $200,000 |
| Nov 16, 2023 | Completed final sign-off Jan 2025 | 140 Marview Wy | 1) g/f develop by adding 1 full bath & 1 bed. 1 mastersuite & master bath & 1 entertainment room w/ wet bar. 2) reconfig (e) interior stairs case to meetcurrent code compliance. convert (e) bedroom into master suite w/ fullbath. kitchen remodel.add new deck & skylight on 2/f.stucco repair whole sfd.Details
1) g/f develop by adding 1 full bath & 1 bed. 1 mastersuite & master bath & 1 entertainment room w/ wet bar. 2) reconfig (e) interior stairs case to meetcurrent code compliance. convert (e) bedroom into master suite w/ fullbath. kitchen remodel.add new deck & skylight on 2/f.stucco repair whole sfd. | $250,000 | |
| Nov 6, 2023 | Completed final sign-off May 2025 | 2275 25th Av | Bay C T Construction Inc. | lightwell infill. remodel (e) master bed, (e) family room & garage. 1/f: remodel & relocate (e) bath, wetbar and (e) laundry. add (n) bath, n sauna & (n) ent room at 1/f. relocate & reconfig int. stairs,convert 2 (e) beds into 2 (n) master beds at 2/f. add (n) platform deck at 1/f. add (n) cantilevrDetails
lightwell infill. remodel (e) master bed, (e) family room & garage. 1/f: remodel & relocate (e) bath, wetbar and (e) laundry. add (n) bath, n sauna & (n) ent room at 1/f. relocate & reconfig int. stairs,convert 2 (e) beds into 2 (n) master beds at 2/f. add (n) platform deck at 1/f. add (n) cantilevr | $300,000 |
| Oct 26, 2023 | Completed final sign-off Sep 2026 | 622 19th Av | Building Construction Express | remodel 2/f dining, living room and bathroom,remodel and relocate kitcyen and add 1 new office on 2/f. add new exterior deck with staircase to rear yard on 2/f.Details
remodel 2/f dining, living room and bathroom,remodel and relocate kitcyen and add 1 new office on 2/f. add new exterior deck with staircase to rear yard on 2/f. | $150,000 |
| Oct 25, 2023 | Completed final sign-off Mar 2024 | 694 Valencia St | Lai Yang Construction | replace & relocate for cooking equipment under existing hood. cosmetically remodel (e) restaurant with newtiles, flooring and lighting.Details
replace & relocate for cooking equipment under existing hood. cosmetically remodel (e) restaurant with newtiles, flooring and lighting. | $5,000 |
| Oct 20, 2023 | Completed final sign-off Sep 2024 | 2287 18th Av | Gary Liu | relocate (e) laundry & powder room at 1/f. add (n) bath, wic,storage, and wet bar on 1/f.relocate interior stairs to rear access and remodel (e) subpfloor system to level out habitable area at 1/f.propose (n) platfoorm deck +/- 27in from grade at rear yard. bathroom remodel 2/f.Details
relocate (e) laundry & powder room at 1/f. add (n) bath, wic,storage, and wet bar on 1/f.relocate interior stairs to rear access and remodel (e) subpfloor system to level out habitable area at 1/f.propose (n) platfoorm deck +/- 27in from grade at rear yard. bathroom remodel 2/f. | $120,000 |
| Oct 20, 2023 | In progress issued Nov 2023 | 1842 47th Av | new exterior 2/f deck with staircase to rear yard.Details
new exterior 2/f deck with staircase to rear yard. | $30,000 | |
| Oct 3, 2023 | Completed final sign-off Jun 2024 | 332 Baltimore Wy | Apex Construction Inc | remodel the (e) kitchen with open desig by removing wall btwn kitchen & living room. rmeodel (e) bathrooms on 2/f per plans. add skylights on 2/f. reconfigure the door at the rear (e) beedroom per plan. add a deck with stairscase from 2/f to the rear yard.Details
remodel the (e) kitchen with open desig by removing wall btwn kitchen & living room. rmeodel (e) bathrooms on 2/f per plans. add skylights on 2/f. reconfigure the door at the rear (e) beedroom per plan. add a deck with stairscase from 2/f to the rear yard. | $50,000 |
