Wing Tung Lau
- Listed as
- contractor, engineer, subcontractor
- Firm
- Alex Builder Inc
- Based in
- Millbrae
- On San Francisco permits
- Feb 2008 to Nov 2025
88 permits since 2000 (contractor on 82 permits, subcontractor on 5 permits, engineer on 1 permit): 70 completed, 6 in progress, 7 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 7, 2025 | Completed final sign-off Nov 2025 | 561 Duncan St | Alex Builder Inc | revision to 202002285791. 1/f added new laundry room, 2/f change powder room layout. 3/f laundry room and bathrom layout change.Details
revision to 202002285791. 1/f added new laundry room, 2/f change powder room layout. 3/f laundry room and bathrom layout change. | $20,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 755 Duncan St | O Donoghue Construction Inc. | provide excavation sequence and shoring to accommodate foundation installation. bpa#: 202303103512.Details
provide excavation sequence and shoring to accommodate foundation installation. bpa#: 202303103512. | $20,000 |
| Sep 25, 2025 | In progress issued Sep 2025 | 565 Duncan St | Alex Builder Inc | third floor: revision to pa#202506027674. replacement and repair of existing roof joist as necessary due to dry rot. all work will be perform interior. no work at exterior outside face of the property.Details
third floor: revision to pa#202506027674. replacement and repair of existing roof joist as necessary due to dry rot. all work will be perform interior. no work at exterior outside face of the property. | $2,500 |
| Aug 13, 2025 | In progress issued Aug 2025 | 565 Duncan St | Alex Builder Inc | new windows in place and replace stucco related to window change.Details
new windows in place and replace stucco related to window change. | $5,000 |
| Jul 28, 2025 | Completed final sign-off Oct 2025 | 1726 30th Av | Alex Builder Inc | repair stucco at the front building where facing street - in-kind.Details
repair stucco at the front building where facing street - in-kind. | $2,500 |
| Jun 2, 2025 | In progress issued Jun 2025 | 565 Duncan St | Alex Builder Inc | 1/f: convert (e) storage into a new family room, bedroom, bathroom, laundry room, and utility room. 2/f: convert (e) lightwell space into conditioned space for living room.Details
1/f: convert (e) storage into a new family room, bedroom, bathroom, laundry room, and utility room. 2/f: convert (e) lightwell space into conditioned space for living room. | $70,000 |
| Apr 1, 2025 | In progress issued Aug 2025 | 565 Duncan St | Alex Builder Inc | voluntary new outdoor retaining walls and wood fence at the rear yard near property line. no work will be performed at the main house.Details
voluntary new outdoor retaining walls and wood fence at the rear yard near property line. no work will be performed at the main house. | $5,000 |
| Nov 22, 2024 | Completed final sign-off Nov 2025 | 561 Duncan St | Alex Builder Inc | new 2 retaining walls to create concrete patio at rear yard.Details
new 2 retaining walls to create concrete patio at rear yard. | $10,000 |
| Nov 5, 2024 | Completed final sign-off Oct 2025 | 1726 30th Av | Alex Builder Inc | 1st fl - convert (e) family rm area into 2 bedrm and 2 bathrms; new staircase to 2nd fl; infill under 2nd fl cantiilever; 2nd fl - kitchen remodel, bathroom remodel, new bathrm; remove (e) lightwell; new deckDetails
1st fl - convert (e) family rm area into 2 bedrm and 2 bathrms; new staircase to 2nd fl; infill under 2nd fl cantiilever; 2nd fl - kitchen remodel, bathroom remodel, new bathrm; remove (e) lightwell; new deck | $70,000 |
| Mar 27, 2024 | Completed final sign-off Jul 2025 | 160 Upland Dr | Alex Builder Inc | replace (e) foundation at rear of property to include bearing wall, posts and beam at ground floorDetails
replace (e) foundation at rear of property to include bearing wall, posts and beam at ground floor | $80,000 |
| Dec 13, 2023 | In progress issued Mar 2024 | 2760 Vallejo St | Ren Lei Construction Co, Matarozzi/Pelsinger Builders Inc., Clayton Timbrell & Co | remove and replace existing failing concrete retaining wall in the rear yard along the east property line.Details
remove and replace existing failing concrete retaining wall in the rear yard along the east property line. | $15,000 |
