Neil Kaye
- Listed as
- architect, authorized agent-others
- Firm
- Natoma Architects Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Sep 2026
70 permits since 2000 (architect on 69 permits, authorized agent-others on 1 permit): 40 completed, 2 in progress, 18 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 285 Beacon St | Doran Construction & Design | renovation at 3rd fl and roof only. renovate mbr closet and dressing room. at 3rd fl deck replace damaged decking. minor renovation to kitchen. replace astro turf with granite at 3rd fl rear yard. install new spiral stair.Details
renovation at 3rd fl and roof only. renovate mbr closet and dressing room. at 3rd fl deck replace damaged decking. minor renovation to kitchen. replace astro turf with granite at 3rd fl rear yard. install new spiral stair. | $65,000 |
| Dec 12, 2025 | Completed final sign-off Jun 2026 | 1271 46th Av | Redhorse Constructors Inc. | revision to 202108166476. field change to upgrade structural wall and floor framing from wood to light gauge metal.Details
revision to 202108166476. field change to upgrade structural wall and floor framing from wood to light gauge metal. | |
| Nov 24, 2025 | In progress filed Nov 2025, not yet issued | 575 Kansas St | renovate existing bathroom all within existing building envelope. no additional workDetails
renovate existing bathroom all within existing building envelope. no additional work | $22,000 | |
| Jun 26, 2025 | Completed final sign-off Feb 2026 | 2343 Fillmore St | Vertex Builders Dba Signal Hill Builders | revision to pa #202407257315 to the lobby space only. changes pertain to finishes, arrangement of lobby millwork furniture and limited ceiling and lighting changes.Details
revision to pa #202407257315 to the lobby space only. changes pertain to finishes, arrangement of lobby millwork furniture and limited ceiling and lighting changes. | $100 |
| Aug 15, 2024 | Completed final sign-off Feb 2026 | 2343 Fillmore St | Vertex Builders Dba Signal Hill Builders | non structural interior improvement of (e) animal hospital. non-structural reconfiguration of lvl 1 & 2. ada compliance maintained throughout bldg. upgrade of (e) storefront windows to improve thermal performance & enhance storefront transparency in visibility zone. fire life safety deferred.Details
non structural interior improvement of (e) animal hospital. non-structural reconfiguration of lvl 1 & 2. ada compliance maintained throughout bldg. upgrade of (e) storefront windows to improve thermal performance & enhance storefront transparency in visibility zone. fire life safety deferred. | $2,650,000 |
| Feb 6, 2024 | Completed final sign-off Feb 2025 | 2343 Fillmore St | Blueline Associates Inc | renovation of existing interior garage for use in medical imaging.Details
renovation of existing interior garage for use in medical imaging. | $200,399 |
| Nov 7, 2023 | Completed final sign-off Nov 2023 | 500 19th St | to comply w/ nov 202286907. document the installed chainlink fence & gate along the perimeter of the vacant lot. remove storing automobiles, revert to vacant lot.Details
to comply w/ nov 202286907. document the installed chainlink fence & gate along the perimeter of the vacant lot. remove storing automobiles, revert to vacant lot. | $7,000 | |
| Jul 28, 2023 | Expired or cancelled expired Jun 2026 | 1273 46th Av | Redhorse Constructors Inc. | revision to bpa#202111243105, correct fire/life safety summary on page a0.0a, to correctly reference code section crc 309.Details
revision to bpa#202111243105, correct fire/life safety summary on page a0.0a, to correctly reference code section crc 309. | |
| Jul 28, 2023 | Never finaled issued Aug 2023, no final | 1271 46th Av | Redhorse Constructors Inc. | revision to bpa#202108166476, correct fire/life safety summary on page a0.0a, to correctly reference code section crc 309.Details
revision to bpa#202108166476, correct fire/life safety summary on page a0.0a, to correctly reference code section crc 309. | |
