16 permits since 2000 (architect on 15 permits, authorized agent-others on 1 permit): 12 completed, 1 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2025 | Completed final sign-off Oct 2025 | 231 11th Av | Cameron Builders Sf | demolish existing unpermitted 7x8 storage shed connected to the rear of the existing first floor unit and rebuild to current codes in the same locationDetails
demolish existing unpermitted 7x8 storage shed connected to the rear of the existing first floor unit and rebuild to current codes in the same location | $21,000 |
| Aug 1, 2025 | In progress issued Jul 2026 | 2522 Lake St | Mark Stegmaier / Sierra West | propose adu at rear of (g/f) within permitted unconditioned storage room (#1941). additional space is also being taken from adjacent storage space & mehc room. bldg footprint will not change. elec, mech, & plumbing work part of this permit.Details
propose adu at rear of (g/f) within permitted unconditioned storage room (#1941). additional space is also being taken from adjacent storage space & mehc room. bldg footprint will not change. elec, mech, & plumbing work part of this permit. | $157,000 |
| Dec 9, 2024 | Completed final sign-off Dec 2025 | 5328 Mission St | to comply w/ nov 201488721: demo unpermitted 2nd story rear horizontal addition. demo (e) shed. replace deck/stair at residential unit (rear yard)Details
to comply w/ nov 201488721: demo unpermitted 2nd story rear horizontal addition. demo (e) shed. replace deck/stair at residential unit (rear yard) | $6,000 | |
| May 31, 2024 | Expired or cancelled cancelled Dec 2024 | 99 06th Av | replace single pane windows with dual pane windows. lake street elevation of sunroom. replace in kind slideing door, rear elevation of sunroomDetails
replace single pane windows with dual pane windows. lake street elevation of sunroom. replace in kind slideing door, rear elevation of sunroom | $12,000 | |
| Feb 20, 2019 | Expired or cancelled withdrawn Apr 2019 | 5030 03rd St | legalization of an illegal detached unit. half bath will be added. ordinance #43-14.**maher n/a**Details
legalization of an illegal detached unit. half bath will be added. ordinance #43-14.**maher n/a** | $15,000 | |
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 64 Athens St | construct rear deck per plans. rebuild stairs to backyard in kindDetails
construct rear deck per plans. rebuild stairs to backyard in kind | $6,000 | |
| Jun 22, 2018 | Completed final sign-off Oct 2018 | 345 Oxford St | Mizen Construction Inc | removal and replacement at rear yard elevated wood decks and stair. replace in kind.Details
removal and replacement at rear yard elevated wood decks and stair. replace in kind. | $25,000 |
| Dec 12, 2017 | Completed final sign-off May 2018 | 2942 Webster St | J Bradford Construction | revision to 201608306346, retaining wall and stair in backyardDetails
revision to 201608306346, retaining wall and stair in backyard | $6,000 |
| May 5, 2017 | Expired or cancelled expired Mar 2020 | 3606 Taraval St | revision to pa #201508255189 & #201612013905 - the equipment layout for the front coffee & food service for unit 3606 has been modified slightly to allow for more merchandise display area. a new water heater closet will be constructed at the exterior rear facade.Details
revision to pa #201508255189 & #201612013905 - the equipment layout for the front coffee & food service for unit 3606 has been modified slightly to allow for more merchandise display area. a new water heater closet will be constructed at the exterior rear facade. | ||
| Dec 1, 2016 | Completed final sign-off Feb 2018 | 3606 Taraval St | revision to pa 2015-0825-5189. the proposed floor area of unit 3606 (within the bldg footprint) has increased slightly to accommodate food prep areaDetails
revision to pa 2015-0825-5189. the proposed floor area of unit 3606 (within the bldg footprint) has increased slightly to accommodate food prep area | $10,000 | |
| Aug 26, 2016 | Completed final sign-off Jun 2017 | 71 Curtis St | Dan Barrett Construction | to comply w/ nov 201549474. legalization of illegal unit relocate (e) kitchen per ordinance# 43-14.Details
to comply w/ nov 201549474. legalization of illegal unit relocate (e) kitchen per ordinance# 43-14. | $55,000 |
| Oct 21, 2015 | Completed final sign-off Apr 2018 | 1318 Cole St | Zecenas Construction | below garage addition of a 1 bedroom unit behind a partially below grade (e) garage. elec and plumb work will be part of the scope. the project will remove approx 438 cubic yards of soil. sprinkler work under separate permit.Details
below garage addition of a 1 bedroom unit behind a partially below grade (e) garage. elec and plumb work will be part of the scope. the project will remove approx 438 cubic yards of soil. sprinkler work under separate permit. | $325,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2018 | 3606 Taraval St | H Construction Co | value engineering front facade back to original. interior layout, simplified and door on rear moved. revision to prmit 201404032416.Details
value engineering front facade back to original. interior layout, simplified and door on rear moved. revision to prmit 201404032416. | |
| Apr 3, 2014 | Completed final sign-off Dec 2020 | 3606 Taraval St | remodel of (e) commercial & residnetial spaces, addition (rear yard) of commercial & residential spaces. new decks @ upper residential units. kitchennette. (2) toilet rooms.Details
remodel of (e) commercial & residnetial spaces, addition (rear yard) of commercial & residential spaces. new decks @ upper residential units. kitchennette. (2) toilet rooms. | $188,750 | |
| Mar 13, 2014 | Completed final sign-off Feb 2017 | 450 Hoffman Av | Ab Mour Development | a 4'-0" rear extension of the ground level & 1st fl levels. corrective work to (e) concrete garage slab.Details
a 4'-0" rear extension of the ground level & 1st fl levels. corrective work to (e) concrete garage slab. | $225,000 |
| Dec 9, 2013 | Completed final sign-off Nov 2014 | 1524 Lombard St | Linebarger Const & Plbg | remodel of kitchen & bathroom of existing 350 sq ft ground level apartment & repalce existing 2 rear windows.Details
remodel of kitchen & bathroom of existing 350 sq ft ground level apartment & repalce existing 2 rear windows. | $22,500 |