Back to kitchen remodel contractors
Golden State Marble And Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Aug 2021 to Jul 2026
- Last 24 months
- 17 permits filed
23 permits since 2000: 10 completed, 11 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
10 kitchen remodel permits: 1 completed, 7 in progress, 2 never finaled. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Aug 2026 | 39 Cityview Wy | 1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service.Details
1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service. | $150,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 3155 Broderick St | unit 202: kitchen and hall bathroom remodel. like for like. no structual changes.Details
unit 202: kitchen and hall bathroom remodel. like for like. no structual changes. | $45,000 |
| Apr 20, 2026 | Completed final sign-off Oct 2026 | 555 06th Av | unit#a: remodel hallway & master bathroom, like to like, remodel kitchen, like to like, no structural change, replace 8 windows on the rear and lightwell (retrofit), no wall/framing modifications.Details
unit#a: remodel hallway & master bathroom, like to like, remodel kitchen, like to like, no structural change, replace 8 windows on the rear and lightwell (retrofit), no wall/framing modifications. | $75,000 |
| Feb 27, 2026 | In progress issued Mar 2026 | 1377 Post St | remodel of 3 bathrooms & 1 kitchen. like for like. no structural changes.Details
remodel of 3 bathrooms & 1 kitchen. like for like. no structural changes. | $100,000 |
| Nov 5, 2025 | In progress issued Nov 2025 | 4158 20th St | unit a: kitchen and bathroom remodel, no structual change, in kind, like for like replacement.Details
unit a: kitchen and bathroom remodel, no structual change, in kind, like for like replacement. | $35,000 |
| Sep 23, 2025 | In progress issued Sep 2025 | 4164 25th St | kitchen & bathroom remodel. no structural change.Details
kitchen & bathroom remodel. no structural change. | $30,000 |
| Mar 19, 2025 | In progress issued Mar 2025 | 2205 Pine St | front bldg - unit b: bathroom and kitchen remodel in kind at same location. no structural change. replace t-111 with hardie siding on east side and rear (approx. 1000 sf), replace 9 windows on the side and rear in kind in same location. repair leaking area on the roof. ( no visible on the street)Details
front bldg - unit b: bathroom and kitchen remodel in kind at same location. no structural change. replace t-111 with hardie siding on east side and rear (approx. 1000 sf), replace 9 windows on the side and rear in kind in same location. repair leaking area on the roof. ( no visible on the street) | $30,000 |
| Jul 3, 2023 | Never finaled filed Jul 2023, never issued | 2235 Sutter St | 1. add unit front of unit on first floor (one bedroom, living room, one bathroom and kitchen) 2. to comply with nov 202286846 3. new unit per "four-unit density exception for residential districts" ordinance 210-22Details
1. add unit front of unit on first floor (one bedroom, living room, one bathroom and kitchen) 2. to comply with nov 202286846 3. new unit per "four-unit density exception for residential districts" ordinance 210-22 | $80,000 |
| Jul 22, 2022 | Never finaled filed Jul 2022, never issued | 2235 Sutter St | add adu per california state program at front of unit on first floor(one bedroom, living room, one bathroom and kitchen and washer/dryer. to comply with notice of violation#202286846Details
add adu per california state program at front of unit on first floor(one bedroom, living room, one bathroom and kitchen and washer/dryer. to comply with notice of violation#202286846 | $80,000 |
| Aug 11, 2021 | In progress issued Aug 2025 | 949 Vienna St | horizontal and vertical addition to existing two story single family home. 2 bedroom & 2 bathroom, secondary kitchen (with 2 electric burners), & family room on first floor. second floor 2 bedroom and 2 bathroom remodel new third floor unit, 2 bedroom and 2 bathroom. project per sb9 and sb330.Details
horizontal and vertical addition to existing two story single family home. 2 bedroom & 2 bathroom, secondary kitchen (with 2 electric burners), & family room on first floor. second floor 2 bedroom and 2 bathroom remodel new third floor unit, 2 bedroom and 2 bathroom. project per sb9 and sb330. | $160,000 |