Nilgun A Wolpe
- Listed as
- authorized agent-others, engineer
- Firm
- Ny Engineering Consulting
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Aug 2026
202 permits since 2000 (engineer on 201 permits, authorized agent-others on 1 permit): 129 completed, 40 in progress, 15 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 202.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 3753 22nd St | 3-story rear addition to an existing sfr with attached 1-car garage. general interior remodeling. no changes to front facade. proposed construction not dummy project is subject to ab112 all-electric ordinance.Details
3-story rear addition to an existing sfr with attached 1-car garage. general interior remodeling. no changes to front facade. proposed construction not dummy project is subject to ab112 all-electric ordinance. | $400,000 | |
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 414 Mason St | rev. to #2025 0527 7287; demo of unpermitted storage room w/ loft at 4th floor suite #402 has been done in the field per pa# 2025.0527.7287. no re-building of storage box or other improvements at this time.Details
rev. to #2025 0527 7287; demo of unpermitted storage room w/ loft at 4th floor suite #402 has been done in the field per pa# 2025.0527.7287. no re-building of storage box or other improvements at this time. | ||
| Jul 27, 2026 | In progress issued Sep 2026 | 3210 Gough St | Flores General Building | renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area.Details
renovation of unit 202 on 3d fl. new kitchen and bath locations. new bedroom, new bedroom egresss window facing gough. associated structural, plumbing, mech, elec. no chang to habitable area. | $40,000 |
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 1723 Stockton St | convert 1/f storage into adu per state adu program, planning code section 207.2.Details
convert 1/f storage into adu per state adu program, planning code section 207.2. | $75,000 | |
| Jun 9, 2026 | In progress issued Jul 2026 | 1723 Stockton St | unit # 1723a: renovate one unit on first floor at rear bldg to match approved units at upper floors. no change to areas. new kitchen. 2 baths. replace windows not visible from st. 3 property line windows in kind and 2 facing the court to change in size. structural permit is 2026-6127-4608.Details
unit # 1723a: renovate one unit on first floor at rear bldg to match approved units at upper floors. no change to areas. new kitchen. 2 baths. replace windows not visible from st. 3 property line windows in kind and 2 facing the court to change in size. structural permit is 2026-6127-4608. | $75,000 | |
| Apr 24, 2026 | In progress filed Apr 2026, not yet issued | 531 44th Av | installation of 3 skylights. not visible from streetDetails
installation of 3 skylights. not visible from street | $25,000 | |
| Apr 9, 2026 | In progress filed Apr 2026, not yet issued | 1174 Pacific Av | basement - reinforce basement structure below (n) opening created on 1st fl; 1st fkm 1174 - remove partial partition wall @ living rm; new arch opening @ living rm; replace closet door into sliding door; 3rd fl, 1178 remodel (e) kitchen; remodel (e) & bathroom; demo partition wall between kitchen &Details
basement - reinforce basement structure below (n) opening created on 1st fl; 1st fkm 1174 - remove partial partition wall @ living rm; new arch opening @ living rm; replace closet door into sliding door; 3rd fl, 1178 remodel (e) kitchen; remodel (e) & bathroom; demo partition wall between kitchen & | $48,000 | |
| Mar 3, 2026 | In progress filed Mar 2026, not yet issued | 519 Capp St | (n) front steps, fence & gateDetails
(n) front steps, fence & gate | $25,000 | |
| Feb 2, 2026 | In progress issued May 2026 | 150 Liberty St | Olive Remodeling | vertical addition of 4th story and stair to upper unit, 152 liberty, addition of (n) roof deck at 4th floor, sprinkler entire building with nfpa 13r system on seperate permit, full seismic upgrade.Details
vertical addition of 4th story and stair to upper unit, 152 liberty, addition of (n) roof deck at 4th floor, sprinkler entire building with nfpa 13r system on seperate permit, full seismic upgrade. | $175,000 |
| Jan 27, 2026 | In progress issued Feb 2026 | 1725 Stockton St | revision to 202407317615. the purpose of this revision is to provide new structural foundation design based on existing conditions.Details
revision to 202407317615. the purpose of this revision is to provide new structural foundation design based on existing conditions. | ||
| Jan 24, 2026 | In progress filed Jan 2026, not yet issued | 2 Turquoise Wy | interior remodeling at main (2nd) fl. new construction habitable 1st fl "room down" infill under main fl. new replacement deck less than 10' above grade. new room exposure less than 12'. no area outside (e) footprint. assuming sec. 311 exempt byt ' pal' required to proceed to bpa. new ext. siding.Details
