Back to bathroom remodel contractors
Mylett Construction/J Mylett
- Based in
- Pacifica
- On San Francisco permits
- Jun 2015 to Jan 2026
- Last 24 months
- 3 permits filed
15 permits since 2000: 12 completed, 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2026 | In progress issued Jan 2026 | 2525 22nd Av | revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved intoDetails
revision to pa #202506259388: new wall to align with existing wall at s.w. corner, part of horizontal expansion/change walls at interior stair to kitchen/new slider patio door at n-w patio/change windows 0034 004 size(smaller) changes in layout of new bath 1 & 2, furnace & water, heater moved into | |
| Jul 22, 2025 | Completed final sign-off Jun 2026 | 4255 24th St | construct new half bathroom within entryway/bedroom at 4255 24th st. plumbing, electrical, mech, carpentry, finish materials compliant to current building codes. new sink/toilet w/ bidet. 2 new electrical circuits, 1 bidet, 2 gfci receptacles. new drop ceiling for fan duct work.Details
construct new half bathroom within entryway/bedroom at 4255 24th st. plumbing, electrical, mech, carpentry, finish materials compliant to current building codes. new sink/toilet w/ bidet. 2 new electrical circuits, 1 bidet, 2 gfci receptacles. new drop ceiling for fan duct work. | $30,000 |
| May 15, 2024 | Completed final sign-off Jul 2024 | 1284 18th Av | unit 102: 1 kitchen & 1 bathroom remodel in-kind. replace kitchen cabinet, applicances, sink, garbage disposal. new tile backsplash. replace e) tub, shower walls & floor (tile) replace plumbing fixture, shower sliding glass door, vanity sink cabinet. replace e) heat lampDetails
unit 102: 1 kitchen & 1 bathroom remodel in-kind. replace kitchen cabinet, applicances, sink, garbage disposal. new tile backsplash. replace e) tub, shower walls & floor (tile) replace plumbing fixture, shower sliding glass door, vanity sink cabinet. replace e) heat lamp | $30,000 |
| Feb 20, 2024 | Completed final sign-off Jun 2024 | 7 Upper Tr | ref 202401304899. replace (e) borken attic ladder with new drop down ladder (interior). bath/kitch windws (4) to be low(e), double hung, same size as (e) not visible from st.Details
ref 202401304899. replace (e) borken attic ladder with new drop down ladder (interior). bath/kitch windws (4) to be low(e), double hung, same size as (e) not visible from st. | $4,000 |
| Dec 30, 2021 | Completed final sign-off Jun 2024 | 7 Upper Tr | remodel (e) bathroom, change cabinets/counter @ (e) kitchenDetails
remodel (e) bathroom, change cabinets/counter @ (e) kitchen | $15,000 |
| May 12, 2020 | Never finaled issued Sep 2020, no final | 423 27th Av | -add art studio and storage room to the first floor of the house. -remodel half bath to full bathroom. - upgrade gravity furnace - upgrade electrical panelDetails
-add art studio and storage room to the first floor of the house. -remodel half bath to full bathroom. - upgrade gravity furnace - upgrade electrical panel | $145,000 |
| Jun 19, 2015 | Completed final sign-off Sep 2015 | 71 Juanita Wy | repair from water damaged (flood) on upstair bathroom. all hardwood flooring & baseboard, downstair sheetrock in garage area, remove & replace as close as practical.Details
repair from water damaged (flood) on upstair bathroom. all hardwood flooring & baseboard, downstair sheetrock in garage area, remove & replace as close as practical. | $50,000 |