John W. Lau
- Listed as
- architect, designer, engineer
- Firm
- Design Consultants Group, Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Aug 2026
179 permits since 2000 (engineer on 164 permits, architect on 14 permits, designer on 1 permit): 100 completed, 34 in progress, 20 never finaled, 25 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 179.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 3055 23rd Av | Level 8 Construction Inc | build new wall & storage in master bedroom.Details
build new wall & storage in master bedroom. | $15,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 2150 Hyde St | Donald Wu | unit 1 interior remodel ref#202507020071 & 202607275624: remove (e) non-bearing kitchen wall & door. extend bathroom by removing (e) non-bearing interior wall & constructing (n) non-bearing wall. remove (e) closets & construct 2 (n) closets. (e) covered window opening on lightwell will be re...Details
unit 1 interior remodel ref#202507020071 & 202607275624: remove (e) non-bearing kitchen wall & door. extend bathroom by removing (e) non-bearing interior wall & constructing (n) non-bearing wall. remove (e) closets & construct 2 (n) closets. (e) covered window opening on lightwell will be re... | $10,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 82 Rockridge Dr | ref# bldg-26-789. replace (e) siding with stucco. replace (e) pitch roof with flat roof.Details
ref# bldg-26-789. replace (e) siding with stucco. replace (e) pitch roof with flat roof. | $2,500 | |
| Jul 20, 2026 | In progress issued Aug 2026 | 1747 Buchanan St | 328 Construction | rev to pa# 202410163077: convert the previous approved japanese restaurnt into a chinese dumpling restaurant. 1) replace approved walk in freezer with reach in freezer. 2) remove ada counter at service counter. 3) install point of sale stand.4) replace the cooking equipmet under approved type 1 hoodDetails
rev to pa# 202410163077: convert the previous approved japanese restaurnt into a chinese dumpling restaurant. 1) replace approved walk in freezer with reach in freezer. 2) remove ada counter at service counter. 3) install point of sale stand.4) replace the cooking equipmet under approved type 1 hood | |
| Jun 29, 2026 | In progress issued Aug 2026 | 2800 Balboa St | Galaxy Building Construction | unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studioDetails
unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studio | $50,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 624 46th Av | Planart Construction Corp | 1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged.Details
1st fl - relocate garage door, recycle area, laundry, mechanical room & storage. new bathroom, new multi use room & bedroom; 2nd fl - upgrade stair way, convert (e) dining room into kitchen and kitchen into dining room; roof - add new skylights. (e) curb to remain unchanged. | $120,000 |
| Jun 3, 2026 | In progress issued Sep 2026 | 2360 03rd St | Dcs Plumbing Llc | ti to convert (e) retail space to (n) office space as allowed by planning section 202.1. for historic category a w/in umu zoning district. ti work will include removing shelves, new flooring, in-kind bathroom remodel & new paintDetails
ti to convert (e) retail space to (n) office space as allowed by planning section 202.1. for historic category a w/in umu zoning district. ti work will include removing shelves, new flooring, in-kind bathroom remodel & new paint | $60,000 |
| Apr 20, 2026 | In progress issued Apr 2026 | 1065 Ashbury St | Duffy Construction Llc | revision to bpa: 202511129393 - remove shear walls from approved permit.Details
revision to bpa: 202511129393 - remove shear walls from approved permit. | |
| Apr 17, 2026 | In progress filed Apr 2026, not yet issued | 257 Hale St | Axa Construction | fill lightwell(patio) along west property line for new bath on level 2 exterior property line wall to be 1 hr fire rated and match(e) waall. roof infill to match(e) & be class b min. add 2 skylights- over corredor & over kitchen islandDetails
fill lightwell(patio) along west property line for new bath on level 2 exterior property line wall to be 1 hr fire rated and match(e) waall. roof infill to match(e) & be class b min. add 2 skylights- over corredor & over kitchen island | $25,000 |
| Mar 12, 2026 | In progress issued May 2026 | 1457 Broderick St | Fg Force Construction Inc | remodel kitchen, dining, and bathrooms; add wall in sunroom; add closet in front bedroomDetails
remodel kitchen, dining, and bathrooms; add wall in sunroom; add closet in front bedroom | $80,000 |
| Feb 6, 2026 | In progress issued May 2026 | 2260 Greenwich St | Level 8 Construction Inc | 1)remodel existing 1st floor including converting 62 sf of storage space to habitable space, enlarge(e) bathroom 2) remodel (e) kitchen at 2nd floor - this project does not remove a unit protectedunder section 317 of the planning code.Details
1)remodel existing 1st floor including converting 62 sf of storage space to habitable space, enlarge(e) bathroom 2) remodel (e) kitchen at 2nd floor - this project does not remove a unit protectedunder section 317 of the planning code. | $100,000 |
