Ronald Yu
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Yuflux Engineering Llc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Sep 2026
460 permits since 2000 (engineer on 354 permits, authorized agent-others on 52 permits, architect on 39 permits, pmt consultant/expediter on 15 permits, designer on 4 permits): 311 completed, 29 in progress, 65 never finaled, 55 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 460.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Oct 2026 | 335 Yerba Buena Av | Kj Form Builders Inc | converted partial garage into new living space 894 sq.ft. remodel (e) kitchen, bedroom and bathroom. add (n) powder room and two bathrooms at 2nd fl. relocate stairways from 1st fl to 2nd fl. relocate washer & dryer and replace water heater & radiant heat flooring.Details
converted partial garage into new living space 894 sq.ft. remodel (e) kitchen, bedroom and bathroom. add (n) powder room and two bathrooms at 2nd fl. relocate stairways from 1st fl to 2nd fl. relocate washer & dryer and replace water heater & radiant heat flooring. | $200,000 |
| Sep 11, 2026 | Expired or cancelled cancelled Sep 2026 | 25 Seville St | legalize 1 udu at g/f. 540sf.Details
legalize 1 udu at g/f. 540sf. | $60,000 | |
| Aug 13, 2026 | In progress issued Aug 2026 | 534 18th Av | Ren Lei Construction Co | revision to bpa: 202510177605 - reconfigure bathroom plan and convert door to window on 1st floor, reconf. bathroom and closet plan on 2nf floor, relocate laundry room from 3rd floor to 2nd floor and reconf. master bedroom/ bathroom plan at 3rd floor.Details
revision to bpa: 202510177605 - reconfigure bathroom plan and convert door to window on 1st floor, reconf. bathroom and closet plan on 2nf floor, relocate laundry room from 3rd floor to 2nd floor and reconf. master bedroom/ bathroom plan at 3rd floor. | |
| Jun 30, 2026 | In progress issued Jul 2026 | 201 Molimo Dr | K Y J Construction Company | revision to bpa: 202605141293 - revised (n) kitchen location and revised door location from the garage to kitchen, add (n) sliding door at basement (e) family room, add (n) deck 295.43 sqft at basement level. relocate water heater & furnace at basement, 2 n) skylightsDetails
revision to bpa: 202605141293 - revised (n) kitchen location and revised door location from the garage to kitchen, add (n) sliding door at basement (e) family room, add (n) deck 295.43 sqft at basement level. relocate water heater & furnace at basement, 2 n) skylights | $10,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 1887 47th Av | Scott Lu's Construction Inc. | revision to 202202188303: 3rd fl reconfigure bathroom and closet.add skylight at office,convert door and window to sliding door. 2nd fl reconfigure bedroom closet at rear, front bay window depth reduced from 3' to 2'. 1st fl add elec top 2 burner and bdrm window convert to sliding door,relocatDetails
revision to 202202188303: 3rd fl reconfigure bathroom and closet.add skylight at office,convert door and window to sliding door. 2nd fl reconfigure bedroom closet at rear, front bay window depth reduced from 3' to 2'. 1st fl add elec top 2 burner and bdrm window convert to sliding door,relocat | |
| May 22, 2026 | In progress issued May 2026 | 618 03rd Av | to comply w/ complaint 202655282, 1st/f legalize bathroom, relocate w/h, replace garage door. 4th/f: convert half bath to full & replace bedroom windowsDetails
to comply w/ complaint 202655282, 1st/f legalize bathroom, relocate w/h, replace garage door. 4th/f: convert half bath to full & replace bedroom windows | $28,000 | |
| May 15, 2026 | Completed final sign-off Jul 2026 | 517 Ulloa St | Ren Lei Construction Co | remove front setback concrete and replace w/landscaping (work within property line)Details
remove front setback concrete and replace w/landscaping (work within property line) | $1,500 |
| May 15, 2026 | In progress filed May 2026, not yet issued | 2154 Taylor St | revision to bpa: 202401123932 - modify stair + bumpers+ add mechanical sliding access.Details
revision to bpa: 202401123932 - modify stair + bumpers+ add mechanical sliding access. | $8,000 | |
| May 15, 2026 | In progress issued May 2026 | 2010 16th Av | remove 2nd floor wall + (2) skylights. legalize 3 bathrooms+ toilet room + add office on 1st floor, remove posts on 1st floor.Details
remove 2nd floor wall + (2) skylights. legalize 3 bathrooms+ toilet room + add office on 1st floor, remove posts on 1st floor. | $85,000 | |
| May 14, 2026 | In progress issued May 2026 | 201 Molimo Dr | K Y J Construction Company | relocate stairway from basement to 1st fl and 1st fl to 2nd. relocate kitchen to 1st fl. convert partial garage space into new kitchen 6.97 sq ft. add new bedroom 1 and 4 2nd fl. new bath 2nd fl. replace e water heater and e furnace.Details
relocate stairway from basement to 1st fl and 1st fl to 2nd. relocate kitchen to 1st fl. convert partial garage space into new kitchen 6.97 sq ft. add new bedroom 1 and 4 2nd fl. new bath 2nd fl. replace e water heater and e furnace. | $100,000 |
