Mark Bucciarelli
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Baukunst
- Based in
- Daly City
- On San Francisco permits
- Sep 2003 to Aug 2026
197 permits since 2000 (architect on 191 permits, authorized agent-others on 3 permits, engineer on 3 permits, designer on 1 permit): 108 completed, 14 in progress, 29 never finaled, 46 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 197.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2026 | In progress filed Aug 2026, not yet issued | 45 Saturn St | interior remodeling including the creation of new habitable, conditioned space,minor changes to exteriorDetails
interior remodeling including the creation of new habitable, conditioned space,minor changes to exterior | $175,000 | |
| Aug 24, 2026 | In progress filed Aug 2026, not yet issued | 3753 22nd St | 3-story rear addition to an existing sfr with attached 1-car garage. general interior remodeling. no changes to front facade. proposed construction not dummy project is subject to ab112 all-electric ordinance.Details
3-story rear addition to an existing sfr with attached 1-car garage. general interior remodeling. no changes to front facade. proposed construction not dummy project is subject to ab112 all-electric ordinance. | $400,000 | |
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 414 Mason St | rev. to #2025 0527 7287; demo of unpermitted storage room w/ loft at 4th floor suite #402 has been done in the field per pa# 2025.0527.7287. no re-building of storage box or other improvements at this time.Details
rev. to #2025 0527 7287; demo of unpermitted storage room w/ loft at 4th floor suite #402 has been done in the field per pa# 2025.0527.7287. no re-building of storage box or other improvements at this time. | ||
| Apr 21, 2026 | In progress filed Apr 2026, not yet issued | 816 Kansas St | rev 201705247572: elimination of previously approved 3rd floor. minor rear horizontal addition at both floors, both dwelling units.Details
rev 201705247572: elimination of previously approved 3rd floor. minor rear horizontal addition at both floors, both dwelling units. | ||
| Jan 24, 2026 | In progress filed Jan 2026, not yet issued | 2 Turquoise Wy | interior remodeling at main (2nd) fl. new construction habitable 1st fl "room down" infill under main fl. new replacement deck less than 10' above grade. new room exposure less than 12'. no area outside (e) footprint. assuming sec. 311 exempt byt ' pal' required to proceed to bpa. new ext. siding.Details
interior remodeling at main (2nd) fl. new construction habitable 1st fl "room down" infill under main fl. new replacement deck less than 10' above grade. new room exposure less than 12'. no area outside (e) footprint. assuming sec. 311 exempt byt ' pal' required to proceed to bpa. new ext. siding. | $200,000 | |
| Jan 12, 2026 | In progress issued Jul 2026 | 250 Arleta Av | Thomas Le Construction Inc | new 1-story addition at rear with 2-bedrooms and roof deck to (e) sfr.Details
new 1-story addition at rear with 2-bedrooms and roof deck to (e) sfr. | $150,000 |
| Sep 2, 2025 | In progress filed Sep 2025, not yet issued | 1677 48th Av | rear cottage. new relocated kitchen; bathroom remodeling.Details
rear cottage. new relocated kitchen; bathroom remodeling. | $50,000 | |
| Jun 23, 2025 | Completed final sign-off Mar 2026 | 867 28th Av | remodeling (e) hall bath & (n) master bathDetails
remodeling (e) hall bath & (n) master bath | $10,000 | |
| Jun 13, 2025 | Completed final sign-off Feb 2026 | 414 Mason St | Ja Constructoin | 5/f ste# 502: demo unpermitted partitions, loft, and doors. no new work at this time.Details
5/f ste# 502: demo unpermitted partitions, loft, and doors. no new work at this time. | $3,500 |
| Apr 15, 2025 | Expired or cancelled withdrawn Nov 2025 | 791 26th Av | convert (e) udu into new jadu. new master bathroom on 3/f, rmeodel 1/2 bathroom on 2/f.Details
convert (e) udu into new jadu. new master bathroom on 3/f, rmeodel 1/2 bathroom on 2/f. | $200,000 | |
| Feb 27, 2025 | Completed final sign-off Jul 2025 | 3953 Geary Bl | (e) unsafe wood-framed interior stair serving previously permitted 2nd floor. dwelling unit (pa# 202009023294). to be replaced with steel construction stair.Details
(e) unsafe wood-framed interior stair serving previously permitted 2nd floor. dwelling unit (pa# 202009023294). to be replaced with steel construction stair. | $25,000 | |
| Jan 31, 2025 | In progress filed Jan 2025, not yet issued | 2358 18th Av | Hung's General Construction | interior remodel of 1st and 2nd floors. new rooms down at 1st floor rear, converted from garage shell space. no new area outside (e) building envelope other than lightwell and courtyard infill. excavation for rooms down ceiling height.Details
