Back to bathroom remodel contractors
Threemile Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Jul 2026
- Last 24 months
- 11 permits filed
32 permits since 2000: 25 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 in progress. Typically 20 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 302 Bay Shore Bl | commerical t.i. g/f: new ada compliant bathroom. replace main water line.Details
commerical t.i. g/f: new ada compliant bathroom. replace main water line. | $35,000 |
| Mar 23, 2026 | Completed final sign-off Jun 2026 | 511 Buchanan St | unit 511a: 1 kitchen and 2 bathroom remodels like for like.Details
unit 511a: 1 kitchen and 2 bathroom remodels like for like. | $60,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 41 Apollo St | comply w/ nov #: 202548003: 2nd floor - kitchen remodel sink and stove keep in same location. a full bathroom remodel.Details
comply w/ nov #: 202548003: 2nd floor - kitchen remodel sink and stove keep in same location. a full bathroom remodel. | $20,000 |
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 259 Upper Tr | unit #2 3/f only: relocate (e) kitchen & dining to (e) stuio area. propose (n) in-unit laundry and (n) living room. reorient (e) bath fixtures. propose (n) furnace @ garage. electrical upgrades w/ wiring, led ligths, & subpanel.Details
unit #2 3/f only: relocate (e) kitchen & dining to (e) stuio area. propose (n) in-unit laundry and (n) living room. reorient (e) bath fixtures. propose (n) furnace @ garage. electrical upgrades w/ wiring, led ligths, & subpanel. | $25,000 |
| Sep 2, 2025 | Completed final sign-off Dec 2025 | 259 Upper Tr | unit #1: add (n) master bathroom & relocate (e) closet within (e) bedroom. remodel (e) common bath. convert (e) storage in (n) laundry closet. all work on 2/f.Details
unit #1: add (n) master bathroom & relocate (e) closet within (e) bedroom. remodel (e) common bath. convert (e) storage in (n) laundry closet. all work on 2/f. | $38,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 312 Stratford Dr | two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11).Details
two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11). | $40,000 |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 2591 27th Av | remodel 2nd fl. kitchen and bathroom two new skylight and convert breakast area to officeDetails
remodel 2nd fl. kitchen and bathroom two new skylight and convert breakast area to office | $65,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2023 | 679 14th Av | ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room.Details
ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room. | $150,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2025 | 1655 Revere Av | add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested.Details
add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested. | $150,000 |
| Sep 21, 2021 | Completed final sign-off Feb 2025 | 1210 40th Av | convert existing livable space into adu 500 sf, add new interior stairs, add new skylight in bathroom. add power and office to main on ground 1st fl. add new stairs between garage and main unit at 2nd fl.Details
convert existing livable space into adu 500 sf, add new interior stairs, add new skylight in bathroom. add power and office to main on ground 1st fl. add new stairs between garage and main unit at 2nd fl. | $35,000 |
| May 17, 2019 | Completed final sign-off Feb 2020 | 2074 46th Av | add 1 full bath & walk-in closet, relocate (e) washer & dryer, relocate (e)wall at fron entranceDetails
add 1 full bath & walk-in closet, relocate (e) washer & dryer, relocate (e)wall at fron entrance | $39,000 |
| Oct 20, 2017 | Completed final sign-off Jun 2018 | 311 Lyon St | add a full bath in e sunroom at 311 lyon stDetails
add a full bath in e sunroom at 311 lyon st | $13,000 |
| Dec 16, 2016 | Completed final sign-off Jun 2017 | 2121 Judah St | remodel the bathroom for unit at 2nd floor. replace vanity, toilet, and shower pan. do tile floor and wall.Details
remodel the bathroom for unit at 2nd floor. replace vanity, toilet, and shower pan. do tile floor and wall. | $6,000 |
| Nov 2, 2016 | Completed final sign-off Aug 2017 | 2435 42nd Av | 1st fl add 2 bedrooms, 2 full baths, 1 den and playroomDetails
1st fl add 2 bedrooms, 2 full baths, 1 den and playroom | $100,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 427 Moscow St | renovation of single family dwelling. add family room, bedroom, bath, storage on 1st fl. relocate (e) kitchen and remodel (e) bath on 2nd fl. add bathroom and study, infill (e) lightwell on 2nd floor. add 19'x7' rear deck.Details
renovation of single family dwelling. add family room, bedroom, bath, storage on 1st fl. relocate (e) kitchen and remodel (e) bath on 2nd fl. add bathroom and study, infill (e) lightwell on 2nd floor. add 19'x7' rear deck. | $50,000 |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 2006 32nd Av | construct one bathroom, one bedrrom, and playroom on ground floor.Details
construct one bathroom, one bedrrom, and playroom on ground floor. | $18,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 230 Brazil Av | remodel 1st floor. add playroom, 1/2 bath, laundry, storage roomDetails
remodel 1st floor. add playroom, 1/2 bath, laundry, storage room | $42,000 |