Darryl Hon
- Listed as
- authorized agent-others, contractor
- Firm
- Hon's Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
400 permits since 2000 (contractor on 400 permits, authorized agent-others on 13 permits): 326 completed, 5 in progress, 42 never finaled, 27 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 400.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Aug 2026 | 2222 Leavenworth St | Hon's Construction Inc. | repair facade per inspection report "sf facade maintenance program". remove, prep & recoat lose and failing coatings throughout exteior facade. repair instances of cracked and spalling concrete, including @ fire escape landings & anchorage. repair cracked stone and failed mortar/grant joints andDetails
repair facade per inspection report "sf facade maintenance program". remove, prep & recoat lose and failing coatings throughout exteior facade. repair instances of cracked and spalling concrete, including @ fire escape landings & anchorage. repair cracked stone and failed mortar/grant joints and | $424,000 |
| Aug 11, 2026 | In progress issued Sep 2026 | 3548 Pierce St | Hon's Construction Inc. | unit #5: interior rehabilitations to one unit on 4th floor: new kitchen, new bath, renovated bath, new laundry, new bedroom, mep upgrade and structural. no change to space heating, water heating, unit area or exteriors.Details
unit #5: interior rehabilitations to one unit on 4th floor: new kitchen, new bath, renovated bath, new laundry, new bedroom, mep upgrade and structural. no change to space heating, water heating, unit area or exteriors. | $60,000 |
| Jul 28, 2026 | In progress issued Aug 2026 | 675 Ofarrell St | Brighter Bay Builders Inc, Hon's Construction Inc. | #18: rehabilitate living room, kitchen, and bathroom. sister fire damaged floor joist and patch opening in floor.Details
#18: rehabilitate living room, kitchen, and bathroom. sister fire damaged floor joist and patch opening in floor. | $60,000 |
| Jun 26, 2026 | In progress issued Jun 2026 | 675 Ofarrell St | Hon's Construction Inc. | install new drywall in common area where the existing drywall has been removed due to the fire damage.Details
install new drywall in common area where the existing drywall has been removed due to the fire damage. | $35,000 |
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 175 21st Av | Hon's Construction Inc. | remove and replace 400 sq ft of dry-rot and sidings on one exterior wall - not street visible.Details
remove and replace 400 sq ft of dry-rot and sidings on one exterior wall - not street visible. | $30,000 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | revision to application 202509094906, install new stair guardrail in existing location.Details
revision to application 202509094906, install new stair guardrail in existing location. | $2,000 |
| Mar 23, 2026 | Completed final sign-off Apr 2026 | 22 Vandewater St | Hon's Construction Inc. | repair one loose balcony bolt and reinforce with new wood blocking, back of bldg. seal pipe peetrations with paint and stucco for unit 206-208. this is to comply with sb721 reuirement and is less than 50% repair.Details
repair one loose balcony bolt and reinforce with new wood blocking, back of bldg. seal pipe peetrations with paint and stucco for unit 206-208. this is to comply with sb721 reuirement and is less than 50% repair. | $12,941 |
| Mar 2, 2026 | Completed final sign-off Mar 2026 | 741 Castro St | Hon's Construction Inc. | replace rotted stair treads and risers, exterior landing boards, rotted 4x4 support under first landing, and handrail sections (8 fett only) at the exterior back yard staricase to comply sb721 requirement. the repairs is less than 50% of the structure of the staircase.Details
replace rotted stair treads and risers, exterior landing boards, rotted 4x4 support under first landing, and handrail sections (8 fett only) at the exterior back yard staricase to comply sb721 requirement. the repairs is less than 50% of the structure of the staircase. | $17,000 |
| Dec 19, 2025 | Completed final sign-off Jul 2026 | 2360 Polk St | Hon's Construction Inc. | t.i. of e) fast casual restaurant to accommodate new sushi handrool restaurant: included adding hall to e) restroom, update e) restroom to accommodate new access, relocate some e) kitchen equipment, adding some kitchen equipmentDetails
t.i. of e) fast casual restaurant to accommodate new sushi handrool restaurant: included adding hall to e) restroom, update e) restroom to accommodate new access, relocate some e) kitchen equipment, adding some kitchen equipment | $60,000 |
| Dec 16, 2025 | In progress filed Dec 2025, not yet issued | 1424 Valencia St | Hon's Construction Inc. | to comply with nov: 202547750: installation of new height restriction bar extending out 10 ft from face of bldg to prvent vehicle collision. 10ft x 6ft above street.Details
to comply with nov: 202547750: installation of new height restriction bar extending out 10 ft from face of bldg to prvent vehicle collision. 10ft x 6ft above street. | $944 |
| Dec 9, 2025 | Completed final sign-off Mar 2026 | 1436 Pacific Av | Hon's Construction Inc. | scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails.Details
scope of work under this permit includes: rebuild existing rear stairway in like kind configureation with new guardrails. | $20,000 |