interior remodel of 1st and 2nd floors. new rooms down at 1st floor rear, converted from garage shell space. no new area outside (e) building envelope other than lightwell and courtyard infill. excavation for rooms down ceiling height. | $400,000 |
| Jan 8, 2025 | Completed final sign-off Jul 2026 | 2714 Noriega St | F Liu Construction | remodel (e) 1st floor (rooms down) conditioned space. remodel (e) 2nd floor kitchen & bathrooms. wall removal between kitchen / dining & living room. (e) gas gurn & gas wh to remain. new vinyl replacement windows. new interior doors & entry door unit with sidelight.Details
remodel (e) 1st floor (rooms down) conditioned space. remodel (e) 2nd floor kitchen & bathrooms. wall removal between kitchen / dining & living room. (e) gas gurn & gas wh to remain. new vinyl replacement windows. new interior doors & entry door unit with sidelight. | $120,000 |
| Dec 30, 2024 | In progress issued Feb 2025 | 300 Darien Wy | Opulent Bay Homes Inc | revision to pa# 202201266727, minor field modifications, window removal at alley & replaced infill wall, outdoor mini-split unit moved to roof, instant hot water heater moved to entry side of dwelling unit, new cement plaster at alley wall since dry rot discovered.Details
revision to pa# 202201266727, minor field modifications, window removal at alley & replaced infill wall, outdoor mini-split unit moved to roof, instant hot water heater moved to entry side of dwelling unit, new cement plaster at alley wall since dry rot discovered. | |
| Nov 10, 2024 | Completed final sign-off Jan 2026 | 763 University St | Tgi Builders Ca Inc | cut down (e) side parapets to comply with planning complaint # 10564-enf. new flashing cap. comply with discretionary review (dr) action #2008.0147dDetails
cut down (e) side parapets to comply with planning complaint # 10564-enf. new flashing cap. comply with discretionary review (dr) action #2008.0147d | $25,000 |
| Sep 24, 2024 | In progress filed Sep 2024, not yet issued | 649 Central Av | to comply with physical inspection report #cc-8587. legalize ext wood rear stair. decomission rear unpermitted room at 1st fl/crawl space. non habitable & no heatingDetails
to comply with physical inspection report #cc-8587. legalize ext wood rear stair. decomission rear unpermitted room at 1st fl/crawl space. non habitable & no heating | $20,000 | |
| Sep 3, 2024 | In progress filed Sep 2024, not yet issued | 127 Skyview Wy | hybrid jadu conversion of (e) living space (family room) at 1st floor of a single family dwelling. per gov. section 65852.2 (e) dedicated (e) rear entry. integral bath & laundry @ (e) garage for residence. (single family + jadu)Details
hybrid jadu conversion of (e) living space (family room) at 1st floor of a single family dwelling. per gov. section 65852.2 (e) dedicated (e) rear entry. integral bath & laundry @ (e) garage for residence. (single family + jadu) | $40,000 | |
| Aug 29, 2024 | Completed final sign-off Dec 2024 | 1132 Masonic Av | Sunset Home Builders Inc | addition of (n) bathroom located at upper floorDetails
addition of (n) bathroom located at upper floor | $20,000 |
| Aug 21, 2024 | In progress filed Aug 2024, not yet issued | 1254 48th Av | mantory seismic soft story upgrade per structural plans per ch34: 2012 iebc appendex. no alterations to exterior elevations. to comply with complaint 202422501.Details
mantory seismic soft story upgrade per structural plans per ch34: 2012 iebc appendex. no alterations to exterior elevations. to comply with complaint 202422501. | $70,000 | |
| Jul 1, 2024 | Completed final sign-off Jan 2025 | 104 Eureka St | Sft Construction Corp | rev to pa# 2019-0409-7445; rev to previously pulled seismic related permit. standard, non blase resistant glass at store front, (3) sistered strong walls in lieu of steel monent frameDetails
rev to pa# 2019-0409-7445; rev to previously pulled seismic related permit. standard, non blase resistant glass at store front, (3) sistered strong walls in lieu of steel monent frame | |
| May 7, 2024 | Expired or cancelled cancelled Aug 2024 | 2358 18th Av | Hung's General Construction | interior remodel of 1st & 2nd floors of (e) sfr. new adu convert from (e) garage shell @ rear. 1 car space to be preserved. no new area outside (e) building envelope. (sfd + adu) about 9ft deep retaining wall, 139 cy excavation in rear.Details
interior remodel of 1st & 2nd floors of (e) sfr. new adu convert from (e) garage shell @ rear. 1 car space to be preserved. no new area outside (e) building envelope. (sfd + adu) about 9ft deep retaining wall, 139 cy excavation in rear. | $400,000 |
| Apr 25, 2024 | Completed final sign-off Jan 2025 | 1059 Leavenworth St | John O'rourke | soft stort retrofit as required by sfebc 505eDetails
soft stort retrofit as required by sfebc 505e | $70,000 |
