Kevin Morton
- Listed as
- architect, designer, engineer
- Firm
- Hohbach-Lewin Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Sep 2026
33 permits since 2000 (engineer on 31 permits, architect on 1 permit, designer on 1 permit): 20 completed, 12 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 400 Pacific Av | basement & 1st floor partial seismic upgrades, ada accessibility upgrades, office ti. mep under separate permits.Details
basement & 1st floor partial seismic upgrades, ada accessibility upgrades, office ti. mep under separate permits. | $300,000 | |
| Jul 6, 2026 | In progress filed Jul 2026, not yet issued | 402 Jackson St | new 510sf roof deck and (e) exterior fire escape/landing revision per ab-019. see 2025-012106coa & a0.5 for prior coa approval.Details
new 510sf roof deck and (e) exterior fire escape/landing revision per ab-019. see 2025-012106coa & a0.5 for prior coa approval. | $150,000 | |
| Jun 16, 2026 | In progress issued Jul 2026 | 120 Grant Av | Sajo, Inc. | revision to pa#: 202506279718. demo (e) and replace subfloor (phase 2 south floor area).Details
revision to pa#: 202506279718. demo (e) and replace subfloor (phase 2 south floor area). | $10,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 120 Grant Av | Sajo, Inc. | barricade (only) for replacement of door in storefront ref 2025-0710-9261Details
barricade (only) for replacement of door in storefront ref 2025-0710-9261 | $5,000 |
| Jun 10, 2026 | In progress filed Jun 2026, not yet issued | 657 Arkansas St | 1st fl: renovate (e) bedroom closets, bathroom and home office. 2nd fl: renovate (e) kitchen and dining areas, remove and replace (e) wood burning fireplace with new gas fp and add 2new skylights. replace (e) house gas furnace with new heat pump and replace (e). replace (e) tank water heater with neDetails
1st fl: renovate (e) bedroom closets, bathroom and home office. 2nd fl: renovate (e) kitchen and dining areas, remove and replace (e) wood burning fireplace with new gas fp and add 2new skylights. replace (e) house gas furnace with new heat pump and replace (e). replace (e) tank water heater with ne | $235,000 | |
| Jun 2, 2026 | In progress issued Jun 2026 | 1 Sansome St | Fuel Oil System | install 2000 gallon fiberglass-coated-steel double wall ust in sidewalk to replace ust removal bpa 202602256471. install new pump and pipe to connect new ust to existing day tank. install new panel control and sensors for leak detection, overfill protection, and vacuum moritoringDetails
install 2000 gallon fiberglass-coated-steel double wall ust in sidewalk to replace ust removal bpa 202602256471. install new pump and pipe to connect new ust to existing day tank. install new panel control and sensors for leak detection, overfill protection, and vacuum moritoring | $100,000 |
| May 5, 2026 | In progress issued Sep 2026 | 350 Bush St | Novo Construction Inc | fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring.Details
fl: 4 & 5: installation of 6 (e) phone boots and their associated anchoring. | $6,500 |
| Apr 3, 2026 | In progress issued Jun 2026 | 555 09th St | P S R West Coast Builders Inc | back of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024Details
back of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024 | $400,000 |
| Dec 22, 2025 | In progress issued Aug 2026 | 402 Jackson St | Rod Heisler Construction | voluntary seismic upgrade -no exterior changes proposed.Details
voluntary seismic upgrade -no exterior changes proposed. | $400,000 |
| Sep 22, 2025 | Completed final sign-off Oct 2025 | 200 Powell St | Pacific Wide Builders Inc. | revision to 202507020036: structural detail & calculation provided for new suspended light boxDetails
revision to 202507020036: structural detail & calculation provided for new suspended light box | |
| Jan 3, 2025 | In progress filed Jan 2025, not yet issued | 2201 Broadway | D Kelly Construction Inc. | repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage.Details
repair of (e) exit stair; wood rot remediation and replacement of roofing with minor modification to roof drainage. | $25,000 |
