Golden State Marble And Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Aug 2021 to Jul 2026
- Last 24 months
- 17 permits filed
23 permits since 2000: 8 completed, 13 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 17, 2026 | In progress issued Jul 2026 | 339 04th Av | remodeling hallway bathroom, no structural change. like to like. approximately 40sf.Details
remodeling hallway bathroom, no structural change. like to like. approximately 40sf. | $20,000 |
| Jun 29, 2026 | In progress issued Aug 2026 | 39 Cityview Wy | 1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service.Details
1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service. | $150,000 |
| Jun 4, 2026 | Completed final sign-off Jul 2026 | 631 18th Av | revision to 202603137564 2 bathroom remodel. enlarge shower and add tub.Details
revision to 202603137564 2 bathroom remodel. enlarge shower and add tub. | $60,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 3155 Broderick St | unit 202: kitchen and hall bathroom remodel. like for like. no structual changes.Details
unit 202: kitchen and hall bathroom remodel. like for like. no structual changes. | $45,000 |
| Apr 20, 2026 | Completed final sign-off Oct 2026 | 555 06th Av | unit#a: remodel hallway & master bathroom, like to like, remodel kitchen, like to like, no structural change, replace 8 windows on the rear and lightwell (retrofit), no wall/framing modifications.Details
unit#a: remodel hallway & master bathroom, like to like, remodel kitchen, like to like, no structural change, replace 8 windows on the rear and lightwell (retrofit), no wall/framing modifications. | $75,000 |
| Mar 13, 2026 | Completed final sign-off Jul 2026 | 631 18th Av | two bathrooms remodel, in kind(downstairs and upstairs hall baths). no structural change. replace furnace, repair the rear deck, less 50%.Details
two bathrooms remodel, in kind(downstairs and upstairs hall baths). no structural change. replace furnace, repair the rear deck, less 50%. | $60,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 1377 Post St | remodel of 3 bathrooms & 1 kitchen. like for like. no structural changes.Details
remodel of 3 bathrooms & 1 kitchen. like for like. no structural changes. | $100,000 |
| Dec 30, 2025 | Completed final sign-off Apr 2026 | 778 10th Av | replace rear damaged siding approx 500 sqft. non street visible.Details
replace rear damaged siding approx 500 sqft. non street visible. | $5,000 |
| Nov 25, 2025 | Completed final sign-off Jan 2026 | 4156 20th St | to obtain final inspection for work approved under pa# 202405101871 and pa# 202404119800. all work is complete.Details
to obtain final inspection for work approved under pa# 202405101871 and pa# 202404119800. all work is complete. | |
| Nov 5, 2025 | In progress issued Nov 2025 | 4158 20th St | unit a: kitchen and bathroom remodel, no structual change, in kind, like for like replacement.Details
unit a: kitchen and bathroom remodel, no structual change, in kind, like for like replacement. | $35,000 |
| Sep 23, 2025 | In progress issued Sep 2025 | 4164 25th St | kitchen & bathroom remodel. no structural change.Details
kitchen & bathroom remodel. no structural change. | $30,000 |
| Aug 26, 2025 | In progress issued Aug 2025 | 538 39th Av | upstair bathroom remodeling (no structural change)Details
upstair bathroom remodeling (no structural change) | $15,000 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 1564 Green St | to comply physical inspection report #cc-8692. 3r report 202504083916Details
to comply physical inspection report #cc-8692. 3r report 202504083916 | |
| May 23, 2025 | In progress issued May 2025 | 2205 Pine St | revision to pa#202503192577. add new laundry unit on the hall wayDetails
revision to pa#202503192577. add new laundry unit on the hall way | |
| May 15, 2025 | Completed final sign-off Jul 2026 | 915 Garfield St | remove interior stair, convert storage into 1 bedroom, and walkin closet for a total of 4 bedrooms. 2 bathrooms & wet bar at 1st flDetails
remove interior stair, convert storage into 1 bedroom, and walkin closet for a total of 4 bedrooms. 2 bathrooms & wet bar at 1st fl | $40,000 |