| Apr 26, 2023 | Completed final sign-off Jun 2024 | 4234 24th St | Alex Builder Inc | excavation shoring for proposed apartment building, more than 50 cubic yard, ref approved pa# 201909262861.Details
excavation shoring for proposed apartment building, more than 50 cubic yard, ref approved pa# 201909262861. | $50,000 |
| Mar 10, 2023 | Completed final sign-off Jun 2026 | 755 Duncan St | O Donoghue Construction Inc. | proposed horizontal & vertical addition to expand the existing unit & add one additional adu unitDetails
proposed horizontal & vertical addition to expand the existing unit & add one additional adu unit | $1,400,000 |
| Nov 23, 2022 | In progress issued Sep 2025 | 2725 Broadway | Ren Lei Construction Co, Green City Construction Inc | basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces.Details
basement excavation to enlarge (e) garage and new foundations. max 3 parking spaces. | $175,000 |
| Nov 14, 2022 | Completed final sign-off Oct 2025 | 1195 Tennessee St | Alex Builder Inc | complete foundation replaceement in compliance with teh 2019 sfbcDetails
complete foundation replaceement in compliance with teh 2019 sfbc | $125,000 |
| Jun 13, 2022 | Completed final sign-off Jan 2024 | 1350 Marin St | Alex Builder Inc | the front entrance to be modified to accommodate an accessible ramp with handril to be in compliance. the (e) ada toilet to be verified for compliance based on provided detail sheet a-208. ** maher: n/a ** to comply with abe program, abe# 202204190500.Details
the front entrance to be modified to accommodate an accessible ramp with handril to be in compliance. the (e) ada toilet to be verified for compliance based on provided detail sheet a-208. ** maher: n/a ** to comply with abe program, abe# 202204190500. | $10,000 |
| Mar 23, 2022 | Completed final sign-off Feb 2023 | 3350 16th St | Alex Builder Inc | soft story retrofit (comply with nov 201992371)Details
soft story retrofit (comply with nov 201992371) | $60,000 |
| Nov 16, 2021 | Completed final sign-off Apr 2022 | 501 Jersey St | Alex Builder Inc | revise plywood shear walls. revision to pa #201709056926Details
revise plywood shear walls. revision to pa #201709056926 | |
| Apr 20, 2021 | Completed final sign-off Jul 2025 | 1728 Quint St | Ten-Ten Construction Co, Alex Builder Inc | legalizeation of dwelling unit installed w/o permit, legalization of existing unauthorized dwelling unit under ordinance 43-14, install kitchen w/o permit.Details
legalizeation of dwelling unit installed w/o permit, legalization of existing unauthorized dwelling unit under ordinance 43-14, install kitchen w/o permit. | $8,000 |
| Feb 12, 2021 | Completed final sign-off Mar 2022 | 2472 Vallejo St | Alex Builder Inc | kitchen and bath remodel - lower unit onlyDetails
kitchen and bath remodel - lower unit only | $30,000 |
| Jan 28, 2021 | Completed final sign-off Jul 2026 | 1221 Waller St | Alex Builder Inc | to comply with nov202056261.no work to be done on 1/f under this pemrit.add 1 new master bedroom on 2/f per plan.relocate (e) bathroom on 2/f per plan.enlarge (e) kitchen & living room on 2/f per plan.relocate laundry room on 2/f. repair/underpin (e) foundation.Details
to comply with nov202056261.no work to be done on 1/f under this pemrit.add 1 new master bedroom on 2/f per plan.relocate (e) bathroom on 2/f per plan.enlarge (e) kitchen & living room on 2/f per plan.relocate laundry room on 2/f. repair/underpin (e) foundation. | $30,000 |
| Aug 5, 2020 | Expired or cancelled expired Dec 2025 | 44 Aztec St | Alex Builder Inc, Chl Construction Company | provide temporary shoring system to facilitate excavation and construction of the proposed new building per apparoved pa 2015-0624-9730Details
provide temporary shoring system to facilitate excavation and construction of the proposed new building per apparoved pa 2015-0624-9730 | $10,000 |
| Feb 28, 2020 | Completed final sign-off Nov 2025 | 561 Duncan St | Alex Builder Inc | interior remodel and rear horizontal & vertical expansion, add a new dwelling unit.Details
interior remodel and rear horizontal & vertical expansion, add a new dwelling unit. | $640,000 |
