Block 3762, lot 014
528 Bryant St
- City’s use
- Industrial
- Built
- 1923
- Stories
- 2
- Rooms
- 4 bathrooms
- Building
- 5,000 sq ft
- Lot
- 3,837 sq ft
- Zoning
- MUO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2024 | Completed final sign-off Apr 2025 | 528 Bryant St | Vida De Colores Construction | revision to pa# 2023-0428-6756 pony wall detail with simpson rckw3 @ 24" o.c and storefront entry section concrete detail for new slab with #5 rebar @ 12" o.c each wayDetails
revision to pa# 2023-0428-6756 pony wall detail with simpson rckw3 @ 24" o.c and storefront entry section concrete detail for new slab with #5 rebar @ 12" o.c each way | $2,500 |
| Apr 28, 2023 | Completed final sign-off Apr 2025 | 528 Bryant St | Zack De Vito Inc, Vida De Colores Construction | change of land use from sales & service, nonretail - wholesale to office. building renovation for change of use including; alteration of facade for transparency by new glazing for lobby entry, (e) garage door to remain as loading area, interior demarkation of lobby from office space #1 with half ...Details
change of land use from sales & service, nonretail - wholesale to office. building renovation for change of use including; alteration of facade for transparency by new glazing for lobby entry, (e) garage door to remain as loading area, interior demarkation of lobby from office space #1 with half ... | |
| Jan 10, 2019 | Completed final sign-off Jan 2019 | 530 Bryant St | to obtain final inspection for work approved under pa # 201301178210. all work is complete.Details
to obtain final inspection for work approved under pa # 201301178210. all work is complete. | ||
| Jun 13, 2018 | Completed final sign-off Jun 2018 | 528 Bryant St | Tri Point Mprovements | rev to pa# 201804095874; roof-facing facade field built documentation for planning review as requested by dbi insp.clancy (e)( annex to remainDetails
rev to pa# 201804095874; roof-facing facade field built documentation for planning review as requested by dbi insp.clancy (e)( annex to remain | |
| May 4, 2018 | Never finaled issued May 2018, no final | 528 Bryant St | street spaceDetails
street space | ||
| Apr 9, 2018 | Completed final sign-off Jun 2018 | 528 Bryant St | Tri Point Mprovements | occupation of #528 by #530 tenant same use (comp. gaming demo/wholesales). new accessible toilet & wet bar per prior l.o.d. use is wholesale sales. maher naDetails
occupation of #528 by #530 tenant same use (comp. gaming demo/wholesales). new accessible toilet & wet bar per prior l.o.d. use is wholesale sales. maher na | $25,000 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 528 Bryant St | Tri Point Mprovements | bldg shell upgrades. new street & roof side alum. storefront system. removal of exg window, removal of annex appendage at roof. beam at 2nd floor. new cement plaster exterior at front facade & rear, roof side facade. parapet resolution. n/a for maher.Details
bldg shell upgrades. new street & roof side alum. storefront system. removal of exg window, removal of annex appendage at roof. beam at 2nd floor. new cement plaster exterior at front facade & rear, roof side facade. parapet resolution. n/a for maher. | $45,000 |
| Aug 31, 2017 | Completed final sign-off Jun 2018 | 530 Bryant St | Tri Point Mprovements | (n) hvac heat pump at lower roof. maher n/aDetails
(n) hvac heat pump at lower roof. maher n/a | $10,000 |
| Jul 7, 2016 | Completed final sign-off Jul 2016 | 530 Bryant St | Tri Point Mprovements | to obtain final inspection for work approved under pa# 201306240286. all work is complete.Details
to obtain final inspection for work approved under pa# 201306240286. all work is complete. | |
| Jun 2, 2015 | Completed final sign-off Jul 2016 | 530 Bryant St | Tri Point Mprovements | revision to 201306240286 new accessible ramp and exit door. confirm use as b and not m, gaming showroom, non retail maher not req.Details
revision to 201306240286 new accessible ramp and exit door. confirm use as b and not m, gaming showroom, non retail maher not req. | $6,000 |
| Jun 24, 2013 | Completed final sign-off Jul 2016 | 530 Bryant St | Tri Point Mprovements | change of use from auto repairs to mechantile, computer gaming demonstrations & wholesales. no hard ti. moveable furniture installation only. compliance w/ ordinance no. 155-13 no required.Details
change of use from auto repairs to mechantile, computer gaming demonstrations & wholesales. no hard ti. moveable furniture installation only. compliance w/ ordinance no. 155-13 no required. | $1,000 |
| Jun 7, 2013 | Completed final sign-off Jul 2013 | 530 Bryant St | 2) new ada compliant bathrooms (m&w) added to existing 1st floor shell space. new kitchenette, storage & janitor's closet.Details
2) new ada compliant bathrooms (m&w) added to existing 1st floor shell space. new kitchenette, storage & janitor's closet. | $45,000 | |
| Jan 17, 2013 | Completed final sign-off Jan 2019 | 530 Bryant St | Associated Builders | reroofingDetails
reroofing | $16,725 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tri Point Mprovements (7), Vida De Colores Construction (2), Associated Builders, Zack De Vito Inc
- Architects
- Mark Bucciarelli (5), James W. Zack (2)
- Engineers
- Nilgun A. Wolpe
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.