| Mar 23, 2024 | In progress issued Dec 2025 | 2195 Quesada Av | Ket Construction Inc. | legalization of an udu to state converted adu (three bedrooms, great room with kitchen, one bathroom and laundry closet). addressing of code enforcement case # 2021-011249enf. (e) garage converted to living area. curb cut infill. demo of unpermitted addition.Details
legalization of an udu to state converted adu (three bedrooms, great room with kitchen, one bathroom and laundry closet). addressing of code enforcement case # 2021-011249enf. (e) garage converted to living area. curb cut infill. demo of unpermitted addition. | $120,000 |
| Jan 22, 2024 | Expired or cancelled cancelled Mar 2024 | 792 Arguello Bl | t.i. for a beauty salon subject to conditional use since previous dry cleaners per ord. # 209-21.Details
t.i. for a beauty salon subject to conditional use since previous dry cleaners per ord. # 209-21. | $100,000 | |
| Jan 12, 2024 | Completed final sign-off Dec 2024 | 240 Hartford St | J5 Real Estate Development Co | approx. 2.5 linear feet of reinforcing retaining wall to be built on the 639 castro property. new wall will be anchored to the existing wall that is shared between the 2 properties at that location (se corner of 639 castro & ne corner 240 hartford.Details
approx. 2.5 linear feet of reinforcing retaining wall to be built on the 639 castro property. new wall will be anchored to the existing wall that is shared between the 2 properties at that location (se corner of 639 castro & ne corner 240 hartford. | $4,500 |
| Jan 12, 2024 | Completed final sign-off Dec 2024 | 633 Castro St | approx 0. 5 linear feet of reinforcing retaining wall to be built at the southeast corner of the property and anchored to the existing retaing wall.Details
approx 0. 5 linear feet of reinforcing retaining wall to be built at the southeast corner of the property and anchored to the existing retaing wall. | $9,000 | |
| Nov 7, 2023 | Completed final sign-off Nov 2024 | 246 Judah St | Ly Construction | remodeling of 2-dwelling units (#1 & #3) in an (e) 4-unit apt w/ commercial space. no new area outside of shell. no structural work. bedroom added to each unit. remodel of bath & kitchen @ each unit.Details
remodeling of 2-dwelling units (#1 & #3) in an (e) 4-unit apt w/ commercial space. no new area outside of shell. no structural work. bedroom added to each unit. remodel of bath & kitchen @ each unit. | $45,000 |
| Sep 25, 2023 | Never finaled filed Sep 2023, never issued | 127 Skyview Wy | remodeling of (e) master bath at 3rd floor of a single family residence.Details
remodeling of (e) master bath at 3rd floor of a single family residence. | $7,000 | |
| Aug 7, 2023 | Expired or cancelled withdrawn Oct 2026 | 3753 22nd St | 3-story rear addition to an existing sfr with attached 1-car garage. general interior remodeling. no changes to front facade. proposed construction not visible from right-of-wayDetails
3-story rear addition to an existing sfr with attached 1-car garage. general interior remodeling. no changes to front facade. proposed construction not visible from right-of-way | $600,000 | |
| Jul 28, 2023 | Expired or cancelled withdrawn Sep 2026 | 1134 Geneva Av | add 1 studio adu on (e) 1/f with 1 full bathroom & 1 kitchen. see related pa 202107295371.Details
add 1 studio adu on (e) 1/f with 1 full bathroom & 1 kitchen. see related pa 202107295371. | $60,000 | |
| Jul 25, 2023 | Completed final sign-off Jul 2026 | 124 Lyon St | Francies Construction Inc | creation of an adu (state converted) within (e) duplex. no new area added outside building envelope. no exterior changes. interior remodeling on 1st,2nd and 3rd floors.Details
creation of an adu (state converted) within (e) duplex. no new area added outside building envelope. no exterior changes. interior remodeling on 1st,2nd and 3rd floors. | $150,000 |
| Jun 6, 2023 | Completed final sign-off Dec 2024 | 639 Castro St | J5 Real Estate Development Co | approx. 17.5 linear feet of reinforcing retaining wall that spans the east (rear) property line and will be anchored to the existing retaining wall.Details
approx. 17.5 linear feet of reinforcing retaining wall that spans the east (rear) property line and will be anchored to the existing retaining wall. | $45,000 |
| Mar 27, 2023 | Never finaled filed Mar 2023, never issued | 312 Pioche St | addressing nov#202296209. conversion of unauthorized dwelling unit to adu. garage to living area. note that "rooms down" were permitted under pa#201104134001. illegal kitchen at garage added after the fact.Details
addressing nov#202296209. conversion of unauthorized dwelling unit to adu. garage to living area. note that "rooms down" were permitted under pa#201104134001. illegal kitchen at garage added after the fact. | $30,000 | |
| Sep 14, 2022 | Completed final sign-off Mar 2026 | 3774 Mission St | Itu Construction | (rear building) general interior remodeling of 1 dwelling unit at rear. no new area. new heating system. new white framed vinyl windows.Details