interior remodeling at main (2nd) fl. new construction habitable 1st fl "room down" infill under main fl. new replacement deck less than 10' above grade. new room exposure less than 12'. no area outside (e) footprint. assuming sec. 311 exempt byt ' pal' required to proceed to bpa. new ext. siding. | $200,000 | |
| Jan 5, 2026 | In progress filed Jan 2026, not yet issued | 672 Hamilton St | Wing On Construction Inc | revision to pa#: 202107295380 and 202401184228. 1) retaining wall at grid line e. 2) drawing index s-2 1st flr foundation plan and detail.Details
revision to pa#: 202107295380 and 202401184228. 1) retaining wall at grid line e. 2) drawing index s-2 1st flr foundation plan and detail. | |
| Nov 12, 2025 | In progress issued Mar 2026 | 414 Mason St | Ja Constructoin | demo unpermitted storage room w/ loft at 4/f ste #402, new non-combustible storage room with storage loft at same size & location as existing.Details
demo unpermitted storage room w/ loft at 4/f ste #402, new non-combustible storage room with storage loft at same size & location as existing. | $16,000 |
| Oct 31, 2025 | In progress issued Sep 2026 | 4135 19th St | S L M Development Inc. | horizontal addition floors 1 & 2. "rooms down" expansion into first floor, new bath and bedroom new windows. excavation of 28.7 cubic yards at rear, new retaining walls.Details
horizontal addition floors 1 & 2. "rooms down" expansion into first floor, new bath and bedroom new windows. excavation of 28.7 cubic yards at rear, new retaining walls. | $100,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 600 Texas St | Ava Jamshidnejad | revision to 202504144355 new footing grid line 4 (between grid line c and f), new footing grid line 1 (between grid line d and f)Details
revision to 202504144355 new footing grid line 4 (between grid line c and f), new footing grid line 1 (between grid line d and f) | |
| Sep 19, 2025 | In progress filed Sep 2025, not yet issued | 288 Moultrie St | Zafra Incorporated | unit legalization/adu.work to be done:bathoom fixtures replacement/kitchen sink replacement,passge door removalDetails
unit legalization/adu.work to be done:bathoom fixtures replacement/kitchen sink replacement,passge door removal | $8,000 |
| Aug 27, 2025 | In progress issued Mar 2026 | 1360 Wayland St | Mcdp Dba Geothersun Construction | 3rd floor addtion to an existing 2-story sfr subject to sec311 (site permit) planning/ design review process. rooftop pv solar system. new elevator to servce all floors. interior remodel of existing floors. pv system at roof.Details
3rd floor addtion to an existing 2-story sfr subject to sec311 (site permit) planning/ design review process. rooftop pv solar system. new elevator to servce all floors. interior remodel of existing floors. pv system at roof. | $500,000 |
| Aug 13, 2025 | In progress issued Jan 2026 | 4135 19th St | S L M Development Inc. | interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen.Details
interior remodel to unit 4135 at 2nd floor to include bathroom and kitchen. | $75,000 |
| Jul 28, 2025 | Completed final sign-off Mar 2026 | 3774 Mission St | Itu Construction | rear bldg: revision to 202209142451, additional foundation because there was no existing footingDetails
rear bldg: revision to 202209142451, additional foundation because there was no existing footing | |
| Jul 28, 2025 | Completed final sign-off Mar 2026 | 3774 Mission St | Itu Construction | front bldg: revision to 202209142449, additional foundation because there was no existing footingDetails
front bldg: revision to 202209142449, additional foundation because there was no existing footing | |
| Jul 18, 2025 | Completed final sign-off Jul 2026 | 519 Capp St | Vt Construction And Remodeling | interior remodel including (n) kitchen w/(n) hood in each unit; bathroom remodel in each unit/ (n) 1/2 bath on lower floor. remove (e) unpermitted sunrooms & convert back to rear porch; add concrete foundation & concrete slab while lowering floor elevation to crawl spaceDetails
interior remodel including (n) kitchen w/(n) hood in each unit; bathroom remodel in each unit/ (n) 1/2 bath on lower floor. remove (e) unpermitted sunrooms & convert back to rear porch; add concrete foundation & concrete slab while lowering floor elevation to crawl space | $450,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 461 Gates St | Ava Jamshidnejad | revision to pa# 202503051616: replace (e) entry stair with new entry stair and rails in same location - updated details.Details
revision to pa# 202503051616: replace (e) entry stair with new entry stair and rails in same location - updated details. | $1,000 |
| Jun 6, 2025 | Completed final sign-off Aug 2026 | 90 Peralta Av | Occidental Express, Hugo Tejada/Dba Alpha & Omega Renovation | 1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level.Details
1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level. | $25,000 |
| Jun 3, 2025 | In progress issued Aug 2025 | 1596 Guerrero St | provide seismic upgrade to meet requirements of mandatory programDetails
provide seismic upgrade to meet requirements of mandatory program | $25,000 | |