| Jul 20, 2023 | Completed final sign-off Nov 2024 | 74 New Montgomery St | remodel 1 unit in a 7 story residential apartment building. remodel kitchen and baths. minor alteration of some wallsDetails
remodel 1 unit in a 7 story residential apartment building. remodel kitchen and baths. minor alteration of some walls | $235,121 | |
| May 24, 2023 | Completed final sign-off May 2025 | 164 South Park | Tipco Construction Inc | improvements to bldg facade to improve access & address sf planning storefront transparency guidelines for commercial businesses. limited to exterior improvements to bldg facade at the south park frontage. imrpovements have no impact on bldg layout, heigh, bldg area, use/occupancy.Details
improvements to bldg facade to improve access & address sf planning storefront transparency guidelines for commercial businesses. limited to exterior improvements to bldg facade at the south park frontage. imrpovements have no impact on bldg layout, heigh, bldg area, use/occupancy. | $179,615 |
| May 8, 2023 | Completed final sign-off Jul 2023 | 1271 46th Av | Redhorse Constructors Inc. | installation of helical pile foundations for the approved addenda 2021-0818-66476; the helical piles will be installed at a depth of no less than 25' and to the capacity value dictated by the approved structual drawings, calculations and manufacturer specificationDetails
installation of helical pile foundations for the approved addenda 2021-0818-66476; the helical piles will be installed at a depth of no less than 25' and to the capacity value dictated by the approved structual drawings, calculations and manufacturer specification | $20,000 |
| Dec 16, 2022 | Never finaled filed Dec 2022, never issued | 67 Belcher St | to erect a 5-story, 31-dwelling units, type 3a, residential building.Details
to erect a 5-story, 31-dwelling units, type 3a, residential building. | $14,000,000 | |
| Dec 16, 2022 | Never finaled filed Dec 2022, never issued | 67 Belcher St | to demolish a 2-story, mixed-used, type v building.Details
to demolish a 2-story, mixed-used, type v building. | $100,000 | |
| Nov 22, 2022 | Completed final sign-off Apr 2023 | 555 19th St | Modern Construction Inc | interior t.i. includes 2 new accessible shingle user shower rooms with one shower and one lavatory each on level one.Details
interior t.i. includes 2 new accessible shingle user shower rooms with one shower and one lavatory each on level one. | $28,000 |
| Nov 24, 2021 | Completed final sign-off Jun 2026 | 1273 46th Av | Redhorse Constructors Inc. | (rear bldg) alteration of existing rear one bedroom unit. unit will be renovated to studio. work is part of new construction project under pa #202108166476.Details
(rear bldg) alteration of existing rear one bedroom unit. unit will be renovated to studio. work is part of new construction project under pa #202108166476. | |
| Aug 16, 2021 | Completed final sign-off Jun 2026 | 1271 46th Av | Redhorse Constructors Inc. | erect new 4-story type-v 1 family dwelling unitDetails
erect new 4-story type-v 1 family dwelling unit | $1,200,000 |
| Aug 13, 2021 | Completed final sign-off Jun 2026 | 1271 46th Av | Redhorse Constructors Inc. | demolish existing type-v two family dwelling, two story building.Details
demolish existing type-v two family dwelling, two story building. | $39,000 |
| May 25, 2021 | Never finaled issued Dec 2021, no final | 1 Avenue Of The Palms | Blach+Cahill Joint Venture | priority processing per mayor ed #17-02 to erect 5 stories 1 basement, type v-a over 1-a w/ 3hr podium 117 residential units, 3 retail shell spaces on ground floor, garage with 59 stalls and storage in the basement. treasure island parcel b1Details
priority processing per mayor ed #17-02 to erect 5 stories 1 basement, type v-a over 1-a w/ 3hr podium 117 residential units, 3 retail shell spaces on ground floor, garage with 59 stalls and storage in the basement. treasure island parcel b1 | $55,000,000 |
| Feb 27, 2021 | Never finaled filed Feb 2021, never issued | 224 Clara St | to erect 5 stories, no basement, type iii-a, 9 units multi family house.Details
