Back to kitchen remodel contractors
Threemile Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Jul 2026
- Last 24 months
- 11 permits filed
32 permits since 2000: 25 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 12 completed. Typically 3 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2026 | Completed final sign-off Jun 2026 | 511 Buchanan St | unit 511a: 1 kitchen and 2 bathroom remodels like for like.Details
unit 511a: 1 kitchen and 2 bathroom remodels like for like. | $60,000 |
| Dec 19, 2025 | Completed final sign-off Apr 2026 | 41 Apollo St | comply w/ nov #: 202548003: 2nd floor - kitchen remodel sink and stove keep in same location. a full bathroom remodel.Details
comply w/ nov #: 202548003: 2nd floor - kitchen remodel sink and stove keep in same location. a full bathroom remodel. | $20,000 |
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 259 Upper Tr | unit #2 3/f only: relocate (e) kitchen & dining to (e) stuio area. propose (n) in-unit laundry and (n) living room. reorient (e) bath fixtures. propose (n) furnace @ garage. electrical upgrades w/ wiring, led ligths, & subpanel.Details
unit #2 3/f only: relocate (e) kitchen & dining to (e) stuio area. propose (n) in-unit laundry and (n) living room. reorient (e) bath fixtures. propose (n) furnace @ garage. electrical upgrades w/ wiring, led ligths, & subpanel. | $25,000 |
| Jul 15, 2025 | Completed final sign-off Aug 2025 | 1906 Santiago St | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. | $10,000 |
| May 3, 2024 | Completed final sign-off Jul 2025 | 312 Stratford Dr | two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11).Details
two bathroom (e) remodel, kitchen (e) relocated. add two new bathroom and one office. convert family room into bedroom. relcoate water heater. replace windows (11). | $40,000 |
| Apr 17, 2024 | Completed final sign-off Nov 2024 | 3436 Moraga St | remodel an existing kitchen at 2nd fl. upgrade 100 amp service panel to 200 ampDetails
remodel an existing kitchen at 2nd fl. upgrade 100 amp service panel to 200 amp | $15,000 |
| Jun 29, 2023 | Completed final sign-off Apr 2024 | 2591 27th Av | remodel 2nd fl. kitchen and bathroom two new skylight and convert breakast area to officeDetails
remodel 2nd fl. kitchen and bathroom two new skylight and convert breakast area to office | $65,000 |
| Jan 11, 2022 | Completed final sign-off Jun 2023 | 679 14th Av | ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room.Details
ground floor: to reduce extg permitted habitable space & relocated extg full bath, renew & relocate extg furnace & water heater. 2nd floor: to convert extg playroom to master bath, remodel & relocate extg kitchen. remodel extg bath room & add a laundry room. | $150,000 |
| Nov 24, 2021 | Completed final sign-off Jul 2022 | 342 Byxbee St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $12,000 |
| Nov 1, 2021 | Completed final sign-off Dec 2025 | 1655 Revere Av | add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested.Details
add one adu at the rear of the garage on the ground floor of an existing 2-unit, three story building. the (n) unit will be two bedroom with a kitchen and two baths. no variances are required or requested. | $150,000 |
| Nov 26, 2014 | Completed final sign-off Feb 2015 | 63 Encanto Av | kitchen remodel: replace kitchen cabinets, countertop, faucet, sink, wall & floor tile. add 4 outlets above countertop. no walls moved, removed or added. all fixtures layouts to remain unchanged.Details
kitchen remodel: replace kitchen cabinets, countertop, faucet, sink, wall & floor tile. add 4 outlets above countertop. no walls moved, removed or added. all fixtures layouts to remain unchanged. | $16,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 427 Moscow St | renovation of single family dwelling. add family room, bedroom, bath, storage on 1st fl. relocate (e) kitchen and remodel (e) bath on 2nd fl. add bathroom and study, infill (e) lightwell on 2nd floor. add 19'x7' rear deck.Details
renovation of single family dwelling. add family room, bedroom, bath, storage on 1st fl. relocate (e) kitchen and remodel (e) bath on 2nd fl. add bathroom and study, infill (e) lightwell on 2nd floor. add 19'x7' rear deck. | $50,000 |