| May 21, 2025 | In progress issued Mar 2026 | 765 Bay St | B-Side Inc. | repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade.Details
repair and replace (e) exterior finishes and water proofing in kind. interior renovations, expand into crawspace at first floor. sesimic upgrade. | $300,000 |
| May 16, 2025 | In progress issued Apr 2026 | 246 Bocana St | Ava Jamshidnejad | conversion of garage/storage to new habitable space 2. 2nd floor renovation 3. 3rd floor additionDetails
conversion of garage/storage to new habitable space 2. 2nd floor renovation 3. 3rd floor addition | $375,000 |
| May 12, 2025 | In progress issued Jun 2025 | 4135 19th St | S L M Development Inc. | foundation repair and replacementDetails
foundation repair and replacement | $50,000 |
| May 7, 2025 | In progress issued Aug 2025 | 239 Duboce Av | new concrete foundation next to e brick foundation. new concrete slab, new bath at workshop, new door to the rearDetails
new concrete foundation next to e brick foundation. new concrete slab, new bath at workshop, new door to the rear | $150,000 | |
| May 5, 2025 | In progress issued Aug 2025 | 1834 Gough St | Bergquist Builders | remodel of an existing 2 story building with a basement, and interior remodel throughout.Details
remodel of an existing 2 story building with a basement, and interior remodel throughout. | $170,000 |
| May 2, 2025 | In progress issued Aug 2025 | 600 Texas St | Ava Jamshidnejad | excavation of approx 47 cu yd; remodel and horizontal expansion of 1st fl; remodel of 2nd fl (partial); removal of gas service, full electric 20181Details
excavation of approx 47 cu yd; remodel and horizontal expansion of 1st fl; remodel of 2nd fl (partial); removal of gas service, full electric 20181 | $185,000 |
| Apr 3, 2025 | In progress issued Jun 2026 | 414 Mason St | Ja Constructoin | demo only, no ti. ab017Details
demo only, no ti. ab017 | $35,000 |
| Mar 12, 2025 | In progress issued Nov 2025 | 1596 Guerrero St | 2 adu's within (e) envelope at 1st floor parking & storage areas. seismic upgrade under separate pa# 202410304074 (otc-not issue yet).Details
2 adu's within (e) envelope at 1st floor parking & storage areas. seismic upgrade under separate pa# 202410304074 (otc-not issue yet). | $100,000 | |
| Jan 8, 2025 | Completed final sign-off Jul 2026 | 2714 Noriega St | F Liu Construction | remodel (e) 1st floor (rooms down) conditioned space. remodel (e) 2nd floor kitchen & bathrooms. wall removal between kitchen / dining & living room. (e) gas gurn & gas wh to remain. new vinyl replacement windows. new interior doors & entry door unit with sidelight.Details
remodel (e) 1st floor (rooms down) conditioned space. remodel (e) 2nd floor kitchen & bathrooms. wall removal between kitchen / dining & living room. (e) gas gurn & gas wh to remain. new vinyl replacement windows. new interior doors & entry door unit with sidelight. | $120,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2026 | 1430 Hyde St | Be Home Remodeling Inc | reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair.Details
reconfiguration of one split bathroom into one full bath and one half bath on 2nd flr. removal of wall in kitchen and dining room, kitchen remodel. new cabinets at laundry room, sink repair. | $100,000 |
| Nov 19, 2024 | Completed final sign-off Jan 2025 | 1059 Leavenworth St | John O'rourke | revision to pa # 2024-0425-0692 new foundationDetails
revision to pa # 2024-0425-0692 new foundation | $5,000 |
| Sep 24, 2024 | In progress issued Sep 2025 | 754 42nd Av | Jesus Henriquez | (n) rear deck and stairs; (n) door to rear deckDetails
(n) rear deck and stairs; (n) door to rear deck | $50,000 |
| Sep 9, 2024 | In progress issued Sep 2024 | 150 Bronte St | J5 Real Estate Development Co | revision to pa 2016-0916-7950 to change the previously approved, ~10-foot tall, steel soldier pile and wood lagging wall adjacent to the east side of the rear patio to a concrete retaining wall using a previously approved structural detail.Details
revision to pa 2016-0916-7950 to change the previously approved, ~10-foot tall, steel soldier pile and wood lagging wall adjacent to the east side of the rear patio to a concrete retaining wall using a previously approved structural detail. | $1,000 |
| Aug 28, 2024 | In progress issued Oct 2024 | 379 27th St | convert (e) detached garage to habitable living space.Details
convert (e) detached garage to habitable living space. | $50,000 | |
| Aug 19, 2024 | Completed final sign-off May 2025 | 110 32nd Av | Ly Construction | revision to pa#'s 2016-0621-0534, 2022-0211-7868, 2021-0823-6921, 2020-0828-2848 & 2022-0329-1124 alter layout ground fl entry, kitchen & bathroom layout change, remove fire escape, replace patio door with windows on 2nd fl & solarium detailsDetails