| Oct 3, 2023 | Completed final sign-off Nov 2024 | 1400 Ortega St | C L & Y Construction Inc. | rev to pa202303143683 only: update foundation plan to change method of construction at the rear of the building, r & r (e) damaged foundation along grid b - btwn grids 4 & 5 and provide (n) grade beam at front due to (e) field conditions.Details
rev to pa202303143683 only: update foundation plan to change method of construction at the rear of the building, r & r (e) damaged foundation along grid b - btwn grids 4 & 5 and provide (n) grade beam at front due to (e) field conditions. | |
| Oct 3, 2023 | Completed final sign-off May 2024 | 1388 47th Av | replace damaged drywall throughout. electrical upgrades with h.e. led lighting. reconfigure (e) bathroom, (e) laundry & (e) kitchen. shrink (e) bedroom to add (n) closet & bath. convert (e) dining room to (n) bedroom with closet. remove and replace all doors.Details
replace damaged drywall throughout. electrical upgrades with h.e. led lighting. reconfigure (e) bathroom, (e) laundry & (e) kitchen. shrink (e) bedroom to add (n) closet & bath. convert (e) dining room to (n) bedroom with closet. remove and replace all doors. | $150,000 | |
| Sep 15, 2023 | Never finaled filed Sep 2023, never issued | 417 Clement St | to comply with accessible business entrance per ord 51-16 @ 1/f. abe 201812273544 cat 3. barrier removal at front entrance.Details
to comply with accessible business entrance per ord 51-16 @ 1/f. abe 201812273544 cat 3. barrier removal at front entrance. | $8,000 | |
| Sep 13, 2023 | Expired or cancelled cancelled Dec 2023 | 174 Cayuga Av | rev pa 202307252866: reduce scope of work front approved permit. remove 1/f alt from scope of work and revert back to (e) layout. update structural plans. details and special inspection.Details
rev pa 202307252866: reduce scope of work front approved permit. remove 1/f alt from scope of work and revert back to (e) layout. update structural plans. details and special inspection. | ||
| Aug 25, 2023 | Completed final sign-off Oct 2024 | 35 27th Av | Great Ocean Construction Inc. | full covering (e) court yard to enlarge (e) kitchen, remodel (e) kitchen. new sliding door. half-bathroom remodel.Details
full covering (e) court yard to enlarge (e) kitchen, remodel (e) kitchen. new sliding door. half-bathroom remodel. | $80,000 |
| Aug 24, 2023 | Never finaled filed Aug 2023, never issued | 135 Gladstone Dr | adu per government code 65852.2 remodel existing kitchen and bath on 2nd floor. reconfigure interior stair. enlarge laundry closet on 2nd floor. add 8 new skylights. new wooden deck and stairs at rear of house.Details
adu per government code 65852.2 remodel existing kitchen and bath on 2nd floor. reconfigure interior stair. enlarge laundry closet on 2nd floor. add 8 new skylights. new wooden deck and stairs at rear of house. | $100,000 | |
| Aug 23, 2023 | Completed final sign-off Feb 2024 | 184 Lunado Wy | rev to pa202002265523.relocate wall btw (e) family rm and (e) closet on 1/f.remove the fireplace on 2/f living room.redesign the (e) kitchen w/ open.split the (e) bathroom into 2 (n) bathrm on 2/f. relocate the (e) closet in south (e) bedrm on 2/f.switch the locatino of shower and wc in (e) masterbaDetails
rev to pa202002265523.relocate wall btw (e) family rm and (e) closet on 1/f.remove the fireplace on 2/f living room.redesign the (e) kitchen w/ open.split the (e) bathroom into 2 (n) bathrm on 2/f. relocate the (e) closet in south (e) bedrm on 2/f.switch the locatino of shower and wc in (e) masterba | $30,000 | |
| Aug 2, 2023 | Completed final sign-off Jul 2024 | 1355 Minna St | B B M T Inc | to comply with complaints 202027525/202026711/202026791. to installation of rtu at roof at (e) tenant space. not visible from the public right of way.Details
to comply with complaints 202027525/202026711/202026791. to installation of rtu at roof at (e) tenant space. not visible from the public right of way. | $10,000 |
