H. Allen Gruen
- Listed as
- architect, engineer
- Based in
- Oakland
- On San Francisco permits
- Oct 2005 to Apr 2023
14 permits since 2000 (engineer on 13 permits, architect on 1 permit): 11 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2023 | Completed final sign-off Jun 2024 | 4234 24th St | Alex Builder Inc | excavation shoring for proposed apartment building, more than 50 cubic yard, ref approved pa# 201909262861.Details
excavation shoring for proposed apartment building, more than 50 cubic yard, ref approved pa# 201909262861. | $50,000 |
| Jun 21, 2022 | Completed final sign-off Oct 2022 | 232 Fillmore St | Case Pacific Company | permeation grouting at south side property line, work not visible from st.Details
permeation grouting at south side property line, work not visible from st. | $20,000 |
| Jun 27, 2019 | Completed final sign-off May 2021 | 1452 Broadway | Landmark Construction Inc. | temporary shoring of elevator pit and auto parking lifts. refer to original bpa #201405276744.Details
temporary shoring of elevator pit and auto parking lifts. refer to original bpa #201405276744. | $20,000 |
| Dec 6, 2017 | Completed final sign-off Apr 2021 | 856 Capp St | horizontal addtion & create new 9 units residential low-rise. retain (e) institutional structure.Details
horizontal addtion & create new 9 units residential low-rise. retain (e) institutional structure. | $2,545,000 | |
| Jun 27, 2017 | Completed final sign-off Aug 2018 | 37 Blake St | Ace Drilling & Excavation | provide temporary shoring consisting of soldier beams, lagging, walers and internal braces to accommodate foundation excavation.Details
provide temporary shoring consisting of soldier beams, lagging, walers and internal braces to accommodate foundation excavation. | $38,000 |
| Jul 9, 2014 | Completed final sign-off Nov 2020 | 2815 Polk St | Partners Contracting Inc., Design Line Construction, Nuport Construction Inc | to erect 3 stories, 1 basement, type iii-a, 3 units residential building.Details
to erect 3 stories, 1 basement, type iii-a, 3 units residential building. | $1,500,000 |
| May 23, 2014 | Completed final sign-off Dec 2015 | 911 Minnesota St | Cht Properties Development | comply with nov# 201399141 & 200838950. interior remodel of (e) residence. (e) building is 2 story. proposed structural will be 2 story, 3 bedrooms & 2 1/2 baths. no change to the size of the building envelope. no exterior work.Details
comply with nov# 201399141 & 200838950. interior remodel of (e) residence. (e) building is 2 story. proposed structural will be 2 story, 3 bedrooms & 2 1/2 baths. no change to the size of the building envelope. no exterior work. | $100,000 |
| Jan 30, 2014 | Completed final sign-off May 2015 | 35 Rico Wy | Cork Corporation | perimeation grouting of foundation wall next to 31 rico way (pa #2013.0211.9885).; compliance with ord. 155-13 not requiredDetails
perimeation grouting of foundation wall next to 31 rico way (pa #2013.0211.9885).; compliance with ord. 155-13 not required | $5,500 |
| Nov 18, 2011 | Expired or cancelled cancelled Jan 2020 | 619 Hayes St | replace (e) common foundation @ east property line (with 615 hayes st) & modify the shared sanitary sewer lines so that they cross east property line @ a lower elevation. this work is undertaken in connection with project @ the neighboring property (615 hyes st)Details
replace (e) common foundation @ east property line (with 615 hayes st) & modify the shared sanitary sewer lines so that they cross east property line @ a lower elevation. this work is undertaken in connection with project @ the neighboring property (615 hyes st) | $20,000 | |
| Nov 18, 2011 | Expired or cancelled cancelled May 2013 | 615 Hayes St | convert (e) lower level area to living area comprising reduced garage, study/guest room, laundry, bath & hall with new stair to (e) living area above. replace (e) common foundation & alterations to shared utilities require work 2 the adjacent property. work 2 619 hayes st under taken in connectionDetails
convert (e) lower level area to living area comprising reduced garage, study/guest room, laundry, bath & hall with new stair to (e) living area above. replace (e) common foundation & alterations to shared utilities require work 2 the adjacent property. work 2 619 hayes st under taken in connection | $150,000 | |
| Jun 10, 2010 | Completed final sign-off Sep 2018 | 5050 Mission St | James E Roberts-Obayashi Corporation | to erect 6 stories, no basement, 61 units of commerical & residential mix used building. includes mep and structural. f/a and sprinklers on separate permit.Details
to erect 6 stories, no basement, 61 units of commerical & residential mix used building. includes mep and structural. f/a and sprinklers on separate permit. | $11,500,000 |
| Jun 17, 2008 | Never finaled issued Dec 2008, no final | 746 Carolina St | temporary excavation shoring design.Details
temporary excavation shoring design. | $30,000 | |
| Apr 5, 2007 | Completed final sign-off Jul 2007 | 117 Moffitt St | deck repair, reinforce existing deck to secure it's footing on steep grade.Details
deck repair, reinforce existing deck to secure it's footing on steep grade. | $20,000 | |
| Oct 19, 2005 | Completed final sign-off Jun 2006 | 100 Buena Vista Tr | Peter Downey Construction Co., Inc. | install security gate & decorative rail across front of property,replace (e)metal rail,filling space at edge of front steps with metal studwall,clad in stucco.repair brick steps & landing on south side of house.Details
install security gate & decorative rail across front of property,replace (e)metal rail,filling space at edge of front steps with metal studwall,clad in stucco.repair brick steps & landing on south side of house. | $25,000 |