revision to pa#'s 2016-0621-0534, 2022-0211-7868, 2021-0823-6921, 2020-0828-2848 & 2022-0329-1124 alter layout ground fl entry, kitchen & bathroom layout change, remove fire escape, replace patio door with windows on 2nd fl & solarium details | $15,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 1474 41st Av | repair/replace foundation and framing at rear - 25 ft of structure. replace exterior glazing to meet title 24. work to comply w/ nov# 202423634.Details
repair/replace foundation and framing at rear - 25 ft of structure. replace exterior glazing to meet title 24. work to comply w/ nov# 202423634. | $20,000 | |
| Jul 30, 2024 | In progress issued Oct 2024 | 1212 19th St | Vonnegut Thoreau Construction | rear yard retaining wall. building currently being converted to two family under pa# 202211176785.Details
rear yard retaining wall. building currently being converted to two family under pa# 202211176785. | $23,000 |
| Jul 25, 2024 | Completed final sign-off Jul 2026 | 121 Ellert St | Mcdp Dba Geothersun Construction | interior remodel demo / repair existing stairs - replace inkind. (n) interior stairs, (n) secondary kitchen+bathroom on lower floor.Details
interior remodel demo / repair existing stairs - replace inkind. (n) interior stairs, (n) secondary kitchen+bathroom on lower floor. | $600,000 |
| Jul 5, 2024 | Completed final sign-off Jul 2025 | 263 Lexington St | Aaron Gordon Construction Inc | remodel of (e) kitchen on level 2 (unit 1) new cabintry enlarge opening between kitchen and dining room replace rear windows in kind (facing rear yard)Details
remodel of (e) kitchen on level 2 (unit 1) new cabintry enlarge opening between kitchen and dining room replace rear windows in kind (facing rear yard) | $50,000 |
| Jul 1, 2024 | Completed final sign-off Jan 2025 | 104 Eureka St | Sft Construction Corp | rev to pa# 2019-0409-7445; rev to previously pulled seismic related permit. standard, non blase resistant glass at store front, (3) sistered strong walls in lieu of steel monent frameDetails
rev to pa# 2019-0409-7445; rev to previously pulled seismic related permit. standard, non blase resistant glass at store front, (3) sistered strong walls in lieu of steel monent frame | |
| May 8, 2024 | In progress issued Jun 2025 | 2500 Broadway | full int remodel, infill under (e) deck. below grade expansion of north garage. change of exterior stair. minor ext changes- railing, windows, doors. structural upgrade, earth shoring for garage expansionDetails
full int remodel, infill under (e) deck. below grade expansion of north garage. change of exterior stair. minor ext changes- railing, windows, doors. structural upgrade, earth shoring for garage expansion | $650,000 | |
| Apr 25, 2024 | Completed final sign-off Jan 2025 | 1059 Leavenworth St | John O'rourke | soft stort retrofit as required by sfebc 505eDetails
soft stort retrofit as required by sfebc 505e | $70,000 |
| Apr 5, 2024 | In progress filed Apr 2024, not yet issued | 668 Hamilton St | Wing On Construction Inc | revision to pa# 202107295403 proposed envelope expansions include 2nd floor and 3rd floor envelope expansion.Details
revision to pa# 202107295403 proposed envelope expansions include 2nd floor and 3rd floor envelope expansion. | $10,000 |
| Feb 22, 2024 | In progress filed Feb 2024, not yet issued | 244 Divisadero St | to comply with nov 202295196 reconstruction of fire damaged building repair & replace (e) construction in-kind. work on all 5 units including 246 divisadero and commercial spaceDetails
to comply with nov 202295196 reconstruction of fire damaged building repair & replace (e) construction in-kind. work on all 5 units including 246 divisadero and commercial space | $100,000 | |
| Feb 9, 2024 | Completed final sign-off Oct 2025 | 1723 Stockton St | this permit is to partially comply with nov 202307019. no final for scope at front building until rear building has been issued and completed, scope: clairfy address, 1st floor demo at unpermitted area. reinstall 5/8 drywall only, 4th floor interior ti.Details
this permit is to partially comply with nov 202307019. no final for scope at front building until rear building has been issued and completed, scope: clairfy address, 1st floor demo at unpermitted area. reinstall 5/8 drywall only, 4th floor interior ti. | $100,000 | |
| Jan 30, 2024 | Completed final sign-off Jun 2024 | 1106 Brazil Av | fixing (e) foundation along northern and eastern sides of property.Details
fixing (e) foundation along northern and eastern sides of property. | $50,000 | |
| Jan 24, 2024 | Completed final sign-off Mar 2026 | 259 07th Av | Wilko Builders Llc. | to establish state adu on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + adu)Details
to establish state adu on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + adu) | $142,000 |
| Jan 11, 2024 | Completed final sign-off Jul 2024 | 660 Myra Wy | Mizen Construction Inc | replacing windows at main bathroom, lower bedroom, bathroom. replace water and termite damaged framing and sheathing. replace street balcony railing. ref app# 202307132053.Details
replacing windows at main bathroom, lower bedroom, bathroom. replace water and termite damaged framing and sheathing. replace street balcony railing. ref app# 202307132053. | $250,000 |