(rear building) general interior remodeling of 1 dwelling unit at rear. no new area. new heating system. new white framed vinyl windows. | $70,000 |
| Sep 14, 2022 | Completed final sign-off Mar 2026 | 3774 Mission St | Itu Construction | (front building) general interior remodeling of 2 dwelling units. 116 sf infill at unit facing courtyard. rear stair replacement in same configuration. no work at street facing commercial space.Details
(front building) general interior remodeling of 2 dwelling units. 116 sf infill at unit facing courtyard. rear stair replacement in same configuration. no work at street facing commercial space. | $100,000 |
| Sep 6, 2022 | Never finaled filed Sep 2022, never issued | 32 Byxbee St | new attached adu per ordiance 162-16 of new duplex under a separate permit(parcel a)Details
new attached adu per ordiance 162-16 of new duplex under a separate permit(parcel a) | $40,000 | |
| Sep 2, 2022 | Never finaled filed Sep 2022, never issued | 32 Byxbee St | erect a 3 story with two dwellings and 1 adu bldg with no basement, type -v, r-2 occupancy.(parcel b)Details
erect a 3 story with two dwellings and 1 adu bldg with no basement, type -v, r-2 occupancy.(parcel b) | $900,000 | |
| Sep 2, 2022 | Never finaled filed Sep 2022, never issued | 32 Byxbee St | demo a detached garage.Details
demo a detached garage. | $5,000 | |
| Sep 2, 2022 | Never finaled filed Sep 2022, never issued | 32 Byxbee St | erect a 3 story,2 dwellings & adu bldg with no basement,type -v, r-2 occupancy.(parcel a)Details
erect a 3 story,2 dwellings & adu bldg with no basement,type -v, r-2 occupancy.(parcel a) | $900,000 | |
| Sep 2, 2022 | Never finaled filed Sep 2022, never issued | 32 Byxbee St | demo a one story house,no basement,detached garage. type vDetails
demo a one story house,no basement,detached garage. type v | ||
| Jul 21, 2022 | Never finaled filed Jul 2022, never issued | 93 Leland Av | Gordon Kullberg & Son Inc | remodel of existing dwelling at 2nd fl. demo of existing rear appendage and stair back to original rear face of house. new bath. new heating system.Details
remodel of existing dwelling at 2nd fl. demo of existing rear appendage and stair back to original rear face of house. new bath. new heating system. | $60,000 |
| Apr 4, 2022 | Never finaled filed Apr 2022, never issued | 93 Leland Av | Gordon Kullberg & Son Inc | to erect a 3-story, type 5a, mixed use building with (1) commercial space, 7 dwelling units. adu under a separate permit.Details
to erect a 3-story, type 5a, mixed use building with (1) commercial space, 7 dwelling units. adu under a separate permit. | $1,700,000 |
| Feb 23, 2022 | Expired or cancelled withdrawn Sep 2022 | 139 Quintara St | new family room vertical addition. 4th floor at street. 3rd floor at rear yard. accessed from 3rd floor via spiral stair.Details
new family room vertical addition. 4th floor at street. 3rd floor at rear yard. accessed from 3rd floor via spiral stair. | $190,000 | |
| Jan 26, 2022 | Never finaled issued Dec 2022, no final | 300 Darien Wy | Opulent Bay Homes Inc | per state sb 9. existing garage to be converted to a 2nd dwelling unit. planning enforcement case for sec.317(demo thresholds) #2021-008168enf. main house under construction per #2016-1228-6046 to be reinstated suspended status.Details
per state sb 9. existing garage to be converted to a 2nd dwelling unit. planning enforcement case for sec.317(demo thresholds) #2021-008168enf. main house under construction per #2016-1228-6046 to be reinstated suspended status. | $75,000 |
| Sep 1, 2021 | In progress issued Nov 2023 | 41 Ashton Av | construct new duplex per sb-9Details
construct new duplex per sb-9 | $1,000,000 | |
| Aug 11, 2021 | Never finaled issued Nov 2022, no final | 300 Darien Wy | Prosper Construction Dev Inc., Opulent Bay Homes Inc | revision to pa 2016-1228-6046 for new cement plaster on all (e) walls, minor plan changes, replacement of front porch in kind, and to address planning violation 2021-0088168 and complaint # 2021180539Details
revision to pa 2016-1228-6046 for new cement plaster on all (e) walls, minor plan changes, replacement of front porch in kind, and to address planning violation 2021-0088168 and complaint # 2021180539 | |
| Jul 29, 2021 | Never finaled filed Jul 2021, never issued | 1134 Geneva Av | revised scope: add one dwelling unit at front of ground floor. adu at rear of ground floor not part of this permit. see related pa 202307283290Details
revised scope: add one dwelling unit at front of ground floor. adu at rear of ground floor not part of this permit. see related pa 202307283290 | $120,000 | |
| Jul 2, 2021 | Completed final sign-off Jun 2022 | 104 Marview Wy | J W Construction | new rooms at (e) gargae sheel space. 1 car garage space to be preserved, demo of an (e) unconditioned room at 1st fl. new less steep internal stair at (e) location. 1 new window at rear.Details