| Nov 12, 2025 | In progress issued Mar 2026 | 1065 Ashbury St | Duffy Construction Llc | convert (e) storage area on 1st fl into family & media room; install a spiral staircase connects to 2nd floor unit. close existing illegal door on north side of property. add 1 hr fire rated glass windows on south side property at front entry.Details
convert (e) storage area on 1st fl into family & media room; install a spiral staircase connects to 2nd floor unit. close existing illegal door on north side of property. add 1 hr fire rated glass windows on south side property at front entry. | $100,000 |
| Nov 5, 2025 | In progress issued Nov 2025 | 3868 24th St | revision to pa #202503212787. infill existing window opening at 1st floor. minor layout changes at rear. located at the rear. reference pa# 2025-0728-1718Details
revision to pa #202503212787. infill existing window opening at 1st floor. minor layout changes at rear. located at the rear. reference pa# 2025-0728-1718 | ||
| Oct 27, 2025 | Completed final sign-off Apr 2026 | 212 Hoffman Av | remodel 2 existing bathroom. remodel existing kitchen including adding larger opening between kitchen and dining room. install one new bathroom to create primary suite. no added square footage or exterior changes.Details
remodel 2 existing bathroom. remodel existing kitchen including adding larger opening between kitchen and dining room. install one new bathroom to create primary suite. no added square footage or exterior changes. | $113,241 | |
| Oct 24, 2025 | Completed final sign-off Sep 2026 | 701 Geary St | Jami Construction | t.i. for new convenience store.Details
t.i. for new convenience store. | $60,000 |
| Sep 15, 2025 | In progress filed Sep 2025, not yet issued | 609 26th Av | revision to pa# 202310239220: revise stairs and lightwell in rear yard. revise windows and door in rear wall. eliminate corridor in garage. repair front stair due to rotten wood where found during construction. (all other details to follow approved under pa# 200709112317 s1 and 201106279018)Details
revision to pa# 202310239220: revise stairs and lightwell in rear yard. revise windows and door in rear wall. eliminate corridor in garage. repair front stair due to rotten wood where found during construction. (all other details to follow approved under pa# 200709112317 s1 and 201106279018) | $35,000 | |
| Aug 26, 2025 | Completed final sign-off Dec 2025 | 1278 Minnesota St | R Group, Inc | tenant improvement to install new mechanical systems for pdr (light manufacturing) on ground & mezzanine floorsDetails
tenant improvement to install new mechanical systems for pdr (light manufacturing) on ground & mezzanine floors | $35,000 |
| Jul 28, 2025 | In progress issued Aug 2025 | 3864 24th St | revision to pa #202503212787. reconfigure rear window and remove side door. mep submittal.Details
revision to pa #202503212787. reconfigure rear window and remove side door. mep submittal. | $75,000 | |
| Apr 22, 2025 | Completed final sign-off May 2025 | 1735 Ocean Av | Dennis Construction & Painting Inc | change of use from grocery store to nail & beauty spa; add furniture for beauty spa (no change to walls)Details
change of use from grocery store to nail & beauty spa; add furniture for beauty spa (no change to walls) | $1,000 |
| Apr 3, 2025 | In progress issued Apr 2025 | 2212 Vallejo St | P3 Builders | revision to pa 202501218690 revised framing for heat pump @ roof; replace (e) beam @ living room not visible from streetDetails
revision to pa 202501218690 revised framing for heat pump @ roof; replace (e) beam @ living room not visible from street | $5,000 |
| Mar 28, 2025 | In progress issued Jun 2025 | 1960 Broadway | Archteype Design Builder | revision to pa# 202409039951: revision to framing as the contractor has already framed the proposed wall in wood. the proposed test report will apply solely to newly constructed walls. frt lumber shall be available as an alternative to metal studs.Details
revision to pa# 202409039951: revision to framing as the contractor has already framed the proposed wall in wood. the proposed test report will apply solely to newly constructed walls. frt lumber shall be available as an alternative to metal studs. | $1,000 |
| Mar 21, 2025 | In progress issued Jul 2025 | 3864 24th St | Leonard Schendel Const.Co | tenant improvement for exiting coffee shopDetails
tenant improvement for exiting coffee shop | $100,000 |
| Feb 27, 2025 | In progress issued Mar 2025 | 496 Hazelwood Av | Reliable Construction Inc | move (e) bedroom wallDetails
move (e) bedroom wall | $3,100 |
| Feb 25, 2025 | In progress issued Sep 2025 | 848 De Haro St | Xanderprises Llc | reconfigure 1st floor plan. excavation of 2ft max at 1st floor to gain ceiling height. (n) 2 bathrooms, (n) gameroom & (n)home office at 1st flr. relocate laundry room @ basement. convert family rm into bedroomDetails
reconfigure 1st floor plan. excavation of 2ft max at 1st floor to gain ceiling height. (n) 2 bathrooms, (n) gameroom & (n)home office at 1st flr. relocate laundry room @ basement. convert family rm into bedroom | $40,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 1216 Treat Av | Reliable Construction Inc | revision to pa 202501158408 plans for full front stair replacement in-kindDetails