| Sep 20, 2023 | Never finaled filed Sep 2023, never issued | 64 Winfield St | provide 2 adu's at existing basement crawl space level. raise existing building 3'. provide full seismic upgrade per ab-094Details
provide 2 adu's at existing basement crawl space level. raise existing building 3'. provide full seismic upgrade per ab-094 | $150,000 | |
| Sep 14, 2023 | In progress issued Oct 2023 | 150 Bronte St | J5 Real Estate Development Co | construction revision to bpa# 201609167950 s1: replacing steel beam with wood beam and add post at l4 and roof framing.Details
construction revision to bpa# 201609167950 s1: replacing steel beam with wood beam and add post at l4 and roof framing. | |
| Sep 11, 2023 | In progress issued May 2025 | 1336 Shotwell St | Ava Jamshidnejad | conversion of 1/f to new studio adu. front facade renovation. remove (e) peaked roof for new flat roof and roof deck.Details
conversion of 1/f to new studio adu. front facade renovation. remove (e) peaked roof for new flat roof and roof deck. | $100,000 |
| Aug 25, 2023 | Never finaled issued Sep 2023, no final | 1247 Bosworth St | altered site permit to pa 201612024094: foundation alignment not visible to street. mintor exterior material changes.Details
altered site permit to pa 201612024094: foundation alignment not visible to street. mintor exterior material changes. | ||
| Aug 21, 2023 | Expired or cancelled expired Nov 2025 | 67 Mirabel Av | Blue Bay Painting Contractor | revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope.Details
revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope. | |
| Aug 9, 2023 | Completed final sign-off Jan 2025 | 2052 Greenwich St | Verona Remodeling, Am Construction Inc | creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units.Details
creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units. | $58,000 |
| Aug 3, 2023 | Never finaled issued Aug 2023, no final | 952 Minnesota St | J5 Real Estate Development Co | changing strong wall locations. revision to 202212299374; provide structural improvement to entry stair framingDetails
changing strong wall locations. revision to 202212299374; provide structural improvement to entry stair framing | |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 2500 Broadway | Upscale Construction Inc. | repairing & repainting exterior facade, replacing roofing shingles, replacing rear blaconies, guardrails and deck pavers, replacing egress ladder at the rear, replacing damaged windows, replacing skylights, selective interior remodel and repair as required. (re-roofing under separeted permit)Details
repairing & repainting exterior facade, replacing roofing shingles, replacing rear blaconies, guardrails and deck pavers, replacing egress ladder at the rear, replacing damaged windows, replacing skylights, selective interior remodel and repair as required. (re-roofing under separeted permit) | $417,278 |
| Jun 1, 2023 | Expired or cancelled withdrawn Jun 2023 | 2500 Broadway | repairing and repainting exterior facade. replace some roof shingles. replace rear balconies guardrails and deck pavers. replacing egress ladder at the rear. replace existing fence at pierce st. replacing damaged windows, skylights. selective interior remodel and repair as requiredDetails
repairing and repainting exterior facade. replace some roof shingles. replace rear balconies guardrails and deck pavers. replacing egress ladder at the rear. replace existing fence at pierce st. replacing damaged windows, skylights. selective interior remodel and repair as required | $342,000 | |
| May 31, 2023 | Completed final sign-off Nov 2023 | 159 Bonview St | Ka - Bi Construction Inc. | rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 204810042285, field discovered conditions, repair & remove extg crumbing & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings.Details
rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 204810042285, field discovered conditions, repair & remove extg crumbing & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings. | $500 |
| May 18, 2023 | Completed final sign-off Sep 2024 | 445 Upper Tr | Zack De Vito Inc | unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior workDetails
unit 6: interior renovation of kitchen, 2 baths, (2) bedrooms with new fixtures & finishes. no exterior work | $125,000 |
| Jan 12, 2023 | Completed final sign-off Aug 2025 | 162 Alpine Tr | (n) footing to the rear of the building.Details
(n) footing to the rear of the building. | $100,000 | |
| Dec 16, 2022 | In progress issued Jan 2025 | 1448 Plymouth Av | Fay Construction & Restoration Inc | const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass.Details
const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass. | $100,000 |
| Dec 8, 2022 | In progress issued Feb 2024 | 1018 Pennsylvania Av | S L M Development Inc. | to comply with nov 202172457 and provide (1) adu within existing envelope at 1st floor space per state law government code section 65852.2. remove existing non-compliant front yard fence within public way. portion of existing fence to remain within property lines. (sfd + adu)Details