new rooms at (e) gargae sheel space. 1 car garage space to be preserved, demo of an (e) unconditioned room at 1st fl. new less steep internal stair at (e) location. 1 new window at rear. | $75,000 |
| Apr 21, 2021 | Completed final sign-off Nov 2022 | 127 Skyview Wy | Wei Li Construction | non load bearing wall removal, kitchen remodel. w/ island at 2nd floor. new hardwood flooring at 2nd floor area of work replacement of kitchen window.Details
non load bearing wall removal, kitchen remodel. w/ island at 2nd floor. new hardwood flooring at 2nd floor area of work replacement of kitchen window. | $20,000 |
| Feb 17, 2021 | Never finaled filed Feb 2021, never issued | 97 Leland Av | Gordon Kullberg & Son Inc | to demolish 1 story shed at rear of the property.Details
to demolish 1 story shed at rear of the property. | $10,000 |
| Feb 17, 2021 | Never finaled filed Feb 2021, never issued | 93 Leland Av | Gordon Kullberg & Son Inc | to demolish 1 story cottage at rear of the property.Details
to demolish 1 story cottage at rear of the property. | $20,000 |
| Jan 28, 2021 | Completed final sign-off Sep 2021 | 184 Marietta Dr | S O D Home Group | minor interior changes to an (e) j.r. adu (previously permitted). new sliding glass door to exterior.Details
minor interior changes to an (e) j.r. adu (previously permitted). new sliding glass door to exterior. | $10,000 |
| Jan 11, 2021 | Completed final sign-off Oct 2021 | 1753 Fulton St | Y D Construction Co. Inc. | to comply with nov(complaint)# 2019006617enf. new fence at 1'-o" away from front p.l.Details
to comply with nov(complaint)# 2019006617enf. new fence at 1'-o" away from front p.l. | $5,000 |
| Sep 5, 2020 | Completed final sign-off May 2021 | 3324 19th St | Gordon Kullberg & Son Inc | revision to pa #2014-0219-8846: 4th floor restroom. fire alarm under sep permit. sprinkler ref 202001081430.Details
revision to pa #2014-0219-8846: 4th floor restroom. fire alarm under sep permit. sprinkler ref 202001081430. | |
| Sep 2, 2020 | Completed final sign-off Jul 2025 | 3953 Geary Bl | comply w/ complaint #202041921 (interior/exterior demo) & pln2020-00651prl (window replacement): change of use at 2nd floor from office to residential dwelling unit.Details
comply w/ complaint #202041921 (interior/exterior demo) & pln2020-00651prl (window replacement): change of use at 2nd floor from office to residential dwelling unit. | $60,000 | |
| Mar 2, 2020 | Expired or cancelled cancelled Jul 2024 | 100 Shotwell St | (2)(n) adu's @ 1st fl to replace garage parking. water heater room to remain. previously approved soft-story retrofit permit #201810052489 per ord #162-16Details
(2)(n) adu's @ 1st fl to replace garage parking. water heater room to remain. previously approved soft-story retrofit permit #201810052489 per ord #162-16 | $110,000 | |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 2401 46th Av | 1st fl: demo of (e) partitions, (n) professional office ti, (e) bathroom to remain, (n) heating system, (n) water heater. 2nd fl: reoval of 2nd layer of interior windows and (n) water heater.Details
1st fl: demo of (e) partitions, (n) professional office ti, (e) bathroom to remain, (n) heating system, (n) water heater. 2nd fl: reoval of 2nd layer of interior windows and (n) water heater. | $70,000 | |
| Feb 21, 2020 | Completed final sign-off Feb 2022 | 1453 South Van Ness Av | move two bedrooms in middle of each unit to where existing living room and kitchen are, move living room and kitchen to where existing bedrooms are. use former large water heater room as new bedroom in each unit. (no increase in envelope).Details
move two bedrooms in middle of each unit to where existing living room and kitchen are, move living room and kitchen to where existing bedrooms are. use former large water heater room as new bedroom in each unit. (no increase in envelope). | $100,000 | |
| Nov 1, 2019 | Completed final sign-off Jun 2020 | 507 04th Av | Rockland Construction Group Inc | structural revision to pa 2019-0123-0981 widening of approved rear deck, voluntary seismic upgradeDetails
structural revision to pa 2019-0123-0981 widening of approved rear deck, voluntary seismic upgrade | $500 |
| Aug 16, 2019 | Expired or cancelled cancelled Nov 2024 | 1630 Kirkwood Av | to erect a type 5-a, 4-story two dwelling unit building with no basement.Details
to erect a type 5-a, 4-story two dwelling unit building with no basement. | $800,000 | |
| Jun 17, 2019 | Expired or cancelled withdrawn Feb 2024 | 3542 24th St | interior remodel at existing 2nd floor dwelling. creation of 3rd unit at 1st floor garage/shell space. n ew wood window system to replace garage door, no work at occupied 3rd flDetails
interior remodel at existing 2nd floor dwelling. creation of 3rd unit at 1st floor garage/shell space. n ew wood window system to replace garage door, no work at occupied 3rd fl | $150,000 | |