| Apr 20, 2026 | Expired or cancelled cancelled May 2026 | 51 Tucker Av | extension 475 sq ft at first floor and 2nd floor. remodel existing kitchen.Details
extension 475 sq ft at first floor and 2nd floor. remodel existing kitchen. | $80,000 | |
| Mar 3, 2026 | Expired or cancelled cancelled Mar 2026 | 51 Tucker Av | extension 475sf at 1/f and 2/f. remodel (e) kitchen. new deck at the rear yard ~348sf.Details
extension 475sf at 1/f and 2/f. remodel (e) kitchen. new deck at the rear yard ~348sf. | $80,000 | |
| Mar 2, 2026 | Completed final sign-off Mar 2026 | 15 Gladeview Wy | Damar Construction And Remodeling Inc | revision to permit 2023-0404-5036-s1. change in deck guardrail from previously approved cable rail system to a glass balustrade system with a top rail. from cable guardrail to glass guardrail systemDetails
revision to permit 2023-0404-5036-s1. change in deck guardrail from previously approved cable rail system to a glass balustrade system with a top rail. from cable guardrail to glass guardrail system | $100 |
| Feb 27, 2026 | Completed final sign-off Sep 2026 | 2177 Ofarrell St | O'pro Construction Inc. | common area - decay repair and replacement in-kind for stair in lightwell <50% - not visible from street. upgrade connectionsDetails
common area - decay repair and replacement in-kind for stair in lightwell <50% - not visible from street. upgrade connections | $3,500 |
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 2150 Taylor St | revision to bpa # 2019-07-15-5920. 1. reconfigure unit #1 to make space for existing meters reconfigure rear unit. 2. consolidate unit 2 & 3 into single unit. 3. reconfigure bikes, mechanical, and laundry. 4. reconfigure rear unit.Details
revision to bpa # 2019-07-15-5920. 1. reconfigure unit #1 to make space for existing meters reconfigure rear unit. 2. consolidate unit 2 & 3 into single unit. 3. reconfigure bikes, mechanical, and laundry. 4. reconfigure rear unit. | ||
| Feb 10, 2026 | In progress issued Feb 2026 | 3421 20th St | Advance Energy Construction Inc | recommencement and completion of work approved under 201803295058 and 202009275177Details
recommencement and completion of work approved under 201803295058 and 202009275177 | $280,000 |
| Dec 8, 2025 | In progress issued Mar 2026 | 534 18th Av | Ren Lei Construction Co | comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed room on 3rd fl. add one bathroom on 3rd fl. remove deck at rear item number 4.Details
comply with nov 202316929 horizontal three story addition at rear. add 2 bed and 1.5 bath & entertainment, wet bar with 2 elec burner, expand kitchen and dinning room, add shower on 2nd fl. remove bed room on 3rd fl. add one bathroom on 3rd fl. remove deck at rear item number 4. | $250,000 |
| Dec 3, 2025 | Completed final sign-off Sep 2026 | 1101 Sloat Bl | K Y J Construction Company | convert partial e) garage to be n) bedroom & powder rm (389.82 sf) convert e) deck into new office at 1st/f (54.58 sf). replace e) window to n) sliding door @ 1st/f. remodel e) bath & add new bath @ 2nd/f. relocate/replace washer/dryer. relocate e) electrical meter. new window thru outDetails
convert partial e) garage to be n) bedroom & powder rm (389.82 sf) convert e) deck into new office at 1st/f (54.58 sf). replace e) window to n) sliding door @ 1st/f. remodel e) bath & add new bath @ 2nd/f. relocate/replace washer/dryer. relocate e) electrical meter. new window thru out | $20,000 |
| Nov 25, 2025 | Completed final sign-off Mar 2026 | 634 22nd Av | K Y J Construction Company | revision pa 202506118472 to change concrete pad locationsDetails
revision pa 202506118472 to change concrete pad locations | |
| Oct 17, 2025 | Completed final sign-off Mar 2026 | 15 Gladeview Wy | Damar Construction And Remodeling Inc | revision to bpa 202304045036. reduce deck at rear.Details
revision to bpa 202304045036. reduce deck at rear. | |
| Sep 19, 2025 | In progress issued Oct 2025 | 1478 41st Av | Ren Lei Construction Co | 1 story horizontal addition, add bathroom & 2 bedrooms; kitchen w/2 burner stove & convert 1 bedroom to great roomDetails
1 story horizontal addition, add bathroom & 2 bedrooms; kitchen w/2 burner stove & convert 1 bedroom to great room | $80,000 |
| Sep 5, 2025 | Completed final sign-off Apr 2026 | 170 Arleta Av | Ren Lei Construction Co | revision to 202504023555: reconfigure bath on 1sr fl & walls. relocate washer to 2nd/f & add 3 closets, reconfigure bathroom & modify skylights (invisible from st) & replace fire place w/electric.Details
revision to 202504023555: reconfigure bath on 1sr fl & walls. relocate washer to 2nd/f & add 3 closets, reconfigure bathroom & modify skylights (invisible from st) & replace fire place w/electric. | |
| Aug 15, 2025 | Completed final sign-off Dec 2025 | 32 Nebraska St | True Star Builders | revision 202502251047- enclose (e) skylight and add (4) new skylights. reconfigure (2) bathrooms and stairs at 2nd floor. reconfigure stair and bathroom and move garage door forward. rev to structural plan to accomodate architectural changesDetails