| Jul 24, 2019 | Completed final sign-off Mar 2021 | 2424 Divisadero St | Ren Lei Construction Co, Alex Builder Inc | remodel kitchen and remove rear yard bay window. remodel 5 bathrooms, all new electrical work( abandon old knob and tube where possible) convert unheated storage @ 2nd floor to heated rooms and media, hobby. remove photography studio/darkroom at front of 2nd floor. repair dry rot @ rear.Details
remodel kitchen and remove rear yard bay window. remodel 5 bathrooms, all new electrical work( abandon old knob and tube where possible) convert unheated storage @ 2nd floor to heated rooms and media, hobby. remove photography studio/darkroom at front of 2nd floor. repair dry rot @ rear. | $578,440 |
| Jul 18, 2019 | Completed final sign-off Sep 2020 | 2616 24th Av | Alex Builder Inc | rev to pa# 201503201525; 1st fl. eliminate 1 bedroom & 1 bath, relocate (e) bed rm & family rm to rear, reconfigure (e) 2 baths, 2nd fl. replace (e) windows in-kind, reconfigure (e) kitchen & (e) bath, exterior replace (e) stucco fnish at front side in-kind.Details
rev to pa# 201503201525; 1st fl. eliminate 1 bedroom & 1 bath, relocate (e) bed rm & family rm to rear, reconfigure (e) 2 baths, 2nd fl. replace (e) windows in-kind, reconfigure (e) kitchen & (e) bath, exterior replace (e) stucco fnish at front side in-kind. | $100,000 |
| Nov 6, 2018 | Expired or cancelled expired May 2022 | 1525 Shotwell St | Alex Builder Inc | install temporary shoring along property lines to allow for excavations for new development. ref pa 201806283214Details
install temporary shoring along property lines to allow for excavations for new development. ref pa 201806283214 | $40,000 |
| Oct 30, 2018 | Completed final sign-off Jun 2019 | 2028 Mcallister St | Alex Builder Inc | replace window in kind. replace wood siding on side and rear of building. not visible from public way. approx 1,300 sq ftDetails
replace window in kind. replace wood siding on side and rear of building. not visible from public way. approx 1,300 sq ft | |
| Sep 4, 2018 | Completed final sign-off Mar 2023 | 819 14th St | Alex Builder Inc | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc apendix a4Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc apendix a4 | $130,000 |
| Aug 27, 2018 | Completed final sign-off May 2023 | 1950 Eddy St | O Donoghue Construction Inc., Alex Builder Inc | 1st floor: seismic retrofit. foundation placementDetails
1st floor: seismic retrofit. foundation placement | $150,000 |
| Jul 5, 2018 | Never finaled issued May 2022, no final | 248 03rd Av | Jwl 888 Construction Inc, Bejarano Construction 9inc | legalize ground flr unit per ord# 43-14. excavation of the (n) ground flr unit in order to provide minimum ceilingDetails
legalize ground flr unit per ord# 43-14. excavation of the (n) ground flr unit in order to provide minimum ceiling | $65,000 |
| Jun 28, 2018 | Completed final sign-off Jul 2022 | 1525 Shotwell St | Terence Mcmahon Construction, Alex Builder Inc | ref pa# 201312305280the work will include all structural retaining walls for additon of a lap pool, hot tub & pool equip. room the lap pool drawings will be submitted seperatley by the pool contractor. perimeter fence at property line.Details
ref pa# 201312305280the work will include all structural retaining walls for additon of a lap pool, hot tub & pool equip. room the lap pool drawings will be submitted seperatley by the pool contractor. perimeter fence at property line. | $75,000 |
| Jun 19, 2018 | Never finaled issued Jul 2018, no final | 447 Edinburgh St | Alex Builder Inc | replace existing brick foundation to concrete foundation.Details
replace existing brick foundation to concrete foundation. | $20,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 2121 Fillmore St | Alex Builder Inc | revision to pa 2018-0319-4003 (soft story).Details
revision to pa 2018-0319-4003 (soft story). | |
| Apr 26, 2018 | Completed final sign-off Jun 2019 | 704 Moultrie St | Alex Builder Inc | residential structural foundation repairs per plansDetails
residential structural foundation repairs per plans | $45,000 |
| Mar 19, 2018 | Never finaled issued Mar 2018, no final | 2121 Fillmore St | Alex Builder Inc | revision to 201609288984 s0ft story seismic retrofit; bpa # 201609288984Details