| Jun 12, 2019 | Never finaled issued Jul 2019, no final | 1468 Clay St | Metro General Construction Inc, Y D Construction Co. Inc. | remodel 2 (e) baths, add 2 (n) baths, remove door between units and infill w/ wall.Details
remodel 2 (e) baths, add 2 (n) baths, remove door between units and infill w/ wall. | $45,000 |
| Jun 10, 2019 | Expired or cancelled cancelled Oct 2022 | 1123 Carolina St | Bashaw Construction | basement: new 2nd conditioned dwelling unit space via excavation. new internal stairs, add two new shed dormers, new bath on 2nd floor, new rear deck at 2nd floor. remodeling (e) upper bathroom.Details
basement: new 2nd conditioned dwelling unit space via excavation. new internal stairs, add two new shed dormers, new bath on 2nd floor, new rear deck at 2nd floor. remodeling (e) upper bathroom. | $140,000 |
| May 6, 2019 | Completed final sign-off Aug 2020 | 1820 Lyon St | O'pro Construction Inc. | 2 unit interior remodeling. excavation at lower unit.Details
2 unit interior remodeling. excavation at lower unit. | $150,000 |
| Apr 9, 2019 | Completed final sign-off Jan 2025 | 104 Eureka St | Sft Construction Corp | (residential)soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
(residential)soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $70,000 |
| Apr 9, 2019 | Completed final sign-off Jan 2025 | 104 Eureka St | Sft Construction Corp | (commercial) soft story retrofit per chapter 4d: 2016 cebc appendix a-4Details
(commercial) soft story retrofit per chapter 4d: 2016 cebc appendix a-4 | $20,000 |
| Mar 18, 2019 | Completed final sign-off Jul 2020 | 584 Vermont St | O'pro Construction Inc. | to comply with nov #201625121 & 201762791: work in both units, interior remodeling at extg duplex. 1st floor extg basement made conditioned area. rebuilding #584 stair to grade. abate compliance eid #20163663 no work at rear outbuilding - under sep permit.Details
to comply with nov #201625121 & 201762791: work in both units, interior remodeling at extg duplex. 1st floor extg basement made conditioned area. rebuilding #584 stair to grade. abate compliance eid #20163663 no work at rear outbuilding - under sep permit. | $130,000 |
| Mar 4, 2019 | Completed final sign-off Jun 2021 | 1636 Kirkwood Av | Bens Construction | add units per ord# 162-16. proposed one adu @ (e) 1st flr shell space. garage to remain.Details
add units per ord# 162-16. proposed one adu @ (e) 1st flr shell space. garage to remain. | $80,000 |
| Jan 23, 2019 | Completed final sign-off Jun 2020 | 507 04th Av | Rockland Construction Group Inc | interior remodel at e single family dwelling @ 2nd and 3rd flr, new rear deck off great room 2nd fl. new proposed 2nd dwelling units at 1st fl, 1 bedroom, 1 full bath. garage to remainDetails
interior remodel at e single family dwelling @ 2nd and 3rd flr, new rear deck off great room 2nd fl. new proposed 2nd dwelling units at 1st fl, 1 bedroom, 1 full bath. garage to remain | $150,000 |
| Dec 14, 2018 | Completed final sign-off Oct 2025 | 534 Page St | Velox Construction Inc/Velox Des & Const, Sonoma Build Group Inc, Lin's Builder, Y D Construction Co. Inc. | minor int. remodeling at (e) 5 dwellings, creation of habitable basement as part of 1st fl. front unit, (#538a) depressed rear courtyard for bedroom egress (n) hvac system per unit.Details
minor int. remodeling at (e) 5 dwellings, creation of habitable basement as part of 1st fl. front unit, (#538a) depressed rear courtyard for bedroom egress (n) hvac system per unit. | $200,000 |
| Nov 27, 2018 | Completed final sign-off Jul 2021 | 1634 Kirkwood Av | C R Construction Co Inc | interior remodel at (e) 2nd flr. new heater system & wh, rear exit stair reconfiguration to stay on property. new breezeway creation for rear bedroom egress. emergency escape to r.o.w. lot line adj work under sep coverDetails
interior remodel at (e) 2nd flr. new heater system & wh, rear exit stair reconfiguration to stay on property. new breezeway creation for rear bedroom egress. emergency escape to r.o.w. lot line adj work under sep cover | $80,000 |
| Nov 6, 2018 | Completed final sign-off Nov 2023 | 2675 46th Av | B W H Builder Inc. | horizontal addition. proposed rear addition & sunroom (common) for main house per ord 95-17. note that sunroom not a correct designation for the room being added, requested on plans to have name revised, dmj 12/07/2021;Details
horizontal addition. proposed rear addition & sunroom (common) for main house per ord 95-17. note that sunroom not a correct designation for the room being added, requested on plans to have name revised, dmj 12/07/2021; | $80,000 |
| Oct 24, 2018 | Expired or cancelled withdrawn Feb 2019 | 3542 24th St | interior remodeling at (e) 2nd flr . dwelling creation of 3rd floor unit at 1st flr garage/shell space per ord# 162-16. new wood window/entry system to replace garage door, no work at occupied 3rd flr.Details