| Sep 30, 2024 | Completed final sign-off Jan 2025 | 2741 16th St | P S R West Coast Builders Inc | installing of a temporary pre fabricated vibration test room housing vibration test equipment. accessory to the existing light manufacturing use on the adjacemnt property. ref pa 201211214631Details
installing of a temporary pre fabricated vibration test room housing vibration test equipment. accessory to the existing light manufacturing use on the adjacemnt property. ref pa 201211214631 | $18,000 |
| Aug 29, 2024 | In progress issued Aug 2024 | 5 Lucerne St | Everest Waterproofing & Restoration Inc. | facade repairs to the west side of the subject property of areas of dryrot. wood framing to be removed and replaced in kind per the original construction (1991 ubc) per charter 4 of the 2022 sfebc. maintain fire rating. approx 2500 sf of affected area.Details
facade repairs to the west side of the subject property of areas of dryrot. wood framing to be removed and replaced in kind per the original construction (1991 ubc) per charter 4 of the 2022 sfebc. maintain fire rating. approx 2500 sf of affected area. | $32,000 |
| Jun 12, 2024 | In progress filed Jun 2024, not yet issued | 150 Post St | at gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferredDetails
at gr floor: modification of existing tenant space to health spa. to include selective demo, construction of non load bearing partitions. new office door, frames, millwork, new sinks, finishes. mep deferred | $210,000 | |
| Jun 29, 2023 | Completed final sign-off Oct 2024 | 38 Meadow Dr | Acosta And Sons Inc | ***prioirty process***deferred submittal yerba buena island project - parcel 4y: shop drawings, install interior railings for issued pa# 201905170934 (bldg# 26)Details
***prioirty process***deferred submittal yerba buena island project - parcel 4y: shop drawings, install interior railings for issued pa# 201905170934 (bldg# 26) | |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 35 Meadow Dr | Acosta And Sons Inc | ***priority process***deferred submittal yerba buena island project -parcel 4y: shop drawings - install interior railings for issed pa# 201905170929 (bldg# 21)Details
***priority process***deferred submittal yerba buena island project -parcel 4y: shop drawings - install interior railings for issed pa# 201905170929 (bldg# 21) | |
| Jun 29, 2023 | Completed final sign-off Oct 2024 | 37 Meadow Dr | Acosta And Sons Inc | ***priority process*** deferred submittal yerba buena island project parcel 4y: shop drawings install interior railings for issued pa# 201905170931 (bldg# 23)Details
***priority process*** deferred submittal yerba buena island project parcel 4y: shop drawings install interior railings for issued pa# 201905170931 (bldg# 23) | |
| Oct 19, 2022 | Completed final sign-off Jun 2025 | 700 Minnesota St | Bauman Landscape & Construction Inc. | esprit park - renovation of an (e) park, includeing tree work, (n) lighting and plumbing, site furnishsings, planting, paving, signage, adult exercise equipment, and disability access complinace - related right of way work (curb ramp replacement) natural and synthetic turf lawnsDetails
esprit park - renovation of an (e) park, includeing tree work, (n) lighting and plumbing, site furnishsings, planting, paving, signage, adult exercise equipment, and disability access complinace - related right of way work (curb ramp replacement) natural and synthetic turf lawns | $3,400,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2023 | 711 Eddy St | Branagh Incorporation | revision to pa #201808086727 due to changes in the associated permit changes in the field.Details
revision to pa #201808086727 due to changes in the associated permit changes in the field. | |
| Dec 21, 2020 | Completed final sign-off Apr 2021 | 1740 Franklin St | Everest Waterproofing & Restoration Inc. | facade repairs to north side. brick to be removed and replaced in-kind. corroded steel framing to be repaired. using supplementary plate steel and corrosion resistant coating.Details
facade repairs to north side. brick to be removed and replaced in-kind. corroded steel framing to be repaired. using supplementary plate steel and corrosion resistant coating. | $32,000 |
| Sep 16, 2019 | Completed final sign-off Sep 2020 | 446 Missouri St | Ccm Finish Carpentry & Construction | window replacement with all wood ,double hung windows with ogee lugs. siding repair and replacement to match original construction. street side only per plans.Details
