Permit GraphShortlistSan Francisco building permits since 2000

Mylett Construction/J Mylett

Contractor license
452465
State license record
Based in
Pacifica
On San Francisco permits
Jun 2015 to Jan 2026
Last 24 months
3 permits filed

15 permits since 2000: 12 completed, 2 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 1Stairs 3Kitchen remodel 3Bathroom remodel 7
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 7, 2026In progress
issued Jan 2026
2525 22nd Avrevision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved into
Details
Permit
202601073339
Status
issued
Filed
Jan 7, 2026
Permit issued
Jan 7, 2026
Address
2525 22nd Av

revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved into

Open the permit page

Jul 22, 2025Completed
final sign-off Jun 2026
4255 24th Stconstruct new half bathroom within entryway/bedroom at 4255 24th st. plumbing, electrical, mech, carpentry, finish materials compliant to current building codes. new sink/toilet w/ bidet. 2 new electrical circuits, 1 bidet, 2 gfci receptacles. new drop ceiling for fan duct work.
Details
Permit
202507221304
Status
complete
Filed
Jul 22, 2025
Permit issued
Jul 22, 2025
Final sign-off
Jun 11, 2026
Declared cost
$30,000
Address
4255 24th St

construct new half bathroom within entryway/bedroom at 4255 24th st. plumbing, electrical, mech, carpentry, finish materials compliant to current building codes. new sink/toilet w/ bidet. 2 new electrical circuits, 1 bidet, 2 gfci receptacles. new drop ceiling for fan duct work.

Open the permit page

$30,000
Jun 25, 2025In progress
issued Aug 2025
2525 22nd Avlower floor garage level: except for garage space (room 001). interior remodel of lowered area as shown. add south west corner expansion of the en-suite with the new deck above. acess to deck with new fren ch door in place of the window.
Details
Permit
202506259388
Status
issued
Filed
Jun 25, 2025
Permit issued
Aug 7, 2025
Declared cost
$280,000
Address
2525 22nd Av

lower floor garage level: except for garage space (room 001). interior remodel of lowered area as shown. add south west corner expansion of the en-suite with the new deck above. acess to deck with new fren ch door in place of the window.

Open the permit page

$280,000
May 15, 2024Completed
final sign-off Jul 2024
1284 18th Avunit 102: 1 kitchen & 1 bathroom remodel in-kind. replace kitchen cabinet, applicances, sink, garbage disposal. new tile backsplash. replace e) tub, shower walls & floor (tile) replace plumbing fixture, shower sliding glass door, vanity sink cabinet. replace e) heat lamp
Details
Permit
202405152152
Status
complete
Filed
May 15, 2024
Permit issued
May 15, 2024
Final sign-off
Jul 9, 2024
Declared cost
$30,000
Address
1284 18th Av

unit 102: 1 kitchen & 1 bathroom remodel in-kind. replace kitchen cabinet, applicances, sink, garbage disposal. new tile backsplash. replace e) tub, shower walls & floor (tile) replace plumbing fixture, shower sliding glass door, vanity sink cabinet. replace e) heat lamp

Open the permit page

$30,000
Feb 20, 2024Completed
final sign-off Jun 2024
7 Upper Trref 202401304899. replace (e) borken attic ladder with new drop down ladder (interior). bath/kitch windws (4) to be low(e), double hung, same size as (e) not visible from st.
Details
Permit
202402206181
Status
complete
Filed
Feb 20, 2024
Permit issued
Feb 20, 2024
Final sign-off
Jun 11, 2024
Declared cost
$4,000
Address
7 Upper Tr

ref 202401304899. replace (e) borken attic ladder with new drop down ladder (interior). bath/kitch windws (4) to be low(e), double hung, same size as (e) not visible from st.

Open the permit page

$4,000
Jan 30, 2024Completed
final sign-off Jun 2024
7 Upper Trrevision to pa# 202112305207, add washer/dryer stacked unit, switch stove & fridge locations, new closet w/bifold door for wash/dryer, change shower layout to 42"x42" dreamline shower base. no structural work
Details
Permit
202401304899
Status
complete
Filed
Jan 30, 2024
Permit issued
Jan 30, 2024
Final sign-off
Jun 11, 2024
Declared cost
$5,000
Address
7 Upper Tr

revision to pa# 202112305207, add washer/dryer stacked unit, switch stove & fridge locations, new closet w/bifold door for wash/dryer, change shower layout to 42"x42" dreamline shower base. no structural work

Open the permit page

$5,000
Dec 27, 2023Completed
final sign-off Feb 2024
1284 18th Avunit# 102: replace roofing finish (waterproof) roof/patio due to water damage. more than 50%.
Details
Permit
202312273131
Status
complete
Filed
Dec 27, 2023
Permit issued
Dec 27, 2023
Final sign-off
Feb 5, 2024
Declared cost
$15,000
Address
1284 18th Av

unit# 102: replace roofing finish (waterproof) roof/patio due to water damage. more than 50%.