revision 202502251047- enclose (e) skylight and add (4) new skylights. reconfigure (2) bathrooms and stairs at 2nd floor. reconfigure stair and bathroom and move garage door forward. rev to structural plan to accomodate architectural changes | $5,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 2337 Irving St | install new non-combustible rain cover 9 ft rear of building.Details
install new non-combustible rain cover 9 ft rear of building. | $2,500 | |
| Jul 2, 2025 | Completed final sign-off Jul 2025 | 1351 Mason St | revision to 201802090976. 1) relocate unit 13 entry door 3 ft to the left. 2) add new door from lobby to north garage area. 3) relocate utility room door from north lightwell to lobby. 4) eliminate bathroom window in home office.Details
revision to 201802090976. 1) relocate unit 13 entry door 3 ft to the left. 2) add new door from lobby to north garage area. 3) relocate utility room door from north lightwell to lobby. 4) eliminate bathroom window in home office. | ||
| Jun 26, 2025 | In progress issued Nov 2025 | 634 22nd Av | K Y J Construction Company | 1)extend rear deck 188.79 sq ft. 2)add new french door at 3rd floor. 3)replace glass railing for existing outdoor stair. 4)construction revision of approved pa #202506057994 for 3rd floor bathroom and stair.Details
1)extend rear deck 188.79 sq ft. 2)add new french door at 3rd floor. 3)replace glass railing for existing outdoor stair. 4)construction revision of approved pa #202506057994 for 3rd floor bathroom and stair. | $30,000 |
| Apr 28, 2025 | Completed final sign-off Jun 2026 | 1350 Plymouth Av | K Y J Construction Company | 1) ground floor remodel: adding living space (900 sqft) included two bedrooms, one bedroom, one family room with wet bar. 2) upper floor remodel: relocated kitchen and staircase. bathroom remodel and add one new bathroom. 3 new furnance, new tankless water heater.Details
1) ground floor remodel: adding living space (900 sqft) included two bedrooms, one bedroom, one family room with wet bar. 2) upper floor remodel: relocated kitchen and staircase. bathroom remodel and add one new bathroom. 3 new furnance, new tankless water heater. | $300,000 |
| Apr 2, 2025 | Completed final sign-off Apr 2026 | 170 Arleta Av | Ren Lei Construction Co | 950 sq ft of new conditioned space on the 1st fl. 2 baths 2 beds and media room. relocate 2 bath, remodel kitchenDetails
950 sq ft of new conditioned space on the 1st fl. 2 baths 2 beds and media room. relocate 2 bath, remodel kitchen | $120,000 |
| Feb 25, 2025 | Completed final sign-off Dec 2025 | 32 Nebraska St | True Star Builders, Tri-Star Home Improvement Inc. | 1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor.Details
1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor. | $150,000 |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 347 Athens St | 1)remove rear deck and stairs. 2)legalize new front stair, 3)replace vinyl windows at front with aluminum clad. 4)legalize lightwell infill on east and west side on 2nd floor. 5)update bath, closet, & room configurations.Details
1)remove rear deck and stairs. 2)legalize new front stair, 3)replace vinyl windows at front with aluminum clad. 4)legalize lightwell infill on east and west side on 2nd floor. 5)update bath, closet, & room configurations. | $35,000 | |
| Feb 6, 2025 | Completed final sign-off Jul 2025 | 80 Chaves Av | John Construction Builder | convert front porch to interior foyer, replace front stairs, alter front roof and replace roof tiles, add 2 skylights, change windows per plan and elevations, repair and refinish stucco, replace rear and side wall cladding. ref 2024-1015-2911 for interior work.Details
convert front porch to interior foyer, replace front stairs, alter front roof and replace roof tiles, add 2 skylights, change windows per plan and elevations, repair and refinish stucco, replace rear and side wall cladding. ref 2024-1015-2911 for interior work. | $100,000 |
| Dec 10, 2024 | Completed final sign-off May 2025 | 28 Waterville St | Bradford Huang Contraction Co | revision to pa # 2024-0711-6250 add bathroom to (e) shed at the rear. reconfigure first fl entry.Details
revision to pa # 2024-0711-6250 add bathroom to (e) shed at the rear. reconfigure first fl entry. | $20,000 |
| Dec 10, 2024 | In progress issued May 2025 | 3405 Geary Bl | M L S Builder Inc. | remodel residence on 2nd fl: kitchen & bathroom . add bath and convert great room to 2 bedroom at frontDetails
remodel residence on 2nd fl: kitchen & bathroom . add bath and convert great room to 2 bedroom at front | $45,000 |
| Dec 9, 2024 | Completed final sign-off Apr 2025 | 3925 20th St | Bennett Mason Construction | 2/f: reconfigure kitchen layout and expand existing rear deck per plan.Details
2/f: reconfigure kitchen layout and expand existing rear deck per plan. | $36,800 |
| Nov 14, 2024 | Completed final sign-off Sep 2025 | 1833 11th Av | new retaining walls & stairs in rear & side yards for terraced patios.Details