to comply with nov 202172457 and provide (1) adu within existing envelope at 1st floor space per state law government code section 65852.2. remove existing non-compliant front yard fence within public way. portion of existing fence to remain within property lines. (sfd + adu) | $20,000 |
| Nov 3, 2022 | Completed final sign-off Dec 2022 | 1225 Stanyan St | Art Of Construction Inc | 2'6" max retaining wall at empty lot adjacent to neightboring footingDetails
2'6" max retaining wall at empty lot adjacent to neightboring footing | $5,000 |
| Oct 20, 2022 | Completed final sign-off May 2023 | 1360 Fairfax Av | Carroll Construction | revision to pa 2022-0615-6446. new partitions in warehouse area.new storage and employee break room. new stair & door to side.Details
revision to pa 2022-0615-6446. new partitions in warehouse area.new storage and employee break room. new stair & door to side. | $2,000 |
| Sep 14, 2022 | Completed final sign-off Mar 2026 | 3774 Mission St | Itu Construction | (rear building) general interior remodeling of 1 dwelling unit at rear. no new area. new heating system. new white framed vinyl windows.Details
(rear building) general interior remodeling of 1 dwelling unit at rear. no new area. new heating system. new white framed vinyl windows. | $70,000 |
| Sep 14, 2022 | Completed final sign-off Mar 2026 | 3774 Mission St | Itu Construction | (front building) general interior remodeling of 2 dwelling units. 116 sf infill at unit facing courtyard. rear stair replacement in same configuration. no work at street facing commercial space.Details
(front building) general interior remodeling of 2 dwelling units. 116 sf infill at unit facing courtyard. rear stair replacement in same configuration. no work at street facing commercial space. | $100,000 |
| Jun 21, 2022 | Expired or cancelled expired Sep 2026 | 2301 Lombard St | S L M Development Inc., K 2 Builders Inc | first tenant improvement including finishes and fixtures of barbershop and spa; m & w locker rooms raised platform with hot spa, cold plunges and amenities.Details
first tenant improvement including finishes and fixtures of barbershop and spa; m & w locker rooms raised platform with hot spa, cold plunges and amenities. | $160,000 |
| Jun 17, 2022 | Never finaled issued Aug 2022, no final | 1212 19th St | Vonnegut Thoreau Construction | interior remodel of an existing building including new interior stair connecting 1st and 2nd floor, and foundation replacement.Details
interior remodel of an existing building including new interior stair connecting 1st and 2nd floor, and foundation replacement. | $370,000 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 1360 Fairfax Av | Carroll Construction | t.i. with (n) demising wall and ada toilet for lease space s-3 occupancy. t.i. for canine enrichment with mep and (n) ada toilet for change of use from s-2 to b. (n) exterior roll up doors to access (e) side yard. repair (e) roof.Details
t.i. with (n) demising wall and ada toilet for lease space s-3 occupancy. t.i. for canine enrichment with mep and (n) ada toilet for change of use from s-2 to b. (n) exterior roll up doors to access (e) side yard. repair (e) roof. | $160,000 |
| Jun 15, 2022 | Never finaled issued Jun 2022, no final | 150 Liberty St | Olive Remodeling | replace (e) side & rear windows with (n) aluminum clad wood windows. (n) rear deck, less than 10'0" above grade, extends into required rear yard 12'0" max per planning.Details
replace (e) side & rear windows with (n) aluminum clad wood windows. (n) rear deck, less than 10'0" above grade, extends into required rear yard 12'0" max per planning. | $20,000 |
| May 25, 2022 | Never finaled issued Aug 2023, no final | 412 Lansdale Av | remove existing failing retaining wall at rearyard, and replace with new retaining wall.Details
remove existing failing retaining wall at rearyard, and replace with new retaining wall. | $20,000 | |
| May 12, 2022 | Never finaled issued May 2022, no final | 7949 Geary Bl | Buhler Construction | construct new deck over storage room on 1st fl. construct new exterior stairs from deck to grade.Details
construct new deck over storage room on 1st fl. construct new exterior stairs from deck to grade. | $35,000 |
| May 10, 2022 | Completed final sign-off May 2023 | 686 28th Av | Strong Builders Construction Inc. | structural revision to approved renovation permit 202109168591. new foundations, upgrade seismic systems upsize beamDetails
structural revision to approved renovation permit 202109168591. new foundations, upgrade seismic systems upsize beam | |
| May 6, 2022 | Completed final sign-off Mar 2023 | 1308 Diamond St | to comply with nov# 202289530. rear yard retaining wall and foundation.Details
to comply with nov# 202289530. rear yard retaining wall and foundation. | $10,000 | |