| Dec 8, 2025 | Completed final sign-off Jan 2026 | 721 Geary St | Hon's Construction Inc. | 5th fl unit 24 existing window: infill with 6" fully grouted concrete masonry units. reinforce masonry infill with #4 bars as required for anchorage. apply parge coat to exterior surface and paint to match existing. finish interior surface with gypsum board to match existing.Details
5th fl unit 24 existing window: infill with 6" fully grouted concrete masonry units. reinforce masonry infill with #4 bars as required for anchorage. apply parge coat to exterior surface and paint to match existing. finish interior surface with gypsum board to match existing. | $24,800 |
| Nov 26, 2025 | Completed final sign-off Jan 2026 | 2390 Francisco St | Hon's Construction Inc. | drywall storage room walls and ceiing with 5/8" type x, and clad walls w/ sheet metal. install a new 60 min. fire-rated door assembly to tradesman passageway. install ventilation fan in storage room with make up air from exterior. storage room is in rear left corner of left hand garage.Details
drywall storage room walls and ceiing with 5/8" type x, and clad walls w/ sheet metal. install a new 60 min. fire-rated door assembly to tradesman passageway. install ventilation fan in storage room with make up air from exterior. storage room is in rear left corner of left hand garage. | $20,200 |
| Nov 20, 2025 | Completed final sign-off Aug 2026 | 99 Lupine Av | Hon's Construction Inc. | repair 2 deteriorating joists and deck boards. re fasten guard railing. all work at balcony second floor, non street visible, less than 50% repair.Details
repair 2 deteriorating joists and deck boards. re fasten guard railing. all work at balcony second floor, non street visible, less than 50% repair. | $7,300 |
| Nov 6, 2025 | Completed final sign-off Dec 2025 | 11 Dolores St | Hon's Construction Inc. | repair deteriorated posts and joists, repair loose stair tread, inspect concealed framing, remediate failed coatings and maintain exterior elements per sb-721 requirements, repairs less than 50% of the structure and invisible from the street. all work in stairway. in kind replacement.Details
repair deteriorated posts and joists, repair loose stair tread, inspect concealed framing, remediate failed coatings and maintain exterior elements per sb-721 requirements, repairs less than 50% of the structure and invisible from the street. all work in stairway. in kind replacement. | $12,285 |
| Oct 28, 2025 | Completed final sign-off Nov 2025 | 1395 Union St | Hon's Construction Inc. | repairs to damaged joists, coating maintenance at outside stairs per sb-721 requirement. not visible from street. repairs less than 50% of structure.Details
repairs to damaged joists, coating maintenance at outside stairs per sb-721 requirement. not visible from street. repairs less than 50% of structure. | $8,988 |
| Oct 28, 2025 | Completed final sign-off Nov 2025 | 35 Lafayette St | Hon's Construction Inc. | replacing deteriorated treads, posts and planks; adding bracing, securing loose decking and repairing coating at outside stairs per sb_721 requirement. not visible from the street. repairs less than 50% of the structure.Details
replacing deteriorated treads, posts and planks; adding bracing, securing loose decking and repairing coating at outside stairs per sb_721 requirement. not visible from the street. repairs less than 50% of the structure. | $10,535 |
| Oct 28, 2025 | Completed final sign-off Oct 2025 | 20 Romolo Pl | Hon's Construction Inc. | repairing or replacing damaged wood, restoring railings, cleaning & coating corroded metal parts repairs less than 50% of the structure at outside stair per sb-721 requirement. not visible from the street.Details
repairing or replacing damaged wood, restoring railings, cleaning & coating corroded metal parts repairs less than 50% of the structure at outside stair per sb-721 requirement. not visible from the street. | $10,300 |
| Oct 28, 2025 | Completed final sign-off Nov 2025 | 210 Church St | Hon's Construction Inc. | repairing or replace damaged wood, installing proper supports, leveling stairs as needed, refinishing surfaces at outside stair per sb-721. not visible from the street. repairs less than 50% of the structure.Details
repairing or replace damaged wood, installing proper supports, leveling stairs as needed, refinishing surfaces at outside stair per sb-721. not visible from the street. repairs less than 50% of the structure. | $9,070 |
| Sep 9, 2025 | Completed final sign-off Mar 2026 | 610 Leavenworth St | Hon's Construction Inc. | to perform repairs per facade inspection report provided by borne consulting per sffmp. remove prep and recoat loose and failing coating throughout exterior facade. repair cracked or missing bricks units repointing. seal open penetrations. secure unsecure pipes and wiring. street visible.Details
to perform repairs per facade inspection report provided by borne consulting per sffmp. remove prep and recoat loose and failing coating throughout exterior facade. repair cracked or missing bricks units repointing. seal open penetrations. secure unsecure pipes and wiring. street visible. | $458,578 |
| Sep 9, 2025 | Completed final sign-off Aug 2026 | 958 Capp St | Hon's Construction Inc. | interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroomDetails
interior remodel of 1 residential unit in a 4 unit building. work includes adding a bathroom and relocating the kitchen relocate bedroom | $58,000 |
| Sep 4, 2025 | Completed final sign-off May 2026 | 619 Connecticut St | Hon's Construction Inc. | revision to 202506068043. correct existing fl 3 plan to show tub in bath, revise proposed plan to show shower in bath 1.Details
revision to 202506068043. correct existing fl 3 plan to show tub in bath, revise proposed plan to show shower in bath 1. | $1,500 |
| Sep 2, 2025 | Expired or cancelled cancelled Aug 2026 | 1008 Larkin St | Hon's Construction Inc. | remove and replace two street facing windows with new aluminum clad wood window frame. same sides and locations. u-factor 0.29 windows.Details
remove and replace two street facing windows with new aluminum clad wood window frame. same sides and locations. u-factor 0.29 windows. | $1,500 |
| Sep 2, 2025 | Completed final sign-off Nov 2025 | 140 Duboce Av | Hon's Construction Inc. | to perform repairs per facade inspection report provided by borne consulting per sf facade maintenance program (sffmp), remove prep and recoat loose and tailing coating throughout exterior facade, repair instances of spalling stucco coating and wood siding, seal open penetrations,secure unsecureDetails
to perform repairs per facade inspection report provided by borne consulting per sf facade maintenance program (sffmp), remove prep and recoat loose and tailing coating throughout exterior facade, repair instances of spalling stucco coating and wood siding, seal open penetrations,secure unsecure | $317,870 |
| Jul 3, 2025 | Completed final sign-off Aug 2025 | 3605 20th St | Hon's Construction Inc. | remove and replace (1) 2x6 pt at landing. fasten the existing handrail ath the bottom level of the stairs. less than 50%. comply with sb721. not street visible. stair repair, in-kindDetails
remove and replace (1) 2x6 pt at landing. fasten the existing handrail ath the bottom level of the stairs. less than 50%. comply with sb721. not street visible. stair repair, in-kind | $4,960 |
| Jun 6, 2025 | Completed final sign-off Nov 2025 | 506 Sawyer St | Hon's Construction Inc. | to obtain final inpsection for work approved under 201910316162. all work is complete.Details
to obtain final inpsection for work approved under 201910316162. all work is complete. | |
| Jun 5, 2025 | Completed final sign-off May 2026 | 619 Connecticut St | Hon's Construction Inc. | 1)correct action in response nov#202428070 opening cut by fire dept in response has been secured patched and weather sealed no structural damage observed by engineeer 2)utilities have been secured 3)remove and replace fire damaged guard rail at 3rd fl. deck 4)remove portions of ceiling and remodelDetails
1)correct action in response nov#202428070 opening cut by fire dept in response has been secured patched and weather sealed no structural damage observed by engineeer 2)utilities have been secured 3)remove and replace fire damaged guard rail at 3rd fl. deck 4)remove portions of ceiling and remodel | $2,500 |
| May 23, 2025 | Completed final sign-off Oct 2025 | 630 Alvarado St | Hon's Construction Inc. | revision to 202503051587: change guardrail from top mounted to face mounted. no changing to balconies layout or sizeDetails
revision to 202503051587: change guardrail from top mounted to face mounted. no changing to balconies layout or size | $5,000 |
| Mar 24, 2025 | Completed final sign-off May 2025 | 1201 Pine St | Hon's Construction Inc. | repair interior wall covering and exterior siding where damaged by vehicle. re-secure 2 stubs below window. all exterior trim and siding to match existing. comply with nov #202535478Details
repair interior wall covering and exterior siding where damaged by vehicle. re-secure 2 stubs below window. all exterior trim and siding to match existing. comply with nov #202535478 | $12,500 |
| Mar 5, 2025 | Completed final sign-off Oct 2025 | 630 Alvarado St | Hon's Construction Inc. | rev to pa# 2024-1101-4251: repair of wood framed balconies, scope includes stuctural repairs (installation of new joists, beams and posts, and water proofing repairs. no layout or size changes to the balconies proposed.Details
rev to pa# 2024-1101-4251: repair of wood framed balconies, scope includes stuctural repairs (installation of new joists, beams and posts, and water proofing repairs. no layout or size changes to the balconies proposed. | $328,480 |
| Feb 14, 2025 | Completed final sign-off Jun 2025 | 140 Duboce Av | Hon's Construction Inc. | patch and repair damaged front facade cementitius coating. touch up paint where repairs madeDetails
patch and repair damaged front facade cementitius coating. touch up paint where repairs made | $41,676 |
| Feb 14, 2025 | Completed final sign-off May 2025 | 630 Grand View Av | Hon's Construction Inc. | sister new blocking and joist where shows signs of water damage. patch back stucco trench opened for sb72, inspections, misc touch up paint repair less than 15% of deck, work not visible from street.Details
sister new blocking and joist where shows signs of water damage. patch back stucco trench opened for sb72, inspections, misc touch up paint repair less than 15% of deck, work not visible from street. | $40,822 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 781 Ofarrell St | Hon's Construction Inc. | interior - prep (e) rebar and coat with corrosion inhibiting bonding agent epoxy new 1/4" threaded rod where (e) rebar damaged greater than 20%. prep and patch concrete where removed roughly 10 lf. reinstall drywall and covering and paintDetails