new retaining walls & stairs in rear & side yards for terraced patios. | $250,000 | |
| Oct 15, 2024 | Completed final sign-off Jul 2025 | 80 Chaves Av | John Construction Builder | interior remodel: convert existing storage to 1 bedroom, 1 media room, 1 home office, and 1 bathroom on ground floor. add 1 bath on 2nd floor. no exterior work.Details
interior remodel: convert existing storage to 1 bedroom, 1 media room, 1 home office, and 1 bathroom on ground floor. add 1 bath on 2nd floor. no exterior work. | $250,000 |
| Sep 13, 2024 | In progress issued Jul 2025 | 3421 20th St | Advance Energy Construction Inc | replace furnace & water heaters ( no fire rated assembly penetration). 2/f , 3/f & 4/f (total 6 units)Details
replace furnace & water heaters ( no fire rated assembly penetration). 2/f , 3/f & 4/f (total 6 units) | $24,000 |
| Sep 13, 2024 | In progress issued Jul 2025 | 3421 20th St | Advance Energy Construction Inc | as built revision for bpa# 201612306363 and 202002073886: structural plan update framing and foundation.Details
as built revision for bpa# 201612306363 and 202002073886: structural plan update framing and foundation. | |
| Aug 28, 2024 | In progress issued Sep 2024 | 2275 Jackson St | Pro-Crete Builders Inc. | as built revision pa 2021709158441 modify storage room area. update shearwall details and locations and foundation detailsDetails
as built revision pa 2021709158441 modify storage room area. update shearwall details and locations and foundation details | |
| Jul 11, 2024 | Completed final sign-off Dec 2025 | 331 Capistrano Av | Ren Lei Construction Co | to comply with nov #202423535 front window replacement. remove juliet balcony. update 3rd fl modification. add roof deck at front. ground floor unit to be addressed under seperate permit. unit 201408063132 - legalize dwelling unit without permit per ordDetails
to comply with nov #202423535 front window replacement. remove juliet balcony. update 3rd fl modification. add roof deck at front. ground floor unit to be addressed under seperate permit. unit 201408063132 - legalize dwelling unit without permit per ord | $12,000 |
| Jun 14, 2024 | Completed final sign-off Jun 2024 | 215 03rd Av | Ren Lei Construction Co | rev: 202405081685: update eero at front of the 1/f bedroom window to include historice code section 8.503. update 2/f kitchen layout & fire place.Details
rev: 202405081685: update eero at front of the 1/f bedroom window to include historice code section 8.503. update 2/f kitchen layout & fire place. | $5,000 |
| May 16, 2024 | Completed final sign-off Jan 2025 | 1833 11th Av | rev to pa 2022-0203-7259 for exterior work alter front facade, enlarge windows for egress, and add/remove windows per plans. rev to pa# 2024-0229-6796; minor interior layout and structural modifications reference bpa 202310108332Details
rev to pa 2022-0203-7259 for exterior work alter front facade, enlarge windows for egress, and add/remove windows per plans. rev to pa# 2024-0229-6796; minor interior layout and structural modifications reference bpa 202310108332 | $30,000 | |
| May 13, 2024 | Completed final sign-off Feb 2025 | 254 Beverly St | Dliu Construction | 2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plansDetails
2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plans | $150,000 |
| May 8, 2024 | Completed final sign-off Jun 2024 | 215 03rd Av | Ren Lei Construction Co | to comply w/ nov 202421698 to include 1st floor - add wet bar and enclose stairs with (n)wall and door. 2nd floor add window in pantry and glass guardrail. 3rd floor add window in bedroom and bathroom and update name of roof deck, roof framing and light tubeDetails
to comply w/ nov 202421698 to include 1st floor - add wet bar and enclose stairs with (n)wall and door. 2nd floor add window in pantry and glass guardrail. 3rd floor add window in bedroom and bathroom and update name of roof deck, roof framing and light tube | $10,000 |
| Feb 29, 2024 | Completed final sign-off Jan 2025 | 1833 11th Av | revision to 202310108332. e 1st fl laundry to remain. remove new pantry and closet from 2nd fl. replace rear window and sliding door. structural modificationsDetails
revision to 202310108332. e 1st fl laundry to remain. remove new pantry and closet from 2nd fl. replace rear window and sliding door. structural modifications | $22,000 | |
| Feb 8, 2024 | Completed final sign-off Feb 2025 | 3188 16th St | Kent Deng | residential remodel on second floor. add full bathroom, remodel (e) bath, relocate kitchen sink. add closets.Details
residential remodel on second floor. add full bathroom, remodel (e) bath, relocate kitchen sink. add closets. | $38,000 |
| Jan 31, 2024 | Completed final sign-off Mar 2025 | 2019 23rd Av | Galaxy Building Construction | as built revision 201808308786 & 202107235020. add two skylights and replace two front windows on second fl. update (e) skylights and door swings (first fl). reconfigure first floor bathroom and rear stucoo to hardiboard. (no new fixtures)Details