to erect 5 stories, no basement, type iii-a, 9 units multi family house. | $4,500,000 | |
| Feb 27, 2021 | Never finaled filed Feb 2021, never issued | 228 Clara St | to demolish 2 story single family.Details
to demolish 2 story single family. | $15,000 | |
| Jan 5, 2021 | Never finaled issued Aug 2021, no final | 5600 Geary Bl | Evra Construction | prop h t.i. to convert (e) vacant bldg from m, b occupancy to a-3. place of worship with 100 occupants. increase plumbing fixture count in accessible restrooms.Details
prop h t.i. to convert (e) vacant bldg from m, b occupancy to a-3. place of worship with 100 occupants. increase plumbing fixture count in accessible restrooms. | $2,000 |
| Sep 26, 2020 | Completed final sign-off Oct 2023 | 350 11th St | Carolan Construction | revision to pa #201504224291-s2, revise 1st floor to add elevator control room and also add an elevator hoistway sprinkler access door at roof.Details
revision to pa #201504224291-s2, revise 1st floor to add elevator control room and also add an elevator hoistway sprinkler access door at roof. | $5,000 |
| Feb 18, 2020 | Expired or cancelled cancelled Dec 2023 | 2146 03rd St | Singh Construction | alter site permit to 2014-0106-5657s w/ increased elevator penthouse size.**maher n/a**Details
alter site permit to 2014-0106-5657s w/ increased elevator penthouse size.**maher n/a** | |
| Feb 3, 2020 | Completed final sign-off Oct 2023 | 350 11th St | Carolan Construction | revision to pa #201504224291-s2, change detail of rear windows and planter box at rear.Details
revision to pa #201504224291-s2, change detail of rear windows and planter box at rear. | $10,000 |
| Jan 31, 2020 | Completed final sign-off Nov 2020 | 347 Grant Av | interior upgrade and barrier removal of existing tenant space, basement and ground levels, 2 viewing room, 1 empoyee break room, 2 employee offices, 1 art wallDetails
interior upgrade and barrier removal of existing tenant space, basement and ground levels, 2 viewing room, 1 empoyee break room, 2 employee offices, 1 art wall | $97,542 | |
| Dec 18, 2019 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Assoc Inc. | revision to pa# 2018-0216-1503 s3: to include permanent gate at entry to court 2 on hooper; additional permanent gate at entry to court 2 on channel st; and temporary gates out of 184 hooper while court 2 is under counstructionDetails
revision to pa# 2018-0216-1503 s3: to include permanent gate at entry to court 2 on hooper; additional permanent gate at entry to court 2 on channel st; and temporary gates out of 184 hooper while court 2 is under counstruction | $300,000 |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 188 Hooper St | Nibbi Bros Assoc Inc. | assembly permit ref 201802161503 s3Details
assembly permit ref 201802161503 s3 | |
| Sep 6, 2019 | Expired or cancelled expired Nov 2024 | 4112 21st St | J Reilly Construction | alter site: admin permit to pa#201705096079, correct permit form slope of work: "remodel and addition to an existing single family residence from 1009 sq ft to 3475 sq ft" work includes new basement, new 3rd floor addition, remodel of all existing bath, bedroom and kitchen. basement height 27'-7".Details
alter site: admin permit to pa#201705096079, correct permit form slope of work: "remodel and addition to an existing single family residence from 1009 sq ft to 3475 sq ft" work includes new basement, new 3rd floor addition, remodel of all existing bath, bedroom and kitchen. basement height 27'-7". | |
| Aug 27, 2019 | Never finaled issued Aug 2020, no final | 390 Stonecrest Dr | Valley Home Builders Inc | addition on the rear 161 sq ft. first fl of an existing 2 story single family residence and remodel master bedroom and master bathDetails
addition on the rear 161 sq ft. first fl of an existing 2 story single family residence and remodel master bedroom and master bath | $75,000 |
| Nov 8, 2018 | Never finaled issued Nov 2019, no final | 255 Shipley St | Arcon Construction Corp | demolish a type 3, 2-story auto repair bldg.Details
