Golden State Marble And Construction Inc
- Based in
- San Mateo
- On San Francisco permits
- Aug 2021 to Jul 2026
- Last 24 months
- 17 permits filed
23 permits since 2000: 10 completed, 11 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 1 completed, 2 in progress. Typically 37 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Aug 2026 | 39 Cityview Wy | 1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service.Details
1st floor: add 2 bedrooms, family room and 2 bathrooms. 2nd floor: remodel kitchen and bathroom, add 1 bathroom and rear deck. replace new windows and doors per plan. upgrade service. | $150,000 |
| Mar 13, 2026 | Completed final sign-off Jul 2026 | 631 18th Av | two bathrooms remodel, in kind(downstairs and upstairs hall baths). no structural change. replace furnace, repair the rear deck, less 50%.Details
two bathrooms remodel, in kind(downstairs and upstairs hall baths). no structural change. replace furnace, repair the rear deck, less 50%. | $60,000 |
| Nov 9, 2023 | In progress issued Jun 2025 | 4160 25th St | add bathroom,laundry room, media room, stairs & lounge on 1st fl (4162 25th st).infill west light well & new deck on top of infileed deck on 3rd fl (4164 25th st). add 2 walls in basement. entire building to be equipped with automatic fire sprinkler type nfpa 13r throughoutDetails
add bathroom,laundry room, media room, stairs & lounge on 1st fl (4162 25th st).infill west light well & new deck on top of infileed deck on 3rd fl (4164 25th st). add 2 walls in basement. entire building to be equipped with automatic fire sprinkler type nfpa 13r throughout | $140,000 |