revision to pa 202501158408 plans for full front stair replacement in-kind | $4,000 |
| Jan 30, 2025 | In progress issued Jul 2025 | 2208 Vallejo St | P3 Builders | lower ceiling at hallway, frame access for (2) force air units. install heat pump at roof, not visible from street per bpa 202501218690.Details
lower ceiling at hallway, frame access for (2) force air units. install heat pump at roof, not visible from street per bpa 202501218690. | $15,000 |
| Jan 22, 2025 | In progress issued May 2025 | 64 06th St | comply with nov 202430231. remove (e) 6" raised platform at counter area replace (e) counter.Details
comply with nov 202430231. remove (e) 6" raised platform at counter area replace (e) counter. | $5,000 | |
| Jan 21, 2025 | In progress issued Jan 2025 | 2212 Vallejo St | P3 Builders | add new heat pump at roof, not visible from street. add new lights in unit.non-bearing walls @ living room.Details
add new heat pump at roof, not visible from street. add new lights in unit.non-bearing walls @ living room. | $30,000 |
| Dec 12, 2024 | Completed final sign-off Apr 2026 | 1270 La Playa | soft story retrofit- mandatory soft story program. to comply with nov #202297158 per iebc-2021Details
soft story retrofit- mandatory soft story program. to comply with nov #202297158 per iebc-2021 | $30,000 | |
| Oct 25, 2024 | Expired or cancelled expired Apr 2026 | 227 Church St | Current Construction | revision to permit 202401224348-s1 to include mech t24 sheets.Details
revision to permit 202401224348-s1 to include mech t24 sheets. | |
| Oct 24, 2024 | Completed final sign-off Jan 2025 | 18 Harlow St | Reliable Construction Inc | minor revision in foundation structural ref pa 202107023713 & 202404230612Details
minor revision in foundation structural ref pa 202107023713 & 202404230612 | |
| Oct 3, 2024 | In progress issued Nov 2024 | 225 Farallones St | front bldg: 1) reconfiguring interior layout of upper level of main bldg - including adding a (n) bathroom 2) move (e) stairs at the main front bldg 3) convert (e) storage to 517 sf of habitable space at ground flr basement of main bldg.Details
front bldg: 1) reconfiguring interior layout of upper level of main bldg - including adding a (n) bathroom 2) move (e) stairs at the main front bldg 3) convert (e) storage to 517 sf of habitable space at ground flr basement of main bldg. | $150,000 | |
| Sep 19, 2024 | In progress issued Sep 2024 | 1416 Powell St | H D Construction Company | to revise pa# 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outwardDetails
to revise pa# 201509157040: showing ada door to setbarck from e) 2'4" to n) 5'4" inside the building & swing outward | $5,000 |
| Sep 3, 2024 | In progress issued Oct 2024 | 1960 Broadway | Archteype Design Builder | unit #7 - remodel (e) bedrooms, (e) kitchen, (e) bathrooms; build (n) closets; install (n) lights in all rooms; install (n) switches in all rooms; replace (e) windows @ front of building 5 windows, true dvided lites, single hung to be replaced like for likeDetails
unit #7 - remodel (e) bedrooms, (e) kitchen, (e) bathrooms; build (n) closets; install (n) lights in all rooms; install (n) switches in all rooms; replace (e) windows @ front of building 5 windows, true dvided lites, single hung to be replaced like for like | $30,000 |
| May 14, 2024 | In progress issued May 2024 | 905 Russia Av | J P Petrie Associates Inc | add new foundation and new bearing wall to support existing framing to reduce vertical load on existing retaining wall.Details
add new foundation and new bearing wall to support existing framing to reduce vertical load on existing retaining wall. | $60,000 |
| Apr 24, 2024 | Completed final sign-off Nov 2024 | 431 27th Av | additional work to pa# 202305198180 & 202310209110, add skylight in kitchen, replace in-kind front windows, re-roof entire building, raise floor at new office at ground floor, for (e) beam at living room.Details
additional work to pa# 202305198180 & 202310209110, add skylight in kitchen, replace in-kind front windows, re-roof entire building, raise floor at new office at ground floor, for (e) beam at living room. | $40,000 | |
| Mar 27, 2024 | Expired or cancelled cancelled Jun 2024 | 4221 Geary Bl | Vladimir Vinarskiy Dba V & V Electric | electric lighting planDetails
electric lighting plan | $40,000 |
| Jan 8, 2024 | Completed final sign-off Mar 2026 | 1575 43rd Av | Precision General Contruction, Home Improvement Company | convert (e) storage area on lower floor to 831 sf gf (n) habitable area. infill 40 sf of area at left property line. remove (e) stair at left side of bldg. reconfigure internal stair to lower level. add (n) bathroom at main level.Details
convert (e) storage area on lower floor to 831 sf gf (n) habitable area. infill 40 sf of area at left property line. remove (e) stair at left side of bldg. reconfigure internal stair to lower level. add (n) bathroom at main level. | $150,000 |
| Dec 22, 2023 | In progress filed Dec 2023, not yet issued | 652 Kearny St | conversion of office use to residential.build a bike room/trash room/electrical room on the 1st floor,convert 2nd floor office into residetial units, build a new deck on the roof, build a new penthouse.Details