revision to 201609288984 s0ft story seismic retrofit; bpa # 201609288984 | $5,000 |
| Jan 4, 2018 | Completed final sign-off Sep 2020 | 1848 Buchanan St | R & D Construction Co Inc | to comply with nov 201521471: int remodel at (e) 2 du create fr, laundry, revised stair & 3/4 bath at garage level (made part of #1848 dir above). depressed private open space patio for #1848 at side yard. new skyloghts at #1850. refurb the 3rd flr $1850 roofdeck. new rear wood stair to gradeDetails
to comply with nov 201521471: int remodel at (e) 2 du create fr, laundry, revised stair & 3/4 bath at garage level (made part of #1848 dir above). depressed private open space patio for #1848 at side yard. new skyloghts at #1850. refurb the 3rd flr $1850 roofdeck. new rear wood stair to grade | $100,000 |
| Dec 21, 2017 | Completed final sign-off Mar 2019 | 159 Marietta Dr | Zhong Art Construction Inc, Alex Builder Inc | rear yard landscaping with new retaining wall per plans.Details
rear yard landscaping with new retaining wall per plans. | $25,000 |
| Dec 7, 2017 | Completed final sign-off Mar 2019 | 159 Marietta Dr | Zhong Art Construction Inc, Alex Builder Inc | residential interior remodel of structure to accommodate additonal habitable space. all work limited to within e building envelope. added habitable area <500 sq ft. bsmt: 2 bedrm, 2 full bath, 1st fl:1 bdrm, full bath, 2nd fl: remodel kitdchen , mster bedroom/bath, skylightsDetails
residential interior remodel of structure to accommodate additonal habitable space. all work limited to within e building envelope. added habitable area <500 sq ft. bsmt: 2 bedrm, 2 full bath, 1st fl:1 bdrm, full bath, 2nd fl: remodel kitdchen , mster bedroom/bath, skylights | $100,000 |
| Sep 13, 2017 | Completed final sign-off May 2022 | 1240 Grove St | Alex Builder Inc | seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4Details
seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4 | $120,000 |
| Sep 7, 2017 | Completed final sign-off May 2022 | 921 Dolores St | Mulhall Construction Inc., Alex Builder Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $76,986 |
| Sep 5, 2017 | Completed final sign-off Apr 2022 | 501 Jersey St | Alex Builder Inc | seismic retrofit of soft story comply w/ sfebc chapter 4d mandatory seismic retrofit per 2019 cebc appendex a4Details
seismic retrofit of soft story comply w/ sfebc chapter 4d mandatory seismic retrofit per 2019 cebc appendex a4 | $18,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2022 | 1524 Jackson St | Alex Builder Inc | seismic upgrade to comply with ord 66-13 soft story retrofit per sfebc ch 4d, 2016 cebc app a4, maher not reqDetails
seismic upgrade to comply with ord 66-13 soft story retrofit per sfebc ch 4d, 2016 cebc app a4, maher not req | $28,000 |
| Aug 1, 2017 | Completed final sign-off Jun 2019 | 2028 Mcallister St | Alex Builder Inc | 1/f: add 2 bedrooms, 1 media room, 2 full bathrooms, one powder room, two wic per plans. add interior open stairs to create connnection between 1/f & 2/f per plan. 2/f: reconfigure interior layout, add interior staircase to create connection between 2/f & 3/f per plans.Details
1/f: add 2 bedrooms, 1 media room, 2 full bathrooms, one powder room, two wic per plans. add interior open stairs to create connnection between 1/f & 2/f per plan. 2/f: reconfigure interior layout, add interior staircase to create connection between 2/f & 3/f per plans. | $60,000 |
| Jun 19, 2017 | Completed final sign-off Nov 2019 | 3512 21st St | D3 Construction, Alex Builder Inc | structural upgrade lower most story, foundation work. no change in exterior facade. change window in the back.Details
structural upgrade lower most story, foundation work. no change in exterior facade. change window in the back. | $50,000 |
| Mar 7, 2017 | Completed final sign-off Jun 2018 | 2121 Fillmore St | Alex Builder Inc | add ada door opener on 1st floor per plan at retail area for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
add ada door opener on 1st floor per plan at retail area for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $10,000 |
| Feb 24, 2017 | Completed final sign-off Sep 2018 | 1100 Clay St | Alex Builder Inc | soft story seismic retrofit to comply with sfbc chapter 34b mandatory seismic retrofit iebc a4 maher naDetails