interior - prep (e) rebar and coat with corrosion inhibiting bonding agent epoxy new 1/4" threaded rod where (e) rebar damaged greater than 20%. prep and patch concrete where removed roughly 10 lf. reinstall drywall and covering and paint | $22,289 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 2023 Folsom St | Hon's Construction Inc. | sb721 work: remove and replace crack wood post, near upper landing, remove and replace crack stair, tread then paint, primer and coat. wood railing as needed all repairs in like kind. repairs less than 10& of overall stair structure. work not visible from street.Details
sb721 work: remove and replace crack wood post, near upper landing, remove and replace crack stair, tread then paint, primer and coat. wood railing as needed all repairs in like kind. repairs less than 10& of overall stair structure. work not visible from street. | $8,025 |
| Jan 23, 2025 | Completed final sign-off Feb 2025 | 2240 Larkin St | Hon's Construction Inc. | repair per sb721 report: install new blocking at ceiling ov 2nd fl exterior walkway. total 3 blk. apply new paint coating at guard railing from 2nd to 4th fl. patche stucco where opened for sb721 inspection at ceiling of 2nd fl exterior walkway. jobs not visible from the streetsDetails
repair per sb721 report: install new blocking at ceiling ov 2nd fl exterior walkway. total 3 blk. apply new paint coating at guard railing from 2nd to 4th fl. patche stucco where opened for sb721 inspection at ceiling of 2nd fl exterior walkway. jobs not visible from the streets | $25,948 |
| Jan 17, 2025 | Completed final sign-off Feb 2025 | 140 Duboce Av | Hon's Construction Inc. | repair decking at lower level, remove and replace cracked stair tread as needed. sand & paint wood railings as needed. less than 50%. comply sb721. not visible to the street.Details
repair decking at lower level, remove and replace cracked stair tread as needed. sand & paint wood railings as needed. less than 50%. comply sb721. not visible to the street. | $3,295 |
| Jan 14, 2025 | Completed final sign-off Jun 2025 | 1599 Green St | Hon's Construction Inc. | repair losing and failing concrete from 1st floor to roof, apply traffic coating as needed, seal stair to wall transition at roof floor & around guard railing post to slab connections at all levels, patch stucco, install soffit vents on 2nd & 3rd fl, & touch up stucco & paint at street level.Details
repair losing and failing concrete from 1st floor to roof, apply traffic coating as needed, seal stair to wall transition at roof floor & around guard railing post to slab connections at all levels, patch stucco, install soffit vents on 2nd & 3rd fl, & touch up stucco & paint at street level. | $17,963 |
| Jan 14, 2025 | Completed final sign-off Apr 2025 | 1509 Golden Gate Av | Hon's Construction Inc. | repair loosen hand railing or rusted components at balconies and cracking in cement plaster at base of exterior stairs & landings. touch up with stucco and paint at the repair places as needed. remove and replace dry rotted facia board at unit #302. stair repair is less than 50%.Details
repair loosen hand railing or rusted components at balconies and cracking in cement plaster at base of exterior stairs & landings. touch up with stucco and paint at the repair places as needed. remove and replace dry rotted facia board at unit #302. stair repair is less than 50%. | $24,210 |
| Jan 14, 2025 | Completed final sign-off May 2025 | 4030 19th St | Hon's Construction Inc. | repair losen hand railing or rusted components at balconies. touch up with stucco & paint or sealant at the repair place as needed. replace plywood substrate at unit 15 with new. remove & replace damaged facia board at unit #15.Details
repair losen hand railing or rusted components at balconies. touch up with stucco & paint or sealant at the repair place as needed. replace plywood substrate at unit 15 with new. remove & replace damaged facia board at unit #15. | $22,606 |
| Oct 25, 2024 | Completed final sign-off Mar 2026 | 686 Post St | Hon's Construction Inc. | to perform repairs facade inspection reporst provided by borne consulting per sf facade maintenance propgram (sffmp) remove prep and recoat loose and failing coating throughout exterior facade. repair instances of spelling concrete. seal open penetrations. secure unsecure pipes and wiring.Details
to perform repairs facade inspection reporst provided by borne consulting per sf facade maintenance propgram (sffmp) remove prep and recoat loose and failing coating throughout exterior facade. repair instances of spelling concrete. seal open penetrations. secure unsecure pipes and wiring. | $85,000 |
| Oct 25, 2024 | Completed final sign-off Aug 2025 | 828 Jones St | Hon's Construction Inc. | to perform repairs per facade inspection report: provided by bone consulting per sf facade maintenance program (sffmp) remove prep and recoat loose and failing coating throughout exterior facade. repair instances of spelling concrete seal open penetrations. secure unsecure pipes and wiring.Details
