Block 5409, lot 005
40 Ceres St
- City’s use
- Single Family Residential
- Built
- 1929
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,174 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 7, 2026 | In progress issued Jul 2026 | 40 Ceres St | Building Construction Express | comply 2025-010489enf: legalize as-built family room w/ wet bar, media room, laundry & tradesman door relocation. and garage door w/o setback at 1/f.reduce as-built shed size and fully remove as-built tool shed at rear. convert (e) storage into office on 1/f.Details
comply 2025-010489enf: legalize as-built family room w/ wet bar, media room, laundry & tradesman door relocation. and garage door w/o setback at 1/f.reduce as-built shed size and fully remove as-built tool shed at rear. convert (e) storage into office on 1/f. | $45,000 |
| Aug 16, 2013 | Completed final sign-off Aug 2013 | 40 Ceres St | R P Construction Inc. | replace with new wood garage door.Details
replace with new wood garage door. | $600 |
| May 30, 2013 | Completed final sign-off Aug 2013 | 40 Ceres St | revision to pa# 2012-1120-4582-repair dry rot at front (interior) on 1st floor & re-size rooms on 1st floor per plans. relocate water heater & furnaceDetails
revision to pa# 2012-1120-4582-repair dry rot at front (interior) on 1st floor & re-size rooms on 1st floor per plans. relocate water heater & furnace | ||
| May 1, 2013 | Expired or cancelled cancelled Jan 2026 | 40 Ceres St | revision to app#201211204582 to change storage room to study room and change location of extg entry door and garage door at ground floor per plan.Details
revision to app#201211204582 to change storage room to study room and change location of extg entry door and garage door at ground floor per plan. | $5,000 | |
| Nov 20, 2012 | Completed final sign-off Aug 2013 | 40 Ceres St | R P Construction Inc. | convert existing playroom to a bedroom and a laundry room on 1st floor per plan. add one bath, one mud room and two storage room on 1st floor per planDetails
convert existing playroom to a bedroom and a laundry room on 1st floor per plan. add one bath, one mud room and two storage room on 1st floor per plan | $40,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.