Permit GraphShortlistSan Francisco building permits since 2000

Mylett Construction/J Mylett

Contractor license
452465
State license record
Based in
Pacifica
On San Francisco permits
Jun 2015 to Jan 2026
Last 24 months
3 permits filed

15 permits since 2000: 12 completed, 2 in progress, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 1Stairs 3Kitchen remodel 3Bathroom remodel 7

1 deck permit: 1 in progress. Typically 43 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 25, 2025In progress
issued Aug 2025
2525 22nd Avlower floor garage level: except for garage space (room 001). interior remodel of lowered area as shown. add south west corner expansion of the en-suite with the new deck above. acess to deck with new fren ch door in place of the window.
Details
Permit
202506259388
Status
issued
Filed
Jun 25, 2025
Permit issued
Aug 7, 2025
Declared cost
$280,000
Address
2525 22nd Av

lower floor garage level: except for garage space (room 001). interior remodel of lowered area as shown. add south west corner expansion of the en-suite with the new deck above. acess to deck with new fren ch door in place of the window.

Open the permit page

$280,000