to perform repairs per facade inspection report: provided by bone consulting per sf facade maintenance program (sffmp) remove prep and recoat loose and failing coating throughout exterior facade. repair instances of spelling concrete seal open penetrations. secure unsecure pipes and wiring. | $100,000 |
| Oct 16, 2024 | Completed final sign-off Jan 2026 | 721 Geary St | Hon's Construction Inc. | make repairs per facade inspection report per sf facade maintenance program (sffmp). remove,prep, and recoat loose and failing coating throughout exterior facade: repair instances of spalling concrete. seal open penetrations. secure unsecure pipes and wiring. replace cracked brick units including...Details
make repairs per facade inspection report per sf facade maintenance program (sffmp). remove,prep, and recoat loose and failing coating throughout exterior facade: repair instances of spalling concrete. seal open penetrations. secure unsecure pipes and wiring. replace cracked brick units including... | $200,000 |
| Oct 4, 2024 | Completed final sign-off May 2025 | 798 Post St | Hon's Construction Inc. | perform facade repair work per facade inspection report. repair of brick units, repair of brick mortar points, prep and re-coat loose and failing coating.Details
perform facade repair work per facade inspection report. repair of brick units, repair of brick mortar points, prep and re-coat loose and failing coating. | $200,000 |
| Aug 27, 2024 | Completed final sign-off May 2025 | 122 Highland Av | Hon's Construction Inc., Artcraft Construction | revised scope of work 9/23/24: to comply with nov item 2 - demo (e) required rear egress stair & construct (n) required egress stair in kind replacement; nov item 3 - remove & properly dispose of peeling paint & repaint per nov instructions. to comply w/nov 202423517Details
revised scope of work 9/23/24: to comply with nov item 2 - demo (e) required rear egress stair & construct (n) required egress stair in kind replacement; nov item 3 - remove & properly dispose of peeling paint & repaint per nov instructions. to comply w/nov 202423517 | $10,000 |
| Jul 25, 2024 | Completed final sign-off Aug 2024 | 242 Mallorca Wy | Hon's Construction Inc. | revision to work underway per permit# 202406215026: skylight in new location from previous permit.Details
revision to work underway per permit# 202406215026: skylight in new location from previous permit. | |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 242 Mallorca Wy | Hon's Construction Inc. | install new skylight in master bedroom.Details
install new skylight in master bedroom. | $1,400 |
| Apr 8, 2024 | Completed final sign-off Jul 2024 | 200 Arguello Bl | Hon's Construction Inc. | apply new balcony coating at four balconies. repair any soft or dry rotted subatrate, remove and replace existing facia board at face of four balconies per sb721.Details
apply new balcony coating at four balconies. repair any soft or dry rotted subatrate, remove and replace existing facia board at face of four balconies per sb721. | $7,500 |
| Mar 14, 2024 | Completed final sign-off May 2024 | 971 Elizabeth St | Hon's Construction Inc. | remove and replace bathroom window rear yard facing in kind. sill >60" aff. u=.30maxDetails
remove and replace bathroom window rear yard facing in kind. sill >60" aff. u=.30max | $1,000 |
| Mar 4, 2024 | Completed final sign-off May 2024 | 466 14th St | Hon's Construction Inc. | unit 10 @ 2nd floor -kitchen remodel in kind to include new paint and flooring. no removal of wallsDetails
unit 10 @ 2nd floor -kitchen remodel in kind to include new paint and flooring. no removal of walls | $20,000 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 971 Elizabeth St | Hon's Construction Inc. | one bathroom remodeling. all locations to remain the same. install new fixtures and tile. non structuralDetails
one bathroom remodeling. all locations to remain the same. install new fixtures and tile. non structural | $10,000 |
| Dec 15, 2023 | Completed final sign-off Mar 2024 | 45 Chilton Av | Hon's Construction Inc. | replace existing bathtub with shower. remove and replace plumbing fistures with new at gr fl . no wall changes. all plumbing fixture locations remain in the same location with exception of shower replacing tub. shower pan inspection required. bathroom is approx. 50 sq ft.Details
replace existing bathtub with shower. remove and replace plumbing fistures with new at gr fl . no wall changes. all plumbing fixture locations remain in the same location with exception of shower replacing tub. shower pan inspection required. bathroom is approx. 50 sq ft. | $20,000 |
| Jun 28, 2023 | Completed final sign-off Aug 2024 | 1635 Chestnut St | Hon's Construction Inc. | revision to 202304196051: increasing framing size at 3rd fl (front bldg)Details
revision to 202304196051: increasing framing size at 3rd fl (front bldg) | $2,000 |
| Jun 26, 2023 | Completed final sign-off Jul 2023 | 517 Green St | Hon's Construction Inc. | to comply with nov# 201959911. install handrailing at common area staircaseDetails
to comply with nov# 201959911. install handrailing at common area staircase | $3,000 |
| Jun 26, 2023 | Completed final sign-off Sep 2023 | 969 Elizabeth St | Hon's Construction Inc. | restoration of kitchen at unit 969. install a full size oven stove, replace refrigrator. add gfic outlets.Details
restoration of kitchen at unit 969. install a full size oven stove, replace refrigrator. add gfic outlets. | $3,500 |