demolish a type 3, 2-story auto repair bldg. | $8,000 |
| Nov 8, 2018 | Never finaled issued Sep 2021, no final | 255 Shipley St | Arcon Construction Corp | erect a type 5, 4-story, one basement mixed use bldg with 24 residential units. new bldg will be on both lots 070 & 071. **comply w/ maher ord 155-13, route to dph**Details
erect a type 5, 4-story, one basement mixed use bldg with 24 residential units. new bldg will be on both lots 070 & 071. **comply w/ maher ord 155-13, route to dph** | $7,850,000 |
| Aug 10, 2018 | Completed final sign-off Oct 2018 | 188 Hooper St | Ferma Corporation, Nibbi Bros Assoc Inc. | bldg 3. demolition of a one-story, type iib building. maher n/a. (ref:bldg 1 - demo appl# 2018-02-16-1494).Details
bldg 3. demolition of a one-story, type iib building. maher n/a. (ref:bldg 1 - demo appl# 2018-02-16-1494). | |
| Aug 10, 2018 | Completed final sign-off Oct 2018 | 188 Hooper St | Ferma Corporation, Nibbi Bros Assoc Inc. | bldg 2. demolition of a one-story, type iib building. maher n/a. ref bldg 1 - demo appl# 2018-02-16-1494.Details
bldg 2. demolition of a one-story, type iib building. maher n/a. ref bldg 1 - demo appl# 2018-02-16-1494. | |
| May 14, 2018 | Never finaled issued Jul 2018, no final | 1726 Mission St | Ace Drilling & Excavation | to demolish 2 stories, warehouse building. ** maher: n/a **Details
to demolish 2 stories, warehouse building. ** maher: n/a ** | $25,000 |
| May 14, 2018 | Never finaled issued Jul 2018, no final | 1730 Mission St | Ace Drilling & Excavation | to demolish 2 stories, warehouse building. ** maher: n/a **Details
to demolish 2 stories, warehouse building. ** maher: n/a ** | $25,000 |
| Feb 16, 2018 | Completed final sign-off Apr 2021 | 188 Hooper St | Nibbi Bros Assoc Inc. | to erect 5 stories, no basement, type iii-b over i-a, 280 dwelling unit building for residential student housing. (r-2,a-2,s-2) maher ordinance comply.Details
to erect 5 stories, no basement, type iii-b over i-a, 280 dwelling unit building for residential student housing. (r-2,a-2,s-2) maher ordinance comply. | $28,600,000 |
| Feb 16, 2018 | Completed final sign-off Oct 2018 | 188 Hooper St | Ferma Corporation, Nibbi Bros Assoc Inc. | bldg 1. priority processing. demolition of a one-story, type iib building. maher n/a.Details
bldg 1. priority processing. demolition of a one-story, type iib building. maher n/a. | $120,000 |
| Feb 7, 2018 | Completed final sign-off Jun 2019 | 555 19th St | Modern Construction Inc | minor remodel of existing industrial space to provide small enclosed workshop spaces w/ doors/partitions, a remodeled break area, and conversion of urinals to toilet in two bathrooms 1st, 2nd, 3rd floor. maher ord 155-13 naDetails
minor remodel of existing industrial space to provide small enclosed workshop spaces w/ doors/partitions, a remodeled break area, and conversion of urinals to toilet in two bathrooms 1st, 2nd, 3rd floor. maher ord 155-13 na | $35,000 |
| Jan 26, 2018 | Completed final sign-off May 2018 | 797 22nd St | Oliver & Company Inc. | revision to pa 2017-0110-6839 scope is to revise (n) window sizes to fit (e) rough openings as measured after removal of interior finishes. keep (e) window #7. change entry doors to wood frame glass. changes shownDetails
revision to pa 2017-0110-6839 scope is to revise (n) window sizes to fit (e) rough openings as measured after removal of interior finishes. keep (e) window #7. change entry doors to wood frame glass. changes shown | |
| Dec 19, 2017 | Never finaled issued Jul 2018, no final | 1726 Mission St | Henry J Rabbitt & Sons Inc | to erect 6 stories, no basement, type iiia, 40 unit apartment building with garage and retail (r-2,m,s-2) on two lots 3532/004a & 005. ** maher: n/a **Details
to erect 6 stories, no basement, type iiia, 40 unit apartment building with garage and retail (r-2,m,s-2) on two lots 3532/004a & 005. ** maher: n/a ** | $9,000,000 |
| Jun 8, 2017 | Completed final sign-off Feb 2020 | 340 11th St | Ace Drilling & Excavation | demolition of a 2-story commercial building with no basements. n/a for maher ordinance.Details