as built revision 201808308786 & 202107235020. add two skylights and replace two front windows on second fl. update (e) skylights and door swings (first fl). reconfigure first floor bathroom and rear stucoo to hardiboard. (no new fixtures) | $15,000 |
| Dec 6, 2023 | In progress issued Dec 2023 | 1351 Mason St | Kenny Gong Construction | 2/f: apt 3 - remodel kitchen and 1 bath. add 1 bath. replace 4 windows in kind in lightwell. windows not visible from street. apt 4 - remodel kitchen and relocate 1 bath. replace 1 window in kind in lightwell. window not visible from street. no exterior/facade work.Details
2/f: apt 3 - remodel kitchen and 1 bath. add 1 bath. replace 4 windows in kind in lightwell. windows not visible from street. apt 4 - remodel kitchen and relocate 1 bath. replace 1 window in kind in lightwell. window not visible from street. no exterior/facade work. | $30,000 |
| Dec 1, 2023 | Completed final sign-off Aug 2024 | 3024 Taraval St | accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3024 taraval st per category checklist complaince forms. abe #202306071031Details
accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3024 taraval st per category checklist complaince forms. abe #202306071031 | $2,000 | |
| Dec 1, 2023 | Completed final sign-off Sep 2024 | 3028 Taraval St | accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3028 taraval st per category checklist complaince forms. abe #202205230977Details
accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3028 taraval st per category checklist complaince forms. abe #202205230977 | $2,000 | |
| Dec 1, 2023 | Completed final sign-off Sep 2024 | 3032 Taraval St | accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3020/3024/3028/3032 taraval st per category checklist complaince forms. abe #202205230978Details
accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3020/3024/3028/3032 taraval st per category checklist complaince forms. abe #202205230978 | $2,000 | |
| Dec 1, 2023 | Completed final sign-off Jul 2024 | 3020 Taraval St | accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3020 taraval st per category checklist complaince forms. abe #202205251025Details
accessible business entrance program per ordinance 51-16: install a power door operator at addresses 3020 taraval st per category checklist complaince forms. abe #202205251025 | $2,000 | |
| Nov 9, 2023 | In progress issued Jun 2025 | 4160 25th St | Golden State Marble And Construction Inc | add bathroom,laundry room, media room, stairs & lounge on 1st fl (4162 25th st).infill west light well & new deck on top of infileed deck on 3rd fl (4164 25th st). add 2 walls in basement. entire building to be equipped with automatic fire sprinkler type nfpa 13r throughoutDetails
add bathroom,laundry room, media room, stairs & lounge on 1st fl (4162 25th st).infill west light well & new deck on top of infileed deck on 3rd fl (4164 25th st). add 2 walls in basement. entire building to be equipped with automatic fire sprinkler type nfpa 13r throughout | $140,000 |
| Oct 19, 2023 | Completed final sign-off Oct 2023 | 2154 Taylor St | Yk Mason & Sons Inc | revision to pa 202210194724 and 202103156516. revise unit numbers.Details
revision to pa 202210194724 and 202103156516. revise unit numbers. | |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 325 Harvard St | revision to pa# 202205194640. 1st fl bathroom, closet, and storage reconfiguration.Details
revision to pa# 202205194640. 1st fl bathroom, closet, and storage reconfiguration. | ||
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 135 Corona St | Dliu Construction | minor residential interior remodel single family residence to remodel e bathrooms and e kithen on 2nd fl for non structural partition walls, per plan. remodel e laundry area to laundry new bath on gr fl per plans. no change to existing building envelopeDetails
minor residential interior remodel single family residence to remodel e bathrooms and e kithen on 2nd fl for non structural partition walls, per plan. remodel e laundry area to laundry new bath on gr fl per plans. no change to existing building envelope | $78,000 |
| Aug 28, 2023 | In progress issued Dec 2024 | 742 26th Av | Ren Lei Construction Co | vert+horz addition & remodel. add adu w/2 bdrms & 2 baths at 1st flr. full remodel of 2nd flr+add 2 bdrms and 2 baths. new 3rd flr to include 3 baths 3 bdrms and 1 kitchen. (n) 3rd flr exterior facade to match existing. new rear balconies.Details
vert+horz addition & remodel. add adu w/2 bdrms & 2 baths at 1st flr. full remodel of 2nd flr+add 2 bdrms and 2 baths. new 3rd flr to include 3 baths 3 bdrms and 1 kitchen. (n) 3rd flr exterior facade to match existing. new rear balconies. | $830,000 |
| Aug 2, 2023 | Completed final sign-off Mar 2024 | 1550 22nd Av | infill portion of south lightwell against neighbor's blind wall, add (2) bedrooms, entertainment room, & (2) baths on ground floor, add 1.5 bath on 2/fDetails
infill portion of south lightwell against neighbor's blind wall, add (2) bedrooms, entertainment room, & (2) baths on ground floor, add 1.5 bath on 2/f | $250,000 | |
