Blue Sky Building
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Jun 2026
- Last 24 months
- 4 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 88 Merlin St | rev 202604300396: replace both (e) damaged wooden truss.Details
rev 202604300396: replace both (e) damaged wooden truss. | |
| May 16, 2025 | Completed final sign-off Dec 2025 | 1839 09th Av | remove & replace (e) deteriorating retaining walls at rear yard.Details
remove & replace (e) deteriorating retaining walls at rear yard. | $5,000 |
| May 13, 2025 | Completed final sign-off Sep 2025 | 2230 Balboa St | revision to pa #202503212799 work beyond scope: r&r plaster w/ drywall at 2/f & 1/f entrance. update minor interior non-bearing wall reconfiguration @ 2/f. eliminate unpermitted rear exterior canopy cover. structural strengthening (e) exterior rear platform deck in compliance w/ sf code.Details
revision to pa #202503212799 work beyond scope: r&r plaster w/ drywall at 2/f & 1/f entrance. update minor interior non-bearing wall reconfiguration @ 2/f. eliminate unpermitted rear exterior canopy cover. structural strengthening (e) exterior rear platform deck in compliance w/ sf code. | $68,700 |
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 2230 Balboa St | remodel (e) bathroom & kitchen. no change in layout/ wall demo; electrical upgrade to 2nd level; remove (e) wall and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace in kind). remove (e) fireplace insert in living room, patch.Details
remodel (e) bathroom & kitchen. no change in layout/ wall demo; electrical upgrade to 2nd level; remove (e) wall and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace in kind). remove (e) fireplace insert in living room, patch. | $10,000 |
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 140 Roanoke St | remodel 1 kitchen (relocate sink and electrical); 1 bathroom remodel (new tub and toilet). remove fireplace and patch. replace (e) furnace & ducting with new . new roofing. exterior painting.Details
remodel 1 kitchen (relocate sink and electrical); 1 bathroom remodel (new tub and toilet). remove fireplace and patch. replace (e) furnace & ducting with new . new roofing. exterior painting. | $55,000 |
| Jul 12, 2023 | Completed final sign-off Mar 2026 | 1719 33rd Av | revision to pa #201710110865-s1, layout foundation, rebuild foundation.Details
revision to pa #201710110865-s1, layout foundation, rebuild foundation. | $50,000 |
| Oct 11, 2017 | Completed final sign-off Mar 2026 | 1719 33rd Av | horizontal & vertical addition with a new adu proposed, adu on the lower level. all windows to be replaced, minor excuvation at lower level to maintain 9'-0" flor to ceiling in living spaceDetails
horizontal & vertical addition with a new adu proposed, adu on the lower level. all windows to be replaced, minor excuvation at lower level to maintain 9'-0" flor to ceiling in living space | $120,000 |