Open the permit page

$15,000
Jan 31, 2023Completed
final sign-off Feb 2024
7 Upper Trrevision # 2021-1230-5207: replace approximately 200 sqft of siding in kind. not street facing.
Details
Permit
202301311067
Status
complete
Filed
Jan 31, 2023
Permit issued
Jan 31, 2023
Final sign-off
Feb 2, 2024
Declared cost
$2,000
Address
7 Upper Tr

revision # 2021-1230-5207: replace approximately 200 sqft of siding in kind. not street facing.

Open the permit page

$2,000
Apr 25, 2022Completed
final sign-off Oct 2022
2585 23rd Avreviison to pa# 202203180331. due to field conditions, obtain framing detail for stairs. existing framing dry rotted. front facade repairs due to dryrot.
Details
Permit
202204252870
Status
complete
Filed
Apr 25, 2022
Permit issued
Apr 25, 2022
Final sign-off
Oct 5, 2022
Address
2585 23rd Av

reviison to pa# 202203180331. due to field conditions, obtain framing detail for stairs. existing framing dry rotted. front facade repairs due to dryrot.

Open the permit page

Mar 18, 2022Completed
final sign-off Oct 2022
2585 23rd Avfront entry stair and dry rot replacement. replace entry stair and any dry rot in-kind (close as practical),
Details
Permit
202203180331
Status
complete
Filed
Mar 18, 2022
Permit issued
Mar 18, 2022
Final sign-off
Oct 5, 2022
Declared cost
$38,500
Address
2585 23rd Av

front entry stair and dry rot replacement. replace entry stair and any dry rot in-kind (close as practical),

Open the permit page

$38,500
Dec 30, 2021Completed
final sign-off Jun 2024
7 Upper Trremodel (e) bathroom, change cabinets/counter @ (e) kitchen
Details
Permit
202112305207
Status
complete
Filed
Dec 30, 2021
Permit issued
Jan 31, 2022
Final sign-off
Jun 11, 2024
Declared cost
$15,000
Address
7 Upper Tr

remodel (e) bathroom, change cabinets/counter @ (e) kitchen

Open the permit page

$15,000
May 12, 2020Never finaled
issued Sep 2020, no final
423 27th Av-add art studio and storage room to the first floor of the house. -remodel half bath to full bathroom. - upgrade gravity furnace - upgrade electrical panel
Details
Permit
202005127455
Status
issued
Filed
May 12, 2020
Permit issued
Sep 1, 2020
Declared cost
$145,000
Address
423 27th Av

-add art studio and storage room to the first floor of the house. -remodel half bath to full bathroom. - upgrade gravity furnace - upgrade electrical panel

Open the permit page

$145,000
Aug 29, 2019Completed
final sign-off Mar 2020
159 15th Avremove existing stucco, paper and wire, replace damage sheething (water) with new constructional humbor. doubel paper, lath and stucco smooth finish. front of bldg, facing street.
Details
Permit
201908290245
Status
complete
Filed
Aug 29, 2019
Permit issued
Aug 29, 2019
Final sign-off
Mar 30, 2020
Declared cost
$35,000
Address
159 15th Av

remove existing stucco, paper and wire, replace damage sheething (water) with new constructional humbor. doubel paper, lath and stucco smooth finish. front of bldg, facing street.

Open the permit page

$35,000
Nov 25, 2015Completed
final sign-off Dec 2015
410 Bartlett Strevision to 201408254625. structural details at eliminated garage 11 and garage door, new use electrical room
Details
Permit
201511253656
Status
complete
Filed
Nov 25, 2015
Permit issued
Nov 25, 2015
Final sign-off
Dec 1, 2015
Address
410 Bartlett St

revision to 201408254625. structural details at eliminated garage 11 and garage door, new use electrical room

Open the permit page

Jun 19, 2015Completed
final sign-off Sep 2015
71 Juanita Wyrepair from water damaged (flood) on upstair bathroom. all hardwood flooring & baseboard, downstair sheetrock in garage area, remove & replace as close as practical.
Details
Permit
201506199450
Status
complete
Filed
Jun 19, 2015
Permit issued
Jun 19, 2015
Final sign-off
Sep 24, 2015
Declared cost
$50,000
Address
71 Juanita Wy

repair from water damaged (flood) on upstair bathroom. all hardwood flooring & baseboard, downstair sheetrock in garage area, remove & replace as close as practical.

Open the permit page

$50,000