soft story seismic retrofit to comply with sfbc chapter 34b mandatory seismic retrofit iebc a4 maher na | $20,000 |
| Sep 28, 2016 | Completed final sign-off Jun 2018 | 2121 Fillmore St | Alex Builder Inc | soft story retrofit (residential) per sfbc chapter 34b, 2012 iebc appendix a-4 (commercial pa #201609288980).Details
soft story retrofit (residential) per sfbc chapter 34b, 2012 iebc appendix a-4 (commercial pa #201609288980). | $40,000 |
| Jun 10, 2016 | Completed final sign-off Jul 2016 | 66 Geneva Av | Alex Builder Inc | repair walkway inside building.Details
repair walkway inside building. | $3,000 |
| May 12, 2016 | Completed final sign-off Nov 2016 | 155 Arbor St | Alex Builder Inc | add new deck at rear of building of 1st floor per plan. repair retaining wall on basement floor per plan.Details
add new deck at rear of building of 1st floor per plan. repair retaining wall on basement floor per plan. | $20,000 |
| Mar 1, 2016 | Completed final sign-off Apr 2017 | 147 Judson Av | Z Construction Company Inc, Alex Builder Inc | develop basement accessory rooms - new rooms - bedroom, bathroom, office and bonus room.Details
develop basement accessory rooms - new rooms - bedroom, bathroom, office and bonus room. | $80,000 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 545 Oak St | Alex Builder Inc | soft story retrofit per sfbc chapter 34b engineering criteria engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria engineering criteria 2012 iebc appendix a-4 | $20,000 |
| Jan 19, 2016 | Never finaled issued Mar 2016, no final | 135 San Leandro Wy | P J Hegarty Construction, Alex Builder Inc | provide foundation excavation sequence and temporary building shoring for 201508315634Details
provide foundation excavation sequence and temporary building shoring for 201508315634 | $10,000 |
| Sep 23, 2015 | Expired or cancelled expired Jul 2026 | 771 Corbett Av | Kent Deng, Alex Builder Inc | comply with nov and adding livable space in the basement floor. comply with nov #201552641. legalize 1st floor. excavate basement and 1st floor. new cantilever deck.Details
comply with nov and adding livable space in the basement floor. comply with nov #201552641. legalize 1st floor. excavate basement and 1st floor. new cantilever deck. | $88,000 |
| Aug 3, 2015 | Completed final sign-off Oct 2017 | 314 Walnut St | P J Hegarty Construction, Alex Builder Inc | horizontal addition at rear all flor. remodel kitchen & one bathroom. remove 3 bathrooms and provide 4 new bathrooms. remove walls at 1st flr. provide new elevator . remove (e) stairs & replace. provide new roof decks at 1st & 3rd flr. provide new balcony at 2nd flr master bedroom.Details
horizontal addition at rear all flor. remodel kitchen & one bathroom. remove 3 bathrooms and provide 4 new bathrooms. remove walls at 1st flr. provide new elevator . remove (e) stairs & replace. provide new roof decks at 1st & 3rd flr. provide new balcony at 2nd flr master bedroom. | $375,000 |
| Apr 14, 2015 | Completed final sign-off Jun 2017 | 3149 Washington St | Alex Builder Inc | sub-basement: convert (e) unconditioned sp to conditioned sp incl 2 bedrms, 1 bath, wet bar & living space. basement: add 2 (n) stair to 1st floor, kitchen, half bath & laundry. 1st fl:relocate (e) kitchen, new stair to 2nd fl. remove (e) bath, add 1/2 bath. 2nd flr: remove (e) bath, add laun &bathDetails
sub-basement: convert (e) unconditioned sp to conditioned sp incl 2 bedrms, 1 bath, wet bar & living space. basement: add 2 (n) stair to 1st floor, kitchen, half bath & laundry. 1st fl:relocate (e) kitchen, new stair to 2nd fl. remove (e) bath, add 1/2 bath. 2nd flr: remove (e) bath, add laun &bath | $100,000 |
| Apr 2, 2015 | Expired or cancelled expired Sep 2024 | 446 Ralston St | Alex Builder Inc | retaining wall in rear yardDetails
retaining wall in rear yard | $3,000 |
| Mar 20, 2015 | Completed final sign-off Sep 2020 | 2616 24th Av | Kevin Lin Construction Inc, Alex Builder Inc | new 2 stories horizontal rear addition. new 2 bedrooms, family room & 2 bathrooms @ 1st floor. new 2 master bedrooms & bathrooms @ 2nd floor.Details