conversion of office use to residential.build a bike room/trash room/electrical room on the 1st floor,convert 2nd floor office into residetial units, build a new deck on the roof, build a new penthouse. | $200,000 | |
| Dec 12, 2023 | In progress filed Dec 2023, not yet issued | 3032 24th St | remodel unit 3032a, convert (e) living to (n) study & (n) bath, relocate living room and kitchen, rehabilitate (e) bedroom at rear, relocate bath.Details
remodel unit 3032a, convert (e) living to (n) study & (n) bath, relocate living room and kitchen, rehabilitate (e) bedroom at rear, relocate bath. | $30,000 | |
| Nov 21, 2023 | Expired or cancelled cancelled Jul 2026 | 530 Castro St | Dcs Plumbing Llc | to comply with abe# 202001140921: replace front door in kind for improvement program.Details
to comply with abe# 202001140921: replace front door in kind for improvement program. | $10,000 |
| Nov 17, 2023 | Completed final sign-off May 2024 | 79 Scott St | Dcs Plumbing Llc | revision to pa# 2023-0814-4336 dry rot repair of front facadeDetails
revision to pa# 2023-0814-4336 dry rot repair of front facade | |
| Nov 9, 2023 | Expired or cancelled expired Jan 2026 | 43 Diamond St | D L Construction | interior remodel only: convert (e) family room & bedroom to be a (n) adu at 1st flr. add (n) kitchen, convert half bath to be a (n) full bathroom. no structural changes, all other details shall refer to pa# 2003-0114-5180Details
interior remodel only: convert (e) family room & bedroom to be a (n) adu at 1st flr. add (n) kitchen, convert half bath to be a (n) full bathroom. no structural changes, all other details shall refer to pa# 2003-0114-5180 | $40,000 |
| Oct 23, 2023 | Completed final sign-off Apr 2024 | 127 Knockash Hl | Level 8 Construction Inc | revision to pa# 202307061548: dry rot repair of front garage area.Details
revision to pa# 202307061548: dry rot repair of front garage area. | |
| Sep 26, 2023 | Completed final sign-off Nov 2025 | 250 Detroit St | Sarris Construction, Cal C A D E Construction Inc | remove (e) wall between kitchen & bedrm; convert (e) bedrm to kitchen; convert (e) kitchen dining rm; convert (e) dining room bedrm/office; convert (e) family rm to primary bedrm; add (n) primary bathrm; convert portion of laundry rm to closetDetails
remove (e) wall between kitchen & bedrm; convert (e) bedrm to kitchen; convert (e) kitchen dining rm; convert (e) dining room bedrm/office; convert (e) family rm to primary bedrm; add (n) primary bathrm; convert portion of laundry rm to closet | $200,000 |
| Sep 14, 2023 | Completed final sign-off Jul 2026 | 1270 La Playa | Gendros Construction | to comply with nov#2022010533en to submit a revision to pa#202210025793. repair all floors where all interior finish including walls and ceiling are removed due to smoke & water damage during fire on the 3/f. repair the exterior wllas, including stucco, architecrural motifs, windows &Details
to comply with nov#2022010533en to submit a revision to pa#202210025793. repair all floors where all interior finish including walls and ceiling are removed due to smoke & water damage during fire on the 3/f. repair the exterior wllas, including stucco, architecrural motifs, windows & | |
| Jul 17, 2023 | Never finaled filed Jul 2023, never issued | 2126 40th Av | correct the drafting error, existing 30"x30" skylight will be remained. relocate the new skylight at kitchen location. all unchanged features and details shall follow approved plan #201908280126.Details
correct the drafting error, existing 30"x30" skylight will be remained. relocate the new skylight at kitchen location. all unchanged features and details shall follow approved plan #201908280126. | ||
| Jul 3, 2023 | Expired or cancelled expired Jun 2025 | 731 Noe St | Macken Construction | replace existing deck at front of property, replace (e) 5' high retaining wall at rear of property. comply with nov 202184279Details
replace existing deck at front of property, replace (e) 5' high retaining wall at rear of property. comply with nov 202184279 | $25,000 |
| May 22, 2023 | Completed final sign-off Feb 2024 | 2442 Polk St | P3 Builders | remodel existing bathrooms, kitchen and laundry in kind. remove 2 permanently sealed non functional fireplaces. no structural work and all existing walls to remainDetails
remodel existing bathrooms, kitchen and laundry in kind. remove 2 permanently sealed non functional fireplaces. no structural work and all existing walls to remain | $37,000 |
| May 19, 2023 | Completed final sign-off Nov 2024 | 431 27th Av | remodel e kitchen including removal bearing wall, remodel e bathroom @ main lvl, add new closet @ 2nd flr, convert e storage @ ground flr to habitable space 100sf, add stairs from foyer to to new 108sf habitable area, remodel e bathroom @ gr fl, convert to extg bedrm to family rm at gr flr, add newDetails
remodel e kitchen including removal bearing wall, remodel e bathroom @ main lvl, add new closet @ 2nd flr, convert e storage @ ground flr to habitable space 100sf, add stairs from foyer to to new 108sf habitable area, remodel e bathroom @ gr fl, convert to extg bedrm to family rm at gr flr, add new | $127,000 | |