| Jun 6, 2023 | Completed final sign-off Jan 2024 | 971 Elizabeth St | Hon's Construction Inc. | revision to 202305248515. kitchen layout at unit 971. powder room layout at room 971. rear wall change. to show existing kitchen at unit 969.Details
revision to 202305248515. kitchen layout at unit 971. powder room layout at room 971. rear wall change. to show existing kitchen at unit 969. | $100 |
| May 24, 2023 | Completed final sign-off Jan 2024 | 971 Elizabeth St | Hon's Construction Inc. | revision to approved permit application #202203039178. voluntary structural posts additions and 1 footing.Details
revision to approved permit application #202203039178. voluntary structural posts additions and 1 footing. | $3,000 |
| May 12, 2023 | Completed final sign-off Jul 2023 | 1300 26th Av | Hon's Construction Inc. | for 2495 irving st: install new floor tiles in bathroom. install grab bars in bathroom. interior paint.Details
for 2495 irving st: install new floor tiles in bathroom. install grab bars in bathroom. interior paint. | $15,000 |
| Apr 26, 2023 | Completed final sign-off May 2024 | 340 Judah St | Hon's Construction Inc. | upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 202304176798.Details
upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 202304176798. | $8,000 |
| Apr 26, 2023 | Completed final sign-off May 2024 | 338 Judah St | Hon's Construction Inc. | upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 201812122905.Details
upgrade extg commercial entry per ordinance 51-16 abe program, to comply w/ accessible business entrance program abe# 201812122905. | $8,000 |
| Apr 19, 2023 | Completed final sign-off Aug 2024 | 1635 Chestnut St | Hon's Construction Inc. | interior remodel of existing 1st & 2nd flrs residential unit including new interior stairs, new bathroom & small lightwell in-fill.Details
interior remodel of existing 1st & 2nd flrs residential unit including new interior stairs, new bathroom & small lightwell in-fill. | $150,000 |
| Feb 24, 2023 | Completed final sign-off May 2023 | 755 Ofarrell St | Hon's Construction Inc. | repair spalling/delaminating concrete on the southwest corner. prep and patch per plans. exterior work only.Details
repair spalling/delaminating concrete on the southwest corner. prep and patch per plans. exterior work only. | $30,000 |
| Feb 3, 2023 | Completed final sign-off Mar 2024 | 1511 Haight St | Hon's Construction Inc., Golden Snail Builders | correct work described in nov 202302608. electrical work behind bar, 2 bathroom remodels in kind. refer to complaint eid 202302610Details
correct work described in nov 202302608. electrical work behind bar, 2 bathroom remodels in kind. refer to complaint eid 202302610 | $8,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2024 | 660 Powell St | Hon's Construction Inc. | upgrade (e) commercial entry per ordinance 51-16. to comply with the accessible business entry program. abe # 201812122910. no physical work.Details
upgrade (e) commercial entry per ordinance 51-16. to comply with the accessible business entry program. abe # 201812122910. no physical work. | |
| Dec 7, 2022 | Completed final sign-off Nov 2024 | 785 Ofarrell St | Hon's Construction Inc. | to comply with accessible business entry program abe #202212025406. install (n) power door operators. install (n) door and compliant door hardware. remove (e) security gate.Details
to comply with accessible business entry program abe #202212025406. install (n) power door operators. install (n) door and compliant door hardware. remove (e) security gate. | $5,000 |
| Dec 7, 2022 | Completed final sign-off Nov 2024 | 777 Ofarrell St | Hon's Construction Inc. | to comply with accessible business entry program abe #202212025407. install (n) power door operators. install (n) door and compliant door hardware.Details
to comply with accessible business entry program abe #202212025407. install (n) power door operators. install (n) door and compliant door hardware. | $5,000 |
| Oct 25, 2022 | Expired or cancelled cancelled Oct 2025 | 318 Turk St | Hon's Construction Inc. | to comply with abe#201812122915. upgrade to (e) commercial entry for ada compliance per ord 51-16 abe prog; relocate & repair (e) power door operator; slop (e) entry within property line; install compliant door hardware; remove (e) out-swinging gate.Details
to comply with abe#201812122915. upgrade to (e) commercial entry for ada compliance per ord 51-16 abe prog; relocate & repair (e) power door operator; slop (e) entry within property line; install compliant door hardware; remove (e) out-swinging gate. | $8,000 |
| Oct 25, 2022 | Expired or cancelled cancelled Oct 2025 | 212 Church St | Hon's Construction Inc. | abe: upgrade to (e) commercial entry at 212 church st, for ada compliance per ord# 51-16 abe program. abe# 201812173047. install power door operator. replace concrete at recessed entry.Details
abe: upgrade to (e) commercial entry at 212 church st, for ada compliance per ord# 51-16 abe program. abe# 201812173047. install power door operator. replace concrete at recessed entry. | $5,000 |
| Sep 16, 2022 | Completed final sign-off Jan 2023 | 630 Grand View Av | Hon's Construction Inc. | revision to pa# 202009275192. revise drawings to show solid core doors to swing into building, and to correct property line location on plans. remove awnings.Details