| Jul 3, 2023 | Never finaled filed Jul 2023, never issued | 2235 Sutter St | Golden State Marble And Construction Inc | 1. add unit front of unit on first floor (one bedroom, living room, one bathroom and kitchen) 2. to comply with nov 202286846 3. new unit per "four-unit density exception for residential districts" ordinance 210-22Details
1. add unit front of unit on first floor (one bedroom, living room, one bathroom and kitchen) 2. to comply with nov 202286846 3. new unit per "four-unit density exception for residential districts" ordinance 210-22 | $80,000 |
| Jun 29, 2023 | Completed final sign-off Jul 2025 | 1591 21st Av | Pro Modern Construction | ground fl. remodel for habitable space for total of 3 bed, 1 media, 1 laundry and 1 bath minor remodel of 2nd fl. per plns to have 2 bed and 2 1/2 bath add new sklight and relocate interior stair, structural strengthening where needed for minor ground fl. interior remodelDetails
ground fl. remodel for habitable space for total of 3 bed, 1 media, 1 laundry and 1 bath minor remodel of 2nd fl. per plns to have 2 bed and 2 1/2 bath add new sklight and relocate interior stair, structural strengthening where needed for minor ground fl. interior remodel | $125,000 |
| Jun 1, 2023 | Completed final sign-off Jan 2024 | 1351 Mason St | unit 2: revision to 202206226878: add 1 bathroom, remodel 1 kitchen & 1 bathroom, replace 10 windowsDetails
unit 2: revision to 202206226878: add 1 bathroom, remodel 1 kitchen & 1 bathroom, replace 10 windows | $5,000 | |
| May 18, 2023 | Completed final sign-off Mar 2024 | 691 Madrid St | Dliu Construction | minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawinDetails
minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawin | $250,000 |
| May 2, 2023 | Never finaled issued May 2023, no final | 4160 25th St | Golden State Marble & Granite Inc. | remodel bathroom and kitchen on 2nd fl; structural strengthening with plywood sheathing, floor strengthening where needed; remove two windows and relocate door on 1st fl; window replacement; no increase in square footage of existing space. amend to pa202302031394 for additional work.Details
remodel bathroom and kitchen on 2nd fl; structural strengthening with plywood sheathing, floor strengthening where needed; remove two windows and relocate door on 1st fl; window replacement; no increase in square footage of existing space. amend to pa202302031394 for additional work. | $85,000 |
| Apr 11, 2023 | Completed final sign-off Sep 2023 | 517 Ulloa St | Ren Lei Construction Co | rev to pa# 2022-0519-4636: fur out wall on west side of first fl. reconfigure master bathroom and closet and kitchen on 2nd fl. add shearwalls at 2nd floor front walls.Details
rev to pa# 2022-0519-4636: fur out wall on west side of first fl. reconfigure master bathroom and closet and kitchen on 2nd fl. add shearwalls at 2nd floor front walls. | |
| Apr 11, 2023 | Completed final sign-off May 2024 | 2470 23rd Av | Ripplewood Holding | revision to bpa#202212017481, move interior staircase in building envelope, extra support for (e) foundation @ rear of building. no change to exterior building envelope.Details
revision to bpa#202212017481, move interior staircase in building envelope, extra support for (e) foundation @ rear of building. no change to exterior building envelope. | $4,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2026 | 15 Gladeview Wy | Damar Construction And Remodeling Inc | 205 sf addition to rear of house w/roof deck above (212 sf). new 75 sf deck off of upper level with stairs to yard. new 511 sf deck at yard.Details
205 sf addition to rear of house w/roof deck above (212 sf). new 75 sf deck off of upper level with stairs to yard. new 511 sf deck at yard. | $95,000 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 41 Mount Vernon Av | Deluxe Custom Construction | 2/f: interior remodel of kitchen and bathrooms. g/f: interior remodel to add habitable space. no change to (e) exterior bldg envelope. add new interior stairway to downstairs per plans. repair of (e) flat root, where needed. new rear windows per plans.Details
2/f: interior remodel of kitchen and bathrooms. g/f: interior remodel to add habitable space. no change to (e) exterior bldg envelope. add new interior stairway to downstairs per plans. repair of (e) flat root, where needed. new rear windows per plans. | $200,000 |
| Mar 17, 2023 | Completed final sign-off May 2024 | 706 25th Av | Golden State Marble & Granite Inc. | revision to permit 202212097966. replace lath and plaster with sheet rock on 2/f. revise beam and step on 1/f plan, and existing window at rear to remain.Details
revision to permit 202212097966. replace lath and plaster with sheet rock on 2/f. revise beam and step on 1/f plan, and existing window at rear to remain. | |
| Feb 23, 2023 | Never finaled filed Feb 2023, never issued | 317 Bradford St | erect 3 stories, 1 basement, type v-b, two unit residential r-3 (sb9 project)Details
erect 3 stories, 1 basement, type v-b, two unit residential r-3 (sb9 project) | $500,000 | |