| Mar 30, 2023 | Completed final sign-off Sep 2023 | 306 Church St | Lopez Quality Construction | 2/f unit# 306: remodel kitchen entirely w/new fixtures & finishes, convert existing full bathroom into 2 full bathrooms, install new heating unit.Details
2/f unit# 306: remodel kitchen entirely w/new fixtures & finishes, convert existing full bathroom into 2 full bathrooms, install new heating unit. | $80,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 534 11th Av | Yes General Construction Builder Llc | revision to pa# 201512316234, 1st flr and 2nd flr layout (interior only), other details no change, shall be follow previous approved plans.Details
revision to pa# 201512316234, 1st flr and 2nd flr layout (interior only), other details no change, shall be follow previous approved plans. | |
| Feb 28, 2023 | Completed final sign-off Mar 2023 | 4076 26th St | Flmc Development Corp Dba Adamo Campagna | revision tp 2022-1003-3626 change (n) bathroom to future bathroomDetails
revision tp 2022-1003-3626 change (n) bathroom to future bathroom | |
| Feb 22, 2023 | Never finaled filed Feb 2023, never issued | 835 33rd Av | revision to bpa#2016-09-02666 and #2018-07063904.1st fl:add (n)windows @ stair & laundry room,replaced garage door in kind,reconfigured door location@ family room.2nd fl:eliminated window @ kitchen,relocated window @ stair location,reconfigured window location @ play room.Details
revision to bpa#2016-09-02666 and #2018-07063904.1st fl:add (n)windows @ stair & laundry room,replaced garage door in kind,reconfigured door location@ family room.2nd fl:eliminated window @ kitchen,relocated window @ stair location,reconfigured window location @ play room. | $20,000 | |
| Jan 31, 2023 | In progress issued Aug 2024 | 292 Arleta Av | Construction Unlimited | erect a 3-story, type 5b, multi-family building containing 2 new dwelling units per sb-9 and 1 new accessory dwelling unit at 1st floor per ca gov code 65852.2.Details
erect a 3-story, type 5b, multi-family building containing 2 new dwelling units per sb-9 and 1 new accessory dwelling unit at 1st floor per ca gov code 65852.2. | $282,000 |
| Jan 31, 2023 | In progress issued Aug 2024 | 292 Arleta Av | demolish a one-story, type 5b, singel family building.Details
demolish a one-story, type 5b, singel family building. | $40,000 | |
| Jan 30, 2023 | In progress issued Aug 2024 | 4736 03rd St | Ivan Alberto Rivera Rivas | alter site pa# 2017-0425-4772 and comply w/ nov 20218935. bldg c(rear bldg) 1st floor legalization per ord# 43-14. demolish 2nd floor illegal unit at rear lot. demolish commercial (e) storage at 1st floor rear lot and conver to residential. total 950 sf new habitable area.Details
alter site pa# 2017-0425-4772 and comply w/ nov 20218935. bldg c(rear bldg) 1st floor legalization per ord# 43-14. demolish 2nd floor illegal unit at rear lot. demolish commercial (e) storage at 1st floor rear lot and conver to residential. total 950 sf new habitable area. | $131,000 |
| Jan 17, 2023 | Completed final sign-off Jan 2023 | 3515 20th St | Cal Builder Pro Inc | t.i. change counter tops at sushi case working area, change all lighting trim, change chairs and tables, paintingDetails
t.i. change counter tops at sushi case working area, change all lighting trim, change chairs and tables, painting | $18,000 |
| Dec 30, 2022 | Completed final sign-off Mar 2023 | 1624 Oakdale Av | to comply wsf accessible business entrance program ordinance #51-16 & 102-18, abe 202206271784Details
to comply wsf accessible business entrance program ordinance #51-16 & 102-18, abe 202206271784 | $15,000 | |
| Dec 14, 2022 | Expired or cancelled expired Sep 2026 | 2379 21st Av | convert a closet to master bathroom.Details
convert a closet to master bathroom. | $10,000 | |
| Nov 18, 2022 | Completed final sign-off Jun 2023 | 76 Amethyst Wy | J P Petrie Associates Inc | 1/f: reposition the entry door by filling in the existing entrance alcove. relocate the (e) water closet. demolish interior walls that are attached to the existing kitchen, dining room and w/c.Details
1/f: reposition the entry door by filling in the existing entrance alcove. relocate the (e) water closet. demolish interior walls that are attached to the existing kitchen, dining room and w/c. | $50,000 |
| Sep 16, 2022 | In progress issued May 2024 | 2122 41st Av | Sequoia Bay Construction Inc, Jpg Home Improvement Inc | remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property.Details
remodel (e) kitchen, bathrooms & launtry room. install (n) windows at front side of property. remove (e) fireplace. build two floor addition in rear of property. build second story deck in rear of property. | $125,000 |
| Sep 16, 2022 | Never finaled issued Oct 2022, no final | 2739 Mcallister St | Parkson Construction Company | revision to pa 2015-0831-5729 install new patio door at the 1st floor of the rear new building (2739a mcallister st) access to new patio at rear yard. other details shall follow the previously approved plans. add new retaining wall and foundation workDetails
revision to pa 2015-0831-5729 install new patio door at the 1st floor of the rear new building (2739a mcallister st) access to new patio at rear yard. other details shall follow the previously approved plans. add new retaining wall and foundation work | $5,000 |