| Mar 28, 2022 | Completed final sign-off Mar 2023 | 168 Jordan Av | B R S Construction | 1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook.Details
1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook. | $33,000 |
| Mar 17, 2022 | Completed final sign-off Jun 2022 | 157 Crescent Av | Foundations R Us | removing drywall routed members as in kind at cantilever. new beam and new footing and grid line 1 (between a to a.7) new footing at gridline a and a.7Details
removing drywall routed members as in kind at cantilever. new beam and new footing and grid line 1 (between a to a.7) new footing at gridline a and a.7 | $15,000 |
| Dec 22, 2021 | Completed final sign-off Apr 2023 | 2344 15th St | K 2 Builders Inc | revision to pa #202104299557. revised footing at garage north wall, revised beam, revised shear wall locationDetails
revision to pa #202104299557. revised footing at garage north wall, revised beam, revised shear wall location | $1,200 |
| Dec 2, 2021 | Completed final sign-off Apr 2022 | 224 Day St | Stay Covered Builders Inc | revision to permit #202109017602. 1)work being performed is on 2nd floor bathrooms. 2)walls removed and beam installed to creatre hallway. 3) relocate extg master bath & master closet. 4)added skylights close to property line. 5)removed ceiling of 1st floor living for plmg for bathroomsDetails
revision to permit #202109017602. 1)work being performed is on 2nd floor bathrooms. 2)walls removed and beam installed to creatre hallway. 3) relocate extg master bath & master closet. 4)added skylights close to property line. 5)removed ceiling of 1st floor living for plmg for bathrooms | $80,000 |
| Nov 29, 2021 | Completed final sign-off Aug 2024 | 2094 Bush St | Go Solar Direct Inc Dba Oria Builders, Mission Home Remodeling Inc | complete (e) basement reno: remove (e) water heater and replace by indoor tankless water heater. (n) electrical ventless laundry machine, remove (e) complete bathr. replace by (n) powder room. (n) spiral staircase to connect first floor and basement, per plan, elec, mech, plumbing by codeDetails
complete (e) basement reno: remove (e) water heater and replace by indoor tankless water heater. (n) electrical ventless laundry machine, remove (e) complete bathr. replace by (n) powder room. (n) spiral staircase to connect first floor and basement, per plan, elec, mech, plumbing by code | $70,000 |
| Nov 19, 2021 | Completed final sign-off Jun 2023 | 3464 Clay St | Box Canyon Builders Dba The Englander | demolition: a) framing refer to structural drawings for add'l demo scope as reqd for insertion of (n) work. b) plumbing remove (e) fixtures and equipment as reqd for (n) work. replace all (e) toilets. c) flooring remove (e) carpet throughout. remove (e) carpet at all interior stairs.Details
demolition: a) framing refer to structural drawings for add'l demo scope as reqd for insertion of (n) work. b) plumbing remove (e) fixtures and equipment as reqd for (n) work. replace all (e) toilets. c) flooring remove (e) carpet throughout. remove (e) carpet at all interior stairs. | $125,000 |
| Nov 15, 2021 | Completed final sign-off Jul 2023 | 60 Appleton Av | Huey Const Mngmt Co Inc - Dba M H Const. | seismic retro on foundation (existing)Details
seismic retro on foundation (existing) | $80,000 |
| Nov 12, 2021 | Completed final sign-off Dec 2022 | 216 Yerba Buena Av | K 2 Builders Inc | retaining wall changes @ rear for soil engineer upgraded soil report: job site construction revision per pa# 201907267134Details
retaining wall changes @ rear for soil engineer upgraded soil report: job site construction revision per pa# 201907267134 | |
| Oct 12, 2021 | Completed final sign-off Dec 2022 | 2674 Filbert St | K 2 Builders Inc | interior remodel: replacement of (e) g/f bathroom, add new dry sauna, new gas fireplace, new replacement of (e) door and (e) windows with new french doors at rear balcony, replacement of 3' of (e) wood slat exterior stair enclosure with new glass view panels. no change to habitable square footage.Details
interior remodel: replacement of (e) g/f bathroom, add new dry sauna, new gas fireplace, new replacement of (e) door and (e) windows with new french doors at rear balcony, replacement of 3' of (e) wood slat exterior stair enclosure with new glass view panels. no change to habitable square footage. | $60,000 |
| Sep 2, 2021 | Completed final sign-off Dec 2025 | 162 Alpine Tr | interior remodel including kitchen and (e) bathroom. replace all windows. adding 3/4 bathroom o lower level & 1/2 bath on entrey level, reroof non-visible. visible window replacement under seperate permit.Details
interior remodel including kitchen and (e) bathroom. replace all windows. adding 3/4 bathroom o lower level & 1/2 bath on entrey level, reroof non-visible. visible window replacement under seperate permit. | $700,000 | |
| Aug 17, 2021 | Completed final sign-off Apr 2023 | 109 16th Av | Segale Construction | remodel of ground flr unit kitchen, enlarging (e) opening into kit. remove (e) sliding door & window in kit to one window. remodeling 1 bathrm by replancing (e) fixtures & updating to led lights, replace (5) front in-kind w/ wood clad windows.Details