interior remodeling at (e) 2nd flr . dwelling creation of 3rd floor unit at 1st flr garage/shell space per ord# 162-16. new wood window/entry system to replace garage door, no work at occupied 3rd flr. | $150,000 | |
| Oct 12, 2018 | Expired or cancelled cancelled May 2020 | 1627 24th Av | new stair connecting 1st & 2nd floors in an enclosed lightwell, minor interior remodeling.Details
new stair connecting 1st & 2nd floors in an enclosed lightwell, minor interior remodeling. | $20,000 | |
| Sep 26, 2018 | Expired or cancelled withdrawn Jun 2024 | 263 19th Av | creation of 3rd unit at 1st floor garage/shell space. elimination of curb cut new wood window/entry door to replace garage door.Details
creation of 3rd unit at 1st floor garage/shell space. elimination of curb cut new wood window/entry door to replace garage door. | $150,000 | |
| Aug 30, 2018 | Expired or cancelled cancelled Nov 2022 | 4121 20th St | comply with 201852211 residential build out of basement made part of unit above. remodel at all levels, kitchen, baths, 2 new dormers.habitable space at 3rd fl. ref pa# 2018-0619-2346.Details
comply with 201852211 residential build out of basement made part of unit above. remodel at all levels, kitchen, baths, 2 new dormers.habitable space at 3rd fl. ref pa# 2018-0619-2346. | $200,000 | |
| Aug 27, 2018 | Expired or cancelled cancelled Mar 2023 | 19 Heron St | change of use in response to complaint #2018-00472enf (planing dept)Details
change of use in response to complaint #2018-00472enf (planing dept) | ||
| Jul 25, 2018 | Expired or cancelled cancelled Jan 2026 | 21 Atalaya Tr | minor remoel at e basement. family rm with wetbar, bdrm, 1 full bath new elec, mini split hvac system.Details
minor remoel at e basement. family rm with wetbar, bdrm, 1 full bath new elec, mini split hvac system. | $25,000 | |
| Jul 2, 2018 | Expired or cancelled withdrawn Oct 2019 | 1712 Union St | soft story retrofit per sfebc chapter 4d: 2016 cebdc appendix a-4(residential)Details
soft story retrofit per sfebc chapter 4d: 2016 cebdc appendix a-4(residential) | $30,000 | |
| Jul 2, 2018 | Expired or cancelled withdrawn Oct 2019 | 1712 Union St | soft story retrofit per sfebc chapter 4d: 2016 cebdc appendix a-4(commercial)Details
soft story retrofit per sfebc chapter 4d: 2016 cebdc appendix a-4(commercial) | $20,000 | |
| Jun 4, 2018 | Never finaled issued Feb 2019, no final | 179 Judson Av | Hung's General Construction | (2) story rear addition & (n) conditioned living area @ (e) 1st floor garage spaceDetails
(2) story rear addition & (n) conditioned living area @ (e) 1st floor garage space | $300,000 |
| May 30, 2018 | Completed final sign-off Mar 2019 | 977 Jackson St | Vector Construction Inc. | mandated tier iii seismic soft story upgrade. new foundation & shearwalls at (e) basement service spaces/ soft story retrofit per sfbc chapter 4d 2016 iebc appx a4Details
mandated tier iii seismic soft story upgrade. new foundation & shearwalls at (e) basement service spaces/ soft story retrofit per sfbc chapter 4d 2016 iebc appx a4 | $80,000 |
| May 17, 2018 | Expired or cancelled withdrawn May 2018 | 526 Garfield St | interior remodeling, new bathroom, remodel/relocation of kitchen, stair reconfiguration. infill porchDetails
interior remodeling, new bathroom, remodel/relocation of kitchen, stair reconfiguration. infill porch | $110,000 | |
| Apr 9, 2018 | Completed final sign-off Jun 2018 | 528 Bryant St | Tri Point Mprovements | occupation of #528 by #530 tenant same use (comp. gaming demo/wholesales). new accessible toilet & wet bar per prior l.o.d. use is wholesale sales. maher naDetails
occupation of #528 by #530 tenant same use (comp. gaming demo/wholesales). new accessible toilet & wet bar per prior l.o.d. use is wholesale sales. maher na | $25,000 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 528 Bryant St | Tri Point Mprovements | bldg shell upgrades. new street & roof side alum. storefront system. removal of exg window, removal of annex appendage at roof. beam at 2nd floor. new cement plaster exterior at front facade & rear, roof side facade. parapet resolution. n/a for maher.Details
bldg shell upgrades. new street & roof side alum. storefront system. removal of exg window, removal of annex appendage at roof. beam at 2nd floor. new cement plaster exterior at front facade & rear, roof side facade. parapet resolution. n/a for maher. | $45,000 |
| Jan 16, 2018 | Completed final sign-off Nov 2023 | 1930 Powell St | O'pro Construction Inc., Velox Construction Inc/Velox Des & Const | int remodel of (e) 3 units & add 4th at 1st flr garage/shell space. elimination of curb cut (n) wood window system to replace garage door. removal of lightwell at (e) breezeway. new sunken patio for light, vent, egress at rear bedroom of vinyl window at front facade @ 2nd flrDetails