demolition of a 2-story commercial building with no basements. n/a for maher ordinance. | $100,000 |
| May 9, 2017 | Expired or cancelled expired Nov 2024 | 4112 21st St | J Reilly Construction, Hugo Tejada/Dba Alpha & Omega Renovation | remodel & addition to (e) 1006 sf residence to 3443 sf. all bedrooms, bathrooms & kitchens are to be remodeled. bath increase 1 to 2.5 & bedroom increase from 2 to 5.Details
remodel & addition to (e) 1006 sf residence to 3443 sf. all bedrooms, bathrooms & kitchens are to be remodeled. bath increase 1 to 2.5 & bedroom increase from 2 to 5. | $550,000 |
| Jan 10, 2017 | Completed final sign-off May 2018 | 797 22nd St | Oliver & Company Inc. | exterior facade work only. install 5 new windows in boarded up openings, remove 2 doors-change one to single door, remove one vent & window repair/replace wood siding to match existing. ** maher: n/a **Details
exterior facade work only. install 5 new windows in boarded up openings, remove 2 doors-change one to single door, remove one vent & window repair/replace wood siding to match existing. ** maher: n/a ** | $25,000 |
| Oct 17, 2016 | Completed final sign-off Mar 2017 | 48 Whitney St | Arcon Construction Corp | facade replacements - new 42" guardrail to replace (e) 30" deteriorated railing; replace 2 front doors with (n) glazed doors; replace garage door with similar door with etched glass.Details
facade replacements - new 42" guardrail to replace (e) 30" deteriorated railing; replace 2 front doors with (n) glazed doors; replace garage door with similar door with etched glass. | $5,000 |
| Apr 18, 2016 | Expired or cancelled withdrawn Jun 2017 | 694 Tennessee St | renovation & addition of (e) single fam home to (n) 2 unit dwelling, scope include converting basement into (n) occupied space & addition of (n) penthouse, (e) rear deck to be removed for yard spaceDetails
renovation & addition of (e) single fam home to (n) 2 unit dwelling, scope include converting basement into (n) occupied space & addition of (n) penthouse, (e) rear deck to be removed for yard space | $350,000 | |
| Apr 12, 2016 | Expired or cancelled cancelled Nov 2022 | 203 Cotter St | to erect two stories, no basememnt, private elementary, middle school.Details
to erect two stories, no basememnt, private elementary, middle school. | $1,500,000 | |
| Feb 26, 2016 | Completed final sign-off Jun 2023 | 603 Tennessee St | Arcon Construction Corp | to erect 6 stories, no basement, type iii-a over i-a, 24 residential units with mixed used building. (r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil. route to dph**Details
to erect 6 stories, no basement, type iii-a over i-a, 24 residential units with mixed used building. (r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil. route to dph** | $3,000,000 |
| Feb 26, 2016 | Completed final sign-off May 2022 | 603 Tennessee St | Arcon Construction Corp | demolish 2-story, type 5, warehouse building.Details
demolish 2-story, type 5, warehouse building. | $10,000 |
| Dec 9, 2015 | Never finaled issued Nov 2018, no final | 469 Eddy St | Js Sullivan Construction Inc | vertical addition. historic restoration of (e) bldg: construction of an 6 story, 65 ft tall, 32,600 sf mixed use residential-commercial bldg. new bldg will include 29 dwelling units , approx 450 sf of ground flr commerical space & parking garage for 7 cars. n/a for maher ordinance.155-13Details
vertical addition. historic restoration of (e) bldg: construction of an 6 story, 65 ft tall, 32,600 sf mixed use residential-commercial bldg. new bldg will include 29 dwelling units , approx 450 sf of ground flr commerical space & parking garage for 7 cars. n/a for maher ordinance.155-13 | $6,700,000 |
| Nov 12, 2015 | Expired or cancelled expired Oct 2022 | 2740 Mcallister St | J M Construction Llc | vertical addition: renovate (e) 1 unit residential bldg add-2 units for total of 3 units. 9 bedrooms & 6 bathrooms for all units.Details
