Back to bathroom remodel contractors
Blue Sky Building
- Based in
- San Francisco
- On San Francisco permits
- Oct 2017 to Jun 2026
- Last 24 months
- 4 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 2230 Balboa St | remodel (e) bathroom & kitchen. no change in layout/ wall demo; electrical upgrade to 2nd level; remove (e) wall and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace in kind). remove (e) fireplace insert in living room, patch.Details
remodel (e) bathroom & kitchen. no change in layout/ wall demo; electrical upgrade to 2nd level; remove (e) wall and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace in kind). remove (e) fireplace insert in living room, patch. | $10,000 |
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 140 Roanoke St | remodel 1 kitchen (relocate sink and electrical); 1 bathroom remodel (new tub and toilet). remove fireplace and patch. replace (e) furnace & ducting with new . new roofing. exterior painting.Details
remodel 1 kitchen (relocate sink and electrical); 1 bathroom remodel (new tub and toilet). remove fireplace and patch. replace (e) furnace & ducting with new . new roofing. exterior painting. | $55,000 |