Permit GraphShortlistSan Francisco building permits since 2000

Block 3533, lot 044

150 Clinton Park

City’s use
Multi-Family Residential
Built
1907
Stories
3
Units
8
Rooms
9 bathrooms
Building
6,985 sq ft
Lot
2,047 sq ft
Zoning
RM1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

15 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 6, 2024Completed
final sign-off Feb 2025
150 Clinton PkCurran & Associates General Contractorsrepair and replace (e) siding on the side of the building
Details
Permit
202405061478
Status
complete
Filed
May 6, 2024
Permit issued
May 6, 2024
Final sign-off
Feb 12, 2025
Declared cost
$25,000
Address
150 Clinton Pk

repair and replace (e) siding on the side of the building

Open the permit page

$25,000
Nov 13, 2023In progress
issued Nov 2023
150 Clinton PkInternational Fire Incupgradde e fire alarm system in partly sprinkled building to comply with sffc sec 1103.7.6.1. rerplace e facu install a radio. replace smokes annd pulls with new. bells will be replaced with horn strobes. install low frequency sounders inside sleeping rooms.
Details
Permit
202311130671
Status
issued
Filed
Nov 13, 2023
Permit issued
Nov 13, 2023
Declared cost
$16,600
Address
150 Clinton Pk

upgradde e fire alarm system in partly sprinkled building to comply with sffc sec 1103.7.6.1. rerplace e facu install a radio. replace smokes annd pulls with new. bells will be replaced with horn strobes. install low frequency sounders inside sleeping rooms.

Open the permit page

$16,600
Jun 15, 2017Completed
final sign-off Jul 2017
150 Clinton PkAero Construction Increnew pa#201503029694, 201507060727 for final inspection.
Details
Permit
201706159517
Status
complete
Filed
Jun 15, 2017
Permit issued
Jun 15, 2017
Final sign-off
Jul 19, 2017
Address
150 Clinton Pk

renew pa#201503029694, 201507060727 for final inspection.

Open the permit page

Apr 11, 2017Never finaled
issued Apr 2017, no final
150 Clinton PkPoly- On Fire Protection Inc.revision to pa 2017-0228-0329. install fire alarm communicator to monitor new remodel section of fire sprinkler system under pa 2016-0307-1366. new sprinkler system flow switch to be connected to existing building facp to trip fire alarm bells on sprinkler waterflow.
Details
Permit
201704113646
Status
issued
Filed
Apr 11, 2017
Permit issued
Apr 11, 2017
Address
150 Clinton Pk

revision to pa 2017-0228-0329. install fire alarm communicator to monitor new remodel section of fire sprinkler system under pa 2016-0307-1366. new sprinkler system flow switch to be connected to existing building facp to trip fire alarm bells on sprinkler waterflow.

Open the permit page

Feb 28, 2017Never finaled
issued Feb 2017, no final
150 Clinton PkPoly- On Fire Protection Inc.install a fire alarm communicator to monitor the sprinkler system requested by fire marshal
Details
Permit
201702280329
Status
issued
Filed
Feb 28, 2017
Permit issued
Feb 28, 2017
Declared cost
$1,650
Address
150 Clinton Pk

install a fire alarm communicator to monitor the sprinkler system requested by fire marshal

Open the permit page

$1,650
May 27, 2016Never finaled
issued May 2016, no final
150 Clinton Pkstreet space
Details
Permit
M694987
Status
issued
Filed
May 27, 2016
Permit issued
May 27, 2016
Address
150 Clinton Pk

street space

Open the permit page

Apr 15, 2016Never finaled
issued Feb 2018, no final
150 Clinton Pk150 clinton park (unit c). add one unit on basement per plan unit included- kitchen, sleeping area, full bath per ordinance 30-15. seismic permit pa#2015-0706-0727. sprinkler on deferred submittal.
Details
Permit
201604154879
Status
issued
Filed
Apr 15, 2016
Permit issued
Feb 22, 2018
Declared cost
$50,000
Address
150 Clinton Pk

150 clinton park (unit c). add one unit on basement per plan unit included- kitchen, sleeping area, full bath per ordinance 30-15. seismic permit pa#2015-0706-0727. sprinkler on deferred submittal.

