Michael Coughlin
- License
- C73968
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C73968 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Mar 2023 to Dec 2024
3 permits since 2000 (engineer on 2 permits, architect on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hl81 Construction Inc., M K Construction Co.
- Architects
- Patricia Haight
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2024 | Completed final sign-off Dec 2025 | 5328 Mission St | to comply w/ nov 201488721: demo unpermitted 2nd story rear horizontal addition. demo (e) shed. replace deck/stair at residential unit (rear yard)Details
to comply w/ nov 201488721: demo unpermitted 2nd story rear horizontal addition. demo (e) shed. replace deck/stair at residential unit (rear yard) | $6,000 | |
| Nov 12, 2024 | Completed final sign-off Jun 2026 | 1737 Mckinnon Av | Hl81 Construction Inc. | remodel (e) ktichen & bathroom. paint inside. add a new bathroom on 2/f. upgrade electrical panel and wiring. remodel (e) bathroom on first floor.Details
remodel (e) ktichen & bathroom. paint inside. add a new bathroom on 2/f. upgrade electrical panel and wiring. remodel (e) bathroom on first floor. | $30,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2023 | 616 Teresita Bl | M K Construction Co. | remove & replace front stair in-kind. repair damaged wood. brick stair to brick stairDetails
remove & replace front stair in-kind. repair damaged wood. brick stair to brick stair | $30,000 |