vertical addition: renovate (e) 1 unit residential bldg add-2 units for total of 3 units. 9 bedrooms & 6 bathrooms for all units. | $250,000 |
| Sep 17, 2015 | Completed final sign-off Jun 2016 | 1117 Ocean Av | change of use permit. no work. see drawing notes. change of use from (e) office to residential unit 10. add bicycle rack at existing parking stall.Details
change of use permit. no work. see drawing notes. change of use from (e) office to residential unit 10. add bicycle rack at existing parking stall. | $12,000 | |
| Sep 14, 2015 | Completed final sign-off Apr 2016 | 1144 Montgomery St | remodel unit #1144b - interior bath & kitchen renovation (relocation). add washer/dryer & dishwasher. no change in occupancy, all renovations within existing bldg envelope.Details
remodel unit #1144b - interior bath & kitchen renovation (relocation). add washer/dryer & dishwasher. no change in occupancy, all renovations within existing bldg envelope. | $65,000 | |
| May 8, 2015 | Never finaled issued Oct 2015, no final | 621 Stockton St | K G Builder | penthouse, unit #301 - project to include interior renovation of existing penthouse unit within existing building, remodel and relocation of kitchen, laundry and master bedroom. remodel of bathroom & bedrooms. no change in occupancy or use. n/a ordinance #155-13Details
penthouse, unit #301 - project to include interior renovation of existing penthouse unit within existing building, remodel and relocation of kitchen, laundry and master bedroom. remodel of bathroom & bedrooms. no change in occupancy or use. n/a ordinance #155-13 | $90,000 |
| May 8, 2015 | Expired or cancelled cancelled Jan 2026 | 1305 Lombard St | #3- interior renovation, proect to include relocation & remodel of existing kitchen & bathroom, remodel (e) bedroom & bath, add office & bathroom. all renovation within existing unit and not to exceed existing building envelope. n/a ordinance #155-13Details
#3- interior renovation, proect to include relocation & remodel of existing kitchen & bathroom, remodel (e) bedroom & bath, add office & bathroom. all renovation within existing unit and not to exceed existing building envelope. n/a ordinance #155-13 | $60,000 | |
| May 8, 2015 | Expired or cancelled cancelled Jan 2026 | 1305 Lombard St | #5- interior renovation, proect to include relocation & remodel of existing kitchen & bathroom, remodel (e) bedroom & bath, add office & bathroom. all renovation within existing unit and not to exceed existing building envelope. no change in occupancy/use. n/a ordinance #155-13Details
#5- interior renovation, proect to include relocation & remodel of existing kitchen & bathroom, remodel (e) bedroom & bath, add office & bathroom. all renovation within existing unit and not to exceed existing building envelope. no change in occupancy/use. n/a ordinance #155-13 | $60,000 | |
| May 8, 2015 | Expired or cancelled cancelled Jan 2026 | 1305 Lombard St | #1- interior renovation, proect to include relocation & remodel of existing kitchen & bathroom, remodel (e) bedroom & bath, add office & bathroom. all renovation within existing unit and not to exceed existing building envelope. n/a ordinance #155-13Details
#1- interior renovation, proect to include relocation & remodel of existing kitchen & bathroom, remodel (e) bedroom & bath, add office & bathroom. all renovation within existing unit and not to exceed existing building envelope. n/a ordinance #155-13 | $60,000 | |
| Oct 17, 2014 | Completed final sign-off Mar 2017 | 48 Whitney St | Arcon Construction Corp | 1 story vertical addition on (e) 2 story house over basement & horizontal addition extending into rear yard. remodel living areas. kitchen, bedrooms, bathrooms. add 1 bedroom.Details
1 story vertical addition on (e) 2 story house over basement & horizontal addition extending into rear yard. remodel living areas. kitchen, bedrooms, bathrooms. add 1 bedroom. | $500,000 |
| Aug 13, 2014 | Never finaled issued Jul 2016, no final | 2209 09th Av | excavate unfinished basement 600 sq. ft. install new stair & replace (e) stair. install 3 new windows. create new bedrm, den & one full bath at basement.Details
