Block 0631, lot 006
2225 Steiner St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 4
- Units
- 3
- Rooms
- 7 bedrooms, 5 bathrooms
- Building
- 5,781 sq ft
- Lot
- 2,966 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 23, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | Rico's General Construction | minor encroachment - 2 new planters as requested by dpw inspectorDetails
minor encroachment - 2 new planters as requested by dpw inspector | |
| May 2, 2017 | Never finaled issued May 2017, no final | 2225 Steiner St | street space permitDetails
street space permit | ||
| Apr 24, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | Rico's General Construction | revision to app#201703151543. remove from scope of work 3 window at lightwell on north side of building infilled with one hour rating.Details
revision to app#201703151543. remove from scope of work 3 window at lightwell on north side of building infilled with one hour rating. | |
| Mar 17, 2017 | Completed final sign-off Mar 2017 | 2225 Steiner St | San Francisco Fire Protection | as builts to 201612195300 remove one & replace 1 notification appliance to reflect the job site revise riser & calsc maher naDetails
as builts to 201612195300 remove one & replace 1 notification appliance to reflect the job site revise riser & calsc maher na | |
| Mar 15, 2017 | Completed final sign-off Jun 2017 | 2225 Steiner St | Rico's General Construction | as built revisions to 201406259480 - changes as per plans, relocation of powder room, new window schedule , relocation of mechanical room for all 3 units, relocation of washer/dryer room.Details
as built revisions to 201406259480 - changes as per plans, relocation of powder room, new window schedule , relocation of mechanical room for all 3 units, relocation of washer/dryer room. | |
| Dec 19, 2016 | Completed final sign-off Mar 2017 | 2225 Steiner St | San Francisco Fire Protection | ref. 201608266118,201406259480; installation of new fire alarm system,new control panel,aes radio,heat det &pull stn in garage. annunciator panel in vestibule area,install monitor modules to tie-in waterflow & 2 tamper swtches; maher n/aDetails
ref. 201608266118,201406259480; installation of new fire alarm system,new control panel,aes radio,heat det &pull stn in garage. annunciator panel in vestibule area,install monitor modules to tie-in waterflow & 2 tamper swtches; maher n/a | $7,300 |
| Oct 19, 2016 | Never finaled issued Oct 2016, no final | 2225 Steiner St | street space permitDetails
street space permit | ||
| Sep 15, 2016 | Expired or cancelled cancelled Jan 2026 | 2225 Steiner St | Rico's General Construction | Details
| $1,500 |
| Aug 26, 2016 | Completed final sign-off Mar 2017 | 2225 Steiner St | Serrano Fire Protection Systems | full installation of fire sprinkler system throughout the bldg in accordance nfpa13 edition 2013. including underground piping using a new 2" fire service. ref app#201406259480. n/a ordinance #155-13Details
full installation of fire sprinkler system throughout the bldg in accordance nfpa13 edition 2013. including underground piping using a new 2" fire service. ref app#201406259480. n/a ordinance #155-13 | $35,000 |
| Aug 11, 2016 | Never finaled issued Aug 2016, no final | 2225 Steiner St | street spaceDetails
street space | ||
| Apr 7, 2016 | Completed final sign-off Jun 2017 | 2225 Steiner St | Alpine Construction, Rico's General Construction | temporary shoring for new patio area at rear. n/a for maher. piers will be dug in more than 8' soil.Details
temporary shoring for new patio area at rear. n/a for maher. piers will be dug in more than 8' soil. | $4,000 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 2225 Steiner St | street space permitDetails
street space permit | ||
| Jul 10, 2015 | Never finaled issued Jul 2015, no final | 2225 Steiner St | street spaceDetails
street space | ||
| Jun 25, 2015 | Expired or cancelled cancelled Jul 2017 | 2225 Steiner St | Rico's General Construction | commencement of work not started under previously approved pa# 201110197184Details
commencement of work not started under previously approved pa# 201110197184 | $20,000 |
| Jun 18, 2015 | Completed final sign-off Jun 2017 | 2225 Steiner St | Rico's General Construction | revision to app#201406259480. modification due to extg conditions. additional/underpinning on north and south walls. moment frame re-calculations. n/a for maherDetails
revision to app#201406259480. modification due to extg conditions. additional/underpinning on north and south walls. moment frame re-calculations. n/a for maher | $60,000 |
| Feb 11, 2015 | Completed final sign-off Jun 2017 | 2225 Steiner St | Rico's General Construction | remove sheetrocks and insulation of electrical and plumbing fixtures, and finishes for whole interiors of the building. separate permit for all remodelling.Details
remove sheetrocks and insulation of electrical and plumbing fixtures, and finishes for whole interiors of the building. separate permit for all remodelling. | $2,000 |
| Jun 25, 2014 | Completed final sign-off Jun 2017 | 2225 Steiner St | provide habitable space at rear 1st floor include bedroom,bathroom and patio. connect to floor above with new stairs. remodel 2nd, 3rd , 4th floors and add patio door and guardrail at all master bedrooms. partial lightwell fill in. n/a for the maher ordinance #155-13Details
provide habitable space at rear 1st floor include bedroom,bathroom and patio. connect to floor above with new stairs. remodel 2nd, 3rd , 4th floors and add patio door and guardrail at all master bedrooms. partial lightwell fill in. n/a for the maher ordinance #155-13 | $350,000 | |
| Oct 19, 2011 | Completed final sign-off Jun 2017 | 2225 Steiner St | S F Garage Company Inc. | provide 1 car garage at the building, provide sidewalk curb cut in front of building. provide steel moment frame at garage levelDetails
provide 1 car garage at the building, provide sidewalk curb cut in front of building. provide steel moment frame at garage level | $20,000 |
| Jan 27, 2011 | Never finaled issued Jan 2011, no final | 2225 Steiner St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Rico's General Construction (8), San Francisco Fire Protection (2), Alpine Construction, S F Garage Company Inc., Serrano Fire Protection Systems
- Architects
- William Pashelinsky
- Engineers
- Kevin S. Morton (3), Harold Howell