Block 3753, lot 070
255 Shipley St
- City’s use
- Industrial
- Built
- 1923
- Stories
- 1
- Rooms
- 2 bathrooms
- Building
- 8,500 sq ft
- Lot
- 7,749 sq ft
- Zoning
- MUR
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2020 | Completed final sign-off Jun 2025 | 255 Shipley St | B B J Electric, Inc | provide an emergency radio responder coverage system that meets state & local requirements. ref. 2015-1231-6246 sb-7 / 2015-1231-6246 sb-8.Details
provide an emergency radio responder coverage system that meets state & local requirements. ref. 2015-1231-6246 sb-7 / 2015-1231-6246 sb-8. | $35,000 |
| Aug 30, 2019 | Never finaled filed Aug 2019, never issued | 255 Shipley St | Arcon Construction Corp | installing of a storm water system. ref pa# 2018-1108-5435.Details
installing of a storm water system. ref pa# 2018-1108-5435. | |
| Nov 8, 2018 | Never finaled issued Sep 2021, no final | 255 Shipley St | Arcon Construction Corp | erect a type 5, 4-story, one basement mixed use bldg with 24 residential units. new bldg will be on both lots 070 & 071. **comply w/ maher ord 155-13, route to dph**Details
erect a type 5, 4-story, one basement mixed use bldg with 24 residential units. new bldg will be on both lots 070 & 071. **comply w/ maher ord 155-13, route to dph** | $7,850,000 |
| Nov 8, 2018 | Never finaled issued Nov 2019, no final | 255 Shipley St | Arcon Construction Corp | demolish a type 3, 2-story auto repair bldg.Details
demolish a type 3, 2-story auto repair bldg. | $8,000 |
| Sep 6, 2013 | Completed final sign-off Nov 2013 | 255 Shipley St | relocate extg spray paint booth in address location body shop within non-accessible required workshop areaDetails
relocate extg spray paint booth in address location body shop within non-accessible required workshop area | $10,000 | |
| Mar 4, 2013 | Completed final sign-off Nov 2013 | 255 Shipley St | H Construction Co | barrier removal, enlarge entry door to comply w/ada requirement.Details
barrier removal, enlarge entry door to comply w/ada requirement. | $40,000 |
| Jan 25, 2013 | Completed final sign-off Aug 2013 | 255 Shipley St | H Construction Co | reroofingDetails
reroofing | $3,500 |
| Jan 24, 2013 | Completed final sign-off Nov 2013 | 255 Shipley St | t.i. spray booth accessible entry and bathroom. new office and counter. (change of use: f-1 to s-1 with new spray booth).spray boot installation under seperate permit. m.e.p. under separate permit.Details
t.i. spray booth accessible entry and bathroom. new office and counter. (change of use: f-1 to s-1 with new spray booth).spray boot installation under seperate permit. m.e.p. under separate permit. | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Arcon Construction Corp (3), H Construction Co (2), B B J Electric, Inc
- Architects
- Neil Kaye (2)
- Engineers
- Igor Kleyner
- Authorized agent-otherss
- Ahmad Mohazab (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.