int remodel of (e) 3 units & add 4th at 1st flr garage/shell space. elimination of curb cut (n) wood window system to replace garage door. removal of lightwell at (e) breezeway. new sunken patio for light, vent, egress at rear bedroom of vinyl window at front facade @ 2nd flr | $150,000 |
| Jan 4, 2018 | Completed final sign-off Sep 2020 | 1848 Buchanan St | R & D Construction Co Inc | to comply with nov 201521471: int remodel at (e) 2 du create fr, laundry, revised stair & 3/4 bath at garage level (made part of #1848 dir above). depressed private open space patio for #1848 at side yard. new skyloghts at #1850. refurb the 3rd flr $1850 roofdeck. new rear wood stair to gradeDetails
to comply with nov 201521471: int remodel at (e) 2 du create fr, laundry, revised stair & 3/4 bath at garage level (made part of #1848 dir above). depressed private open space patio for #1848 at side yard. new skyloghts at #1850. refurb the 3rd flr $1850 roofdeck. new rear wood stair to grade | $100,000 |
| Nov 17, 2017 | Completed final sign-off Mar 2019 | 1371 Broadway | O'pro Construction Inc. | interior remodeling at (e) 2 dwellings. create 3rd studio unit at 1st floor. new habitable area at 1st fl for unit above common corridor for access to rear yard.Details
interior remodeling at (e) 2 dwellings. create 3rd studio unit at 1st floor. new habitable area at 1st fl for unit above common corridor for access to rear yard. | $200,000 |
| Nov 3, 2017 | Completed final sign-off Nov 2020 | 3379 21st St | O'pro Construction Inc. | interior remodeling at 3379 at 2nd and 3rd floors of (e) 2 unit bldg. 2 new habitable area at basement to be combines with 1st floor(3381 21st street)Details
interior remodeling at 3379 at 2nd and 3rd floors of (e) 2 unit bldg. 2 new habitable area at basement to be combines with 1st floor(3381 21st street) | $125,000 |
| Nov 3, 2017 | Never finaled issued Aug 2019, no final | 1858 40th Av | two story rear addition to an existing two story sfr. (n) bath, (n) bedroom, (n) family room @ 1st floor.Details
two story rear addition to an existing two story sfr. (n) bath, (n) bedroom, (n) family room @ 1st floor. | $400,000 | |
| Nov 3, 2017 | Expired or cancelled cancelled Apr 2024 | 2358 18th Av | Hung's General Construction | horizontal addition. two story rear addition to an (e) single family. 2 new bedrooms & 2 new baths.Details
horizontal addition. two story rear addition to an (e) single family. 2 new bedrooms & 2 new baths. | $350,000 |
| Oct 30, 2017 | Completed final sign-off Dec 2017 | 2627 37th Av | Y R C Construction | revision to pa#201402188682. revise one bedroom into 2 seperate bedrooms at 3rd floor. n/a for maherDetails
revision to pa#201402188682. revise one bedroom into 2 seperate bedrooms at 3rd floor. n/a for maher | $2,000 |
| Sep 21, 2017 | Completed final sign-off Dec 2020 | 160 Corona St | 2-story rear addition & conditioned area at (e) basement. add 1 bath @ 2nd floor.Details
2-story rear addition & conditioned area at (e) basement. add 1 bath @ 2nd floor. | $380,000 | |
| Sep 13, 2017 | Completed final sign-off Jul 2020 | 1111 Jones St | Wong Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $50,000 |
| Sep 12, 2017 | Completed final sign-off Nov 2019 | 168 Sickles Av | Yong And Zhuo Construction Inc | mandatory soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. new foundations & shearwalls at (e) 1st flr service spacesDetails
mandatory soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. new foundations & shearwalls at (e) 1st flr service spaces | $50,000 |
| Sep 12, 2017 | Completed final sign-off Oct 2024 | 550 Guerrero St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $60,000 | |
| Sep 11, 2017 | Completed final sign-off Sep 2019 | 661 Castro St | Peter Spediacci Company | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Sep 6, 2017 | Completed final sign-off Jan 2018 | 1355 Bay St | Vector Construction Inc. | revision to app#201602018478(adu) and 201602018471 previously approved structural plans missing from pulled job copies. n/a for maherDetails
revision to app#201602018478(adu) and 201602018471 previously approved structural plans missing from pulled job copies. n/a for maher | |
| Aug 31, 2017 | Completed final sign-off Jun 2018 | 530 Bryant St | Tri Point Mprovements | (n) hvac heat pump at lower roof. maher n/aDetails
(n) hvac heat pump at lower roof. maher n/a | $10,000 |
| Aug 23, 2017 | Never finaled issued Jul 2018, no final | 710 22nd St | horizontal addition of a 2-story rear addition, loft-style 4th dwelling unit at rear yard. widening of (e) garage door opening by about 18'. (n) garage door in kind.Details
horizontal addition of a 2-story rear addition, loft-style 4th dwelling unit at rear yard. widening of (e) garage door opening by about 18'. (n) garage door in kind. | $180,000 |