| Aug 18, 2022 | Completed final sign-off Nov 2022 | 54 Lobos St | Deluxe Custom Construction | kitchen remodel on 2nd fl. instlal 1 skylight in kitchen. remove window and install 1 new window at west side of property.Details
kitchen remodel on 2nd fl. instlal 1 skylight in kitchen. remove window and install 1 new window at west side of property. | $15,000 |
| Aug 15, 2022 | Never finaled issued Oct 2022, no final | 1770 Fulton St | Velox Construction Inc/Velox Des & Const, Nu-Look Construction | tenant improvement for a new limited restaurant.Details
tenant improvement for a new limited restaurant. | $50,000 |
| Jun 24, 2022 | Completed final sign-off Jul 2022 | 1261 Filbert St | Joel Mark | revision to pa# 202206075774 & 202001091530. consisting of infilling (e) door at rear kitchen & removing (e) exterior stair, see main floor plan.Details
revision to pa# 202206075774 & 202001091530. consisting of infilling (e) door at rear kitchen & removing (e) exterior stair, see main floor plan. | |
| Apr 25, 2022 | Completed final sign-off Oct 2022 | 2585 23rd Av | Mylett Construction/J Mylett | reviison to pa# 202203180331. due to field conditions, obtain framing detail for stairs. existing framing dry rotted. front facade repairs due to dryrot.Details
reviison to pa# 202203180331. due to field conditions, obtain framing detail for stairs. existing framing dry rotted. front facade repairs due to dryrot. | |
| Jan 20, 2022 | Completed final sign-off Sep 2022 | 2210 Vallejo St | P3 Builders | remodel laundry & 2 bathrooms; convert closet to new powder room (1/2 bath); no exterior work. no structural workDetails
remodel laundry & 2 bathrooms; convert closet to new powder room (1/2 bath); no exterior work. no structural work | $119,000 |
| Jan 12, 2022 | Completed final sign-off Aug 2023 | 59 Digby St | M Bay Area Construction Inc | remodel kitchen & 3 full bathrooms. with new fixtures, cabinets, countertops & flooring. add led lighting throughout the house. no change to the bldg envelope.Details
remodel kitchen & 3 full bathrooms. with new fixtures, cabinets, countertops & flooring. add led lighting throughout the house. no change to the bldg envelope. | $58,000 |
| Dec 8, 2021 | Never finaled filed Dec 2021, never issued | 320 Frederick St | expand original building area. add an accessory dwelling unit (#5) on 1st floor. expand unit #1 area on 2nd floor. expand unit #3 area on 3rd floor. expand unit #4 area on 4th floor. expand garage on 1st floor. remove wall between garage and egress path.Details
expand original building area. add an accessory dwelling unit (#5) on 1st floor. expand unit #1 area on 2nd floor. expand unit #3 area on 3rd floor. expand unit #4 area on 4th floor. expand garage on 1st floor. remove wall between garage and egress path. | $250,000 | |
| Nov 23, 2021 | Completed final sign-off Oct 2022 | 2260 09th Av | B R S Construction | revision to pa 2021-1008-0163 (no plans) kitchen remodel and enlarge kitchen area into (e) laundry room; no exterior changesDetails
revision to pa 2021-1008-0163 (no plans) kitchen remodel and enlarge kitchen area into (e) laundry room; no exterior changes | |
| Oct 28, 2021 | Expired or cancelled withdrawn Oct 2023 | 7333 Geary Bl | revised pa# 201709158713 approved plans as reference. to improve (e) ceiling height 6'8" to 7'6" at basement and rebuild (n) concrete grade stair to connect 1st fl to basement. remove 1 wall & 2 posts in basement. shoring drawings included.Details
revised pa# 201709158713 approved plans as reference. to improve (e) ceiling height 6'8" to 7'6" at basement and rebuild (n) concrete grade stair to connect 1st fl to basement. remove 1 wall & 2 posts in basement. shoring drawings included. | ||
| Oct 19, 2021 | Never finaled filed Oct 2021, never issued | 2438 30th Av | add an adu at the new addition on the 1st floor per ordinance 95-17. concurrent additional work under separate permit (bpa#202005308022). excavation = 15.5 cubic yardDetails
add an adu at the new addition on the 1st floor per ordinance 95-17. concurrent additional work under separate permit (bpa#202005308022). excavation = 15.5 cubic yard | $90,000 | |
| Sep 20, 2021 | Never finaled issued Dec 2021, no final | 3156 Clay St | Deleon Builders Inc | revision to pa 2021-0312-6506 reconfigure the private interior stair to roof deck of unit 3156 on level 3 only; no exterior changes; structural revision to pa 2015-0813-4191 & 2016-0602-8993Details
revision to pa 2021-0312-6506 reconfigure the private interior stair to roof deck of unit 3156 on level 3 only; no exterior changes; structural revision to pa 2015-0813-4191 & 2016-0602-8993 | |
| Aug 23, 2021 | Completed final sign-off May 2022 | 587 24th Av | Archteype Design Builder | revision to pa 202102013703. structural revision to reflect existing conditions.Details
revision to pa 202102013703. structural revision to reflect existing conditions. | $15,000 |
| Mar 30, 2021 | Completed final sign-off Jun 2023 | 435 Laidley St | revision to pa 201801118408. to add wetbar and replace (e) concrete slab on 1st flr. englarge windows per plan and enlarge doors on 3rd flr attic storage. document missing pages on structure plan (s-1.1a, s-1.1b, s-1.2 and s-5.0). revise header size of garage door. details no change shall followDetails
