Block 5967, lot 012
325 Harvard St
- City’s use
- Single Family Residential
- Built
- 1961
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,967 sq ft
- Lot
- 2,748 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 325 Harvard St | revision to pa# 202205194640. 1st fl bathroom, closet, and storage reconfiguration.Details
revision to pa# 202205194640. 1st fl bathroom, closet, and storage reconfiguration. | ||
| Feb 22, 2023 | Completed final sign-off Jan 2024 | 325 Harvard St | Golden State Marble & Granite Inc. | replace front house 2 new aluminum clad wood windows at same location. rear windows 6 retrofit windows at same loction. 1 sliding door at same location. replace up stair bedrooms sheet rock and living room sheet rock on 2nd floor.Details
replace front house 2 new aluminum clad wood windows at same location. rear windows 6 retrofit windows at same loction. 1 sliding door at same location. replace up stair bedrooms sheet rock and living room sheet rock on 2nd floor. | $25,000 |
| May 19, 2022 | Completed final sign-off Jan 2024 | 325 Harvard St | Golden State Marble & Granite Inc. | add bathroom on 1st fl. add sink and electric top & refrigerator and family room @ 1st fl. remove stairs on 2nd fl, and reconfigure room & add one 20Details
add bathroom on 1st fl. add sink and electric top & refrigerator and family room @ 1st fl. remove stairs on 2nd fl, and reconfigure room & add one 20 | $80,000 |
| Mar 26, 2021 | Never finaled issued Mar 2021, no final | 325 Harvard St | kitchen remodel: no structural change. replace cabinets, countertops, floor, sink & fx=ixtures in same location.Details
kitchen remodel: no structural change. replace cabinets, countertops, floor, sink & fx=ixtures in same location. | $14,000 | |
| Feb 28, 2018 | Completed final sign-off Jun 2018 | 325 Harvard St | Christopher Wells Construction Inc. | comply with correction notice dated 2/26/18. repair and replace dry rot at rear wall as needed. no plans needed. rev. to original permit applic. #201711133781.Details
comply with correction notice dated 2/26/18. repair and replace dry rot at rear wall as needed. no plans needed. rev. to original permit applic. #201711133781. | $10,000 |
| Nov 13, 2017 | Completed final sign-off Sep 2018 | 325 Harvard St | Christopher Wells Construction Inc. | repair existing lower level extyerior, rear landing & stair less than 50% repair. replace existing upper level rear, exterior wood cantilevered deck in kind. all work is at rear of house, not visible from street.Details
repair existing lower level extyerior, rear landing & stair less than 50% repair. replace existing upper level rear, exterior wood cantilevered deck in kind. all work is at rear of house, not visible from street. | $15,000 |
| May 17, 2005 | Never finaled issued May 2005, no final | 325 Harvard St | Doan Construction | reroofingDetails
reroofing | $6,850 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.