Block 1422, lot 006
231 11th Ave
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 7
- Units
- 2
- Rooms
- 5 bedrooms, 6 bathrooms
- Building
- 3,434 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 20, 2025 | Completed final sign-off Oct 2025 | 231 11th Av | to comply with physical inspection report #cc-8700.Details
to comply with physical inspection report #cc-8700. | ||
| Aug 8, 2025 | Completed final sign-off Oct 2025 | 231 11th Av | Cameron Builders Sf | demolish existing unpermitted 7x8 storage shed connected to the rear of the existing first floor unit and rebuild to current codes in the same locationDetails
demolish existing unpermitted 7x8 storage shed connected to the rear of the existing first floor unit and rebuild to current codes in the same location | $21,000 |
| Apr 17, 2023 | Completed final sign-off Jun 2023 | 231 11th Av | Rf Fire Alarm Llc | install new sprinkler monitoring system. install nw fire alarm control unit. install wireless alarm radio connumicator. 1 smoke detector, 1 manual pull station. 3 min modules. ref pa 202101223125 and 202110200820 (sprinkler)Details
install new sprinkler monitoring system. install nw fire alarm control unit. install wireless alarm radio connumicator. 1 smoke detector, 1 manual pull station. 3 min modules. ref pa 202101223125 and 202110200820 (sprinkler) | $4,500 |
| Feb 1, 2022 | Completed final sign-off Dec 2024 | 231 11th Av | Deleon Builders Inc | to comply with nov #202026181. revision to pa# 202010086147, 202101223125,202106102155,202108196765. add patio door at 1st floor. reconfigure kitchen and master bathroom layout and replace window on 2nd, 3rd floor due to the new steel column encroached into the window. eliminate 1 window at north,Details
to comply with nov #202026181. revision to pa# 202010086147, 202101223125,202106102155,202108196765. add patio door at 1st floor. reconfigure kitchen and master bathroom layout and replace window on 2nd, 3rd floor due to the new steel column encroached into the window. eliminate 1 window at north, | |
| Oct 20, 2021 | Completed final sign-off Jun 2023 | 231 11th Av | R Lowy Fire Protection Inc | new fire sprinkler system per nfpa 13r and underground service. ref. pa 202101223125.Details
new fire sprinkler system per nfpa 13r and underground service. ref. pa 202101223125. | $35,000 |
| Aug 19, 2021 | Completed final sign-off Dec 2024 | 231 11th Av | Deleon Builders Inc | revision to pa# 2020-1008-6147, 2021-0122-3125, 2021-0610-2155 special moment frame locatins, structural work only, detail and special inspection form no change, shell follow previously approved plan u.o.n.Details
revision to pa# 2020-1008-6147, 2021-0122-3125, 2021-0610-2155 special moment frame locatins, structural work only, detail and special inspection form no change, shell follow previously approved plan u.o.n. | |
| Jun 10, 2021 | Completed final sign-off Dec 2024 | 231 11th Av | rev pa202010086147 / 202101223125 to add a new work on 3/f and attic floor (233).add 3 roof dormers and covert attic space into habitable space. connect to 3/f. cover rear portion of roof to decking.Details
rev pa202010086147 / 202101223125 to add a new work on 3/f and attic floor (233).add 3 roof dormers and covert attic space into habitable space. connect to 3/f. cover rear portion of roof to decking. | $120,000 | |
| Jan 22, 2021 | Completed final sign-off Dec 2024 | 231 11th Av | rev pa 202010086147:infill south lightwell and reconfigure bedroom #2 on 2/f. new work on 3/f (233): infill south lightwell, rmeodel and reconfigure interior layout, convert den into rood deck. add stair to attic storage.Details
rev pa 202010086147:infill south lightwell and reconfigure bedroom #2 on 2/f. new work on 3/f (233): infill south lightwell, rmeodel and reconfigure interior layout, convert den into rood deck. add stair to attic storage. | $120,000 | |
| Oct 8, 2020 | Completed final sign-off Jun 2023 | 231 11th Av | unit 231, 1st & 2nd flr. relocate stair connects 1st and 2nd flr excavation for obtaining adequate ceiling height. infill part of lightwell at north side. voluntary foundation upgrade and lateral strengthening at ground flr.Details
unit 231, 1st & 2nd flr. relocate stair connects 1st and 2nd flr excavation for obtaining adequate ceiling height. infill part of lightwell at north side. voluntary foundation upgrade and lateral strengthening at ground flr. | $80,000 | |
| May 21, 2020 | Expired or cancelled cancelled Jan 2025 | 231 11th Av | to comply with nov# 202026181. kitchen & bathroom remodel with no plan. all interior finishes was stripped down without a permit.Details
to comply with nov# 202026181. kitchen & bathroom remodel with no plan. all interior finishes was stripped down without a permit. | $3,500 | |
| Feb 27, 2007 | Never finaled issued Feb 2007, no final | 233 11th Av | street space permit only.Details
street space permit only. | ||
| Feb 2, 2007 | Completed final sign-off Sep 2007 | 231 11th Av | add new storage and bath at 1st level garage only. no other work. voluntary shearwallDetails
add new storage and bath at 1st level garage only. no other work. voluntary shearwall | $8,000 | |
| Jan 4, 2007 | Never finaled issued Jan 2007, no final | 233 11th Av | street spaceDetails
street space | ||
| Dec 12, 2006 | Completed final sign-off Mar 2007 | 231 11th Av | add anchor bolts 32" on center 40 approx. 40 each. add 1/2 ply to extg walls approx. 750 sq ft on ground floor as per sfbc 1806.6Details
add anchor bolts 32" on center 40 approx. 40 each. add 1/2 ply to extg walls approx. 750 sq ft on ground floor as per sfbc 1806.6 | $4,000 | |
| Nov 9, 2006 | Completed final sign-off Nov 2006 | 231 11th Av | cover ceiling of garage with 5/8" fire code sheetrockm this is a rev. to pa#2006/08/09/9028Details
cover ceiling of garage with 5/8" fire code sheetrockm this is a rev. to pa#2006/08/09/9028 | $1,750 | |
| Aug 9, 2006 | Completed final sign-off Nov 2006 | 231 11th Av | renew 200409224822Details
renew 200409224822 | ||
| Sep 22, 2004 | Expired or cancelled expired Nov 2006 | 231 11th Av | redo both kitchens + bath rooms. kitchen cabinets, counters, sink, appliances, floor + electrical.Details
redo both kitchens + bath rooms. kitchen cabinets, counters, sink, appliances, floor + electrical. | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Deleon Builders Inc (2), Cameron Builders Sf, R Lowy Fire Protection Inc, Rf Fire Alarm Llc
- Architects
- Patricia Haight
- Engineers
- John Lau (2), John W Lau