Threemile Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Jul 2026
- Last 24 months
- 11 permits filed
32 permits since 2000: 25 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Aug 2026 | 509 Buchanan St | comply w/ nov #202657943: remove/replace front damaged & leaning retaining wall in-kind. 5' in length within property line.Details
comply w/ nov #202657943: remove/replace front damaged & leaning retaining wall in-kind. 5' in length within property line. | $4,000 |
| Jun 22, 2026 | In progress issued Jun 2026 | 302 Bay Shore Bl | commerical t.i. g/f: new ada compliant bathroom. replace main water line.Details
commerical t.i. g/f: new ada compliant bathroom. replace main water line. | $35,000 |
| May 18, 2026 | In progress filed May 2026, not yet issued | 10 19th Av | please update scope of work & construction cost. thanks.Details
please update scope of work & construction cost. thanks. | |
| May 18, 2026 | In progress filed May 2026, not yet issued | 10 19th Av | please update scope of work & construction cost. thanks.Details
please update scope of work & construction cost. thanks. | |
| Mar 23, 2026 | Completed final sign-off Jun 2026 | 511 Buchanan St | unit 511a: 1 kitchen and 2 bathroom remodels like for like.Details
unit 511a: 1 kitchen and 2 bathroom remodels like for like. | $60,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 41 Apollo St | comply w/ nov #: 202548003: 2nd floor - kitchen remodel sink and stove keep in same location. a full bathroom remodel.Details
comply w/ nov #: 202548003: 2nd floor - kitchen remodel sink and stove keep in same location. a full bathroom remodel. | $20,000 |
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 259 Upper Tr | unit #2 3/f only: relocate (e) kitchen & dining to (e) stuio area. propose (n) in-unit laundry and (n) living room. reorient (e) bath fixtures. propose (n) furnace @ garage. electrical upgrades w/ wiring, led ligths, & subpanel.Details
unit #2 3/f only: relocate (e) kitchen & dining to (e) stuio area. propose (n) in-unit laundry and (n) living room. reorient (e) bath fixtures. propose (n) furnace @ garage. electrical upgrades w/ wiring, led ligths, & subpanel. | $25,000 |
| Sep 2, 2025 | Completed final sign-off Dec 2025 | 259 Upper Tr | unit #1: add (n) master bathroom & relocate (e) closet within (e) bedroom. remodel (e) common bath. convert (e) storage in (n) laundry closet. all work on 2/f.Details
unit #1: add (n) master bathroom & relocate (e) closet within (e) bedroom. remodel (e) common bath. convert (e) storage in (n) laundry closet. all work on 2/f. | $38,000 |
| Jul 15, 2025 | Completed final sign-off Aug 2025 | 1906 Santiago St | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. | $10,000 |
| May 20, 2025 | Completed final sign-off Sep 2025 | 1530 Noriega St | replace 8 (e) windows in front. redo front stucoo wall. 0.58 max u-factor. 0.41 max shgc.Details
replace 8 (e) windows in front. redo front stucoo wall. 0.58 max u-factor. 0.41 max shgc. | $15,000 |
| Oct 16, 2024 | Completed final sign-off Jul 2025 | 312 Stratford Dr | replace left side and half of rear wall stucco. (not street visible)Details
replace left side and half of rear wall stucco. (not street visible) | $5,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 312 Stratford Dr | two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11).Details
two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11). | $40,000 |
| Apr 17, 2024 | Completed final sign-off Nov 2024 | 3436 Moraga St | remodel an existing kitchen at 2nd fl. upgrade 100 amp service panel to 200 ampDetails
remodel an existing kitchen at 2nd fl. upgrade 100 amp service panel to 200 amp | $15,000 |
| Mar 29, 2024 | Completed final sign-off Jul 2025 | 312 Stratford Dr | remove existing wall finishes at interior walls located on second floor and replace with new 5/8" gypsum board type x with 5d cooler nails or screws @ 4" o.c., area of wall finishes is limited to 1,400 sf. no relocation or removal of existing stud walls.Details
remove existing wall finishes at interior walls located on second floor and replace with new 5/8" gypsum board type x with 5d cooler nails or screws @ 4" o.c., area of wall finishes is limited to 1,400 sf. no relocation or removal of existing stud walls. | $9,000 |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 2591 27th Av | remodel 2nd fl. kitchen and bathroom two new skylight and convert breakast area to officeDetails
remodel 2nd fl. kitchen and bathroom two new skylight and convert breakast area to office | $65,000 |
| Aug 29, 2022 | Expired or cancelled cancelled Dec 2022 | 9 Topeka Av | adding a new layer of fiber cement siding to existing wood siding on left side wall of house.Details
adding a new layer of fiber cement siding to existing wood siding on left side wall of house. | $5,000 |
| Aug 29, 2022 | Never finaled issued Sep 2022, no final | 235 Ramsell St | changing existing wood board siding to fiber cement horizontal siding for second floor front wall of the house. approx 180 sq. ft. of siding. stone to remainDetails