revision to pa# 202009275192. revise drawings to show solid core doors to swing into building, and to correct property line location on plans. remove awnings. | |
| Sep 15, 2022 | Completed final sign-off Nov 2022 | 950 Franklin St | Hon's Construction Inc. | unit #47: remove and replace kitchen countertopsDetails
unit #47: remove and replace kitchen countertops | $5,500 |
| Sep 13, 2022 | Completed final sign-off Sep 2023 | 2355 Leavenworth St | Hon's Construction Inc. | apt# 301 install one new clothes washer and dryer, no structural wall demoDetails
apt# 301 install one new clothes washer and dryer, no structural wall demo | $4,000 |
| Aug 10, 2022 | Completed final sign-off Jun 2023 | 2355 Leavenworth St | Hon's Construction Inc. | unit 201: convert (e) closet to bedroom, rehab (e) kitchen, rehab (e) bathroom, install washer/dryerDetails
unit 201: convert (e) closet to bedroom, rehab (e) kitchen, rehab (e) bathroom, install washer/dryer | $32,000 |
| Aug 1, 2022 | Completed final sign-off Apr 2023 | 307 Athens St | Hon's Construction Inc. | all works on 2/f -remodel bathroom: enlarge shower pan, relocate bathroom door, install new electrical radiant heat pad and new floor tile in living room. instll new fireplace insert.Details
all works on 2/f -remodel bathroom: enlarge shower pan, relocate bathroom door, install new electrical radiant heat pad and new floor tile in living room. instll new fireplace insert. | $60,000 |
| Jun 28, 2022 | Completed final sign-off Jan 2023 | 2200 Leavenworth St | Hon's Construction Inc. | unit #501: 1) convert extg dining and kitchen to study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install second bathroom. 5)install washer and dryer.Details
unit #501: 1) convert extg dining and kitchen to study. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install second bathroom. 5)install washer and dryer. | $48,000 |
| Jun 27, 2022 | Completed final sign-off Jan 2023 | 2200 Leavenworth St | Hon's Construction Inc. | unit 305 3rd fl - rehabilitate (e) kitchen & bathrooms; install washer & gas dryer.Details
unit 305 3rd fl - rehabilitate (e) kitchen & bathrooms; install washer & gas dryer. | $42,000 |
| Jun 22, 2022 | Completed final sign-off Oct 2022 | 947 Bush St | Hon's Construction Inc. | san francisco fire dept review for previously approved pa 202206106071, "repair and replacement of deteriorated concrete parapet and improvement to west wall anchors at locations where parapet is replaced". the same plan has been approved by city planning and building depts. under pa 202206106071.Details
san francisco fire dept review for previously approved pa 202206106071, "repair and replacement of deteriorated concrete parapet and improvement to west wall anchors at locations where parapet is replaced". the same plan has been approved by city planning and building depts. under pa 202206106071. | |
| Jun 10, 2022 | Completed final sign-off Nov 2022 | 947 Bush St | Hon's Construction Inc. | repair and replacement of deteriorated concrete parapet and improvement to (west) wall anchors at locations where parapet is replaced.Details
repair and replacement of deteriorated concrete parapet and improvement to (west) wall anchors at locations where parapet is replaced. | $20,000 |
| Jun 8, 2022 | Completed final sign-off Jun 2024 | 665 Alvarado St | Hon's Construction Inc. | respond to complaint 2019-022212enf - construct stepped retaining wall to restore the rear yard to similar condition prior to the complaint; construct new stair as require for yard access due to stepped retaining wallDetails
respond to complaint 2019-022212enf - construct stepped retaining wall to restore the rear yard to similar condition prior to the complaint; construct new stair as require for yard access due to stepped retaining wall | $15,000 |
| May 18, 2022 | Completed final sign-off Aug 2022 | 686 Post St | Hon's Construction Inc. | repair discovered damaged front facade per plans.Details
repair discovered damaged front facade per plans. | $10,000 |
| Apr 15, 2022 | Completed final sign-off Jun 2023 | 2355 Leavenworth St | Hon's Construction Inc. | #205: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer.Details
#205: 1)convert extg kitchen to bedroom. 2)relocate kitchen. 3)rehabilitate extg bathroom. 4)install washer and dryer. | $42,000 |
| Apr 15, 2022 | Completed final sign-off Feb 2023 | 1454 Union St | Hon's Construction Inc. | #1458a. rehab (e) kitchen and (e) bathroom. install washer/dryer. @ rear bldgDetails
#1458a. rehab (e) kitchen and (e) bathroom. install washer/dryer. @ rear bldg | $18,000 |
| Apr 14, 2022 | Completed final sign-off Nov 2022 | 1760 Golden Gate Av | Hon's Construction Inc. | unit 11: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 11: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $44,000 |
| Apr 14, 2022 | Completed final sign-off Nov 2022 | 1760 Golden Gate Av | Hon's Construction Inc. | unit 10: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer.Details
unit 10: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer and dryer. | $44,000 |
| Apr 7, 2022 | Completed final sign-off Aug 2022 | 460 Ellsworth St | Hon's Construction Inc. | remove and replace (e) one kitchen cabinets and install new including stone countertops. all plumbing locations to remain the same.Details