new 2 stories horizontal rear addition. new 2 bedrooms, family room & 2 bathrooms @ 1st floor. new 2 master bedrooms & bathrooms @ 2nd floor. | $100,000 |
| Mar 10, 2015 | Completed final sign-off Nov 2015 | 66 Borica St | Alex Builder Inc | remodel 1/f including kitchen & bathroom, provide new stair to basement, new habitable space at basement including 2 bedroom, 2 bathrooms, family room and laundry.Details
remodel 1/f including kitchen & bathroom, provide new stair to basement, new habitable space at basement including 2 bedroom, 2 bathrooms, family room and laundry. | $200,000 |
| Mar 6, 2015 | Completed final sign-off Nov 2019 | 964 Noe St | D3 Construction, Alex Builder Inc | extension 10'-6" x 25'-0" @ ground floor in rear yard. infill area @ 2nd floor. new additional wood deck @ 3rd floor. change the front window. site permit. enlarge roof slope.Details
extension 10'-6" x 25'-0" @ ground floor in rear yard. infill area @ 2nd floor. new additional wood deck @ 3rd floor. change the front window. site permit. enlarge roof slope. | $20,000 |
| Mar 2, 2015 | Completed final sign-off Jul 2017 | 150 Clinton Pk | Alex Builder Inc | dry rot repair at front. window trim at central staircase.Details
dry rot repair at front. window trim at central staircase. | $1,500 |
| Dec 30, 2014 | Completed final sign-off Dec 2018 | 38 Liberty St | P J Hegarty Construction, Alex Builder Inc | restore original victorian facade, new 3nd floor and roof deck, new rear yard additon, new garage & curb cut, remodel kitchen & bathrooms.Details
restore original victorian facade, new 3nd floor and roof deck, new rear yard additon, new garage & curb cut, remodel kitchen & bathrooms. | $590,000 |
| Nov 26, 2014 | Completed final sign-off Apr 2017 | 320 Roosevelt Wy | Alex Builder Inc | front facade (n) wood window in (e) window opening. convert basement to 1-bedrm, full bath & powder room. (n) exterior stair to (n) roof deck. 1st fl: complete remodel interior & exterior per plan. 2nd fl: add 3(n) bays & complete remodel interior per plan. (n) concrete exterior stairs per plan.Details
front facade (n) wood window in (e) window opening. convert basement to 1-bedrm, full bath & powder room. (n) exterior stair to (n) roof deck. 1st fl: complete remodel interior & exterior per plan. 2nd fl: add 3(n) bays & complete remodel interior per plan. (n) concrete exterior stairs per plan. | $330,000 |
| Sep 5, 2014 | Completed final sign-off Jun 2017 | 3149 Washington St | Alex Builder Inc | relocate (e) garage, upgrade (e) foundation, minor structural work per plans, excavate (e) sub-basement to create (n) unconditioned space.Details
relocate (e) garage, upgrade (e) foundation, minor structural work per plans, excavate (e) sub-basement to create (n) unconditioned space. | $75,000 |
| Jun 10, 2014 | Completed final sign-off Mar 2015 | 6534 03rd St | Alex Builder Inc | to complete work and obtain final inspection for work approved p/a#200507066945.Details
to complete work and obtain final inspection for work approved p/a#200507066945. | $550,000 |
| Jan 8, 2014 | Completed final sign-off Sep 2014 | 35 Dorland St | Cardea Bldg Dba Dimension Design Group, Alex Builder Inc | underpinning permit to shore property to the west of the subject property @ 29 dorland for a (n) garage under pa #201303263035. underpinning only, no other work under this permit applicaiton.Details
underpinning permit to shore property to the west of the subject property @ 29 dorland for a (n) garage under pa #201303263035. underpinning only, no other work under this permit applicaiton. | $5,000 |
| Jan 8, 2014 | Completed final sign-off Sep 2014 | 25 Dorland St | Cardea Bldg Dba Dimension Design Group, Alex Builder Inc | underpinning permit to shore property to the east of the subject property @ 29 dorland for (n) garage & addition under pa #201303263035. underpinning only, no other work under this permit application.Details
underpinning permit to shore property to the east of the subject property @ 29 dorland for (n) garage & addition under pa #201303263035. underpinning only, no other work under this permit application. | $5,000 |
| Dec 30, 2013 | Expired or cancelled expired Aug 2024 | 1525 Shotwell St | Terence Mcmahon Construction, Alex Builder Inc | to erect 3 stories, no basement, single family dwelling.Details