revision to pa 201801118408. to add wetbar and replace (e) concrete slab on 1st flr. englarge windows per plan and enlarge doors on 3rd flr attic storage. document missing pages on structure plan (s-1.1a, s-1.1b, s-1.2 and s-5.0). revise header size of garage door. details no change shall follow | ||
| Mar 5, 2021 | Completed final sign-off Mar 2022 | 881 Clay St | Golden One Construction Inc | tenant improvement to install mechanical systems for a full service restaurant. ref pa# 202006269228.Details
tenant improvement to install mechanical systems for a full service restaurant. ref pa# 202006269228. | $25,000 |
| Feb 12, 2021 | Completed final sign-off Feb 2022 | 46 Iris Av | Monolith Construction Inc. | remove non-bearing walls between dining room and kitchen at unit 1 on second floor.Details
remove non-bearing walls between dining room and kitchen at unit 1 on second floor. | $10,000 |
| Feb 2, 2021 | Expired or cancelled cancelled Jan 2026 | 948 Mission St | Occidental Express | tenant improvement on current medical cannabis dispensary at ground fl of 925 mission st & expanding mcd area to adjoining ground fl vacant space pf 950 mission st.Details
tenant improvement on current medical cannabis dispensary at ground fl of 925 mission st & expanding mcd area to adjoining ground fl vacant space pf 950 mission st. | $50,000 |
| Feb 1, 2021 | Completed final sign-off May 2022 | 587 24th Av | Archteype Design Builder | add 687 sf of habitable space on (e) 1st fl including infilling under rear cantilevered area. add (n) stairs along rear interior of bldg. remove (e) exterior & interior stairs. reconfigure bedroom layout at 3rd fl & add (n) bathroom & remodel (e) bathroom. add powder room at 2nd fl.Details
add 687 sf of habitable space on (e) 1st fl including infilling under rear cantilevered area. add (n) stairs along rear interior of bldg. remove (e) exterior & interior stairs. reconfigure bedroom layout at 3rd fl & add (n) bathroom & remodel (e) bathroom. add powder room at 2nd fl. | $300,000 |
| Jan 5, 2021 | Never finaled filed Jan 2021, never issued | 214 California St | ste 214 - converting the office space for cannabis distribution(wholesale). no onsite consumption.Details
ste 214 - converting the office space for cannabis distribution(wholesale). no onsite consumption. | ||
| Dec 30, 2020 | Completed final sign-off Sep 2021 | 4660 19th St | Graham Moore Construction Inc | add skylight at kids bathroom & master bathroom. 32" high parapet to be installed at property line roof near master bathroom.Details
add skylight at kids bathroom & master bathroom. 32" high parapet to be installed at property line roof near master bathroom. | $20,000 |
| Dec 14, 2020 | Completed final sign-off Apr 2025 | 108 Lyon St | Reliable Construction Inc | revision to no plan pa# 202009184445: interior remodel. remove upper portion of (e) deck and stairs. new windows and window openings on rear elevation and side (not visible from public right of way). new lower unit door (minimally visible from street). no change to windows on front of building.Details
revision to no plan pa# 202009184445: interior remodel. remove upper portion of (e) deck and stairs. new windows and window openings on rear elevation and side (not visible from public right of way). new lower unit door (minimally visible from street). no change to windows on front of building. | $80,000 |
| Nov 12, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | T J Constr Inc***Ck Id,Tie Liu Only***** | infill ground fl 183 sf under 2nd fl to be habitable spaces. remodel gound fl to have bedroom, family room, home office, 2 full bathrooms, laundry closet. install gas furnace and water heater in garage.Details
infill ground fl 183 sf under 2nd fl to be habitable spaces. remodel gound fl to have bedroom, family room, home office, 2 full bathrooms, laundry closet. install gas furnace and water heater in garage. | $48,000 |
| Nov 6, 2020 | Expired or cancelled cancelled Jan 2026 | 3156 Clay St | revision to pa# 201512306165. reconfigure interior space of level 1, 2,& basement. all detail no change & shall follow previous approved plans. u.o.n.Details
revision to pa# 201512306165. reconfigure interior space of level 1, 2,& basement. all detail no change & shall follow previous approved plans. u.o.n. | ||
| Oct 8, 2020 | Completed final sign-off Jun 2023 | 231 11th Av | unit 231, 1st & 2nd flr. relocate stair connects 1st and 2nd flr excavation for obtaining adequate ceiling height. infill part of lightwell at north side. voluntary foundation upgrade and lateral strengthening at ground flr.Details
unit 231, 1st & 2nd flr. relocate stair connects 1st and 2nd flr excavation for obtaining adequate ceiling height. infill part of lightwell at north side. voluntary foundation upgrade and lateral strengthening at ground flr. | $80,000 | |
| Sep 24, 2020 | Never finaled issued Jun 2021, no final | 1416 Powell St | H D Construction Company | revision to pa 201509157040. revised shear wall at grid line e.Details
revision to pa 201509157040. revised shear wall at grid line e. | $2,000 |