excavate unfinished basement 600 sq. ft. install new stair & replace (e) stair. install 3 new windows. create new bedrm, den & one full bath at basement. | $50,000 | |
| Jun 23, 2014 | Completed final sign-off Mar 2025 | 2100 Mission St | Rf Fire Alarm Llc, The Toboni Group | to erect 6 stories, no basement, type i-a / iii-a, 28 units residential, ground floor commercial building.Details
to erect 6 stories, no basement, type i-a / iii-a, 28 units residential, ground floor commercial building. | $7,500,000 |
| Apr 30, 2014 | Completed final sign-off Oct 2014 | 524 02nd St | interior tenant improvement, new non-structural, non rated partitions, accessible wc, accessible break area. n/a ordinance#155-13.Details
interior tenant improvement, new non-structural, non rated partitions, accessible wc, accessible break area. n/a ordinance#155-13. | $32,500 | |
| Dec 30, 2013 | Completed final sign-off Jun 2014 | 400 South Van Ness Av | Js Sullivan Construction Inc | revision to pa#201111038205 s1 shotcrete wall along south van ness neighbor side approx 124 ft and 15th st side approx 35 ft in lieu of wood frame wall. revise planter per plan, revise bathroom doors per plan.Details
revision to pa#201111038205 s1 shotcrete wall along south van ness neighbor side approx 124 ft and 15th st side approx 35 ft in lieu of wood frame wall. revise planter per plan, revise bathroom doors per plan. | $3,000 |
| Dec 5, 2013 | Completed final sign-off Feb 2014 | 555 19th St | Simply Building Inc | revision to counter and cabinetry of break area of pa# 201302200511.Details
revision to counter and cabinetry of break area of pa# 201302200511. | |
| Dec 3, 2013 | Completed final sign-off Mar 2016 | 50 Oakwood St | Arcon Construction Corp | renovation, addition & facade improvements to an (e) 3 story, 2 units residential building. project will include a horizontal addition into the rear of the property. a small horizontal addition @ front & vertical addition of a 4th floor that is set back from the front & rear of the project.Details
renovation, addition & facade improvements to an (e) 3 story, 2 units residential building. project will include a horizontal addition into the rear of the property. a small horizontal addition @ front & vertical addition of a 4th floor that is set back from the front & rear of the project. | $1,300,000 |
| Jul 12, 2013 | Completed final sign-off Dec 2013 | 599 02nd St | ground floor interior tenant improvement consisting of new partitions @ mezzanine & sliding doors @ both levles.Details
ground floor interior tenant improvement consisting of new partitions @ mezzanine & sliding doors @ both levles. | $35,000 | |
| Aug 3, 2012 | Completed final sign-off Mar 2015 | 8 Octavia St | Cannon Constructors North Inc | erect 47 units, 8 stories, parking, zxc type 1 new building.Details
erect 47 units, 8 stories, parking, zxc type 1 new building. | $12,500,000 |
| Nov 3, 2011 | Completed final sign-off Jun 2014 | 400 South Van Ness Av | to erect 5 story over 1 basement, 40 units residential & commercial building.Details
to erect 5 story over 1 basement, 40 units residential & commercial building. | $3,000,000 | |
| Dec 23, 2010 | Completed final sign-off Jan 2015 | 1875 Mission St | Cullinane Plastering | adaptive re-use of (e) 4 story concrete framed building. change of use from storage to mixed use (primary residential-r2)Details
adaptive re-use of (e) 4 story concrete framed building. change of use from storage to mixed use (primary residential-r2) | $1,500,000 |
| Aug 29, 2006 | Completed final sign-off Apr 2014 | 1080 Sutter St | erect 11 stories, 35 dwelling units mixed use building.Details
erect 11 stories, 35 dwelling units mixed use building. | $2,500,000 | |
| Jun 5, 2001 | Never finaled issued Dec 2001, no final | 3937 23rd St | (n) second floor vertical addition at (e) bathroom, )n) roof deck at (e) roof at rearDetails
(n) second floor vertical addition at (e) bathroom, )n) roof deck at (e) roof at rear | $50,000 |