to erect 3 stories, no basement, single family dwelling. | $538,796 |
| Dec 11, 2013 | Completed final sign-off Apr 2015 | 891 Noe St | Alex Builder Inc | interior remodel: unit a reconfigure interior layout and relocate unit to basement level. unit b: reconfigure layout, add 3 bath rooms, relocate kitchen per planDetails
interior remodel: unit a reconfigure interior layout and relocate unit to basement level. unit b: reconfigure layout, add 3 bath rooms, relocate kitchen per plan | $350,000 |
| Oct 29, 2013 | Completed final sign-off Apr 2015 | 891 Noe St | Alex Builder Inc | revision to app#201306129333. add retaining wall and stairs at rear yard on grade.Details
revision to app#201306129333. add retaining wall and stairs at rear yard on grade. | $25,000 |
| Aug 28, 2013 | Completed final sign-off Feb 2015 | 90 Jersey St | Alex Builder Inc | partial evcavation of rear yard to create usable open space off proposed 1st floor living space. stairs from garage & stepped planter walls. work is in conjunction with pa# 2012-0301-5226Details
partial evcavation of rear yard to create usable open space off proposed 1st floor living space. stairs from garage & stepped planter walls. work is in conjunction with pa# 2012-0301-5226 | |
| Jun 12, 2013 | Completed final sign-off Apr 2015 | 891 Noe St | Alex Builder Inc | voluntary strengthening extg foundation, excavation for garage expansion and add storage at extg garage level per plan.Details
voluntary strengthening extg foundation, excavation for garage expansion and add storage at extg garage level per plan. | $120,000 |
| Feb 22, 2013 | Completed final sign-off Mar 2014 | 175 De Soto St | Alex Builder Inc | replace exiting fondation with new foundation per current code. no new work on upper level floors except to remove lath and plaster portion to examine (e) condition of framing system. any works on upper floor will be under separate permit.Details
replace exiting fondation with new foundation per current code. no new work on upper level floors except to remove lath and plaster portion to examine (e) condition of framing system. any works on upper floor will be under separate permit. | $25,000 |
| Nov 14, 2012 | Completed final sign-off Dec 2012 | 42 Fernwood Dr | Alex Builder Inc | emergency demolition of 2 story single family dwellingDetails
emergency demolition of 2 story single family dwelling | $10,000 |
| Oct 25, 2012 | Completed final sign-off Feb 2013 | 3925 20th St | Alex Builder Inc | revision to pa# 2012-0203-3486-as builts floor plansDetails
revision to pa# 2012-0203-3486-as builts floor plans | |
| Apr 23, 2012 | Completed final sign-off Sep 2012 | 2832 Pine St | Alex Builder Inc | revision to pa# 2011-1116-8993-add a steel post in garage to avoid touch gas meter, move window on the west exterior wall to east exterior wallDetails
revision to pa# 2011-1116-8993-add a steel post in garage to avoid touch gas meter, move window on the west exterior wall to east exterior wall | $100 |
| Feb 3, 2012 | Completed final sign-off Feb 2013 | 3925 20th St | Alex Builder Inc | revision to pa #2008.06.03.3551 - reconfigure interior layout. add entertainment room & bthroom at first floor. infill central skylight at 4th flrDetails
revision to pa #2008.06.03.3551 - reconfigure interior layout. add entertainment room & bthroom at first floor. infill central skylight at 4th flr | $15,000 |
| Oct 20, 2011 | Completed final sign-off Jan 2013 | 3925 20th St | Alex Builder Inc | revision to appl #200806033551: revised retaining wall at rear yard per plan.Details
revision to appl #200806033551: revised retaining wall at rear yard per plan. | $8,000 |
| Apr 29, 2011 | Completed final sign-off May 2011 | 137 Ocean Av | Alex Builder Inc | repair front stair in kind, no change in material from existing wood stairs, pressure tread wood.Details
repair front stair in kind, no change in material from existing wood stairs, pressure tread wood. | $5,000 |
| Nov 3, 2010 | Completed final sign-off Aug 2011 | 300 Delano Av | Alex Builder Inc | per correction notice & report estimated cost of job increased $2,000 per app#2010/08/189016. sheetrock entire 2nd flr.Details