| Sep 3, 2020 | Expired or cancelled expired Mar 2025 | 1155 Valencia St | John Woo Constructionllc | t.i. for a flower workshop. remodel existing spaces to have an ada restroom and a sink for flower arrangement.Details
t.i. for a flower workshop. remodel existing spaces to have an ada restroom and a sink for flower arrangement. | $15,000 |
| Aug 31, 2020 | Expired or cancelled cancelled Jul 2026 | 2469 18th Av | build (n) office, family rm, utility rm & bathrm onground flr. remodel 2nd & 3rd flr bathrooms and bedrms.build (n) roof. rebuild interior stair. infill light well. build new roof deckDetails
build (n) office, family rm, utility rm & bathrm onground flr. remodel 2nd & 3rd flr bathrooms and bedrms.build (n) roof. rebuild interior stair. infill light well. build new roof deck | $50,000 | |
| Aug 31, 2020 | Expired or cancelled expired Mar 2026 | 4221 Geary Bl | Luzt Construction Inc | change of occupancy - convert (e) restaurant to (n) cannabis dispensaryDetails
change of occupancy - convert (e) restaurant to (n) cannabis dispensary | $80,000 |
| Jul 23, 2020 | Completed final sign-off Jul 2025 | 434 20th Av | Kingswood Construction | horizontal & vertical addition to an existing 3-story, 2-unit residential building that will become a 3-story, 3-unit residential building.Details
horizontal & vertical addition to an existing 3-story, 2-unit residential building that will become a 3-story, 3-unit residential building. | $250,000 |
| Jun 13, 2020 | Completed final sign-off Dec 2020 | 493 04th Av | Parkson Construction Company | kitchen and bathroom remodel in-kind with no plans for unit #493 only. replace cabinets, all plumbing and electrical fixtures. no structural wall changesDetails
kitchen and bathroom remodel in-kind with no plans for unit #493 only. replace cabinets, all plumbing and electrical fixtures. no structural wall changes | $15,000 |
| May 30, 2020 | Never finaled filed May 2020, never issued | 2438 30th Av | altered site. revision to approved pa #201501085238 to eliminate the excavation of basement floor addition. horizontal extension of the 1st & 2nd floors. approved building envelope to remain the same. new landscaping/permeable improvement in the required front setback. excavation = 15.5 cubic yards.Details
altered site. revision to approved pa #201501085238 to eliminate the excavation of basement floor addition. horizontal extension of the 1st & 2nd floors. approved building envelope to remain the same. new landscaping/permeable improvement in the required front setback. excavation = 15.5 cubic yards. | $90,000 | |
| Feb 26, 2020 | Never finaled filed Feb 2020, never issued | 1951 33rd Av | two story rear horizontal addition to an (e) single family building to add a new family room & master suite.Details
two story rear horizontal addition to an (e) single family building to add a new family room & master suite. | $100,000 | |
| Feb 10, 2020 | Completed final sign-off Aug 2020 | 410 Austin St | Skye Builders Inc | revision to pa 2019-1017-4751 revise horizontal siding to be replaced inkind with vertical wood siding @ lower front facade. all others no change. shall follow previous approved plan. reinstall mailboxDetails
revision to pa 2019-1017-4751 revise horizontal siding to be replaced inkind with vertical wood siding @ lower front facade. all others no change. shall follow previous approved plan. reinstall mailbox | |
| Dec 24, 2019 | Completed final sign-off Oct 2021 | 442 London St | legalizing unpermit roof deck, structure under deck and grd flr stucture at west side rear corner. construct new wood stair in rear yard. legalizing of dwelling unit under separate permit# 2019-0905-0746.Details
legalizing unpermit roof deck, structure under deck and grd flr stucture at west side rear corner. construct new wood stair in rear yard. legalizing of dwelling unit under separate permit# 2019-0905-0746. | $10,000 | |
| Dec 23, 2019 | Expired or cancelled cancelled Jan 2026 | 2913 California St | voluntary seismic upgrade of soft story; type v (wood frame) building per iebc a4Details
voluntary seismic upgrade of soft story; type v (wood frame) building per iebc a4 | $15,000 | |
| Dec 23, 2019 | Completed final sign-off Sep 2020 | 3515 20th St | D & F Construction, Inc | interior remodel restroom & sushi bar in an existing restaurant.Details
interior remodel restroom & sushi bar in an existing restaurant. | $30,000 |
| Nov 18, 2019 | Completed final sign-off May 2020 | 2078 32nd Av | Graham Moore Construction Inc | rev to pa# 201911086904; extend (e) kitchen with infill of lightwell reconfigure master bath layoutDetails
rev to pa# 201911086904; extend (e) kitchen with infill of lightwell reconfigure master bath layout | $15,000 |
| Nov 12, 2019 | Completed final sign-off Jul 2021 | 2901 Taraval St | revision to pa#2019-0624-4267: to remove stucco bond/moulding in the middle of the building. replace stucco in kind and expansion joints where necessary. wood siding between bay window @ north and south cornerDetails
revision to pa#2019-0624-4267: to remove stucco bond/moulding in the middle of the building. replace stucco in kind and expansion joints where necessary. wood siding between bay window @ north and south corner |