| Feb 23, 2023 | Never finaled filed Feb 2023, never issued | 309 Bradford St | erect 4 stories, 1 basement, type v-b, two unit residential r-3 (sb9 project)Details
erect 4 stories, 1 basement, type v-b, two unit residential r-3 (sb9 project) | $500,000 | |
| Feb 23, 2023 | Never finaled filed Feb 2023, never issued | 305 Bradford St | erect 4 stories, no basement, type v-b, two unit residential r-3Details
erect 4 stories, no basement, type v-b, two unit residential r-3 | $500,000 | |
| Feb 22, 2023 | Completed final sign-off Jan 2024 | 775 Clementina St | revision to pa#202202117874: 1) relayout 1st floor bathroom. add one window in living room. 2)relayout bathroom #2 and office on 2nd floor. 3)convert 3rd floor media room into a bedroom. no additional plumbing fixtures.Details
revision to pa#202202117874: 1) relayout 1st floor bathroom. add one window in living room. 2)relayout bathroom #2 and office on 2nd floor. 3)convert 3rd floor media room into a bedroom. no additional plumbing fixtures. | $30,000 | |
| Feb 21, 2023 | Completed final sign-off Dec 2024 | 1906 Greenwich St | H D Construction Company | revision to permit 202103317642. 1/f: reconfigure laundry and keep (e) rear door. 2/f: reconfigure half bath and closet. 3/f: reconfigure bathroom and closet, and replace windows.Details
revision to permit 202103317642. 1/f: reconfigure laundry and keep (e) rear door. 2/f: reconfigure half bath and closet. 3/f: reconfigure bathroom and closet, and replace windows. | |
| Feb 3, 2023 | In progress issued Feb 2025 | 276 Ellsworth St | kitchen and bathroom remodel on second floor and wall re-configuration.Details
kitchen and bathroom remodel on second floor and wall re-configuration. | $55,000 | |
| Jan 17, 2023 | Completed final sign-off May 2024 | 1111 Hampshire St | Ripplewood Holding | 1/flr: add 2 bedroom, 1 media room & 2 baths, remodel 2nd flr, add fenestrations and skylights.Details
1/flr: add 2 bedroom, 1 media room & 2 baths, remodel 2nd flr, add fenestrations and skylights. | $200,000 |
| Dec 9, 2022 | Completed final sign-off Apr 2024 | 706 25th Av | Golden State Marble & Granite Inc. | add two bedrooms and laundry on the 1st fl. add sliding door on 2nd fl. decay reapir rear deck and stairs in kindDetails
add two bedrooms and laundry on the 1st fl. add sliding door on 2nd fl. decay reapir rear deck and stairs in kind | $85,000 |
| Dec 1, 2022 | Completed final sign-off May 2024 | 2470 23rd Av | Dliu Construction, Ripplewood Holding | 1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fireDetails
1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fire | $225,000 |
| Nov 30, 2022 | Completed final sign-off Sep 2023 | 1335 Divisadero St | Ren Lei Construction Co | 1) revise bpa# 201507010499, 202203109719. 2) reconfigure 3rd floor bathrrom + (3) new skylights. 3) reconfigure second floor dining room wall + add gas fireplace. 4) reconfigure first floor wall.Details
1) revise bpa# 201507010499, 202203109719. 2) reconfigure 3rd floor bathrrom + (3) new skylights. 3) reconfigure second floor dining room wall + add gas fireplace. 4) reconfigure first floor wall. | |
| Nov 9, 2022 | Expired or cancelled cancelled Jan 2026 | 679 04th Av | bedroom and family room and 2 burner electric top and sink on 1st fl; decay repair stairs in kind < 50%Details
bedroom and family room and 2 burner electric top and sink on 1st fl; decay repair stairs in kind < 50% | $65,000 | |
| Sep 23, 2022 | Completed final sign-off May 2023 | 1591 43rd Av | Golden State Marble & Granite Inc. | decay repair and replacement front entry stair in kind. replace terazzo w/slip resistant tile.Details
decay repair and replacement front entry stair in kind. replace terazzo w/slip resistant tile. | $7,500 |
| Sep 16, 2022 | Completed final sign-off Jan 2023 | 35 Reposa Wy | Dliu Construction | remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights,Details
remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights, | $85,000 |
| Aug 1, 2022 | Never finaled issued Aug 2022, no final | 3427 20th St | Advance Energy Construction Inc | 3427/3429/3431 20th street: each unit: remodel (e) kitchen and bathroom including any dry rot repair and replacement all in-kind. each unit add 1 bathroom and washer/dryer laundry box.Details
3427/3429/3431 20th street: each unit: remodel (e) kitchen and bathroom including any dry rot repair and replacement all in-kind. each unit add 1 bathroom and washer/dryer laundry box. | $80,000 |
| Jul 26, 2022 | Never finaled issued Jan 2023, no final | 7000 Geary Bl | Jian Construction Company | foundation and beam improvement @ front of property. wood siding to be repalced inkind where needed - store front tile to be replaced in kind where needed.Details
foundation and beam improvement @ front of property. wood siding to be repalced inkind where needed - store front tile to be replaced in kind where needed. | $30,000 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 2235 Sutter St | Bryan J. Valverde Co | stair repair and upgrade at rear south east corner. revision to 202105281291 plans per inspection reqDetails