per correction notice & report estimated cost of job increased $2,000 per app#2010/08/189016. sheetrock entire 2nd flr. | $2,000 |
| Nov 3, 2010 | Completed final sign-off Aug 2011 | 300 Delano Av | Alex Builder Inc | per correction notice & report estimated cost of job increased $2,000 per app#2010/08/189016. sheetrock entire 2nd flr.Details
per correction notice & report estimated cost of job increased $2,000 per app#2010/08/189016. sheetrock entire 2nd flr. | $6,000 |
| Sep 28, 2010 | Completed final sign-off Aug 2011 | 300 Delano Av | Alex Builder Inc | replace 3 front windows & 2 back windows, same size, same location associating with repairing stucco, replace damaged framing between windows as needed, replace front windows with wood clad with vinyl & 2 back windows with vinyl. u-factor 0.40 max.Details
replace 3 front windows & 2 back windows, same size, same location associating with repairing stucco, replace damaged framing between windows as needed, replace front windows with wood clad with vinyl & 2 back windows with vinyl. u-factor 0.40 max. | $3,000 |
| Aug 12, 2010 | Completed final sign-off Sep 2010 | 298 32nd Av | Alex Builder Inc | remodel garage only. 1)replace extg foundation on west wall. 2)reconstruct west wall with one window and one door.Details
remodel garage only. 1)replace extg foundation on west wall. 2)reconstruct west wall with one window and one door. | $2,000 |
| Jul 30, 2010 | Completed final sign-off Dec 2010 | 1626 47th Av | Alex Builder Inc | replace existing foundation. add one laundry rm, one bedroom, one full bath, one fam. room at garage floor. remove closet at 2nd floorDetails
replace existing foundation. add one laundry rm, one bedroom, one full bath, one fam. room at garage floor. remove closet at 2nd floor | $60,000 |
| Jul 23, 2010 | Completed final sign-off Aug 2011 | 300 Delano Av | Alex Builder Inc | remodel kitchen: cabinets,countertop & sheetrock.Details
remodel kitchen: cabinets,countertop & sheetrock. | $3,000 |
| May 4, 2010 | Completed final sign-off Oct 2010 | 913 Alvarado St | Cht Properties Development, Alex Builder Inc | repalce (e) concrete retaining wall (e) wood stairs (e) wood garage door (e) wood railings, construct (n) 3' high retaining wall, (n) 4" concrete slab at rear yard. install three (n) skylight on (e) roof. replace 32 sq of concrete on sidewk & n drivewayDetails
repalce (e) concrete retaining wall (e) wood stairs (e) wood garage door (e) wood railings, construct (n) 3' high retaining wall, (n) 4" concrete slab at rear yard. install three (n) skylight on (e) roof. replace 32 sq of concrete on sidewk & n driveway | $37,000 |
| Apr 11, 2008 | Completed final sign-off Feb 2013 | 1865 Palou Av | Ting's Construction, Alex Builder Inc | 3 story horizontal and vertical addition to the existing rear building, a one car detached garage in front of the lot is to be demolished under separate permit, the proposed building is to be built on the front of the existing building.Details
3 story horizontal and vertical addition to the existing rear building, a one car detached garage in front of the lot is to be demolished under separate permit, the proposed building is to be built on the front of the existing building. | $220,000 |
| Apr 7, 2008 | Never finaled issued Jun 2009, no final | 2538 Sacramento St | Alex Builder Inc | interior alterations, relocate unit to basement level. new garage. horiz additon at 1st and 2nd floors. bsment: studio, cellar, 2 car garage, storage. 1st fl: kitchen,lvg rm, din rm, patio. 2nd fl: 4 bedrooms, 3 baths, deck, office. roof and roof deckDetails
interior alterations, relocate unit to basement level. new garage. horiz additon at 1st and 2nd floors. bsment: studio, cellar, 2 car garage, storage. 1st fl: kitchen,lvg rm, din rm, patio. 2nd fl: 4 bedrooms, 3 baths, deck, office. roof and roof deck | $230,000 |
| Feb 6, 2008 | Completed final sign-off Jan 2013 | 451 34th Av | G F Construction Co Inc, Alex Builder Inc | to convert a 2 story single family residential bldg into a 4-story 2 residential units bldg by vertical and horizontal additions to the existing bldg.Details
to convert a 2 story single family residential bldg into a 4-story 2 residential units bldg by vertical and horizontal additions to the existing bldg. | $600,000 |