remove and replace (e) one kitchen cabinets and install new including stone countertops. all plumbing locations to remain the same. | $25,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2023 | 2355 Leavenworth St | Hon's Construction Inc. | unit 304 on 5th floor: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer/dryer.Details
unit 304 on 5th floor: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer/dryer. | $35,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2023 | 2355 Leavenworth St | Hon's Construction Inc. | unit 204: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer/dryer.Details
unit 204: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer/dryer. | $35,000 |
| Mar 10, 2022 | Completed final sign-off Jun 2023 | 2355 Leavenworth St | Hon's Construction Inc. | unit 405: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer/dryer.Details
unit 405: convert existing kitchen to bedroom. relocate kitchen. rehab existing bathroom. install washer/dryer. | $35,000 |
| Mar 8, 2022 | Completed final sign-off Oct 2022 | 1369 Hyde St | Hon's Construction Inc. | revision to pa#202109228925. revise structural sheets to match extg field conditions. revise flue, location-revise 6th floor extg framing. wall sheeting at cross wall. show extg wall ledgers.Details
revision to pa#202109228925. revise structural sheets to match extg field conditions. revise flue, location-revise 6th floor extg framing. wall sheeting at cross wall. show extg wall ledgers. | |
| Mar 7, 2022 | Completed final sign-off May 2022 | 1300 26th Av | Hon's Construction Inc. | unit 501: (1) kitchen remodel, remove and replace kitchen countertops. provide and install new kitchen sink and faucet. remove and replace bathroom vanity. paint the unit.Details
unit 501: (1) kitchen remodel, remove and replace kitchen countertops. provide and install new kitchen sink and faucet. remove and replace bathroom vanity. paint the unit. | $15,000 |
| Mar 7, 2022 | Completed final sign-off May 2022 | 1300 26th Av | Hon's Construction Inc. | unit 401: (1) kitchen remodel, remove and replace kitchen countertops. provide and install new kitchen sink and faucet. remove and replace bathroom vanity. paint the unit.Details
unit 401: (1) kitchen remodel, remove and replace kitchen countertops. provide and install new kitchen sink and faucet. remove and replace bathroom vanity. paint the unit. | $15,000 |
| Mar 3, 2022 | Completed final sign-off Jan 2024 | 971 Elizabeth St | Hon's Construction Inc. | existing kitchen remodel. new powder room. new sliding door at dining room.Details
existing kitchen remodel. new powder room. new sliding door at dining room. | $50,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 125 Clayton St | Hon's Construction Inc. | unit 2 - 2nd flr - convert existing kitchen to study; relocate kitchen; rehabilitate existing bathroom and install washer & dryer.Details
unit 2 - 2nd flr - convert existing kitchen to study; relocate kitchen; rehabilitate existing bathroom and install washer & dryer. | $28,000 |
| Feb 7, 2022 | Completed final sign-off Aug 2022 | 634 Powell St | Hon's Construction Inc. | apt 49 - 4th flr: rehab (e) kitchen & bathroom. install washer/gas dryer.Details
apt 49 - 4th flr: rehab (e) kitchen & bathroom. install washer/gas dryer. | $40,000 |
| Jan 20, 2022 | Completed final sign-off Mar 2022 | 1675 Clay St | Hon's Construction Inc. | remodel kitchen in like kind. no structural work, no wall/framing modifications.Details
remodel kitchen in like kind. no structural work, no wall/framing modifications. | $20,000 |
| Jan 12, 2022 | Completed final sign-off Jul 2022 | 2355 Leavenworth St | Hon's Construction Inc. | unit # 102: install 1 new washer & dryer. no wall demo.Details
unit # 102: install 1 new washer & dryer. no wall demo. | $3,500 |
| Dec 23, 2021 | Completed final sign-off Aug 2022 | 2200 Leavenworth St | Hon's Construction Inc. | unit 102: convert (e) kitchen/dining to bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryerDetails
unit 102: convert (e) kitchen/dining to bedroom. relocate kitchen. rehab (e) bathroom. install washer/dryer | $32,000 |
| Dec 3, 2021 | Never finaled issued Dec 2021, no final | 798 Post St | Hon's Construction Inc. | apt #502: remove and replace kitchen countertops. paint and refinish floorsDetails
apt #502: remove and replace kitchen countertops. paint and refinish floors | $12,000 |
| Dec 1, 2021 | Completed final sign-off Apr 2022 | 449 Ofarrell St | Axel8 Construction, Hon's Construction Inc. | unit 301: convert (e) closet nook, rehab (e) kitchen and bathrom. install washer and dryer.Details
unit 301: convert (e) closet nook, rehab (e) kitchen and bathrom. install washer and dryer. | $28,000 |
| Dec 1, 2021 | Completed final sign-off Jun 2022 | 346 Leavenworth St | Hon's Construction Inc. | rehab (e) kithcen, rehab (e) bathroom, install washer/dryer.Details
rehab (e) kithcen, rehab (e) bathroom, install washer/dryer. | $30,000 |
| Nov 24, 2021 | Never finaled issued Dec 2021, no final | 1300 26th Av | Hon's Construction Inc. | unit 604: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer.Details
unit 604: convert existing kitchen to bedroom. relocate kitchen. rehabilitate existing bathroom. install washer/dryer. | $60,000 |
| Nov 24, 2021 | Completed final sign-off Feb 2023 | 962 Capp St | Hon's Construction Inc. | rev to pa# 202008212311: new powder room at ground fl.Details
rev to pa# 202008212311: new powder room at ground fl. |