remodel of ground flr unit kitchen, enlarging (e) opening into kit. remove (e) sliding door & window in kit to one window. remodeling 1 bathrm by replancing (e) fixtures & updating to led lights, replace (5) front in-kind w/ wood clad windows. | $35,000 |
| Aug 16, 2021 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | foundation revision for pa# 201812289328. excavation, concrete foundation, ramps, steps and slab on grade.Details
foundation revision for pa# 201812289328. excavation, concrete foundation, ramps, steps and slab on grade. | $3,000 |
| Jul 2, 2021 | Completed final sign-off Jun 2022 | 104 Marview Wy | J W Construction | new rooms at (e) gargae sheel space. 1 car garage space to be preserved, demo of an (e) unconditioned room at 1st fl. new less steep internal stair at (e) location. 1 new window at rear.Details
new rooms at (e) gargae sheel space. 1 car garage space to be preserved, demo of an (e) unconditioned room at 1st fl. new less steep internal stair at (e) location. 1 new window at rear. | $75,000 |
| Jun 15, 2021 | Completed final sign-off Jun 2023 | 45 Bemis St | Bonilla Construction | amend to pa202103267383: interior remodel - partial reconfig of (e) bath & kitchen. new partitions.replace non-conforming stairs with (n) stairs. no ext work. no new aera. (e) wdws & ext doors to remain. partial voluntary foundatoin / structural update ssd.Details
amend to pa202103267383: interior remodel - partial reconfig of (e) bath & kitchen. new partitions.replace non-conforming stairs with (n) stairs. no ext work. no new aera. (e) wdws & ext doors to remain. partial voluntary foundatoin / structural update ssd. | $60,000 |
| May 28, 2021 | Completed final sign-off Jul 2022 | 939 Sanchez St | K J Woods Construction Inc | rev to pa 201612094657 rev of first and third floor layouts result in reduction of conditioned square footage and glazing surface at windows.Details
rev to pa 201612094657 rev of first and third floor layouts result in reduction of conditioned square footage and glazing surface at windows. | $500,000 |
| May 27, 2021 | Completed final sign-off Jun 2024 | 264 Mullen Av | Canyon Construction | remove kitchen cabinets, disconnect (e) wh. remove flooring, expose remaining foundation. remove (e) foundation in section & replace foundation in sections. replace (e) finishes. no exterior work.Details
remove kitchen cabinets, disconnect (e) wh. remove flooring, expose remaining foundation. remove (e) foundation in section & replace foundation in sections. replace (e) finishes. no exterior work. | $40,000 |
| May 26, 2021 | Completed final sign-off Dec 2021 | 738 Arkansas St | Art Of Construction Inc | install fire rated window along property line, reinforce exterior wall with strong wallDetails
install fire rated window along property line, reinforce exterior wall with strong wall | $12,000 |
| Apr 29, 2021 | Completed final sign-off Apr 2023 | 2344 15th St | K 2 Builders Inc | new post & beam in garage. conversion of (e) unconditioned 1st fl space into new bathroom. renovate 2nd & 3rd fl bathrooms. new skylights & roof.Details
new post & beam in garage. conversion of (e) unconditioned 1st fl space into new bathroom. renovate 2nd & 3rd fl bathrooms. new skylights & roof. | $85,000 |
| Apr 2, 2021 | Completed final sign-off Jun 2022 | 4058 26th St | Douglas Gower Dba Mesa Construction | remove (e) shingle & brick siding from the front facade; restore &/or replace (e) original shiplap wood siding. replace (e) front windows w/(n) 6" taller all wood windows. install (n) porch roof at the entry, (n) decorative pediments over 3/fl windows & a (n) shingled hood over 2/fl windows.Details
remove (e) shingle & brick siding from the front facade; restore &/or replace (e) original shiplap wood siding. replace (e) front windows w/(n) 6" taller all wood windows. install (n) porch roof at the entry, (n) decorative pediments over 3/fl windows & a (n) shingled hood over 2/fl windows. | $40,000 |
| Mar 25, 2021 | Completed final sign-off May 2022 | 2772 Golden Gate Av | voluntary seismic retrofit.Details
voluntary seismic retrofit. | $10,000 | |
| Mar 23, 2021 | Completed final sign-off Mar 2022 | 2137 18th St | Albert Chow | addition to no-plan pa# 202009305537. expand scope of work to include a new master bath & closet on 2nd fl. new skylight over stairs. remodel (e) bedroom, half bath & laundry area on 1st fl.Details
addition to no-plan pa# 202009305537. expand scope of work to include a new master bath & closet on 2nd fl. new skylight over stairs. remodel (e) bedroom, half bath & laundry area on 1st fl. | $130,000 |
| Jan 28, 2021 | Completed final sign-off Sep 2021 | 184 Marietta Dr | S O D Home Group | minor interior changes to an (e) j.r. adu (previously permitted). new sliding glass door to exterior.Details
minor interior changes to an (e) j.r. adu (previously permitted). new sliding glass door to exterior. | $10,000 |