Igor Kleyner
- License
- C62621
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C62621 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Aug 2019 to Sep 2026
2 permits since 2000 (engineer on 2 permits): 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Arcon Construction Corp, Peak General Contractors Inc
- Engineers
- Maheed Mirpoor
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 65 Ramona Av | Peak General Contractors Inc | perform corrective measures to address notice of violation complaint no 2026621189. associated bld permit 202207128248. selective/sequenced demo,removal,replacement of e unreinforced selective and sequenced demolition, removal, placement of e uneinforced footings and slabs in the existing basement.Details
perform corrective measures to address notice of violation complaint no 2026621189. associated bld permit 202207128248. selective/sequenced demo,removal,replacement of e unreinforced selective and sequenced demolition, removal, placement of e uneinforced footings and slabs in the existing basement. | $10,000 |
| Aug 30, 2019 | Never finaled filed Aug 2019, never issued | 255 Shipley St | Arcon Construction Corp | installing of a storm water system. ref pa# 2018-1108-5435.Details
installing of a storm water system. ref pa# 2018-1108-5435. |