window replacement with all wood ,double hung windows with ogee lugs. siding repair and replacement to match original construction. street side only per plans. | $30,000 |
| Feb 19, 2019 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permitDetails
replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit | |
| Apr 24, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | Rico's General Construction | revision to app#201703151543. remove from scope of work 3 window at lightwell on north side of building infilled with one hour rating.Details
revision to app#201703151543. remove from scope of work 3 window at lightwell on north side of building infilled with one hour rating. | |
| Sep 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2225 Steiner St | Rico's General Construction | Details
| $1,500 |
| Jun 27, 2016 | Completed final sign-off Dec 2016 | 5900 03rd St | P S R West Coast Builders Inc | structural steel frame for interior mechanical equipment amend permit # 2016 0208 9065. maher naDetails
structural steel frame for interior mechanical equipment amend permit # 2016 0208 9065. maher na | $15,000 |
| Apr 7, 2016 | Completed final sign-off Jun 2017 | 2225 Steiner St | Alpine Construction, Rico's General Construction | temporary shoring for new patio area at rear. n/a for maher. piers will be dug in more than 8' soil.Details
temporary shoring for new patio area at rear. n/a for maher. piers will be dug in more than 8' soil. | $4,000 |
| Mar 11, 2016 | Completed final sign-off Aug 2016 | 1380 Marin St | E S I Constructors Inc | repair extg columns, pier cap repair. revision to app#201506229578. n/a for maherDetails
repair extg columns, pier cap repair. revision to app#201506229578. n/a for maher | |
| Nov 13, 2015 | Completed final sign-off May 2018 | 446 Missouri St | Ccm Finish Carpentry & Construction | demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd . demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 3rd flr, window reconfiguration at rear of bldg as shown.light tubes on upper flr as shown.Details
demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd . demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 3rd flr, window reconfiguration at rear of bldg as shown.light tubes on upper flr as shown. | $52,500 |
| Nov 13, 2015 | Completed final sign-off May 2018 | 448 Missouri St | Ccm Finish Carpentry & Construction | demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd. demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 2nd flr, window reconfiguration at rear of bldg as shown.Details
demo 3 int walls to accomodate bath relocation. structural beam/posts w/spread footings req'd. demo (e) chimney, relocate water heater. new plywood shear wall w/footing at rear of bldg. new bath addition to 2nd flr, window reconfiguration at rear of bldg as shown. | $52,500 |
| Nov 17, 2011 | Completed final sign-off Mar 2012 | 151 10th St | Cci Com'l Constr & Improv**See 985808*** | structural support for mechanical unit & new skylight on roof. new landing support & new staircase.Details
structural support for mechanical unit & new skylight on roof. new landing support & new staircase. | $7,000 |
| Aug 26, 2011 | Completed final sign-off May 2013 | 135 Powell St | W. L. Butler Construction Inc | demo interior of basement & both floors. new walgreens interior tenant improvement. (e) 2nd floor restaurant becomes part of new walgreens space. add new elevator & escalators & seismic streng thening.Details
demo interior of basement & both floors. new walgreens interior tenant improvement. (e) 2nd floor restaurant becomes part of new walgreens space. add new elevator & escalators & seismic streng thening. | $1,000,000 |
| Jun 2, 2011 | Completed final sign-off May 2013 | 135 Powell St | W. L. Butler Construction Inc | demo (e) store front system & entry doors for new store front, automatic entry doors, entry canopy structure.Details
demo (e) store front system & entry doors for new store front, automatic entry doors, entry canopy structure. | $150,000 |
| Nov 30, 2006 | Completed final sign-off Apr 2008 | 2427 Green St | new garage.Details
new garage. | $120,000 |