changing existing wood board siding to fiber cement horizontal siding for second floor front wall of the house. approx 180 sq. ft. of siding. stone to remain | $5,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2023 | 679 14th Av | ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room.Details
ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room. | $150,000 |
| Nov 24, 2021 | Completed final sign-off Jul 2022 | 342 Byxbee St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $12,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2025 | 1655 Revere Av | add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested.Details
add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested. | $150,000 |
| Sep 21, 2021 | Completed final sign-off Feb 2025 | 1210 40th Av | convert existing livable space into adu 500 sf, add new interior stairs, add new skylight in bathroom. add power and office to main on ground 1st fl. add new stairs between garage and main unit at 2nd fl.Details
convert existing livable space into adu 500 sf, add new interior stairs, add new skylight in bathroom. add power and office to main on ground 1st fl. add new stairs between garage and main unit at 2nd fl. | $35,000 |
| May 17, 2019 | Completed final sign-off Feb 2020 | 2074 46th Av | add 1 full bath & walk-in closet, relocate (e) washer & dryer, relocate (e)wall at fron entranceDetails
add 1 full bath & walk-in closet, relocate (e) washer & dryer, relocate (e)wall at fron entrance | $39,000 |
| Jul 27, 2018 | Completed final sign-off Jul 2024 | 1370 Washington St | legalizing of ground floor dwelling unit under ordinance per #43-14. converting of approved rooms at ground floor per bpa#200303311081. complying with complaint #201837541. **maher n/a**Details
legalizing of ground floor dwelling unit under ordinance per #43-14. converting of approved rooms at ground floor per bpa#200303311081. complying with complaint #201837541. **maher n/a** | $15,000 |
| Dec 14, 2017 | Never finaled issued Jun 2019, no final | 10 19th Av | emergency disability access work. reasonable modification disability improvements (expedited processing): construct (n) 4-stop elevator & connecting lobby/hallway at rear or property. no work visible from street.Details
emergency disability access work. reasonable modification disability improvements (expedited processing): construct (n) 4-stop elevator & connecting lobby/hallway at rear or property. no work visible from street. | $150,000 |
| Oct 20, 2017 | Completed final sign-off Jun 2018 | 311 Lyon St | add a full bath in e sunroom at 311 lyon stDetails
add a full bath in e sunroom at 311 lyon st | $13,000 |
| Dec 16, 2016 | Completed final sign-off Jun 2017 | 2121 Judah St | remodel the bathroom for unit at 2nd floor. replace vanity, toilet, and shower pan. do tile floor and wall.Details
remodel the bathroom for unit at 2nd floor. replace vanity, toilet, and shower pan. do tile floor and wall. | $6,000 |
| Nov 2, 2016 | Completed final sign-off Aug 2017 | 2435 42nd Av | 1st fl add 2 bedrooms, 2 full baths, 1 den and playroomDetails
1st fl add 2 bedrooms, 2 full baths, 1 den and playroom | $100,000 |
| Nov 26, 2014 | Completed final sign-off Feb 2015 | 63 Encanto Av | kitchen remodel: replace kitchen cabinets, countertop, faucet, sink, wall & floor tile. add 4 outlets above countertop. no walls moved, removed or added. all fixtures layouts to remain unchanged.Details
kitchen remodel: replace kitchen cabinets, countertop, faucet, sink, wall & floor tile. add 4 outlets above countertop. no walls moved, removed or added. all fixtures layouts to remain unchanged. | $16,000 |
| Oct 8, 2014 | Completed final sign-off Dec 2014 | 2480 Mission St | #331 & #332: comply to complaint# 201495751 interior t.i. remodel clinic office, provide (n) seperation walls between #331 & 332 at original location, provide (n) partition walls at original location in #331 & 332, provide (n) ada doors at new treatment rooms.Details
#331 & #332: comply to complaint# 201495751 interior t.i. remodel clinic office, provide (n) seperation walls between #331 & 332 at original location, provide (n) partition walls at original location in #331 & 332, provide (n) ada doors at new treatment rooms. | $15,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 427 Moscow St | renovation of single family dwelling. add family room, bedroom, bath, storage on 1st fl. relocate (e) kitchen and remodel (e) bath on 2nd fl. add bathroom and study, infill (e) lightwell on 2nd floor. add 19'x7' rear deck.Details
renovation of single family dwelling. add family room, bedroom, bath, storage on 1st fl. relocate (e) kitchen and remodel (e) bath on 2nd fl. add bathroom and study, infill (e) lightwell on 2nd floor. add 19'x7' rear deck. | $50,000 |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 2006 32nd Av | construct one bathroom, one bedrrom, and playroom on ground floor.Details
construct one bathroom, one bedrrom, and playroom on ground floor. | $18,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 230 Brazil Av | remodel 1st floor. add playroom, 1/2 bath, laundry, storage roomDetails
remodel 1st floor. add playroom, 1/2 bath, laundry, storage room | $42,000 |