stair repair and upgrade at rear south east corner. revision to 202105281291 plans per inspection req | $8,000 |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 2552 24th Av | Dliu Construction | interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans,Details
interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans, | $150,000 |
| Jul 22, 2022 | Never finaled filed Jul 2022, never issued | 2235 Sutter St | Golden State Marble And Construction Inc | add adu per california state program at front of unit on first floor(one bedroom, living room, one bathroom and kitchen and washer/dryer. to comply with notice of violation#202286846Details
add adu per california state program at front of unit on first floor(one bedroom, living room, one bathroom and kitchen and washer/dryer. to comply with notice of violation#202286846 | $80,000 |
| Jun 7, 2022 | Completed final sign-off Aug 2022 | 217 Juanita Wy | Dliu Construction | remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan.Details
remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan. | $150,000 |
| May 19, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | Ren Lei Construction Co | one new bath on 2nd fl. add bathroom, family room, wet bar and 2.5 bath on 1st fl.Details
one new bath on 2nd fl. add bathroom, family room, wet bar and 2.5 bath on 1st fl. | $100,000 |
| May 12, 2022 | Completed final sign-off Jan 2023 | 2106 22nd Av | Ren Lei Construction Co | first floor remodel bathroom. convert office to family room and add media room.Details
first floor remodel bathroom. convert office to family room and add media room. | $85,000 |
| Apr 26, 2022 | Completed final sign-off Nov 2022 | 1040 De Haro St | Golden State Marble & Granite Inc. | structural revision to bpa#201706270490Details
structural revision to bpa#201706270490 | $1,500 |
| Apr 26, 2022 | Completed final sign-off May 2022 | 1557 Francisco St | Ren Lei Construction Co | revise bpa#202102104392. relocate fire place and remove (n) fire place on 3rd fl. reconfigure laundry rm on 3rd fl. relocate fire place and reconfigure closet on 4th fl.Details
revise bpa#202102104392. relocate fire place and remove (n) fire place on 3rd fl. reconfigure laundry rm on 3rd fl. relocate fire place and reconfigure closet on 4th fl. | |
| Apr 15, 2022 | Completed final sign-off Sep 2023 | 517 Ulloa St | Bradford Huang Contraction Co | kitchen & bathroom remodel on 2nd fl (replace in kind, no change in layout). decay repair as in kind and destructive test/ sheetrock removal to expose decay (no struc. work). no exterior work.Details
kitchen & bathroom remodel on 2nd fl (replace in kind, no change in layout). decay repair as in kind and destructive test/ sheetrock removal to expose decay (no struc. work). no exterior work. | $20,000 |
| Apr 7, 2022 | Never finaled filed Apr 2022, never issued | 1909 Quesada Av | erect a 3 story,1 dwelling duplex type 5b.Details
erect a 3 story,1 dwelling duplex type 5b. | $570,000 | |
| Apr 7, 2022 | Never finaled filed Apr 2022, never issued | 1909 Quesada Av | erect a 4 stories,2 dwelling with one basement duplex type 5b.Details
erect a 4 stories,2 dwelling with one basement duplex type 5b. | $570,000 | |
| Mar 24, 2022 | Never finaled filed Mar 2022, never issued | 200 Raymond Av | add adu per state program. two story horizontal addition at rear.Details
add adu per state program. two story horizontal addition at rear. | $60,000 | |
| Feb 23, 2022 | Never finaled filed Feb 2022, never issued | 479 Naples St | bldg b - to erect a 3-story, type 5b, single family building w/o basement.Details
bldg b - to erect a 3-story, type 5b, single family building w/o basement. | $600,000 | |
| Feb 23, 2022 | Never finaled filed Feb 2022, never issued | 479 Naples St | bldg a - to erect a 3-story, type 5b, single family building w/o basement.Details
bldg a - to erect a 3-story, type 5b, single family building w/o basement. | $600,000 | |
| Feb 23, 2022 | Never finaled filed Feb 2022, never issued | 479 Naples St | to demolish a 3-story, type 5b, single family building.Details
to demolish a 3-story, type 5b, single family building. | $20,000 | |
| Feb 18, 2022 | In progress issued Sep 2024 | 1887 47th Av | Scott Lu's Construction Inc. | horizontal addition at rear and one story vertical addition. 1/f add 1 bedroom + 1.5 bathroom, kitchen w/ 2 burner and great room). 2/f 1 bedroom, office, bathroom, & kitchen. 3/f 2 bedroom 2 bathroom.Details
horizontal addition at rear and one story vertical addition. 1/f add 1 bedroom + 1.5 bathroom, kitchen w/ 2 burner and great room). 2/f 1 bedroom, office, bathroom, & kitchen. 3/f 2 bedroom 2 bathroom. | $440,000 |
| Feb 17, 2022 | Completed final sign-off Mar 2022 | 145 Waverly Pl | Golden State Marble & Granite Inc. | ref pa 202102023831 for dph review only. no change from previously issued dwgs.Details
ref pa 202102023831 for dph review only. no change from previously issued dwgs. |