Block 6553, lot 018
4076 26th St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,308 sq ft
- Lot
- 2,962 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2025 | Completed final sign-off Feb 2026 | 4076 26th St | replace existing damaged front stair with wood and concrete stair.Details
replace existing damaged front stair with wood and concrete stair. | $12,000 | |
| Apr 27, 2023 | Completed final sign-off Feb 2024 | 4076 26th St | remove damaged plaster at 2nd fl . replace drywall. no wall changes. in kind window replacement (7) at front of building. approx 1200sfDetails
remove damaged plaster at 2nd fl . replace drywall. no wall changes. in kind window replacement (7) at front of building. approx 1200sf | $8,000 | |
| Feb 28, 2023 | Completed final sign-off Mar 2023 | 4076 26th St | Flmc Development Corp Dba Adamo Campagna | revision tp 2022-1003-3626 change (n) bathroom to future bathroomDetails
revision tp 2022-1003-3626 change (n) bathroom to future bathroom | |
| Oct 3, 2022 | Completed final sign-off Mar 2023 | 4076 26th St | Flmc Development Corp Dba Adamo Campagna | rev to pa 202207057717 consisting of = 1) bathroom @ ground floor 2) clarification to pa 202106253265 and 202112063793 to reflect (n) walls 3) clarify location of wall repair in storage 4) replace siding at rear of building.Details
rev to pa 202207057717 consisting of = 1) bathroom @ ground floor 2) clarification to pa 202106253265 and 202112063793 to reflect (n) walls 3) clarify location of wall repair in storage 4) replace siding at rear of building. | $20,000 |
| Jul 5, 2022 | Completed final sign-off Mar 2023 | 4076 26th St | Flmc Development Corp Dba Adamo Campagna | revision to bpa#202106253265 & 202112063793. bathroom expansion @ main floor, new powder room @ main floor, add storage room & lobby area @ basement, reconfigure framing planDetails
revision to bpa#202106253265 & 202112063793. bathroom expansion @ main floor, new powder room @ main floor, add storage room & lobby area @ basement, reconfigure framing plan | $30,000 |
| Dec 6, 2021 | Completed final sign-off Mar 2023 | 4076 26th St | rev to pa 202106253265, sheet a-3 (remove beam) and s1 (framing)Details
rev to pa 202106253265, sheet a-3 (remove beam) and s1 (framing) | ||
| Jun 25, 2021 | Completed final sign-off May 2023 | 4076 26th St | Flmc Development Corp Dba Adamo Campagna | remodel 1st fl and rebuild existing brick foundation to concrete footingDetails
remodel 1st fl and rebuild existing brick foundation to concrete footing | $20,000 |
| Sep 8, 2008 | Never finaled issued Sep 2008, no final | 4076 26th St | street space & sidewalk.Details
street space & sidewalk. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Flmc Development Corp Dba Adamo Campagna (4)
- Engineers
- Himat Dagli, Himatlai B. Dagli, John Lau, John W. Lau
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.