Open the permit page

$50,000
Mar 7, 2016Never finaled
issued Mar 2016, no final
150 Clinton PkMagnum Construction Group Incinstall firs sprinklers per nfpa 13 for ground flr only. included underground "2" fire service. total 22 heads. ref pa 2015 0318 1211
Details
Permit
201603071366
Status
issued
Filed
Mar 7, 2016
Permit issued
Mar 8, 2016
Declared cost
$12,000
Address
150 Clinton Pk

install firs sprinklers per nfpa 13 for ground flr only. included underground "2" fire service. total 22 heads. ref pa 2015 0318 1211

Open the permit page

$12,000
Jul 6, 2015Completed
final sign-off Jul 2017
150 Clinton PkAero Construction Incsoft story program. seismic retrofit. 2012 iebc appendix a-4
Details
Permit
201507060727
Status
complete
Filed
Jul 6, 2015
Permit issued
Aug 18, 2015
Final sign-off
Jul 19, 2017
Declared cost
$20,000
Address
150 Clinton Pk

soft story program. seismic retrofit. 2012 iebc appendix a-4

Open the permit page

$20,000
Mar 18, 2015Completed
final sign-off Jul 2017
150 Clinton PkAero Construction Inclegalize as-build secondary unit on basement floor per plan. legalize as-build (2) powder rooms & (4) storage on basement floor per plan.
Details
Permit
201503181211
Status
complete
Filed
Mar 18, 2015
Permit issued
Oct 26, 2015
Final sign-off
Jul 26, 2017
Declared cost
$32,000
Address
150 Clinton Pk

legalize as-build secondary unit on basement floor per plan. legalize as-build (2) powder rooms & (4) storage on basement floor per plan.

Open the permit page

$32,000
Mar 3, 2015Never finaled
issued Mar 2015, no final
150 Clinton Pkstreet space
Details
Permit
M564929
Status
issued
Filed
Mar 3, 2015
Permit issued
Mar 3, 2015
Address
150 Clinton Pk

street space

Open the permit page

Mar 2, 2015Completed
final sign-off Jul 2017
150 Clinton PkAlex Builder Incdry rot repair at front. window trim at central staircase.
Details
Permit
201503029694
Status
complete
Filed
Mar 2, 2015
Permit issued
Mar 2, 2015
Final sign-off
Jul 19, 2017
Declared cost
$1,500
Address
150 Clinton Pk

dry rot repair at front. window trim at central staircase.

Open the permit page

$1,500
May 21, 2009Completed
final sign-off Aug 2009
150 Clinton Pknew gas line and heaters, heaters to be located in living room (near front window) and drining room (near light well window)
Details
Permit
200905218851
Status
complete
Filed
May 21, 2009
Permit issued
May 21, 2009
Final sign-off
Aug 10, 2009
Declared cost
$3,700
Address
150 Clinton Pk

new gas line and heaters, heaters to be located in living room (near front window) and drining room (near light well window)

Open the permit page

$3,700
May 11, 2006Expired or cancelled
expired Sep 2007
150 Clinton PkJackey's Roofing & Const/Dba Yip Constrreroofing
Details
Permit
200605111359
Status
expired
Filed
May 11, 2006
Permit issued
May 11, 2006
Declared cost
$10,000
Address
150 Clinton Pk

reroofing

Open the permit page

$10,000
Oct 8, 2003Completed
final sign-off Dec 2003
150 Clinton Pkrepair rear staris & 3 posts with new concrete footings. all wood shall be redwood or treated woods.
Details
Permit
200310086911
Status
complete
Filed
Oct 8, 2003
Permit issued
Oct 8, 2003
Final sign-off
Dec 5, 2003
Declared cost
$500
Address
150 Clinton Pk

repair rear staris & 3 posts with new concrete footings. all wood shall be redwood or treated woods.

Open the permit page

$500

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Aero Construction Inc (3), Poly- On Fire Protection Inc. (2), Alex Builder Inc, Curran & Associates General Contractors, International Fire Inc, Jackey's Roofing & Const/Dba Yip Constr, Magnum Construction Group Inc

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.