| Apr 8, 2025 | Completed final sign-off Jul 2025 | 1564 Green St | replace handrails on rear yard stairs. replace the dryer and exhaust fan vent to the roof. install natural ventilation on the garage door. install vacuum breaker on the shower handheld. handrail height 34" to 38" from stair nosing. min 200 in ventilation at garage door.Details
replace handrails on rear yard stairs. replace the dryer and exhaust fan vent to the roof. install natural ventilation on the garage door. install vacuum breaker on the shower handheld. handrail height 34" to 38" from stair nosing. min 200 in ventilation at garage door. | $800 |
| Mar 19, 2025 | In progress issued Mar 2025 | 2205 Pine St | front bldg - unit b: bathroom and kitchen remodel in kind at same location. no structural change. replace t-111 with hardie siding on east side and rear (approx. 1000 sf), replace 9 windows on the side and rear in kind in same location. repair leaking area on the roof. ( no visible on the street)Details
front bldg - unit b: bathroom and kitchen remodel in kind at same location. no structural change. replace t-111 with hardie siding on east side and rear (approx. 1000 sf), replace 9 windows on the side and rear in kind in same location. repair leaking area on the roof. ( no visible on the street) | $30,000 |
| Nov 9, 2023 | In progress issued Jun 2025 | 4160 25th St | add bathroom,laundry room, media room, stairs & lounge on 1st fl (4162 25th st).infill west light well & new deck on top of infileed deck on 3rd fl (4164 25th st). add 2 walls in basement. entire building to be equipped with automatic fire sprinkler type nfpa 13r throughoutDetails
add bathroom,laundry room, media room, stairs & lounge on 1st fl (4162 25th st).infill west light well & new deck on top of infileed deck on 3rd fl (4164 25th st). add 2 walls in basement. entire building to be equipped with automatic fire sprinkler type nfpa 13r throughout | $140,000 |
| Jul 3, 2023 | Never finaled filed Jul 2023, never issued | 2235 Sutter St | 1. add unit front of unit on first floor (one bedroom, living room, one bathroom and kitchen) 2. to comply with nov 202286846 3. new unit per "four-unit density exception for residential districts" ordinance 210-22Details
1. add unit front of unit on first floor (one bedroom, living room, one bathroom and kitchen) 2. to comply with nov 202286846 3. new unit per "four-unit density exception for residential districts" ordinance 210-22 | $80,000 |
| Dec 16, 2022 | In progress issued Feb 2026 | 2235 Sutter St | bathroom remodel & add bedroom closet & 1 -hr fire separtion adu (under separate permit to comply with nov 202280846Details
bathroom remodel & add bedroom closet & 1 -hr fire separtion adu (under separate permit to comply with nov 202280846 | $30,000 |
| Dec 2, 2022 | In progress issued May 2024 | 20 Wayne Pl | g/f: remove (e) one of the 2 off-street parking space and create a rear yard addition for a new dwelling unit at the (e) 1/f, approx 675sf.Details
g/f: remove (e) one of the 2 off-street parking space and create a rear yard addition for a new dwelling unit at the (e) 1/f, approx 675sf. | $100,000 |
| Jul 22, 2022 | Never finaled filed Jul 2022, never issued | 2235 Sutter St | add adu per california state program at front of unit on first floor(one bedroom, living room, one bathroom and kitchen and washer/dryer. to comply with notice of violation#202286846Details
add adu per california state program at front of unit on first floor(one bedroom, living room, one bathroom and kitchen and washer/dryer. to comply with notice of violation#202286846 | $80,000 |
| Aug 11, 2021 | In progress issued Aug 2025 | 949 Vienna St | horizontal and vertical addition to existing two story single family home. 2 bedroom & 2 bathroom, secondary kitchen (with 2 electric burners), & family room on first floor. second floor 2 bedroom and 2 bathroom remodel new third floor unit, 2 bedroom and 2 bathroom. project per sb9 and sb330.Details
horizontal and vertical addition to existing two story single family home. 2 bedroom & 2 bathroom, secondary kitchen (with 2 electric burners), & family room on first floor. second floor 2 bedroom and 2 bathroom remodel new third floor unit, 2 bedroom and 2 bathroom. project per sb9 and sb330. | $160,000 |