| Jul 25, 2023 | Completed final sign-off Dec 2024 | 174 Cayuga Av | C & H Home Construction | infill e lightwell on 2nd fl. reconfigure e bath, e kitchen living room at 2nd fl. convert e dining rm into new bedroom at 2nd fl. propose new media room, office, bath, relocate laundry and mech equip at 1st fl. replace windows at 1st flDetails
infill e lightwell on 2nd fl. reconfigure e bath, e kitchen living room at 2nd fl. convert e dining rm into new bedroom at 2nd fl. propose new media room, office, bath, relocate laundry and mech equip at 1st fl. replace windows at 1st fl | $120,000 |
| Jul 24, 2023 | Completed final sign-off Oct 2023 | 126 West Portal Av | documenation of techninical infeasibily form for accessible business entrance per ordinance 51-16 on 1/f for unit 126 west portal ave.Details
documenation of techninical infeasibily form for accessible business entrance per ordinance 51-16 on 1/f for unit 126 west portal ave. | ||
| Jul 20, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | O S E Horizon Enterprise | remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system.Details
remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system. | $85,000 |
| Jul 19, 2023 | Completed final sign-off Sep 2026 | 1719 Wallace Av | Destny68 Construction | to comply with nov20309156 to legalize (e) as-built restroom and mezzaninestorage. proposed cannbis grow operation on street level per plan. legalize removal of skylights.Details
to comply with nov20309156 to legalize (e) as-built restroom and mezzaninestorage. proposed cannbis grow operation on street level per plan. legalize removal of skylights. | $15,000 |
| Jul 7, 2023 | Completed final sign-off Aug 2024 | 70 Marietta Dr | rev to pa 202304065144: reduce scope of work on the 1st floor. the (e) footing and (e) slab to remain. relocate the (n) bathroom on 1st floor.Details
rev to pa 202304065144: reduce scope of work on the 1st floor. the (e) footing and (e) slab to remain. relocate the (n) bathroom on 1st floor. | ||
| Jun 23, 2023 | Completed final sign-off Aug 2024 | 2515 26th Av | Precision General Contruction | 1/f: add 1 br,closet,bath,entertainment room and laundry. reconfig (e) bed, bathroomand closet; relocate w/h and furnace to garage; 2/f: add (n) 2/f deck with staircase to rear yard; reconfig location of itnerior staircase; 2/f: remodel and relocate (e) living room, kitchen and dining; int. remodelDetails
1/f: add 1 br,closet,bath,entertainment room and laundry. reconfig (e) bed, bathroomand closet; relocate w/h and furnace to garage; 2/f: add (n) 2/f deck with staircase to rear yard; reconfig location of itnerior staircase; 2/f: remodel and relocate (e) living room, kitchen and dining; int. remodel | $100,000 |
| Jun 23, 2023 | Expired or cancelled cancelled Jan 2024 | 1463 11th Av | Bay Area Builders | partially remove wall between (e) kitchen and (e) dining for open deign on 2/f.Details
partially remove wall between (e) kitchen and (e) dining for open deign on 2/f. | $3,000 |
| Jun 14, 2023 | Completed final sign-off May 2024 | 1563 Underwood Av | Innovative Construction Implement | enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind.Details
enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind. | $100,000 |
| Jun 12, 2023 | Completed final sign-off Aug 2026 | 622 19th Av | Rake Construction Inc | add (n) laundry room, bathroom, family and guest suite on 1/f per plan. reconfig interior staircase. infill lightwel on 3/f. replace front and rear facade windows (20) & add 4 new windows.Details
add (n) laundry room, bathroom, family and guest suite on 1/f per plan. reconfig interior staircase. infill lightwel on 3/f. replace front and rear facade windows (20) & add 4 new windows. | $80,000 |
| Jun 6, 2023 | Completed final sign-off Oct 2023 | 2550 Bay Shore Bl | barrier removal for ada accessibility. maher n/a.Details
barrier removal for ada accessibility. maher n/a. | $15,000 |